CN220058087U - Corrugated plate heating power pipe gallery - Google Patents

Corrugated plate heating power pipe gallery Download PDF

Info

Publication number
CN220058087U
CN220058087U CN202321389475.5U CN202321389475U CN220058087U CN 220058087 U CN220058087 U CN 220058087U CN 202321389475 U CN202321389475 U CN 202321389475U CN 220058087 U CN220058087 U CN 220058087U
Authority
CN
China
Prior art keywords
corrugated
steel plate
corrugated steel
plate
concrete layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321389475.5U
Other languages
Chinese (zh)
Inventor
孙书怀
文风翔
李国华
刘伟瀚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jizhong Energy Jingxing Mining Group Yuanshi Mining Co ltd
Original Assignee
Jizhong Energy Jingxing Mining Group Yuanshi Mining Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jizhong Energy Jingxing Mining Group Yuanshi Mining Co ltd filed Critical Jizhong Energy Jingxing Mining Group Yuanshi Mining Co ltd
Priority to CN202321389475.5U priority Critical patent/CN220058087U/en
Application granted granted Critical
Publication of CN220058087U publication Critical patent/CN220058087U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model discloses a corrugated plate heating power pipe gallery, which comprises a concrete layer, wherein two first corrugated steel plates are arranged at the top end of the inner side wall of the concrete layer, second corrugated steel plates are arranged at the two sides of the bottom of the inner side wall of the concrete layer, and a plurality of guniting openings are formed in the middle of each of the first corrugated steel plates and the second corrugated steel plates; the bottom both sides of concrete layer all are provided with the steel sheet base, are provided with the baseboard between two steel sheet bases, and the top of baseboard is provided with the angle steel, and the top of angle steel is provided with reinforced concrete. The utility model combines the first corrugated steel plate and the second corrugated steel plate with the concrete layer, improves the overall stability and the bearing capacity of the pipe gallery, can effectively resist the influence of external environment and load, and reduces the construction period and the cost.

Description

Corrugated plate heating power pipe gallery
Technical Field
The utility model relates to the field of pipe galleries, in particular to a corrugated plate heating pipe gallery.
Background
With the acceleration of urban process, urban infrastructure construction is increasingly emphasized, and the heat pipe gallery has become an effective measure for solving the problems of urban heating, water supply, water drainage, electric power and the like. The traditional construction method of the heating power pipe gallery usually adopts reinforced concrete or precast slab structures, but the method has the problems of long construction period, high cost and the like. Therefore, the use of corrugated plate heat pipe lanes has attracted considerable attention as an alternative.
For example, chinese patent No. 201520881472.2 discloses a pipe gallery prefabricated member and prefabricated utility pipe gallery, which includes a channel-type prefabricated member including a web and a wing plate, an internal reinforcing steel bar, a connection sealing structure provided at both ends of the web and the wing plate, and a longitudinal stress structure, thereby giving consideration to the structural integrity of the prefabricated member and the convenience of transportation and installation. However, the prefabricated member has the problems of long construction period and high cost. In the construction process, a traditional guniting port cannot well fix a spray gun, so that the stability of the spray gun is insufficient when concrete is poured, and the spray gun needs to be fixed in an auxiliary mode by personnel, so that the operation is troublesome.
For the problems in the related art, no effective solution has been proposed at present.
Disclosure of Invention
(one) solving the technical problems
Aiming at the defects of the prior art, the corrugated plate heating power pipe gallery provided by the utility model has the advantages of reducing the construction period and the cost, and stabilizing the spray gun when concrete is poured, so that the problems of long construction period and high cost of prefabricated members and insufficient stability of the spray gun when the concrete is poured are solved.
(II) technical scheme
In order to realize the advantages of reducing the construction period and the cost and stabilizing the spray gun when pouring concrete, the concrete technical scheme adopted by the utility model is as follows:
the corrugated plate heating power pipe gallery comprises a concrete layer, wherein two first corrugated steel plates are arranged at the top end of the inner side wall of the concrete layer, second corrugated steel plates are arranged at the two sides of the bottom of the inner side wall of the concrete layer, and a plurality of guniting openings are formed in the middle of each of the first corrugated steel plates and the second corrugated steel plates; the bottom both sides of concrete layer all are provided with the steel sheet base, are provided with the baseboard between two steel sheet bases, and the top of baseboard is provided with the angle steel, and the top of angle steel is provided with reinforced concrete.
Further, in order to facilitate the connection of the first corrugated steel plate and the second corrugated steel plate, the bottom end of the first corrugated steel plate is connected with the top end of the second corrugated steel plate through bolts; the shape of first ripple steel sheet is convex structure, and the vertical setting of second ripple steel sheet is in the bottom of first ripple steel sheet.
Further, in order to protect the guniting port, prevent that external pollution from getting into, reduced the leakage risk, the side of guniting port is provided with first apron, and first apron and first corrugated steel plate and second corrugated steel plate threaded connection.
Optionally, a second cover plate is arranged on the side edge of the guniting port, and the second cover plate is in threaded connection with the first corrugated steel plate and the second corrugated steel plate; and a conveying pipeline is arranged in the middle of the second cover plate and positioned at the guniting port.
Further, in order to fix the spray gun when the guniting, make the spray gun stable and reliable when pouring concrete, and can make the spray gun take out in the pipeline that can be smooth, the one end of pipeline is provided with circular cavity, the inside of circular cavity is provided with the button, the button is close to the inside one end of pipeline and is provided with the dog, the one end that the button was kept away from to the dog extends to in the pipeline, the button is kept away from the inside one end of pipeline and is provided with the pull rod, and the pull rod is kept away from the inside one end of pipeline and extends to the outside of circular cavity, the outside cover that just is located the pull rod in the circular cavity is equipped with the spring.
(III) beneficial effects
Compared with the prior art, the corrugated plate heating power pipe gallery provided by the utility model has the following beneficial effects:
(1) The utility model combines the first corrugated steel plate and the second corrugated steel plate with the concrete layer, improves the overall stability and the bearing capacity of the pipe gallery, can effectively resist the influence of external environment and load, and reduces the construction period and the cost.
(2) Through setting up first apron to the protection guniting mouth prevents that external pollution from getting into, has reduced the leakage risk.
(3) Through setting up pipeline, cavity, dog etc to when the guniting, conveniently carry the guniting material, and can block the protruding position of spray gun mouth flange department through the dog, and then can fix the spray gun, make the spray gun stable and reliable when pouring concrete, reduce the operation degree of difficulty, and can be very convenient take out the dog from pipeline in, can make the spray gun take out from pipeline smoothly like this.
Drawings
In order to more clearly illustrate the embodiments of the present utility model or the technical solutions in the prior art, the drawings that are needed in the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present utility model, and other drawings may be obtained according to these drawings without inventive effort for a person skilled in the art.
Fig. 1 is a schematic view of a corrugated plate heat pipe gallery according to a first embodiment of the utility model;
FIG. 2 is an enlarged view of a portion of FIG. 1 at A;
fig. 3 is a side view of a first corrugated steel plate in a corrugated plate heat pipe gallery in accordance with an embodiment of the present utility model;
fig. 4 is a side view of a second corrugated steel plate in a corrugated plate heat pipe rack in accordance with an embodiment of the present utility model;
fig. 5 is a schematic view of a corrugated plate heat pipe gallery according to a second embodiment of the utility model;
fig. 6 is a side view of a first cover plate in a corrugated plate heat pipe gallery in accordance with a first embodiment of the utility model;
fig. 7 is a schematic structural view of a second cover plate in a corrugated plate heat pipe gallery according to a second embodiment of the utility model.
In the figure:
1. a concrete layer; 2. a first corrugated steel sheet; 3. a second corrugated steel plate; 4. a guniting port; 5. a steel plate base; 6. a baseboard; 7. angle steel; 8. reinforced concrete; 9. a bolt; 10. a first cover plate; 11. a second cover plate; 12. a delivery conduit; 13. a circular cavity; 14. round blocks; 15. a stop block; 16. a pull rod; 17. and (3) a spring.
Detailed Description
For the purpose of further illustrating the various embodiments, the present utility model provides the accompanying drawings, which are a part of the disclosure of the present utility model, and which are mainly used to illustrate the embodiments and, together with the description, serve to explain the principles of the embodiments, and with reference to these descriptions, one skilled in the art will recognize other possible implementations and advantages of the present utility model, wherein elements are not drawn to scale, and like reference numerals are generally used to designate like elements.
According to an embodiment of the present utility model, a corrugated plate heat pipe gallery is provided.
Example 1
The utility model is further described with reference to the accompanying drawings and the specific embodiments, as shown in fig. 1-4 and fig. 6, a corrugated plate thermodynamic pipe gallery according to an embodiment of the utility model comprises a concrete layer 1, wherein the concrete layer 1 is C30 concrete, two first corrugated steel plates 2 are arranged at the top end of the inner side wall of the concrete layer 1, second corrugated steel plates 3 are arranged at two sides of the bottom of the inner side wall of the concrete layer 1, and a plurality of guniting openings 4 are arranged in the middle of the first corrugated steel plates 2 and the second corrugated steel plates 3; the bottom both sides of concrete layer 1 all are provided with steel sheet base 5, are provided with baseboard 6 between two steel sheet bases 5, and the top of baseboard 6 is provided with angle steel 7, and angle steel 7's top is provided with reinforced concrete 8 for strengthen the stability of piping lane. In the concrete application, two heat supply and water return pipelines of 1.2 meters are arranged in the corrugated plate heating pipeline gallery, and lighting and illumination electric circuits are arranged, and the materials of the first corrugated steel plate 2 and the second corrugated steel plate 3 are Q235B. .
By means of the scheme, the first corrugated steel plate 2 and the second corrugated steel plate 3 are combined with the concrete layer 1, so that the overall stability and the bearing capacity of the pipe gallery are improved, the influence of external environment and load can be effectively resisted, and the construction period and the cost are reduced.
In one embodiment, for the first deck plate 2, the bottom end of the first deck plate 2 and the top end of the second deck plate 3 are connected by bolts 9; the shape of the first corrugated steel plate 2 is in a circular arc structure, and the second corrugated steel plate 3 is vertically arranged at the bottom end of the first corrugated steel plate 2, so that the connection of the first corrugated steel plate 2 and the second corrugated steel plate 3 is facilitated.
In one embodiment, for the above-mentioned guniting port 4, the side of the guniting port 4 is provided with a first cover plate 10, and the first cover plate 10 is in threaded connection with the first corrugated steel plate 2 and the second corrugated steel plate 3, so as to protect the guniting port 4, prevent external pollution from entering, and reduce the risk of leakage.
Example two
The corrugated plate thermodynamic pipe gallery according to the embodiment of the utility model, as shown in fig. 5 and 7, further comprises a concrete layer 1, wherein the concrete layer 1 is C30 concrete, two first corrugated steel plates 2 are arranged at the top end of the inner side wall of the concrete layer 1, second corrugated steel plates 3 are arranged at two sides of the bottom of the inner side wall of the concrete layer 1, and a plurality of guniting openings 4 are formed in the middle parts of the first corrugated steel plates 2 and the second corrugated steel plates 3; the bottom both sides of concrete layer 1 all are provided with steel sheet base 5, are provided with baseboard 6 between two steel sheet bases 5, and the top of baseboard 6 is provided with angle steel 7, and angle steel 7's top is provided with reinforced concrete 8.
In one embodiment, for the gunite opening 4, a second cover plate 11 is disposed at a side of the gunite opening 4, and the second cover plate 11 is screwed with the first corrugated steel plate 2 and the second corrugated steel plate 3; a conveying pipeline 12 is arranged in the middle of the second cover plate 11 and positioned at the guniting port 4; the one end of pipeline 12 is provided with circular cavity 13, the inside of circular cavity 13 is provided with circle piece 14, the one end that circle piece 14 is close to pipeline 12 inside is provided with dog 15, the one end that circle piece 14 was kept away from to dog 15 extends to pipeline 12 in, the one end that circle piece 14 was kept away from pipeline 12 inside is provided with pull rod 16, and the one end that pipeline 12 was kept away from to pull rod 16 extends to the outside of circular cavity 13, just be located the outside cover of pull rod 16 in the circular cavity 13, thereby conveniently carry the gunning material, and can block the protruding position of spray gun mouth flange department through dog 15, and then can fix the spray gun, make the spray gun stable and reliable when pouring concrete, reduce the operation degree of difficulty, and can be very convenient take out from pipeline 12 in with dog 15 follow pipeline 12 like this.
In order to facilitate understanding of the above technical solutions of the present utility model, the following describes in detail the working principle or operation manner of the present utility model in the actual process.
In practical application, the gunite opening 4 is positioned in the middle of the first corrugated steel plate 2 and the second corrugated steel plate 3 and is used for spraying concrete. In order to prevent the entry of external contaminants, the side edge of the gunite opening 4 is provided with a first cover plate 10 which is bonded to the shape of the corresponding first corrugated steel plate 2 or second corrugated steel plate 3. When guniting, the conveying pipeline 12 is positioned at the side edge of the guniting port 4 and is used for conveying guniting. After the spray gun enters the conveying pipeline 12, the stop block 15 can fix the spray gun, so that the spray gun is stable and reliable in concrete pouring, and the operation difficulty is reduced. The pull rod 16 moves away from the delivery pipe 12 and drives the stopper 15 to be pulled out from the delivery pipe 12 so that the spray gun can be smoothly taken out from the delivery pipe 12.
In summary, the first corrugated steel plate 2 and the second corrugated steel plate 3 are combined with the concrete layer 1, so that the overall stability and the bearing capacity of the pipe gallery are improved, the influence of external environment and load can be effectively resisted, and the construction period and the cost are reduced. By providing the first cover plate 10, the guniting port 4 is protected, external pollution is prevented from entering, and the risk of slurry leakage is reduced. Through setting up pipeline 12, circular cavity 13, dog 15 etc to when the guniting, conveniently carry the guniting material, and can block the protruding position of spray gun mouth flange department through dog 15, and then can fix the spray gun, make the spray gun stable and reliable when pouring concrete, reduce the operation degree of difficulty, and can be very convenient take out dog 15 from pipeline 12 in, can make the spray gun take out from pipeline 12 smoothly like this.
In the present utility model, unless explicitly specified and limited otherwise, the terms "mounted," "configured," "connected," "secured," "screwed," and the like are to be construed broadly and may be, for example, fixedly connected, detachably connected, or integrally formed; can be mechanically or electrically connected; either directly or indirectly through intermediaries, or in communication with each other or in interaction with each other, unless explicitly defined otherwise, the meaning of the terms described above in this application will be understood by those of ordinary skill in the art in view of the specific circumstances.
The foregoing description of the preferred embodiments of the utility model is not intended to be limiting, but rather is intended to cover all modifications, equivalents, alternatives, and improvements that fall within the spirit and scope of the utility model.

Claims (6)

1. The utility model provides a buckled plate heating power piping lane, includes concrete layer (1), its characterized in that, the inside wall top of concrete layer (1) is provided with two first ripple steel sheet (2), the both sides of concrete layer (1) inside wall bottom all are provided with second ripple steel sheet (3), first ripple steel sheet (2) and the middle part of second ripple steel sheet (3) all are provided with a plurality of spouts (4);
the concrete layer (1) is characterized in that steel plate bases (5) are arranged on two sides of the bottom end of the concrete layer (1), a baseboard (6) is arranged between the two steel plate bases (5), angle steel (7) is arranged on the top end of the baseboard (6), and reinforced concrete (8) is arranged on the top end of the angle steel (7).
2. A corrugated board thermodynamic piping lane according to claim 1, characterized in that the bottom end of the first corrugated steel plate (2) and the top end of the second corrugated steel plate (3) are connected by means of bolts (9).
3. A corrugated board thermodynamic pipe gallery according to claim 2, characterized in that the first corrugated steel plate (2) has a circular arc-shaped structure, and the second corrugated steel plate (3) is vertically arranged at the bottom end of the first corrugated steel plate (2).
4. A corrugated board thermodynamic pipe gallery according to claim 1 or 3, characterized in that the side edges of the guniting openings (4) are provided with a first cover plate (10), and that the first cover plate (10) is in threaded connection with the first corrugated steel plate (2) and the second corrugated steel plate (3).
5. A corrugated board thermodynamic pipe gallery according to claim 1 or 3, characterized in that the side edges of the guniting openings (4) are provided with second cover plates (11), and that the second cover plates (11) are in threaded connection with the first corrugated steel plate (2) and the second corrugated steel plate (3);
and a conveying pipeline (12) is arranged in the middle of the second cover plate (11) and positioned at the guniting port (4).
6. The corrugated plate heating power pipe gallery according to claim 5, characterized in that one end of the conveying pipe (12) is provided with a circular cavity (13), a round block (14) is arranged in the circular cavity (13), one end, close to the interior of the conveying pipe (12), of the round block (14) is provided with a stop block (15), one end, far away from the round block (14), of the stop block (15) extends into the conveying pipe (12), one end, far away from the interior of the conveying pipe (12), of the round block (14) is provided with a pull rod (16), one end, far away from the interior of the conveying pipe (12), of the pull rod (16) extends to the exterior of the circular cavity (13), and a spring (17) is sleeved on the outer side, located in the round cavity (13), of the pull rod (16).
CN202321389475.5U 2023-06-02 2023-06-02 Corrugated plate heating power pipe gallery Active CN220058087U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321389475.5U CN220058087U (en) 2023-06-02 2023-06-02 Corrugated plate heating power pipe gallery

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321389475.5U CN220058087U (en) 2023-06-02 2023-06-02 Corrugated plate heating power pipe gallery

Publications (1)

Publication Number Publication Date
CN220058087U true CN220058087U (en) 2023-11-21

Family

ID=88784149

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321389475.5U Active CN220058087U (en) 2023-06-02 2023-06-02 Corrugated plate heating power pipe gallery

Country Status (1)

Country Link
CN (1) CN220058087U (en)

Similar Documents

Publication Publication Date Title
CN108149706A (en) Prefabricated assembled comprehensive pipe gallery spliced by cast-in-place hidden beams and laminated slabs and construction method thereof
CN110284587A (en) A kind of prefabricated window and connection joints of steel structure and the construction method of floaing of staggered floor
CN106284412A (en) A kind of prefabricated pipe gallery and construction method
CN105201070A (en) Intelligent integrated prefabrication pump station
CN220058087U (en) Corrugated plate heating power pipe gallery
CN212427210U (en) UHPC-RC combination coincide assembled utility tunnel structure
CN208280171U (en) A kind of city integrated piping lane
CN209082558U (en) A kind of overlapping fabricated construction pipe gallery
CN205116384U (en) Prefabricated pump station of intelligence integration
CN207032296U (en) A kind of spliced underground pipe gallery
CN109629732A (en) A kind of the cast-in-place concrete stealth beam floor and construction method of pipeline separation
CN205604432U (en) Prefabricated pump station of integration with barrel strengthening rib
CN208777334U (en) Assembled steel structure piping lane with concrete bed
CN212743447U (en) Reinforced structure that building structure is firm anti collapsing
CN205369690U (en) Prefabricated wallboard of assembly type structure
CN114562140A (en) Seam structure of assembled integral pool with laminated plate type structure
CN204753895U (en) Combination wall body of single prefabricated wall section
CN210238566U (en) Assembled piping lane
CN209837237U (en) Concrete sewer drainage assembly
CN208088343U (en) A kind of assembled piping lane component and piping lane
CN208235803U (en) A kind of non-dismantling formwork system chooses part
CN208168054U (en) A kind of integrated wallboard of assembled heat insulation decoration maintenance
CN207392239U (en) A kind of prefabricated piping lane of two-piece unit formula
CN205976108U (en) Double-sided prefabricated core filling wall structure
CN205116380U (en) Prefabricated pump station of integration with level control apparatus

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant