CN220079774U - Sliding type hanging basket construction device - Google Patents

Sliding type hanging basket construction device Download PDF

Info

Publication number
CN220079774U
CN220079774U CN202321622050.4U CN202321622050U CN220079774U CN 220079774 U CN220079774 U CN 220079774U CN 202321622050 U CN202321622050 U CN 202321622050U CN 220079774 U CN220079774 U CN 220079774U
Authority
CN
China
Prior art keywords
rods
sliding
assembly
rod
fixedly arranged
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321622050.4U
Other languages
Chinese (zh)
Inventor
许强
王盛玉
林传亮
桂晨阳
陶创伟
张家新
张新明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Third Construction Co Ltd of CTCE Group
Original Assignee
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Third Construction Co Ltd of CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Tiesiju Civil Engineering Group Co Ltd CTCE Group, Third Construction Co Ltd of CTCE Group filed Critical China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Priority to CN202321622050.4U priority Critical patent/CN220079774U/en
Application granted granted Critical
Publication of CN220079774U publication Critical patent/CN220079774U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model relates to a sliding type hanging basket construction device which comprises a hanging basket body, a sliding assembly and a supporting assembly, wherein the sliding assembly is fixedly arranged on one side of the top end part of the hanging basket body, and the supporting assembly is fixedly arranged on the bottom end part of the hanging basket body; the sliding component is provided with a braking component; a pulley assembly is fixedly arranged on one side surface of the bottom end part of the supporting assembly. The basket hanging device is provided with the sliding component and the pulley component, so that the basket hanging body can be moved conveniently, the times of hanging the basket up and down by operators can be reduced, the construction period is shortened, and the construction efficiency is improved; meanwhile, stability of the hanging basket body during moving is guaranteed, and operation is firm and reliable. The basket hanging device is also provided with the brake component, when the elastic piece is in a releasing state, the horizontal idler wheel is locked, so that the unexpected sliding of the basket hanging body is avoided, and the safety of operators is ensured; when the locking device moves, the locking state can be released by pressing the button of the brake assembly, the operation is convenient and quick, the structure is simple, and the locking device is stable and reliable.

Description

Sliding type hanging basket construction device
Technical Field
The utility model belongs to the field of bridge construction, and relates to a bridge hanging basket, in particular to a sliding hanging basket construction device.
Background
In the building construction process, the hanging basket construction device is a main device for the sectional construction of the prestressed concrete continuous beam, the T-shaped steel structure and the cantilever beam, and can be widely applied to bridge construction along the whole track. When the hanging basket is constructed, the hanging basket is usually fixed on a bridge deck, an operator enters the hanging basket for construction after the hanging basket is firmly fixed, and after each section of construction is completed, the hanging basket moves to the next construction section through the pulley until the construction of the outer side of the whole bridge is completed.
The traditional basket hanging construction needs to repeatedly fix the basket hanging, the steps of hanging the basket up and down by operators and moving the basket hanging every time, and the following problems exist:
1. the hanging basket is difficult to move, the construction period is long, the cost is high, a large number of repeated construction steps exist, and the bridge construction efficiency is affected;
2. when the worker hangs the basket from top to bottom and meets the slope when hanging the basket and remove, the slip appears easily, has the potential safety hazard.
For this reason, we propose a sliding type hanging basket construction device to solve the above problems.
Disclosure of Invention
The utility model aims to overcome the defects of the prior art and provides a sliding type hanging basket construction device which is convenient to operate, safe and reliable.
In order to solve the problems, the technical scheme of the utility model is as follows:
the sliding type hanging basket construction device comprises a hanging basket body, a sliding assembly and a supporting assembly, wherein the sliding assembly is fixedly arranged on one side of the top end part of the hanging basket body, and the supporting assembly is fixedly arranged on the bottom end part of the hanging basket body;
the sliding component is provided with a braking component;
a pulley assembly is fixedly arranged on one side face of the bottom end portion of the supporting assembly, and the pulley assembly and the sliding assembly are located on the same side.
In a further embodiment, the sliding assembly comprises at least one sliding cross rod, a sliding vertical rod, a horizontal roller assembly and a vertical roller assembly, one end part of at least one sliding cross rod is fixedly arranged on one side of the top end part of the hanging basket body, and at least one sliding vertical rod is fixedly arranged at the other end part of the sliding cross rod;
the bottom end part of the sliding cross rod is fixedly provided with the horizontal roller assembly, and the bottom end part of the sliding vertical rod is fixedly provided with the vertical roller assembly.
In a further embodiment, the horizontal roller assembly comprises two horizontal installation rods, two horizontal rollers and horizontal installation shafts, wherein the two horizontal installation rods are respectively and fixedly installed at two end parts of the sliding cross rod, a plurality of horizontal installation shafts are fixedly installed between the two horizontal installation rods at intervals, and the horizontal rollers are sleeved on the horizontal installation shafts;
a plurality of lock holes are formed in at least one end portion of the horizontal roller at intervals.
In a further embodiment, one of the horizontal mounting rods is fixedly provided with the brake assembly, the brake assembly comprises a fixed part and a brake part, and the fixed part is movably provided with the brake part;
the left and right sides of the fixing part are provided with long grooves.
In a further embodiment, the braking portion includes a button, a pair of linkage rods, a lock rod and a long rod, one ends of the two linkage rods respectively penetrate through the two long grooves and are fixedly connected to the left side surface and the right side surface of the button, the other ends of the two linkage rods are respectively and fixedly connected to the long rod, a plurality of lock rods are arranged on the long rod at intervals, and the lock rods are in one-to-one correspondence with the horizontal rollers;
one end part of the elastic piece is fixedly arranged in the button, and the other end part of the elastic piece is fixedly arranged in the fixing part.
In a further embodiment, the fixing portion and the button are located above the horizontal mounting bar, and the long bar and the lock bar are located below the horizontal mounting bar;
when the elastic piece is in a release state, the cantilever end part of the lock rod is positioned in the lock hole.
In a further embodiment, the vertical roller assembly comprises a vertical mounting rod, a vertical roller and a vertical mounting shaft, two vertical mounting rods are fixedly mounted on the sliding vertical rod at intervals, a plurality of vertical mounting shafts are fixedly mounted on the vertical mounting rod at intervals, and the vertical roller is sleeved on the vertical mounting shaft.
In a further embodiment, the hanging basket body comprises two frames, two vertical rods, two cross rods, a reinforcing rod and a bottom plate, wherein the two frames are arranged up and down, a plurality of vertical rods are fixedly arranged between the two frames at a transverse interval, and a plurality of cross rods are fixedly arranged on the vertical rods at a vertical interval;
the bottom plate is fixedly arranged in the frame below;
two the frame is located between the one side of slip subassembly two the stiffening rod is fixed mounting.
In a further embodiment, the supporting component comprises a bottom rod, a supporting cross rod, supporting reinforcing rods, inclined rods and connecting rods, wherein one end parts of the supporting reinforcing rods are fixedly installed on the frames below the two reinforcing rods respectively, the other end parts of the two supporting reinforcing rods are fixedly installed on one end parts of the bottom rod respectively, and one end parts of the two bottom rods are fixedly installed on the pulley component respectively;
a plurality of support cross bars are fixedly arranged between the two support reinforcing rods and between the two bottom rods at intervals;
the four inclined rods are respectively fixedly arranged at four corners of the frame below, and the lower ends of the four inclined rods are respectively fixedly arranged at two ends of the two bottom rods;
a plurality of connecting rods which are obliquely arranged are fixedly arranged between the two diagonal rods which are fixed on the same bottom rod at intervals.
In a further embodiment, the pulley assembly comprises a pulley cross rod and pulleys, two ends of the pulley cross rod are respectively and fixedly arranged at one end parts of the two bottom rods, and a plurality of pulleys are fixedly arranged on the pulley cross rod at intervals.
Compared with the prior art, the utility model has the beneficial effects that:
1. the hanging basket device is provided with the sliding component and the pulley component to form a stable stress system, so that the hanging basket body can be conveniently moved, the hanging basket device can be pushed to a construction position during use, lifting equipment is not needed, flexible and rapid transportation of the hanging basket construction device is realized, and the construction cost is reduced; the times of hanging baskets up and down by operators can be reduced, the construction period is shortened, and the construction efficiency is improved; meanwhile, the stability of the hanging basket body during movement is guaranteed, the operation is firm and reliable, and the life and property safety of a construction site is guaranteed.
2. The hanging basket device is provided with the horizontal roller assembly and the vertical roller assembly, the force of hanging basket bodies is born in the horizontal direction and the vertical direction, the structural stability of the hanging basket device is improved, and the hanging basket is safe and reliable when moving.
3. The hanging basket device is provided with the brake component, when the elastic piece is in a release state, the lock rod is positioned in the lock hole of the horizontal roller, the locking of the horizontal roller is completed, the unexpected sliding condition of the hanging basket body is avoided, the safety of operators is ensured, and the potential safety hazard in the construction of the outer side of the bridge is reduced; when the locking device moves, the locking state can be released by pressing the button of the brake assembly, the operation is convenient and quick, the structure is simple, and the locking device is stable and reliable.
4. This hang basket device all is provided with the reinforcing angle steel on hanging basket body, supporting part and slip subassembly, improves the structural strength who hangs basket construction device, hoisting device's stability.
5. The support component of the hanging basket device forms a plurality of triangular structures, provides firmer support for the hanging basket body, and ensures the stability of the hanging basket construction device during movement.
6. The hanging basket device is simple in structure, easy to install, safe and stable to use, convenient to move, capable of avoiding sliding problems, saving construction cost, shortening construction period and improving construction efficiency.
Drawings
FIG. 1 is a schematic view of a sliding basket construction apparatus;
FIG. 2 is a schematic view of a sliding assembly of a sliding basket construction apparatus;
FIG. 3 is a schematic illustration of a brake assembly of a sliding basket construction apparatus;
FIG. 4 is an exploded view of a brake assembly of a sliding cradle construction apparatus;
fig. 5 is a schematic view of a horizontal roller structure of a sliding type basket hanging construction device.
In the figure: 1. a hanging basket body; 11. a frame; 12. a vertical rod; 13. a cross bar; 14. a reinforcing rod; 15. a bottom plate; 2. a support assembly; 21. a bottom bar; 22. a support rail; 23. supporting the reinforcing rod; 24. a diagonal rod; 25. a connecting rod; 3. a sliding assembly; 31. a sliding cross bar; 32. sliding vertical rods; 33. a horizontal roller assembly; 331. a horizontal mounting bar; 332. a horizontal roller; 3321. a lock hole; 333. a horizontal mounting shaft; 34. a vertical roller assembly; 341. a vertical mounting bar; 342. a vertical roller; 343. a vertical mounting shaft; 4. a pulley assembly; 41. a pulley cross bar; 42. a pulley; 5. a brake assembly; 51. a fixing part; 511. a long groove; 52. a braking section; 521. a button; 522. a linkage rod; 523. a lock lever; 524. a long rod; 525. a limit protrusion; 526. an elastic member.
Detailed Description
In the description of the present utility model, it should be understood that the terms "center", "longitudinal", "lateral", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, are merely for convenience in describing the present utility model and simplifying the description, and do not indicate or imply that the devices or elements referred to must have a specific orientation, be configured and operated in a specific orientation, and thus should not be construed as limiting the present utility model. Furthermore, the terms "first," "second," and the like, are used for descriptive purposes only and are not to be construed as indicating or implying a relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defining "a first", "a second", etc. may explicitly or implicitly include one or more such feature. In the description of the present utility model, unless otherwise indicated, the meaning of "a plurality" is two or more.
Example 1:
the sliding type hanging basket construction device comprises a hanging basket body 1, a supporting component 2 and a sliding component 3, wherein the supporting component 2 is fixedly arranged at the bottom end part of the hanging basket body 1, the sliding component 3 is fixedly arranged at one side of the top end part of the hanging basket body 1, and a brake component 5 is arranged on the sliding component 3; a pulley assembly 4 is fixedly arranged on one side surface of the bottom end part of the supporting assembly 2, and the pulley assembly 4 and the sliding assembly 3 are positioned on the same side of the hanging basket body 1 and the supporting assembly 2.
The hanging basket body 1 comprises two frames 11, vertical rods 12, cross rods 13, reinforcing rods 14 and a bottom plate 15, wherein the frames 11 are of rectangular structures, the two frames 11 are arranged up and down, a plurality of vertical rods 12 which are arranged vertically are fixedly arranged between the two frames 11 at a horizontal interval, a plurality of cross rods 13 which are arranged horizontally are fixedly arranged on the vertical rods 12 at a vertical interval, and the bottom plate 15 is fixedly arranged in the frame 11 positioned below; two reinforcing rods 14 are fixedly arranged between one sides of the two frames 11 positioned on the sliding assembly 3, and the two reinforcing rods 14 are respectively positioned at two corners of the frames 11, so that the structural stability of the hanging basket body 1 is enhanced. Preferably, the frame 11 and the reinforcing rod 14 are made of angle steel.
The sliding assembly 3 includes a pair of sliding cross bars 31, a pair of sliding vertical bars 32, a horizontal roller assembly 33 and a vertical roller assembly 34, and one ends of the two sliding cross bars 31 are respectively and fixedly installed at two corners of the frame 11 located above. Preferably, the sliding cross bar 31 and the frame 11 are integrally formed, thereby improving the structural strength of the sliding assembly 3. The other ends of the two sliding cross bars 31 are respectively fixedly provided with one end parts of two sliding vertical bars 32; the bottom ends of the two sliding cross bars 31 are fixedly provided with horizontal roller assemblies 33; the lower ends of the two sliding vertical rods 32 are fixedly provided with vertical roller assemblies 34. Preferably, the two sliding cross bars 31 and the two sliding vertical bars 32 are made of angle steel.
The horizontal roller assembly 33 comprises two horizontal installation rods 331, two horizontal rollers 332 and horizontal installation shafts 333, the two horizontal installation rods 331 are perpendicular to the sliding cross rods 31, two ends of each horizontal installation rod 331 are fixedly installed at two ends of each sliding cross rod 31 respectively, a plurality of horizontal installation shafts 333 are fixedly installed between the two horizontal installation rods 331 at intervals, each horizontal installation shaft 333 is sleeved with one horizontal roller 332, a plurality of lock holes 3321 are formed in at least one end circumference of each horizontal roller 332 at intervals, and the length of each horizontal roller 332 is determined according to the width of the ballast blocking wall. Preferably, both horizontal mounting bars 331 are made of angle steel.
The vertical roller assembly 34 comprises two vertical installation rods 341, vertical rollers 342 and vertical installation shafts 343, the two vertical installation rods 341 are perpendicular to the sliding vertical rods 32, two ends of the two vertical installation rods 341 are respectively and fixedly installed at the lower end parts of the two sliding vertical rods 32 at intervals, a plurality of vertical installation shafts 343 are fixedly installed between one side surface of the hanging basket body 1 at intervals of the two vertical installation rods 341, and each vertical installation shaft 343 is sleeved with a vertical roller 342. Preferably, both vertical mounting rods 341 are made of angle steel.
A brake assembly 5 is fixedly arranged on a horizontal mounting rod 331 positioned at one end of the sliding vertical rod 32, the brake assembly 5 comprises a fixed part 51 and a brake part 52, and the brake part 52 is arranged on the fixed part 51 in a left-right sliding manner; the left, right and upper sides of the fixing portion 51 are each formed with a long groove 511; the top end of the braking portion 52 is formed with a limiting protrusion 525, and the limiting protrusion 525 is located in the long groove 511 of the top end of the fixing portion 51, for limiting the sliding range of the braking portion 52.
The braking part 52 comprises a button 521, a linkage rod 522, a lock rod 523 and a long rod 524, wherein the linkage rod 522 is of a U-shaped structure, one end parts of the linkage rod 522 are respectively manufactured on the left side surface and the right side surface of the button 521, the other end parts of the two linkage rods 522 are respectively fixedly connected to the long rod 524, and one end parts of the two linkage rods 522 positioned on the button 521 respectively penetrate through the long grooves 511 positioned on the two side surfaces of the fixed part 51; a plurality of lock rods 523 are arranged on the long rods 524 at intervals, and the lock rods 523 are in one-to-one correspondence with the horizontal rollers 332; one end of the elastic member 526 is fixedly installed in the button 521, and the other end of the elastic member 526 is fixedly installed in the fixing portion 51; the fixing portion 51 and the button 521 are located above the horizontal installation bar 331, and the long bar 524 and the lock bar 523 are located below the horizontal installation bar 331. Preferably, the elastic member 526 is a spring.
The support assembly 2 comprises a bottom rod 21, a support cross rod 22, support reinforcing rods 23, diagonal rods 24 and connecting rods 25, wherein one end parts of the support reinforcing rods 23 are respectively and fixedly arranged on the frames 11 below the two reinforcing rods 14, the other end parts of the two support reinforcing rods 23 are respectively and fixedly arranged on one end parts of the bottom rod 21, and the other end parts of the two bottom rods 21 are respectively and fixedly arranged on the pulley assembly 4; a plurality of support cross bars 22 are fixedly arranged between the two support reinforcing rods 23 and between the two bottom rods 21 at intervals; the four inclined rods 24 are respectively fixedly arranged at four corners of the lower side frame 11, and the lower ends of the four inclined rods 24 are respectively fixedly arranged at two ends of the two bottom rods 21; a plurality of connecting rods 25 which are obliquely arranged are fixedly arranged between two inclined rods 24 fixed on the same bottom rod 21 at intervals to form a plurality of triangular structures, so that the stability of the supporting component 2 is enhanced. Preferably, the bottom rod 21 and the supporting and reinforcing rod 23 are made of angle steel, and the supporting and reinforcing rod 23 and the reinforcing rod 14 are integrally made.
The pulley assembly 4 comprises a pulley cross bar 41 and a pulley 42, both ends of the pulley cross bar 41 are respectively and fixedly arranged at one end parts of the two bottom bars 21, and a plurality of pulleys 42 are fixedly arranged on the pulley cross bar 41 at intervals.
The working principle of the utility model is as follows: when the elastic piece 526 is in a natural state, the cantilever end of the lock lever 523 is positioned in the lock hole 3321 of the horizontal roller 332, so as to play a role in braking, and lock the horizontal roller 332, so that the hanging basket body 1 cannot move at the moment; when the button 521 is pressed, the elastic member 526 is in a compressed state, and the button 521 drives the long rod 524 to move outwards through the linkage rod 522, so as to drive the lock rod 523 to move out of the lock hole 3321, release the brake, and the horizontal roller 332 can slide, so that the hanging basket body 1 can move to the next working surface.
Furthermore, it should be understood that although the present disclosure describes embodiments, not every embodiment is provided with a separate embodiment, and that this description is provided for clarity only, and that the disclosure is not limited to the embodiments described in detail below, and that the embodiments described in the examples may be combined as appropriate to form other embodiments that will be apparent to those skilled in the art.

Claims (9)

1. The utility model provides a basket construction equipment is hung to slidingtype which characterized in that: the hanging basket comprises a hanging basket body (1), a sliding assembly (3) and a supporting assembly (2), wherein the sliding assembly (3) is fixedly arranged on one side of the top end part of the hanging basket body (1), and the supporting assembly (2) is fixedly arranged on the bottom end part of the hanging basket body (1);
a brake assembly (5) is arranged on the sliding assembly (3);
a pulley assembly (4) is fixedly arranged on one side surface of the bottom end part of the supporting assembly (2), and the pulley assembly (4) and the sliding assembly (3) are positioned on the same side;
the sliding assembly (3) comprises at least one sliding cross rod (31), a sliding vertical rod (32), a horizontal roller assembly (33) and a vertical roller assembly (34), one end part of at least one sliding cross rod (31) is fixedly arranged on one side of the top end part of the hanging basket body (1), and at least one sliding vertical rod (32) is fixedly arranged at the other end part of the sliding cross rod (31);
the bottom end part of the sliding cross rod (31) is fixedly provided with the horizontal roller assembly (33), and the bottom end part of the sliding vertical rod (32) is fixedly provided with the vertical roller assembly (34).
2. The sliding hanging basket construction device according to claim 1, wherein: the horizontal roller assembly (33) comprises two horizontal installation rods (331), two horizontal rollers (332) and horizontal installation shafts (333), wherein the two horizontal installation rods (331) are respectively and fixedly installed at two end parts of the sliding cross rod (31), a plurality of horizontal installation shafts (333) are fixedly installed between the two horizontal installation rods (331) at intervals, and the horizontal rollers (332) are sleeved on the horizontal installation shafts (333);
at least one end of the horizontal roller (332) is provided with a plurality of lock holes (3321) at intervals.
3. The sliding hanging basket construction device according to claim 2, wherein: the brake assembly (5) is fixedly arranged on one horizontal mounting rod (331), the brake assembly (5) comprises a fixing part (51) and a brake part (52), and the brake part (52) is movably arranged on the fixing part (51);
the left and right sides of the fixing part (51) are provided with long grooves (511).
4. A sliding pannier construction apparatus according to claim 3, wherein: the brake part (52) comprises a button (521), a pair of linkage rods (522), a lock rod (523) and a long rod (524), one ends of the two linkage rods (522) respectively penetrate through the two long grooves (511) to be fixedly connected to the left side surface and the right side surface of the button (521), the other ends of the two linkage rods (522) are respectively fixedly connected to the long rod (524), a plurality of lock rods (523) are arranged on the long rod (524) at intervals, and the lock rods (523) are in one-to-one correspondence with the horizontal rollers (332);
one end part of an elastic member (526) is fixedly arranged in the button (521), and the other end part of the elastic member (526) is fixedly arranged in the fixing part (51).
5. The sliding pannier construction apparatus according to claim 4, wherein: the fixing part (51) and the button (521) are positioned above the horizontal installation rod (331), and the long rod (524) and the lock rod (523) are positioned below the horizontal installation rod (331);
when the elastic piece (526) is in a release state, the cantilever end part of the lock rod (523) is positioned in the lock hole (3321).
6. The sliding hanging basket construction device according to claim 1, wherein: the vertical roller assembly (34) comprises a vertical mounting rod (341), vertical rollers (342) and vertical mounting shafts (343), two vertical mounting rods (341) are fixedly mounted on the sliding vertical rods (32) at intervals, a plurality of vertical mounting shafts (343) are fixedly mounted on the vertical mounting rods (341) at intervals, and the vertical rollers (342) are sleeved on the vertical mounting shafts (343).
7. A sliding pannier construction device according to any of claims 1 to 6, wherein: the hanging basket comprises a hanging basket body (1) and is characterized in that the hanging basket body comprises two frames (11), vertical rods (12), transverse rods (13), reinforcing rods (14) and a bottom plate (15), wherein the two frames (11) are arranged up and down, a plurality of the vertical rods (12) are fixedly arranged between the two frames (11) at a transverse interval, and a plurality of the transverse rods (13) are fixedly arranged on the vertical rods (12) at a vertical interval;
the bottom plate (15) is fixedly arranged in the frame (11) positioned below;
two reinforcement bars (14) are fixedly arranged between one sides of the two frames (11) positioned on the sliding component (3).
8. The sliding pannier construction apparatus according to claim 7, wherein: the supporting assembly (2) comprises a bottom rod (21), a supporting cross rod (22), supporting reinforcing rods (23), inclined rods (24) and connecting rods (25), wherein one end parts of the supporting reinforcing rods (23) are fixedly installed on the frames (11) below the two reinforcing rods (14), one end parts of the bottom rod (21) are fixedly installed on the other end parts of the two supporting reinforcing rods (23), and one end parts of the two bottom rods (21) are fixedly installed on the pulley assembly (4);
a plurality of support cross bars (22) are fixedly arranged between the two support reinforcing rods (23) and between the two bottom rods (21) at intervals;
the four inclined rods (24) are respectively and fixedly arranged at four corners of the frame (11) below, and the lower ends of the four inclined rods (24) are respectively and fixedly arranged at two ends of the two bottom rods (21);
the two diagonal rods (24) fixed on the same bottom rod (21) are fixedly provided with a plurality of connecting rods (25) which are obliquely arranged at intervals.
9. The sliding pannier construction apparatus according to claim 8, wherein: the pulley assembly (4) comprises a pulley cross rod (41) and pulleys (42), two ends of the pulley cross rod (41) are respectively and fixedly arranged at one end parts of the two bottom rods (21), and a plurality of pulleys (42) are fixedly arranged on the pulley cross rod (41) at intervals.
CN202321622050.4U 2023-06-21 2023-06-21 Sliding type hanging basket construction device Active CN220079774U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321622050.4U CN220079774U (en) 2023-06-21 2023-06-21 Sliding type hanging basket construction device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321622050.4U CN220079774U (en) 2023-06-21 2023-06-21 Sliding type hanging basket construction device

Publications (1)

Publication Number Publication Date
CN220079774U true CN220079774U (en) 2023-11-24

Family

ID=88814929

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321622050.4U Active CN220079774U (en) 2023-06-21 2023-06-21 Sliding type hanging basket construction device

Country Status (1)

Country Link
CN (1) CN220079774U (en)

Similar Documents

Publication Publication Date Title
CN220079774U (en) Sliding type hanging basket construction device
CN216446489U (en) Wall-attached support of attached lifting scaffold
CN219773570U (en) Telescopic spandrel girder
CN211736309U (en) Building climbing frame lifting device
CN212771981U (en) Bridge construction hanging basket advancing arrangement track
CN214693065U (en) High-safety building elevator
JP2761828B2 (en) How to install an intermediate frame on a moving sidewalk
CN112158780B (en) Floating type lifting swing connecting device
CN211897881U (en) No. 0 block bracket
CN211897913U (en) Novel hanging basket for bridge construction
JP6520533B2 (en) Overhead crane support device and load receiving member
CN219010950U (en) Monorail sliding operation platform for overhauling outer side of subway viaduct
CN112482241A (en) Walking type hanging bracket for post-pouring section of box girder flange plate and construction method thereof
CN212639754U (en) Movable prestressing force stretch-draw jack suspension
CN216272727U (en) Connecting mechanism of wheel clamping device and crane for port
CN209855195U (en) Guide rail assembly and scaffold
CN216406138U (en) Reinforced vertical rod connecting mechanism
CN211897914U (en) Bridge construction that can improve stability is with hanging basket and bearing truss subassembly thereof
CN214495483U (en) Crane frame body convenient to install
CN220336411U (en) Protection platform lifting point truss for building construction
CN215519932U (en) Creeping formwork structure for super high-rise building engineering construction
CN221031543U (en) Sliding shoe for installing pushing equipment
CN220033734U (en) Arc is to heavy frame structure
CN217977773U (en) Sliding device
CN220377353U (en) Scaffold frame

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant