CN220279579U - Monitoring operation platform for building management - Google Patents

Monitoring operation platform for building management Download PDF

Info

Publication number
CN220279579U
CN220279579U CN202321951928.9U CN202321951928U CN220279579U CN 220279579 U CN220279579 U CN 220279579U CN 202321951928 U CN202321951928 U CN 202321951928U CN 220279579 U CN220279579 U CN 220279579U
Authority
CN
China
Prior art keywords
operation platform
fixedly connected
platform body
building management
connecting column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321951928.9U
Other languages
Chinese (zh)
Inventor
王茹川
袁舫
张扬
王静川
王晓川
张雨晨
袁驰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Gexiang Construction Engineering Co ltd
Original Assignee
Henan Gexiang Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Gexiang Construction Engineering Co ltd filed Critical Henan Gexiang Construction Engineering Co ltd
Priority to CN202321951928.9U priority Critical patent/CN220279579U/en
Application granted granted Critical
Publication of CN220279579U publication Critical patent/CN220279579U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The utility model relates to a monitoring operation platform for building management, which comprises an operation platform body, wherein a fixing plate is fixedly connected to the outer side of the operation platform body, an installation seat is fixedly connected to the upper end of the operation platform body, a fixing rod is fixedly connected to the inner side of the installation seat, a connecting column is installed on the fixing rod, a corrugated cover is fixedly connected between the connecting column and the fixing plate, a locking column is movably connected to the inner side of the connecting column, and a locking groove is formed in the surface of the operation platform body. This monitoring operation platform for building management, through having set up the mount pad, after its operation platform body uses the completion, pull-up locking post makes its locking post separate with the locking groove, under the cooperation of dead lever and connecting seat, pulling handle, handle drive spliced pole removes, and the removal of spliced pole, pulling ripple cover makes its ripple cover shelter from the control panel on its operation platform body, avoids the dust to fall on control panel to influence control panel's use.

Description

Monitoring operation platform for building management
Technical Field
The utility model relates to the technical field of operation platforms, in particular to a monitoring operation platform for building management.
Background
The building management refers to comprehensive management disciplines of progress, quality, safety, funds, mechanical equipment, materials and personnel in the building construction process, and the goal of building management, namely the minimum resource consumption and the maximization of target completion are realized through overall arrangement of the construction elements, so that the building management is also of significance.
When the existing monitoring operation platform is used for a long time, because more dust particles are in a workshop, the more dust particles are easy to adhere to a programmed operation panel, not only are certain influences on the operation platform caused by entering gaps of the operation panel easy, but also the operation platform needs to be cleaned repeatedly, and convenience and comfort level in use are affected.
Disclosure of Invention
Aiming at the defects of the prior art, the utility model provides a monitoring operation platform for building management, which has the advantages of shielding the operation platform, avoiding dust entering into the operation panel and the like, and solves the problems that the existing monitoring operation platform is easy to adhere to the programmed operation panel due to more dust particles in workshops and is easy to enter into gaps of the operation panel to cause certain influence on the operation panel when the existing monitoring operation platform is used for a long time.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides a monitoring operation platform for building management, includes the operation platform body, the outside fixedly connected with fixed plate of operation platform body, the upper end fixedly connected with mount pad of operation platform body, the inboard fixedly connected with dead lever of mount pad, install the spliced pole on the dead lever, fixedly connected with ripple cover between spliced pole and the fixed plate, the inboard swing joint of spliced pole has the locking post, the locking groove has been seted up on the surface of operation platform body.
Further, a sliding groove is formed in the surface of the operation platform body.
Further, the mounting groove is formed in the side wall of the mounting seat, and the fixing rod is located at the inner side of the mounting groove.
Further, the lower extreme fixedly connected with slide of spliced pole, the slide slides in the inboard of spout.
Further, the one end fixedly connected with connecting seat that the spliced pole is close to the dead lever, the connecting seat slides in the outside of dead lever, the perforation has been seted up on the surface of spliced pole.
Further, the upper end fixedly connected with handle of locking post, fixedly connected with spring between handle and the spliced pole, the outside fixedly connected with stopper of locking post.
Compared with the prior art, the technical scheme of the application has the following beneficial effects:
this monitoring operation platform for building management, through having set up the mount pad, after its operation platform body uses the completion, pull-up locking post makes its locking post separate with the locking groove, under the cooperation of dead lever and connecting seat, pulling handle, handle drive spliced pole removes, and the removal of spliced pole, pulling ripple cover makes its ripple cover shelter from the control panel on its operation platform body, avoids the dust to fall on control panel to influence control panel's use.
Drawings
FIG. 1 is a schematic diagram of the front view of the structure of the present utility model;
FIG. 2 is a schematic side view of a structural mount of the present utility model;
fig. 3 is a schematic view showing the three-dimensional connection of the structural connection column and the corrugated cover according to the present utility model.
In the figure: 1. an operation platform body; 101. a chute; 2. a fixing plate; 3. a mounting base; 301. a mounting groove; 4. a fixed rod; 5. a connecting column; 501. a slide; 502. a connecting seat; 503. perforating; 6. a corrugated cover; 7. locking the column; 701. a handle; 702. a spring; 703. a limiting block; 8. locking grooves.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-3, a monitoring operation platform for building management in this embodiment includes an operation platform body 1, a chute 101 is provided on the surface of the operation platform body 1, a control panel is installed on the operation platform body 1, a fixing plate 2 is fixedly connected to the outside of the operation platform body 1, an installation seat 3 is fixedly connected to the upper end of the operation platform body 1, an installation groove 301 is provided on the side wall of the installation seat 3, a fixing rod 4 is fixedly connected to the inside of the installation seat 3, and the fixing rod 4 is located inside the installation groove 301.
The connecting column 5 is installed on the fixed rod 4, the connecting column 5 is slope-shaped, the lower extreme fixedly connected with slide 501 of connecting column 5, slide 501 slides in the inboard of spout 101, one end fixedly connected with connecting seat 502 that connecting column 5 is close to fixed rod 4, connecting seat 502 slides in the outside of fixed rod 4, perforation 503 has been seted up on the surface of connecting column 5, fixedly connected with ripple cover 6 between connecting column 5 and the fixed plate 2, ripple cover 6 is made by the rubber material, the inboard swing joint of connecting column 5 has locking column 7, locking column 7 is located the inboard of perforation 503, the upper end fixedly connected with handle 701 of locking column 7, fixedly connected with spring 702 between handle 701 and the connecting column 5, the outside fixedly connected with stopper 703 of locking column 7, the stopper can restrict locking column 7 and break away from, locking groove 8 has been seted up on the surface of operating platform body 1, the quantity of locking groove 8 is two, the specification of locking groove 8 matches with the specification of locking column 7.
In this embodiment, through the cooperation between fixed plate 2 and locking groove 8 to make its ripple cover 6 shelter from the control panel on its operation platform body 1, avoided the dust to enter into the inboard of control panel.
The working principle of the embodiment is as follows:
through having set up mount pad 3, after its operation platform body 1 uses, pull up locking post 7, make its locking post 7 separate with locking groove 8, under the cooperation of dead lever 4 and connecting seat 502, pulling handle 701, handle 701 drives spliced pole 5 and removes, and the removal of spliced pole 5 pulls ripple cover 6, makes its ripple cover 6 shelter from the control panel on its operation platform body 1, avoids the dust to fall on control panel to influence control panel's use.
It is noted that relational terms such as first and second, and the like are used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Moreover, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising one … …" does not exclude the presence of other like elements in a process, method, article, or apparatus that comprises the element.
Although embodiments of the present utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a monitoring operation platform for building management, includes operation platform body (1), its characterized in that: the automatic locking device is characterized in that a fixing plate (2) is fixedly connected to the outer side of the operation platform body (1), an installation seat (3) is fixedly connected to the upper end of the operation platform body (1), a fixing rod (4) is fixedly connected to the inner side of the installation seat (3), a connecting column (5) is mounted on the fixing rod (4), a corrugated cover (6) is fixedly connected between the connecting column (5) and the fixing plate (2), a locking column (7) is movably connected to the inner side of the connecting column (5), and a locking groove (8) is formed in the surface of the operation platform body (1).
2. The monitoring operation platform for building management according to claim 1, wherein: a sliding groove (101) is formed in the surface of the operation platform body (1).
3. The monitoring operation platform for building management according to claim 1, wherein: the side wall of the mounting seat (3) is provided with a mounting groove (301), and the fixing rod (4) is positioned at the inner side of the mounting groove (301).
4. The monitoring operation platform for building management according to claim 2, wherein: the lower end of the connecting column (5) is fixedly connected with a sliding seat (501), and the sliding seat (501) slides on the inner side of the sliding groove (101).
5. The monitoring operation platform for building management according to claim 1, wherein: one end of the connecting column (5) close to the fixed rod (4) is fixedly connected with a connecting seat (502), the connecting seat (502) slides outside the fixed rod (4), and a perforation (503) is formed in the surface of the connecting column (5).
6. The monitoring operation platform for building management according to claim 1, wherein: the upper end of the locking column (7) is fixedly connected with a handle (701), a spring (702) is fixedly connected between the handle (701) and the connecting column (5), and a limiting block (703) is fixedly connected to the outer side of the locking column (7).
CN202321951928.9U 2023-07-24 2023-07-24 Monitoring operation platform for building management Active CN220279579U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321951928.9U CN220279579U (en) 2023-07-24 2023-07-24 Monitoring operation platform for building management

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321951928.9U CN220279579U (en) 2023-07-24 2023-07-24 Monitoring operation platform for building management

Publications (1)

Publication Number Publication Date
CN220279579U true CN220279579U (en) 2024-01-02

Family

ID=89332998

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321951928.9U Active CN220279579U (en) 2023-07-24 2023-07-24 Monitoring operation platform for building management

Country Status (1)

Country Link
CN (1) CN220279579U (en)

Similar Documents

Publication Publication Date Title
CN110808311B (en) Solar cell panel processing is with dress frame machine
CN220279579U (en) Monitoring operation platform for building management
CN109629986B (en) Assembling device for assembling aerogel heat-insulation sound-insulation honeycomb composite board
CN110901595A (en) Waterproof and dustproof all-liquid-crystal instrument panel for automobile
CN211692205U (en) Hydrophobic aluminum alloy door and window
CN208297314U (en) Dribble test equipment
CN208415995U (en) Filling-up hole tool
CN210832307U (en) High stability air conditioner frame
CN220706866U (en) Sensor data acquisition box convenient to installation
CN221642681U (en) Fault detection alarm device for airplane
CN216051213U (en) Concrete resilience testing device
CN219411673U (en) Wall plastering device
CN216310867U (en) Parking screen display voice broadcast guiding device based on license plate recognition
CN219098981U (en) Installation tool for heater in furnace
CN221145876U (en) Building engineering environment monitoring device
CN220568180U (en) Intelligent public toilet environment detection equipment adjusting mechanism
CN221404944U (en) Environment monitoring device for real-time monitoring
CN220416678U (en) Water and soil conservation monitoring devices convenient to installation
CN219828997U (en) Air conditioner convenient to install
CN218327175U (en) Monitoring device convenient to maintain
CN219906626U (en) Elevator car roof installation fixing structure
CN221042764U (en) Outdoor monitoring equipment
CN215643098U (en) Traffic allocation device based on big data of computer
CN221594378U (en) Automatic liquid sampling device
CN219344552U (en) Curtain wall window with indoor railing

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant