CN220047553U - Highway construction dust device - Google Patents
Highway construction dust device Download PDFInfo
- Publication number
- CN220047553U CN220047553U CN202321388604.9U CN202321388604U CN220047553U CN 220047553 U CN220047553 U CN 220047553U CN 202321388604 U CN202321388604 U CN 202321388604U CN 220047553 U CN220047553 U CN 220047553U
- Authority
- CN
- China
- Prior art keywords
- wall
- fog gun
- support
- gun barrel
- fixed mounting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000000428 dust Substances 0.000 title claims abstract description 37
- 238000010276 construction Methods 0.000 title claims abstract description 24
- 235000017166 Bambusa arundinacea Nutrition 0.000 claims abstract description 14
- 235000017491 Bambusa tulda Nutrition 0.000 claims abstract description 14
- 241001330002 Bambuseae Species 0.000 claims abstract description 14
- 235000015334 Phyllostachys viridis Nutrition 0.000 claims abstract description 14
- 239000011425 bamboo Substances 0.000 claims abstract description 14
- 238000009434 installation Methods 0.000 claims abstract description 8
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 29
- 239000007787 solid Substances 0.000 claims description 3
- 238000000889 atomisation Methods 0.000 claims description 2
- 230000035515 penetration Effects 0.000 claims description 2
- 238000012423 maintenance Methods 0.000 abstract description 3
- 239000007921 spray Substances 0.000 description 7
- 238000005507 spraying Methods 0.000 description 7
- 230000000149 penetrating effect Effects 0.000 description 2
- 230000001105 regulatory effect Effects 0.000 description 2
- 241000276425 Xiphophorus maculatus Species 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 230000001276 controlling effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000000605 extraction Methods 0.000 description 1
- 238000010030 laminating Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000001603 reducing effect Effects 0.000 description 1
- 238000005096 rolling process Methods 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
Landscapes
- Details Or Accessories Of Spraying Plant Or Apparatus (AREA)
Abstract
The utility model discloses a highway construction dust device, which comprises: the fog gun barrel, fog gun barrel's outer wall fixed mounting has the installation piece, square hole has been seted up to the outer wall of installation piece, square rod is connected with in square hole's inner wall through-connection, square rod fixed mounting is in the one end of erection column, the erection column runs through and sets up in the outer wall of support, the outer wall fixed mounting of support has a screw thread section of thick bamboo, the outer wall meshing of screw thread section of thick bamboo is connected with the screw thread cap, the inner wall embedding of support is connected with the holding ring. According to the utility model, the mounting block, the square rod and the threaded cap are arranged, the support ring is arranged to provide support for the fog gun barrel, the threaded cap is rotated to enable the threaded cap to be separated from the outer wall of the threaded barrel, the threaded cap is taken down, the mounting column is pulled to move in the direction away from the fog gun barrel, the square rod is driven to move, the square rod is separated from the square hole inner wall of the outer wall of the mounting block, the fog gun barrel is lifted upwards, the fog gun barrel is convenient to detach from the support, and the fog gun barrel is convenient to detach for maintenance.
Description
Technical Field
The utility model relates to the technical field of dust falling devices, in particular to a highway construction dust falling device.
Background
The highway is constructed according to the highway engineering technical standard specified by the state, and is proved and accepted by highway authorities to be a public road which can be used for vehicles to run in cities, villages and villages, dust is easy to raise in the construction process of the highway, water spraying and dust falling treatment can be carried out by using a highway construction dust falling device before construction, the existing water spraying and dust falling device is generally a fog gun vehicle dust falling device, but the fog gun barrels of the existing highway construction dust falling device are fixedly connected with a bracket, and when the fog gun barrels are damaged, the fog gun barrels are inconvenient to disassemble and maintain.
Patent document CN214972741U discloses a sprinkling and dust settling device for highway construction, and the claim of protection discloses that "comprising a bottom pressurized water tank; the bottom of the spraying main body of the fog gun vehicle is rotationally connected with a bottom pressurized water tank through a rotating shaft; the spray regulating device is arranged at a nozzle at one end of the spray main body of the fog gun carriage; one end of the fastening mechanism is fixedly connected to the surface of the spraying main body of the fog gun vehicle, and the other end of the spraying main body of the fog gun vehicle is connected with the spraying regulation device; according to the utility model, the spray regulating device is arranged in the device, and before spraying is sprayed by wind force, the size and the shape of the spray can be quickly changed by controlling the size and the width of the opening of the rubber ring, so that a better dust reducing effect is achieved. However, the sprinkling and dust settling device for highway construction is not convenient for disassembling the fog gun barrel.
Disclosure of Invention
The utility model aims to provide a highway construction dust device, which aims to solve the technical problems that the fog gun barrel and a bracket of the existing highway construction dust device provided in the background art are fixedly connected, and the fog gun barrel is inconvenient to disassemble and maintain when damaged.
In order to achieve the above purpose, the present utility model provides the following technical solutions: a highway construction dust device, comprising:
the fog gun barrel is fixedly provided with a mounting block on the outer wall;
square holes are formed in the outer wall of the mounting block;
the square rod is connected with the inner wall of square hole in a penetrating way, square rod fixed mounting is in the one end of erection column, the erection column runs through and sets up in the outer wall of support, the outer wall fixed mounting of support has a screw thread section of thick bamboo, the outer wall meshing of screw thread section of thick bamboo is connected with the screw cap, the inner wall embedding of support is connected with the holding ring.
Preferably, an atomization nozzle is fixedly arranged on the inner wall of the fog gun barrel.
Preferably, the support is fixedly arranged at the top of the rotating disc, and the rotating disc is fixedly arranged at the top of the output end of the servo motor.
Preferably, the servo motor is fixedly arranged on the inner wall of the supporting table, and the supporting table is fixedly arranged on the top of the dust settling vehicle.
Preferably, a fixed block is fixedly arranged at the top of the rotating disc, and a telescopic rod is movably connected with the inner wall of the fixed block.
Preferably, the top of dust fall car fixed mounting has the water tank, and the top fixed mounting of water tank has the water pump.
Preferably, the outer wall fixed mounting of fog barrel has the solid fixed ring, and gu fixed ring's top fixed mounting has the spacing ring, and fog barrel's outer wall fixed mounting has long frame, and long frame's inner wall top fixed mounting has the snap ring, and long frame's bottom fixed mounting has the connecting plate, and the outer wall rotation of connecting plate is connected with hollow pole one, and hollow pole one's outer wall rotation is connected with hollow pole two, and hollow pole two's bottom outer wall rotation is connected with the rotation section of thick bamboo, and the connecting pipe is installed in the inner wall penetration of spacing ring.
Compared with the prior art, the utility model has the beneficial effects that:
1. according to the utility model, the mounting block, the square rod and the threaded cap are mounted, the support ring is arranged to provide support for the fog gun barrel, the threaded cap is rotated to separate the threaded cap from the outer wall of the threaded barrel, the threaded cap is taken down, the mounting column is pulled to move in a direction away from the fog gun barrel, the square rod is driven to move, the square rod is separated from the square hole inner wall of the outer wall of the mounting block, the fog gun barrel is lifted upwards, the fog gun barrel is convenient to detach from the bracket, and the fog gun barrel is convenient to detach for maintenance;
2. according to the utility model, the fixing ring, the long frame and the rotating cylinder are arranged, the support ring is arranged to provide support for the fog gun barrel, the threaded cap is rotated to separate the threaded cap from the outer wall of the threaded barrel, the threaded cap is taken down, the mounting column is pulled to move in a direction away from the fog gun barrel to drive the square rod to move, the square rod is separated from the square hole inner wall of the outer wall of the mounting block, the fog gun barrel is lifted upwards, the fog gun barrel and the support are conveniently detached, and the fog gun barrel is conveniently detached for maintenance.
Drawings
FIG. 1 is a schematic diagram of the overall structure of the present utility model;
FIG. 2 is a schematic view of a bracket structure according to the present utility model;
FIG. 3 is a schematic view of a portion of the structure of a water tank according to the present utility model;
FIG. 4 is an enlarged schematic view of the structure of FIG. 3A according to the present utility model;
FIG. 5 is a schematic view of a long frame portion structure of the present utility model;
fig. 6 is an enlarged schematic view of the structure of fig. 5B according to the present utility model.
In the figure: 1. a fog gun barrel; 101. an atomizing nozzle; 2. a mounting block; 201. square holes; 202. square rods; 203. a mounting column; 204. a bracket; 205. a thread cylinder; 206. a threaded cap; 207. a support ring; 3. a rotating disc; 301. a servo motor; 4. a support table; 401. a dust fall vehicle; 5. a fixed block; 501. a telescopic rod; 6. a water tank; 601. a water pump; 7. a fixing ring; 701. a limiting ring; 702. a long frame; 703. a clasp; 704. a connecting plate; 705. a hollow rod I; 706. a hollow rod II; 707. a rotating cylinder; 708. and (5) connecting pipes.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
In the description of the present utility model, it should be noted that the directions or positional relationships indicated by the terms "upper", "lower", "inner", "outer", "front", "rear", "both ends", "one end", "the other end", etc. are based on the directions or positional relationships shown in the drawings, are merely for convenience of describing the present utility model and simplifying the description, and do not indicate or imply that the devices or elements referred to must have a specific direction, be configured and operated in the specific direction, and thus should not be construed as limiting the present utility model. Furthermore, the terms "first," "second," and the like, are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present utility model, it should be noted that, unless explicitly specified and limited otherwise, the terms "mounted," "provided," "connected," and the like are to be construed broadly, and may be fixedly connected, detachably connected, or integrally connected, for example; can be mechanically or electrically connected; can be directly connected or indirectly connected through an intermediate medium, and can be communication between two elements. The specific meaning of the above terms in the present utility model will be understood in specific cases by those of ordinary skill in the art.
Referring to fig. 1, 3 and 5, a highway construction dust device includes: the fog gun barrel 1, the inner wall of the fog gun barrel 1 is fixedly provided with an atomizing nozzle 101, the atomizing nozzle 101 is arranged on one side of the inner wall of the fog gun barrel 1 close to the right end, a bracket 204 is fixedly arranged at the top of a rotating disc 3, the rotating disc 3 is fixedly arranged at the top of the output end of a servo motor 301, the servo motor 301 is fixedly arranged on the inner wall of a supporting table 4, the output end of the servo motor 301 penetrates through the top of the inner wall of the supporting table 4 and is fixedly connected with the bottom of the rotating disc 3, the rotating disc 3 is arranged above the supporting table 4, the top of the rotating disc 3 is fixedly provided with a fixed block 5, the fixed block 5 is arranged on the right side of the bracket 204, the inner wall of the fixed block 5 is movably connected with a telescopic rod 501, the outer wall of the bottom of the fog gun barrel 1 is fixedly provided with a group of fixed blocks 5, the top of the telescopic rod 501 is movably connected with the fixed block 5 at the bottom of the fog gun barrel 1, the supporting bench 4 fixed mounting is in the top of dust fall car 401, the top fixed mounting of dust fall car 401 has water tank 6, and water tank 6 is located the left side of supporting bench 4, the top fixed mounting of water tank 6 has water pump 601, the left side fixedly connected with inlet channel of water pump 601, and inlet channel runs through the top of water tank 6, and extend to the inside of water tank 6, the right side fixedly connected with connecting pipe 708 of water pump 601, and the right-hand member of connecting pipe 708 runs through the outer wall of fog gun barrel 1, and run through with atomizer 101 and be connected, servo motor 301 drives rolling disc 3 and rotates, drive support 204 and fog gun barrel 1 rotate in the horizontal plane, adjust the horizontal angle of fog gun barrel 1, adjust the water spray dust fall scope, telescopic link 501 extends or shortens, carry out the angle modulation in the vertical direction to fog gun barrel 1, adjust the water spray dust fall scope.
Referring to fig. 2 and 4, the outer wall fixed mounting of fog gun barrel 1 has installation piece 2, the installation group number of installation piece 2 is two, the symmetry is installed in fog gun barrel 1's left and right sides outer wall, square hole 201 has been seted up to the outer wall of installation piece 2, square rod 202 is connected with in the inner wall run-through of square rod 202, and the outer wall of square rod 202 and the inner wall laminating of square hole 201, square rod 202 fixed mounting is in the one end of erection column 203, erection column 203 runs through the outer wall that sets up in support 204, support 204 is "U" shape support 204, and the bottom and the top fixed connection of support 204, the outer wall fixed mounting of support 204 has screw thread section of thick bamboo 205, the outer wall of screw thread section of thick bamboo 205 is provided with the screw thread, and erection column 203 runs through the inner wall through screw thread section of thick bamboo 205, the outer wall meshing of screw thread section of thick bamboo 205 is connected with screw thread cap 206, the inner wall of screw thread cap 206 is provided with the screw thread of being connected with to the screw thread section of thick bamboo 205, the inner wall embedding of support 204 is connected with support 204 inner wall of support 204, support 207 both sides outer wall embedding of support 207, support 207 is arc-shaped platy structure, and support 207 is located in support 205 and runs through the outer wall 205 of support 205, and support 207 is located in the bottom of support column 205 and the top of the support column 205, the bottom of the support column is provided with screw thread of the support 205, the upper end of the support is provided with screw thread of screw thread 205, the screw thread is removed from the screw thread 1, and the screw thread is removed from the screw thread 1 to the screw thread of the screw thread cap 206, and is removed to the top of the upper end of the top of the fog gun barrel 1, and is removed to the bottom of the fog gun barrel 1, and is removed to be removed to the upper and convenient to be separated to be moved to the screw thread 1.
Referring to fig. 1, 5 and 6, the outer wall of the fog gun barrel 1 is fixedly provided with a fixed ring 7, the top of the fixed ring 7 is fixedly provided with a limiting ring 701, the number of the fixed rings 7 is two, the fixed ring 7 is arranged on the outer wall of the fog gun barrel 1 along the length direction of the fog gun barrel 1, the outer wall of the fog gun barrel 1 is fixedly provided with a long frame 702, the bottom of the long frame 702 which is fixedly arranged at the left end of the fog gun barrel 1 is in a penetrating shape, the top of the inner wall of the long frame 702 is fixedly provided with a clamping ring 703, the number of the clamping rings 703 is a plurality of groups, the bottom of the long frame 702 is fixedly provided with a connecting plate 704, the outer wall of the connecting plate 704 is rotationally connected with a hollow rod 705, the connecting plate 704 is movably connected with the hollow rod 706 through a guide post, the hollow rod 705 is movably connected with the hollow rod 706 through the guide post, the outer wall of the bottom of the hollow rod 706 is rotationally connected with a rotary barrel 707, the hollow rod II 706 is movably connected with the rotary cylinder 707 through a guide rod, the bottom end of the rotary cylinder 707 is embedded and connected to the top of the water tank 6, a connecting pipe 708 is fixedly connected with the right outer wall of the water pump 601 through the inner wall of the limiting ring 701, the left end of the connecting pipe 708 penetrates through the outer wall of the rotary cylinder 707 and extends to the inside of the rotary cylinder 707, the connecting pipe 708 penetrates through the hollow rod I705 and the hollow rod II 706, the connecting pipe 708 penetrates through the inner wall of the long frame 702 and penetrates through the inner wall of the clamping ring 703, the connecting pipe 708 is fixed through the clamping ring 703, when the fog gun cylinder 1 performs angle adjustment in the vertical direction, the left end of the long frame 702 is driven to move upwards or downwards to drive the first hollow rod and the second hollow rod to rotate, when the fog gun cylinder 1 performs angle adjustment in the horizontal direction, the rotary cylinder 707 is driven to rotate through the hollow rod II 706, the connection penetrates through the inner walls of the hollow rod I705, the hollow rod II 706 and the long frame 702, so that the connection pipe 708 is prevented from being wound or folded when the fog gun barrel 1 is adjusted, and the water delivery effect of the connection pipe 708 is prevented from being influenced.
When the highway construction dust device is used, through servo motor 301 and telescopic link 501, angle in vertical face and the horizontal plane of fog gun barrel 1 is adjusted, and then adjust the dust fall scope to highway construction, start water pump 601, the inside water of extraction water tank 6, get into fog gun barrel 1 inside through connecting pipe 708, outwards spout by atomizer 101, spray the dust fall to highway construction highway section, rotate screw cap 206, make screw cap 206 and screw tube 205 outer wall separation, take down screw cap 206, pulling erection column 203 moves to the direction of keeping away from fog gun barrel 1, drive square pole 202 and remove, break away from with square hole 201 inner wall of installation piece 2 outer wall, upwards lift fog gun barrel 1, be convenient for dismantle fog gun barrel 1 and support 204, be convenient for dismantle fog gun barrel 1 and maintain.
It will be evident to those skilled in the art that the utility model is not limited to the details of the foregoing illustrative embodiments, and that the present utility model may be embodied in other specific forms without departing from the spirit or essential characteristics thereof. The present embodiments are, therefore, to be considered in all respects as illustrative and not restrictive, the scope of the utility model being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Claims (7)
1. A highway construction dust device, characterized by comprising:
the fog gun barrel (1), wherein an installation block (2) is fixedly arranged on the outer wall of the fog gun barrel (1);
square holes (201), wherein square holes (201) are formed in the outer wall of the mounting block (2);
square rod (202), the inner wall through connection of square hole (201) has square rod (202), square rod (202) fixed mounting is in the one end of erection column (203), erection column (203) run through and set up in the outer wall of support (204), the outer wall fixed mounting of support (204) has screw thread section of thick bamboo (205), the outer wall meshing of screw thread section of thick bamboo (205) is connected with screw cap (206), the inner wall embedding of support (204) is connected with support ring (207).
2. The highway construction dust device of claim 1, wherein: an atomization nozzle (101) is fixedly arranged on the inner wall of the fog gun barrel (1).
3. The highway construction dust device of claim 1, wherein: the support (204) is fixedly arranged at the top of the rotating disc (3), and the rotating disc (3) is fixedly arranged at the top of the output end of the servo motor (301).
4. A highway construction dust fall apparatus according to claim 3, wherein: the servo motor (301) is fixedly arranged on the inner wall of the supporting table (4), and the supporting table (4) is fixedly arranged on the top of the dust settling vehicle (401).
5. A highway construction dust fall apparatus according to claim 3, wherein: the top of the rotating disc (3) is fixedly provided with a fixed block (5), and the inner wall of the fixed block (5) is movably connected with a telescopic rod (501).
6. The highway construction dust device of claim 4, wherein: the top of dust fall car (401) fixed mounting has water tank (6), and water pump (601) are installed to the top of water tank (6) fixed mounting.
7. The highway construction dust device of claim 1, wherein: the outer wall fixed mounting of fog gun section of thick bamboo (1) has solid fixed ring (7), the top fixed mounting of solid fixed ring (7) has spacing ring (701), the outer wall fixed mounting of fog gun section of thick bamboo (1) has long frame (702), the inner wall top fixed mounting of long frame (702) has snap ring (703), the bottom fixed mounting of long frame (702) has connecting plate (704), the outer wall rotation of connecting plate (704) is connected with hollow pole one (705), the outer wall rotation of hollow pole one (705) is connected with hollow pole two (706), the bottom outer wall rotation of hollow pole two (706) is connected with rotary cylinder (707), connecting pipe (708) are installed in the inner wall penetration of spacing ring (701).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202321388604.9U CN220047553U (en) | 2023-06-02 | 2023-06-02 | Highway construction dust device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202321388604.9U CN220047553U (en) | 2023-06-02 | 2023-06-02 | Highway construction dust device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN220047553U true CN220047553U (en) | 2023-11-21 |
Family
ID=88785738
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202321388604.9U Active CN220047553U (en) | 2023-06-02 | 2023-06-02 | Highway construction dust device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN220047553U (en) |
-
2023
- 2023-06-02 CN CN202321388604.9U patent/CN220047553U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN212176450U (en) | Paint spraying device for building decoration | |
CN113599935A (en) | Environment-friendly municipal engineering construction dust settling method and equipment | |
CN220047553U (en) | Highway construction dust device | |
US20220186917A1 (en) | Vehicle-road cooperation street lamp for urban road | |
CN213508467U (en) | Piping lane lateral wall concrete structure curing means | |
CN214382769U (en) | Building site heat sink for construction | |
CN114749291A (en) | Atomizing device suitable for arbitrary angle sprays | |
CN211753514U (en) | Rotating mechanism for urban haze purification device | |
CN219092431U (en) | Highway guardrail paint spraying equipment | |
CN214089655U (en) | Foundation structure curing means is used in road and bridge construction | |
CN112037549A (en) | Traffic safety is with portable interim signal lamp | |
CN215916838U (en) | Dust device for building convenient to vehicle passes through | |
CN220789357U (en) | Spraying cooling device for road | |
CN212901277U (en) | Street lamp pole with high-pressure spraying function | |
CN220670350U (en) | Surface blasting dust treatment device | |
CN217698485U (en) | Dust device for building engineering | |
CN219992325U (en) | Municipal bridge spraying machine | |
CN218206188U (en) | Assembled temporary enclosure for construction of constructional engineering | |
CN217518235U (en) | Energy-conserving curing means is used in construction | |
CN220834746U (en) | Spraying dust device | |
CN219741664U (en) | Apple tree is with spouting medicine equipment that conveniently adjusts | |
CN219942243U (en) | Construction site dust fall device | |
CN221452102U (en) | Dust fall ware for building engineering | |
CN220842960U (en) | Unmanned aerial vehicle spouts medicinal medicine storage mechanism installation device | |
CN219364380U (en) | Construction safety notice board fixing device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |