CN220203791U - Road drilling device for traffic engineering construction - Google Patents

Road drilling device for traffic engineering construction Download PDF

Info

Publication number
CN220203791U
CN220203791U CN202320966721.2U CN202320966721U CN220203791U CN 220203791 U CN220203791 U CN 220203791U CN 202320966721 U CN202320966721 U CN 202320966721U CN 220203791 U CN220203791 U CN 220203791U
Authority
CN
China
Prior art keywords
box body
engineering construction
traffic engineering
road drilling
dust
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320966721.2U
Other languages
Chinese (zh)
Inventor
王铁钢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Jingde Transportation Facilities Engineering Co ltd
Original Assignee
Hunan Jingde Transportation Facilities Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Jingde Transportation Facilities Engineering Co ltd filed Critical Hunan Jingde Transportation Facilities Engineering Co ltd
Priority to CN202320966721.2U priority Critical patent/CN220203791U/en
Application granted granted Critical
Publication of CN220203791U publication Critical patent/CN220203791U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model discloses a road drilling device for traffic engineering construction, which relates to the technical field of road drilling and comprises a box body, wherein two sides of the box body are connected with a protective cover through a hydraulic rod A, two sides of the top of the box body are connected with dust collection mechanisms, each dust collection mechanism comprises a dust collector, the bottom of each dust collector is connected with the top of the box body, an air inlet of each dust collector is communicated with a suction head through a corrugated pipe, the bottom of the inside of the box body is fixedly connected with a punching mechanism, square grooves are formed in two sides of the top of a transverse plate, the inside of each square groove is connected with the outside of the corrugated pipe, and a broken stone collection mechanism is sleeved outside each punching mechanism. Road drilling equipment is used in traffic engineering construction prevents that the rubble from getting into the inside of dust catcher and then can lead to the fact the damage to inside spare part to reduce its availability factor, need not the staff and manually clean, reduce staff's amount of labour, prevent simultaneously that the rubble can block up the filter plate, thereby reduce its availability factor.

Description

Road drilling device for traffic engineering construction
Technical Field
The utility model relates to the technical field of road drilling, in particular to a road drilling device for traffic engineering construction.
Background
The drilling machine is required to be used for drilling traffic roads in traffic engineering so as to conveniently install highway guardrails, and the traffic engineering road drilling machine is provided by Chinese patent 2022207953982, and the air treatment box sucks and filters dust in a dust cover in the drilling process through the air conveying pipe and the telescopic pipe, so that the using effect of the drilling machine is improved.
In the process of using the comparison case, dust generated by punching is absorbed, filtered and discharged through the dust collector, dust can be generated and broken stone can be generated in the punching process, and in the process of using the dust collector in the prior art, if the broken stone is absorbed, damage can be caused to parts in the dust collector, so that the use efficiency of the dust collector is reduced.
The prior art is at the absorptive in-process of the rubble dust that produces the road punching at the dust catcher, through setting up the suction head bottom to intercept the rubble that produces that punches, thereby prevent inside the rubble gets into the dust catcher, but the filter plate is at the in-process of intercepting a large amount of rubbles, and the rubble can block up the filter plate, thereby reduces its availability factor.
There is a need for a road drilling device for traffic engineering construction that prevents the breakage and damage of the device.
Disclosure of Invention
The utility model aims to provide a road drilling device for traffic engineering construction, which solves the problem that in the background art, if broken stone is absorbed into a dust collector in the using process, the dust collector can damage internal parts, so that the using efficiency of the dust collector is reduced.
In order to achieve the above purpose, the utility model is realized by the following technical scheme: the utility model provides a road drilling equipment is used in traffic engineering construction, includes the box, the both sides of box all are connected with the protection casing through hydraulic stem A, the both sides at box top all are connected with dust extraction, the inside bottom fixedly connected with of box mechanism that punches, the outside of mechanism that punches has cup jointed rubble collection mechanism.
The broken stone collecting mechanism comprises a tooth frame, a half gear is connected with the inner part of the tooth frame in a meshed mode, the inner part of the half gear is connected with the outer part of the punching mechanism, collecting boxes are fixedly connected to the two sides of the tooth frame through cross arms, and the tops of the collecting boxes are in contact with the bottoms of the dust collecting mechanisms.
Optionally, the dust absorption mechanism includes the dust catcher, the bottom of dust catcher is connected with the top of box, the air intake of dust catcher has the suction head through bellows intercommunication, the bottom fixedly connected with filter plate of suction head.
Optionally, the mechanism of punching includes the diaphragm, the both sides at diaphragm top are all connected with the inside top of box through hydraulic stem B, the top fixedly connected with motor of diaphragm, the output of motor is connected with the drill bit, the outside of drill bit is connected with the inside of half gear.
Optionally, a slot is formed in the bottom of the box body.
Optionally, universal wheels are connected to the bottom of the box at equal intervals.
Optionally, an air outlet of the dust collector is connected with a filter screen.
Optionally, square grooves are formed in two sides of the top of the transverse plate, and the inner parts of the square grooves are connected with the outer parts of the corrugated pipes.
Optionally, the inside of protection casing and the outside sliding connection of box.
The utility model has the technical effects and advantages that:
1. road drilling equipment is used in traffic engineering construction, the in-process of using intercepts the rubble that produces through the filter plate to clean the collection with the rubble of interception through rubble collection mechanism, prevent that the rubble from getting into the inside of dust catcher then can cause the damage to inside spare part, thereby reduce its availability factor.
2. Road drilling equipment is used in traffic engineering construction, the in-process that uses is automatic to drive the rubble collection mechanism through the in-process that punches and clean the rubble of dust absorption mechanism interception in step, need not the staff and clean manually, reduces staff's amount of labour, prevents simultaneously that the rubble can block up the filter plate to reduce its availability factor.
Drawings
FIG. 1 is a front cross-sectional view of the structure of the present utility model;
FIG. 2 is a schematic view of a crushed stone collecting mechanism of the structure of the utility model;
fig. 3 is a schematic diagram of the top of the frame of the present utility model.
In the figure: 1 box, 2 hydraulic stem A, 3 protection casing, 4 dust absorption mechanism, 41 dust catcher, 42 bellows, 43 suction head, 44 filter plate, 55 punching mechanism, 51 diaphragm, 52 hydraulic stem B, 53 motor, 54 drill bit, 6 rubble collection mechanism, 61 tooth frame, 62 semi-gear, 63 xarm, 64 collection box.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments.
The utility model provides a road drilling device for traffic engineering construction, which is shown in figures 1-3, and comprises a box body 1 of a connecting assembly, wherein universal wheels which are convenient for the box body 1 to move are connected at equal intervals at the bottom of the box body 1, a slot is formed in the bottom of the box body 1, and a protective cover 3 which can intercept scraps generated by punching of a punching mechanism 5 is connected to two sides of the box body 1 through a hydraulic rod A2 which provides driving force.
The inside of protection casing 3 and the outside sliding connection of box 1, the both sides at box 1 top all are connected with dust absorption mechanism 4 that can carry out the absorption with the dust, and dust absorption mechanism 4 is including providing the dust catcher 41 of drive power, and the air outlet of dust catcher 41 is connected with carries out filterable filter screen with the dust, and the bottom of dust catcher 41 is connected with the top of box 1.
The air inlet of the dust collector 41 is communicated with a suction head 43 capable of absorbing dust through a corrugated pipe 42 which can be elastically stretched, and a filter plate 44 for intercepting broken stone is fixedly connected to the bottom of the suction head 43.
The bottom fixedly connected with of box 1 inside is to the mechanism 5 that punches of road surface, and mechanism 5 that punches is including coupling assembling's diaphragm 51, and coupling assembling's square groove has been seted up to the both sides at diaphragm 51 top, and the inside in square groove is connected with the outside of bellows 42.
Both sides at the top of the transverse plate 51 are connected with the top inside the box body 1 through telescopic hydraulic rods B52, a motor 53 for providing driving force is fixedly connected to the top of the transverse plate 51, a drill bit 54 for perforating the road surface is connected to the output end of the motor 53, and the outer part of the drill bit 54 is connected with the inner part of a half gear 62.
The outside of mechanism 5 that punches has cup jointed can carry out clear rubble collection mechanism 6 to filter plate 44's bottom, rubble collection mechanism 6 is including inside front and the equidistant tooth frame 61 that is provided with tooth A in back, the inside back of box 1 is through guide slot sliding connection to lead the block that makes it carry out rectilinear motion, be connected between block and the tooth frame 61, the inside meshing of tooth frame 61 is connected with outside equidistant tooth B that is connected with, half gear 62 that meshes between tooth A and the tooth B, half gear 62's inside is connected with the outside of mechanism 5 that punches.
Both sides of the tooth frame 61 are fixedly connected with a collecting box 64 capable of collecting crushed stones through a transmission cross arm 63, one side, far away from the cross arm 63, of the collecting box 64 is communicated with a scraping plate through a transverse groove, the scraping plate can collect the crushed stones, and the top of the collecting box 64 is contacted with the bottom of the dust collection mechanism 4.
During the use, the box body 1 is pushed to a position needing to rotate a hole, the hydraulic rod A2 is started to drive the protective cover 3 to descend, the area of the hole punching position is covered, dust generated by punching is prevented from leaking, the hydraulic rod B52 is started to drive the transverse plate 51 to descend, the drill bit 54 connected with the motor 53 at the top of the transverse plate is enabled to be in contact with the hole punching ground, the drill bit 54 is driven by the starting motor 53 to punch the hole punching ground, the dust collector 41 is started to be matched with the corrugated pipe 42 to drive the suction head 43 to absorb the dust generated by punching, broken stone generated by punching is matched with air flow to adsorb and intercept the dust at the bottom of the filter plate 44 through the filter plate 44, the drill bit 54 drives the toothed frame 61 to reciprocate left and right through the half gear 62 in the rotating process, the cross arm 63 is driven by the toothed frame 61 to drive the collecting box 64 to clean the bottom of the filter plate 44, and broken stone is collected in the collecting box 64.
In the use process, broken stones generated by punching are intercepted through the filter plates 44, and the intercepted broken stones are collected in a cleaning mode through the broken stone collecting mechanism 6, so that broken stones are prevented from entering the dust collector 41 to damage parts in the dust collector 41, and the use efficiency of the dust collector is reduced.
In the use process, the broken stone collecting mechanism 6 is driven to clean broken stone intercepted by the dust collecting mechanism 4 synchronously through the punching process, manual cleaning of staff is not needed, the labor capacity of staff is reduced, meanwhile, the broken stone is prevented from blocking the filter plate 44, and therefore the use efficiency is reduced.
Although embodiments of the present utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (8)

1. The utility model provides a road drilling equipment is used in traffic engineering construction, includes box (1), its characterized in that: both sides of the box body (1) are connected with a protective cover (3) through a hydraulic rod A (2), both sides of the top of the box body (1) are connected with a dust collection mechanism (4), the bottom inside the box body (1) is fixedly connected with a punching mechanism (5), and a broken stone collection mechanism (6) is sleeved outside the punching mechanism (5);
the broken stone collecting mechanism (6) comprises a tooth frame (61), a half gear (62) is connected with the inside of the tooth frame (61) in a meshed mode, the inside of the half gear (62) is connected with the outside of the punching mechanism (5), collecting boxes (64) are fixedly connected to two sides of the tooth frame (61) through cross arms (63), and the tops of the collecting boxes (64) are in contact with the bottoms of the dust collecting mechanisms (4).
2. The road drilling device for traffic engineering construction according to claim 1, wherein: the dust collection mechanism (4) comprises a dust collector (41), the bottom of the dust collector (41) is connected with the top of the box body (1), an air inlet of the dust collector (41) is communicated with a suction head (43) through a corrugated pipe (42), and the bottom of the suction head (43) is fixedly connected with a filter plate (44).
3. The road drilling device for traffic engineering construction according to claim 1, wherein: the punching mechanism (5) comprises a transverse plate (51), two sides of the top of the transverse plate (51) are connected with the top of the inside of the box body (1) through hydraulic rods B (52), a motor (53) is fixedly connected to the top of the transverse plate (51), a drill bit (54) is connected to the output end of the motor (53), and the outer portion of the drill bit (54) is connected with the inner portion of a half gear (62).
4. The road drilling device for traffic engineering construction according to claim 1, wherein: the bottom of the box body (1) is provided with a slot.
5. The road drilling device for traffic engineering construction according to claim 1, wherein: the bottom of the box body (1) is connected with universal wheels at equal intervals.
6. The road drilling device for traffic engineering construction according to claim 2, wherein: an air outlet of the dust collector (41) is connected with a filter screen.
7. A road drilling apparatus for traffic engineering construction according to claim 3, wherein: square grooves are formed in two sides of the top of the transverse plate (51), and the inner parts of the square grooves are connected with the outer parts of the corrugated pipes (42).
8. The road drilling device for traffic engineering construction according to claim 1, wherein: the inside of the protective cover (3) is connected with the outside of the box body (1) in a sliding way.
CN202320966721.2U 2023-04-26 2023-04-26 Road drilling device for traffic engineering construction Active CN220203791U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320966721.2U CN220203791U (en) 2023-04-26 2023-04-26 Road drilling device for traffic engineering construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320966721.2U CN220203791U (en) 2023-04-26 2023-04-26 Road drilling device for traffic engineering construction

Publications (1)

Publication Number Publication Date
CN220203791U true CN220203791U (en) 2023-12-19

Family

ID=89152892

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320966721.2U Active CN220203791U (en) 2023-04-26 2023-04-26 Road drilling device for traffic engineering construction

Country Status (1)

Country Link
CN (1) CN220203791U (en)

Similar Documents

Publication Publication Date Title
CN210439270U (en) Ramming equipment for construction site
CN220203791U (en) Road drilling device for traffic engineering construction
CN114100790A (en) Garbage crushing device for building engineering construction
CN113931112A (en) A cyclic utilization device for landscape architecture abandonment resource
CN111283468B (en) Automatic drilling equipment of watchband
CN218945882U (en) Portable cleaning device
CN111041956A (en) Expansion joint cutting equipment for bridge construction
CN214644139U (en) Glass steel door plate edge cutting machine
CN214346670U (en) A recovery processing device for gardens fallen leaves
CN211941519U (en) Stone cutting machine with dust removal function
CN112121936A (en) Non-woven fabric feeding back device
CN216652173U (en) Dust collector assembly convenient to clean
CN219654727U (en) Efficient mining dust removal ventilation unit
CN220813626U (en) Multifunctional road sweeper
CN221046198U (en) Dust collector of roller sand machine
CN218813407U (en) Dust removal scavenging machine
CN220378335U (en) Tunnel slotting drainage device
CN220322739U (en) Grooving sampler
CN220176350U (en) Continuous dust removal device
CN221052346U (en) Pavement construction device with regulatory function for municipal works
CN213221386U (en) Mine dust cleaning and recycling device
CN218491529U (en) Water channel circulation purification treatment device
CN212612201U (en) Conveniently dismantle electric vacuum cleaner dust absorption section of thick bamboo of filter screen
CN107281831A (en) A kind of intelligent adjustable apparatus for waste gas purification
CN219923956U (en) Dust collection mechanism of large-scale multilayer multi-mechanism needling machine

Legal Events

Date Code Title Description
GR01 Patent grant