base
installation
sliding
rod
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321634410.2U
Other languages
Chinese (zh)
Inventor
孙先东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Shengcheng Construction Engineering Group Co ltd
Original Assignee
Hebei Shengcheng Construction Engineering Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Shengcheng Construction Engineering Group Co ltd filed Critical Hebei Shengcheng Construction Engineering Group Co ltd
Priority to CN202321634410.2U priority Critical patent/CN220037655U/en
Application granted granted Critical
Publication of CN220037655U publication Critical patent/CN220037655U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model discloses a supporting and hanging bracket device for electromechanical installation of a building, which relates to the technical field of electromechanical installation equipment and comprises two installation rods, a transverse plate and a base, wherein the transverse plate and the base are installed between the two installation rods, a first clamping mechanism for clamping an air pipe up and down is arranged on the transverse plate, the first clamping mechanism comprises an upper clamping plate installed right below the transverse plate, a second clamping mechanism for clamping the air pipe left and right is arranged in the base, the second clamping mechanism comprises two side clamping plates sliding in the base, a side groove is formed in one side of the installation rod, a connecting frame is installed on one side of the installation rod, one end of the connecting frame is connected in the side groove in a sliding mode, and a screw rod is rotationally connected in the side groove. The air pipes with different sizes can be clamped and fixed by adjusting the two clamping mechanisms, and the plurality of support hangers can be adjusted to the same height when facing the top surfaces with different heights by adjusting the distance between the top of the connecting frame and the mounting rod, so that the adaptability of the device is improved.

Description

Supporting and hanging frame device for electromechanical installation of building
Technical Field
The utility model relates to the technical field of electromechanical installation equipment, in particular to a supporting and hanging bracket device for electromechanical installation of a building.
Background
Most of the present enterprises have automatic machine equipment, the electromechanical installation industry is born, the electromechanical installation is a work with larger engineering scale, some large enterprises are migrated, one engineering needs to be implemented in nearly half a year, and the technical requirements for installation are quite large, and the electromechanical installation support and hanger of the building is a mechanical connection for supporting and positioning facilities such as pipelines and lines in the building and is mainly used for electromechanical engineering facilities such as water supply and drainage of the building, fire protection, heating, ventilation, air conditioning, fuel gas, heating power, electric power and communication.
Chinese patent publication No. CN209782157U discloses an electromechanical gallows of building, including unable adjustment base, inflation screw, first bracing piece, second bracing piece, fixed block, bottom splint, top splint, welding piece, accommodate the lead screw, adjusting collar, fixed screw, settle the frame, connect the mounting hole, connect end and connector, wherein: the unable adjustment base passes through the expansion screw to be fixed in the top of building, and the inside of unable adjustment base installs the connection end through the bearing.
However, the inventor of the device considers that certain defects exist, the device is inconvenient to adjust the lifting height of the support and hanger to the pipeline according to the use requirement, and the adaptability of the device is greatly reduced; therefore, we provide a supporting and hanging bracket device for electromechanical installation of a building, which solves the problems.
Disclosure of Invention
The utility model aims to make up the defects of the prior art and provides an electromechanical installation support and hanger device for a building.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides a building electromechanical installation gallows device, includes two installation poles and installs diaphragm and the base between two installation poles, be equipped with the first fixture to the upper and lower centre gripping of tuber pipe on the diaphragm, first fixture is including installing the punch holder under the diaphragm, the inside of base is equipped with the second fixture to the tuber pipe left and right sides centre gripping, second fixture is including sliding two side splint inside the base, the side slot has been seted up to one side of installation pole, the link is installed to one side of installation pole, the one end sliding connection of link is in the inside of side slot, the inside rotation of side slot is connected with the screw rod, the one end threaded connection of link is on the screw rod.
Further, rotate on the diaphragm and be connected with threaded sleeve, threaded sleeve's inside threaded connection has lifting screw, lifting screw's bottom is fixed at the top of punch holder, the top fixedly connected with slide bar of punch holder, the slide bar extends to the top of diaphragm.
Further, the inside sliding connection of base has movable frame, the chute has been seted up on the movable frame, a side fixedly connected with connecting rod of side splint, the pull rod is installed to the other end of connecting rod, the both ends of pull rod sliding connection respectively in the inside of two chute.
Further, a bottom rod is fixedly connected to the inside of the movable frame, and the bottom rod extends to the bottom of the base.
Further, the sliding tray is arranged on the outer side face of the base, a sliding block is fixedly connected to the side clamping plate, and the sliding block is in sliding connection with the inside of the sliding tray.
Further, the top fixedly connected with mounting panel of link, a plurality of mounting holes are installed at the top of mounting panel.
Further, the base is arranged at one end far away from the connecting frame and away from the mounting rods, and the base is detachably connected between the two mounting rods through bolts.
Compared with the prior art, the electromechanical installation support and hanger device for the building has the following beneficial effects:
1. according to the utility model, the left and right air pipes are clamped by the two side clamping plates which are close to each other, the upper clamping plate descends and the base clamps the air pipes up and down, the air pipes with different sizes can be clamped and fixed by adjusting the two clamping mechanisms, one end of the connecting frame is driven to slide in the side groove by rotating the screw rod, so that the distance between the top of the connecting frame and the mounting rod is adjusted, a plurality of supporting brackets can be adjusted to the same height when facing the top surfaces with different heights, and the adaptability of the device is improved.
2. According to the utility model, the air pipe is placed on the movable frame, the threaded sleeve is rotated to drive the lifting screw to extend outwards, the upper clamping plate is lowered to clamp the top of the air pipe up and down, the movable frame is lowered through the weight of the air pipe and the extrusion of the upper clamping plate, and the two side clamping plates are pulled to be close to each other under the actions of the chute, the pull rod and the connecting rod, so that the air pipe is automatically clamped and fixed left and right.
Drawings
FIG. 1 is a perspective view of the present utility model;
FIG. 2 is a schematic diagram of a side channel structure of the present utility model;
FIG. 3 is a cross-sectional view of a base structure of the present utility model;
fig. 4 is a schematic view of a base structure of the present utility model.
In the figure: 1. a mounting rod; 11. a side groove; 12. a screw; 2. a cross plate; 3. an upper clamping plate; 31. a threaded sleeve; 32. lifting screw rods; 33. a slide bar; 4. a base; 41. a sliding groove; 5. a side clamping plate; 51. a sliding block; 52. a connecting rod; 53. a pull rod; 6. a movable frame; 61. a chute; 7. a bottom bar; 8. a connecting frame; 81. and (3) mounting a plate.
Detailed Description
The principles and features of the present utility model are described below with reference to the drawings, the examples are illustrated for the purpose of illustrating the utility model and are not to be construed as limiting the scope of the utility model.
The embodiment provides a building electromechanical installation gallows device, and the device can carry out the centre gripping through two fixture to not unidimensional tuber pipe fixedly, through the distance between 8 tops of adjusting link and the installation pole 1, can adjust a plurality of gallows to same height when facing the top surface of co-altitude, has improved the adaptability of device.
Referring to fig. 1 to 4, an electromechanical installation support and hanger device for a building comprises two installation rods 1, a transverse plate 2 and a base 4, wherein the transverse plate 2 and the base 4 are installed between the two installation rods 1, a first clamping mechanism for clamping an air pipe vertically is arranged on the transverse plate 2, the first clamping mechanism comprises an upper clamping plate 3 installed right below the transverse plate 2, the upper clamping plate 3 and the base 4 are used for clamping the air pipe vertically through the descending of the upper clamping plate 3, a threaded sleeve 31 is rotationally connected to the transverse plate 2, lifting screws 32 are connected to the internal threads of the threaded sleeve 31, the bottom ends of the lifting screws 32 are fixed to the top of the upper clamping plate 3, a sliding rod 33 is fixedly connected to the top of the upper clamping plate 3, the sliding rod 33 extends to the top of the transverse plate 2, and the lifting screws 32 are outwards extended through rotating the threaded sleeve 31, so that the upper clamping plate 3 is pushed to descend for clamping.
The inside of base 4 is equipped with the second fixture to the centre gripping about the tuber pipe, second fixture is including sliding two side splint 5 in the base 4 inside, clamp the tuber pipe about through two side splint 5 being close to each other, sliding tray 41 has been seted up to the lateral surface of base 4, fixedly connected with sliding block 51 on side splint 5, sliding block 51 sliding connection has increased the stability of side splint 5 slip in-process through setting up sliding block 51 and sliding tray 41 in the inside of sliding tray 41, base 4 is established and is keeping away from the one end of link 8 in keeping away from installation pole 1, base 4 passes through the bolt and can dismantle the connection between two installation poles 1, through demolising the bolt on the installation pole 1, be convenient for take off base 4 from between two installation poles 1.
The inside sliding connection of base 4 has movable frame 6, the chute 61 has been seted up on the movable frame 6, a side fixedly connected with connecting rod 52 of side splint 5, pull rod 53 is installed to the other end of connecting rod 52, the both ends of pull rod 53 sliding connection respectively in the inside of two chute 61, when the tuber pipe is placed on the movable frame 6, make chute 61 pulling pull rod 53 be close to base 4 center department through the dead weight of tuber pipe or the extrusion of punch holder 3, thereby make the in-process that movable frame 6 descends drive two side splint 5 and be close to each other, the inside fixedly connected with sill bar 7 of movable frame 6, the sill bar 7 extends to the bottom of base 4, be convenient for manually promote movable frame 6 through setting up sill bar 7 and rise.
Side slot 11 has been seted up to one side of installation pole 1, link 8 is installed to one side of installation pole 1, the one end sliding connection of link 8 is in the inside of side slot 11, the inside rotation of side slot 11 is connected with screw rod 12, the one end threaded connection of link 8 is on screw rod 12, install the hand wheel with the top of screw rod 12, make screw rod 12 rotate through the drive hand wheel, thereby make the one end of link 8 slide in the inside of side slot 11, thereby come the distance value between regulation link 8 top and installation pole 1, the top fixedly connected with mounting panel 81 of link 8, a plurality of mounting holes are installed at the top of mounting panel 81, through mounting panel 81 and a plurality of mounting holes of setting, be convenient for install the device at the top surface.
Working principle: two connecting frames 8 are fixed on the top surface by penetrating fixing bolts into mounting holes on a mounting plate 81, one end of each connecting frame 8 is driven to slide in a side groove 11 through a hand wheel at the top of each driving screw 12, so that the height value of a mounting air pipe is adjusted, the air pipe is placed on a movable frame 6, a lifting screw 32 is outwards extended by rotating a threaded sleeve 31, the air pipe is pressed downwards through an upper clamping plate 3, the air pipe is clamped and fixed up and down through the upper clamping plate 3, a base 4 or the movable frame 6, the movable frame 6 is pushed to descend under the action of the extrusion of the upper clamping plate 3 or the dead weight of the air pipe, a pull rod 53 is pulled to be close to the center of the base 4 through a chute 61, and the air pipe is clamped and fixed left and right through two side clamping plates 5.
The foregoing description of the preferred embodiments of the utility model is not intended to limit the utility model to the precise form disclosed, and any such modifications, equivalents, and alternatives falling within the spirit and scope of the utility model are intended to be included within the scope of the utility model.

Claims (7)

1. The utility model provides a building electromechanical installation gallows device, includes two installation pole (1) and installs diaphragm (2) and base (4) between two installation pole (1), its characterized in that: be equipped with the first fixture to the upper and lower centre gripping of tuber pipe on diaphragm (2), first fixture is including installing splint (3) under diaphragm (2), the inside of base (4) is equipped with the second fixture to the centre gripping about the tuber pipe, second fixture is including sliding two side splint (5) inside base (4), side slot (11) have been seted up to one side of installation pole (1), link (8) are installed to one side of installation pole (1), the one end sliding connection of link (8) is in the inside of side slot (11), the inside rotation of side slot (11) is connected with screw rod (12), the one end threaded connection of link (8) is on screw rod (12).
2. The building electro-mechanical mounting hanger apparatus of claim 1, wherein: the novel lifting device is characterized in that a threaded sleeve (31) is rotationally connected to the transverse plate (2), a lifting screw (32) is connected to the threaded sleeve (31) in a threaded mode, the bottom end of the lifting screw (32) is fixed to the top of the upper clamping plate (3), a sliding rod (33) is fixedly connected to the top of the upper clamping plate (3), and the sliding rod (33) extends to the top of the transverse plate (2).
3. The building electro-mechanical mounting hanger apparatus of claim 1, wherein: the inside of the base (4) is connected with a movable frame (6) in a sliding way, a chute (61) is arranged on the movable frame (6), a connecting rod (52) is fixedly connected with one side surface of the side clamping plate (5), the other end of the connecting rod (52) is provided with a pull rod (53), and two ends of the pull rod (53) are respectively and slidably connected inside the two chute grooves (61).
4. A construction machine electrical installation hanger device as claimed in claim 3, wherein: the inside fixedly connected with sill bar (7) of movable frame (6), sill bar (7) extend to the bottom of base (4).
5. The building electro-mechanical mounting hanger apparatus of claim 1, wherein: the sliding groove (41) is formed in the outer side face of the base (4), the sliding block (51) is fixedly connected to the side clamping plate (5), and the sliding block (51) is slidably connected to the inside of the sliding groove (41).
6. The building electro-mechanical mounting hanger apparatus of claim 1, wherein: the top fixedly connected with mounting panel (81) of link (8), a plurality of mounting holes are installed at the top of mounting panel (81).
7. The building electro-mechanical mounting hanger apparatus of claim 1, wherein: the base (4) is arranged at one end far away from the connecting frame (8) and away from the mounting rods (1), and the base (4) is detachably connected between the two mounting rods (1) through bolts.
CN202321634410.2U 2023-06-26 2023-06-26 Supporting and hanging frame device for electromechanical installation of building Active CN220037655U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321634410.2U CN220037655U (en) 2023-06-26 2023-06-26 Supporting and hanging frame device for electromechanical installation of building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321634410.2U CN220037655U (en) 2023-06-26 2023-06-26 Supporting and hanging frame device for electromechanical installation of building

Publications (1)

Publication Number Publication Date
CN220037655U true CN220037655U (en) 2023-11-17

Family

ID=88732280

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321634410.2U Active CN220037655U (en) 2023-06-26 2023-06-26 Supporting and hanging frame device for electromechanical installation of building

Country Status (1)

Country Link
CN (1) CN220037655U (en)

Similar Documents

Publication Publication Date Title
CN220037655U (en) Supporting and hanging frame device for electromechanical installation of building
CN211261078U (en) High-strength mounting structure capable of controlling mounting height of air conditioner
CN201562888U (en) Safety support of guillotine
CN212435302U (en) Dual thermal-insulated bus duct
CN219045780U (en) Mounting structure
CN209398923U (en) Segmental timbering
CN219489543U (en) Auxiliary device for mounting high-rise air conditioner
CN220673301U (en) Adjustable cable support in cable top pipe work well
CN220516711U (en) Simple top plate bolt mounting tool
CN111502329A (en) Temporary protection device for ancient architecture
CN218522044U (en) Clamping distance adjustable suspender clamping device
CN218815430U (en) Indoor building furred ceiling auxiliary stay device
CN215864017U (en) Auxiliary device for installation of clean air conditioning system
CN219388813U (en) Auxiliary lifting device for pipeline installation
CN217683600U (en) Auxiliary bracket for pipeline installation
CN219967740U (en) Building ventilation pipeline mounting fixture
CN219755574U (en) Hanger for house construction
CN219379127U (en) Steel pipe cutting equipment for shipbuilding
CN220727366U (en) Adjustable pipeline bracket
CN220790290U (en) Height-adjustable connecting piece for suspended ceiling of biosafety clean room
CN219885456U (en) Indoor pipeline installation lifting device
CN220581866U (en) Support frame of basement fire control pipeline
CN218863446U (en) Efficient pipeline supporting and hanging frame
CN215908560U (en) Auxiliary device for installing ventilating duct for building
CN211004359U (en) Mounting rack for air duct capable of adjusting height

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant