CN220033719U - High-altitude building construction material lifting device - Google Patents
High-altitude building construction material lifting device Download PDFInfo
- Publication number
- CN220033719U CN220033719U CN202320794665.9U CN202320794665U CN220033719U CN 220033719 U CN220033719 U CN 220033719U CN 202320794665 U CN202320794665 U CN 202320794665U CN 220033719 U CN220033719 U CN 220033719U
- Authority
- CN
- China
- Prior art keywords
- block
- connecting block
- construction material
- building construction
- rear end
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000004035 construction material Substances 0.000 title claims abstract description 34
- 238000009435 building construction Methods 0.000 title claims abstract description 21
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 38
- 239000000463 material Substances 0.000 claims abstract description 26
- 230000007246 mechanism Effects 0.000 claims abstract description 9
- 230000009471 action Effects 0.000 abstract description 5
- 230000000694 effects Effects 0.000 description 4
- 238000000034 method Methods 0.000 description 3
- 230000002787 reinforcement Effects 0.000 description 3
- 238000009434 installation Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 230000000630 rising effect Effects 0.000 description 2
- 240000007594 Oryza sativa Species 0.000 description 1
- 235000007164 Oryza sativa Nutrition 0.000 description 1
- 229920002472 Starch Polymers 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 235000013339 cereals Nutrition 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 235000013312 flour Nutrition 0.000 description 1
- 235000009566 rice Nutrition 0.000 description 1
- 235000019698 starch Nutrition 0.000 description 1
- 239000008107 starch Substances 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a high-altitude building construction material lifting device, which relates to the technical field of mechanical equipment and comprises a main body, wherein a guide device is arranged at the upper end of the main body, a supporting device is arranged at the rear end of the guide device, a material box is arranged at one side of the guide device, a lifting machine is arranged at the rear end of the material box, a reinforcing device is arranged at the rear end of the lifting machine, a driving mechanism is arranged at one side of the lifting machine, and a top plate is arranged at the upper end of the driving mechanism. According to the high-altitude building construction material lifting device, under the combined action of the bottom plate, the guide rod, the sliding groove, the sliding block and the connecting block, the high-altitude building construction material lifting device can stably lift materials to a required floor, and under the combined action of the fixing bolts, the mounting blocks, the connecting block III, the reinforcing plate and the reinforcing plate II, the high-altitude building construction material lifting device can be firmer.
Description
Technical Field
The utility model relates to the technical field of mechanical equipment, in particular to a lifting device for high-altitude building construction materials.
Background
When carrying out high altitude construction operation, need the required material of upper and lower round trip transportation, waste time and energy, consequently need use the material lifting machine. The material hoister is mechanical conveying equipment of a fixing device, is mainly suitable for continuous vertical hoisting of powdery, granular and small-sized materials, and can be widely applied to hoisting of bulk materials of feed factories, flour factories, rice factories, oil factories, starch factories, grain depots, port yards and the like in various scales. The following problems exist in the prior art:
1. the existing high-altitude building construction material lifting device has poor stability when lifting work is carried out, and is not beneficial to work in a building and on the top of the building;
2. the existing high-altitude building construction material lifting device only lifts through the lifting machine in the middle of lifting when lifting work is carried out, so that the material box can shake, and the material is spilled out, so that the practicability is poor.
Disclosure of Invention
In order to solve the technical problems, the utility model adopts the following technical scheme:
the utility model provides a high altitude construction material hoisting device, includes the main part, the upper end of main part is provided with guider, guider's rear end is provided with strutting arrangement, one side of guider is provided with the material case, the rear end of material case is provided with the lifting machine, the rear end of lifting machine is provided with reinforcing apparatus, one side of lifting machine is provided with actuating mechanism, actuating mechanism's upper end is provided with the roof.
The technical scheme of the utility model is further improved as follows: the guide device comprises a bottom plate, a guide rod, a sliding groove, a sliding block and a connecting block, wherein the guide rod is positioned at the upper end of the bottom plate, the sliding groove is positioned on the inner wall of the guide rod, the sliding block is positioned at the front end of the sliding groove, and the connecting block is positioned on one side of the sliding block.
The technical scheme of the utility model is further improved as follows: the upper end of the bottom plate is fixedly connected with the lower end of the guide rod, and one side of the sliding block is fixedly connected with one side of the connecting block.
The technical scheme of the utility model is further improved as follows: the supporting device comprises a fixing block, a second connecting block, a supporting rod, a fixing plate and a second fixing block, wherein the second connecting block is located on one side of the fixing block, the supporting rod is located at the upper end of the second connecting block, the fixing plate is located at the front end of the supporting rod, and the fixing block is located at the rear end of the supporting rod.
The technical scheme of the utility model is further improved as follows: one side of the fixed block is fixedly connected with one side of the second connecting block, and the front end of the supporting rod is fixedly connected with the rear end of the fixed plate.
The technical scheme of the utility model is further improved as follows: the reinforcing device comprises a fixing bolt, a mounting block, a third connecting block, a reinforcing plate and a second reinforcing plate, wherein the fixing bolt is located at the front end of the mounting block, the third connecting block is located at the upper end of the mounting block, the reinforcing plate is located on one side of the third connecting block, and the second reinforcing plate is located at the front end of the reinforcing plate.
The technical scheme of the utility model is further improved as follows: the rear end of the fixing bolt is movably connected with the front end of the mounting block, and one side of the third connecting block is fixedly connected with one side of the reinforcing plate.
By adopting the technical scheme, compared with the prior art, the utility model has the following technical progress:
1. the utility model provides a high-altitude building construction material lifting device, which can enable a lifter to stably lift materials to a required floor under the combined action of a bottom plate, a guide rod, a chute, a sliding block and a connecting block, so that shaking generated in the lifting process is reduced, the practicability is good, the guide device is fixed through the bottom plate, and the guide device is fixedly connected with a material box through the connecting block, so that the material box stably rises along the guide rod through the chute along with the sliding block when the lifting is required.
2. The utility model provides a high-altitude building construction material lifting device, which can be more stable in use under the combined action of a fixing block, a second connecting block, a supporting rod, a fixing plate and a second fixing block, can prolong the service life of the high-altitude building construction material lifting device, has better practicability, and can provide supporting force for a guide rod by fixing the fixing block and the second fixing block on a bottom plate and the rear end of the guide rod respectively when in use, and the fixing plate can play a reinforcing role.
3. The utility model provides a high-altitude building construction material lifting device, which can be firmer under the combined action of a fixing bolt, a mounting block, a third connecting block, a reinforcing plate and a second reinforcing plate, effectively prolong the service life of the device and has better practicability.
Drawings
FIG. 1 is a schematic diagram of a high-altitude construction material lifting device of the present utility model;
FIG. 2 is a schematic view of the guide device of the present utility model;
FIG. 3 is a schematic view of the supporting device of the present utility model;
fig. 4 is a schematic structural view of the reinforcing apparatus of the present utility model.
In the figure: 1. a main body; 2. a guide device; 21. a bottom plate; 22. a guide rod; 23. a chute; 24. a slide block; 25. a connecting block; 3. a support device; 31. a fixed block; 32. a second connecting block; 33. a support rod; 34. a fixing plate; 35. a second fixed block; 4. a material box; 5. a hoist; 6. a reinforcing device; 61. a fixing bolt; 62. a mounting block; 63. a third connecting block; 64. a reinforcing plate; 65. a second reinforcing plate; 7. a driving mechanism; 8. and a top plate.
Detailed Description
The utility model is further illustrated by the following examples:
example 1
As shown in fig. 1-4, the utility model provides a high-altitude building construction material lifting device, which comprises a main body 1, wherein a guide device 2 is arranged at the upper end of the main body 1, a supporting device 3 is arranged at the rear end of the guide device 2, a material box 4 is arranged at one side of the guide device 2, a lifting machine 5 is arranged at the rear end of the material box 4, a reinforcing device 6 is arranged at the rear end of the lifting machine 5, a driving mechanism 7 is arranged at one side of the lifting machine 5, and a top plate 8 is arranged at the upper end of the driving mechanism 7.
Example 2
As shown in fig. 1-4, on the basis of embodiment 1, the present utility model provides a technical solution: preferably, the guiding device 2 comprises a bottom plate 21, a guiding rod 22, a sliding chute 23, a sliding block 24 and a connecting block 25, wherein the guiding rod 22 is positioned at the upper end of the bottom plate 21, the sliding chute 23 is positioned on the inner wall of the guiding rod 22, the sliding block 24 is positioned at the front end of the sliding chute 23, the connecting block 25 is positioned on one side of the sliding block 24, the upper end of the bottom plate 21 is fixedly connected with the lower end of the guiding rod 22, and one side of the sliding block 24 is fixedly connected with one side of the connecting block 25.
In this embodiment, can make this high altitude construction material hoisting device can be stable make the lifting machine promote the floor that needs with the material to reduced the produced rocking at the promotion in-process, the practicality is better, and is fixed this guider through bottom plate 21, rethread connecting block 25 and material case fixed connection, when needs carry out the promotion, the material case then can be along the stable rising of guide bar 22 along with slider 24 through spout 23.
Example 3
As shown in fig. 1-4, on the basis of embodiment 1, the present utility model provides a technical solution: preferably, the supporting device 3 comprises a fixing block 31, a second connecting block 32, a supporting rod 33, a fixing plate 34 and a second fixing block 35, wherein the second connecting block 32 is positioned on one side of the fixing block 31, the supporting rod 33 is positioned at the upper end of the second connecting block 32, the fixing plate 34 is positioned at the front end of the supporting rod 33, the second fixing block 35 is positioned at the rear end of the supporting rod 33, one side of the fixing block 31 is fixedly connected with one side of the second connecting block 32, and the front end of the supporting rod 33 is fixedly connected with the rear end of the fixing plate 34.
In this embodiment, this high altitude construction material hoisting device can be made more firm when using to can increase this high altitude construction material hoisting device's life, the practicality is better, through fixing fixed block 31 and fixed block two 35 respectively on the bottom plate and the rear end of guide bar, when using, bracing piece 33 then can provide holding power for the guide bar, and fixed plate 34 can play the effect of reinforcement.
Example 4
As shown in fig. 1-4, on the basis of embodiment 1, the present utility model provides a technical solution: preferably, the reinforcing apparatus 6 includes a fixing bolt 61, a mounting block 62, a third connecting block 63, a reinforcing plate 64, and a second reinforcing plate 65, where the fixing bolt 61 is located at the front end of the mounting block 62, the third connecting block 63 is located at the upper end of the mounting block 62, the reinforcing plate 64 is located at one side of the third connecting block 63, the second reinforcing plate 65 is located at the front end of the reinforcing plate 64, the rear end of the fixing bolt 61 is movably connected with the front end of the mounting block 62, and one side of the third connecting block 63 is fixedly connected with one side of the reinforcing plate 64.
In this embodiment, can make this high altitude construction material hoisting device more firm to can effectively increase the life of this device, the practicality is better, through fixing two installation pieces 62 on the guide bar through fixing bolt 61, because connecting block three 63 and installation piece 62 fixed connection, thereby fix gusset plate 64 and gusset plate two 65, when this high altitude construction material hoisting device of operation, gusset plate 64 and gusset plate two 65 can play the effect of reinforcement.
The working principle of the high-altitude building construction material lifting device is specifically described below.
As shown in fig. 1-4, through guider 2, can make this high altitude construction material hoisting device can be stable make the lifting machine promote the material to the floor that needs, thereby reduced the produced rocking in the promotion process, the practicality is better, fixed this guider through bottom plate 21, and rethread connecting block 25 and material case fixed connection, when needs promote, the material case then can be along the stable rising of guide bar 22 along slider 24 through spout 23, through strutting arrangement 3, can make this high altitude construction material hoisting device more firm when using, and can increase this high altitude construction material hoisting device's life, the practicality is better, through fixing fixed block 31 and fixed block two 35 on the bottom plate and the rear end of guide bar respectively, when using, then bracing piece 33 can provide the holding power for the guide bar, and fixed plate 34 can play the effect of reinforcement, through reinforcing apparatus 6, can make this high altitude construction material hoisting device more firm, and can effectively increase this device's life, and through installing the fixed block 62 on two reinforcing plates 62 and fixing the connecting block two, thereby the reinforcing plate is good for the function of the second connecting block 64, the function is good, and the reinforcing plate is installed at the second connecting block 64, 65 and the high altitude construction material hoisting device is good, the effect is used, the safety is guaranteed, and the safety is guaranteed.
The foregoing utility model has been generally described in great detail, but it will be apparent to those skilled in the art that modifications and improvements can be made thereto. Accordingly, it is intended to cover modifications or improvements within the spirit of the inventive concepts.
Claims (7)
1. High altitude construction material hoisting device, including main part (1), its characterized in that: the upper end of main part (1) is provided with guider (2), the rear end of guider (2) is provided with strutting arrangement (3), one side of guider (2) is provided with material case (4), the rear end of material case (4) is provided with lifting machine (5), the rear end of lifting machine (5) is provided with reinforcing apparatus (6), one side of lifting machine (5) is provided with actuating mechanism (7), the upper end of actuating mechanism (7) is provided with roof (8).
2. The high-altitude building construction material lifting device according to claim 1, wherein: the guide device (2) comprises a bottom plate (21), a guide rod (22), a chute (23), a sliding block (24) and a connecting block (25), wherein the guide rod (22) is positioned at the upper end of the bottom plate (21), the chute (23) is positioned on the inner wall of the guide rod (22), the sliding block (24) is positioned at the front end of the chute (23), and the connecting block (25) is positioned on one side of the sliding block (24).
3. A high-altitude building construction material lifting device according to claim 2, wherein: the upper end of the bottom plate (21) is fixedly connected with the lower end of the guide rod (22), and one side of the sliding block (24) is fixedly connected with one side of the connecting block (25).
4. The high-altitude building construction material lifting device according to claim 1, wherein: the supporting device (3) comprises a fixed block (31), a second connecting block (32), a supporting rod (33), a fixed plate (34) and a second fixed block (35), wherein the second connecting block (32) is located on one side of the fixed block (31), the supporting rod (33) is located at the upper end of the second connecting block (32), the fixed plate (34) is located at the front end of the supporting rod (33), and the second fixed block (35) is located at the rear end of the supporting rod (33).
5. The overhead building construction material lifting device according to claim 4, wherein: one side of the fixed block (31) is fixedly connected with one side of the second connecting block (32), and the front end of the supporting rod (33) is fixedly connected with the rear end of the fixed plate (34).
6. The high-altitude building construction material lifting device according to claim 1, wherein: the reinforcing device (6) comprises a fixing bolt (61), a mounting block (62), a third connecting block (63), a reinforcing plate (64) and a second reinforcing plate (65), wherein the fixing bolt (61) is located at the front end of the mounting block (62), the third connecting block (63) is located at the upper end of the mounting block (62), the reinforcing plate (64) is located at one side of the third connecting block (63), and the second reinforcing plate (65) is located at the front end of the reinforcing plate (64).
7. The overhead building construction material lifting device according to claim 6, wherein: the rear end of the fixing bolt (61) is movably connected with the front end of the mounting block (62), and one side of the connecting block III (63) is fixedly connected with one side of the reinforcing plate (64).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320794665.9U CN220033719U (en) | 2023-04-12 | 2023-04-12 | High-altitude building construction material lifting device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320794665.9U CN220033719U (en) | 2023-04-12 | 2023-04-12 | High-altitude building construction material lifting device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN220033719U true CN220033719U (en) | 2023-11-17 |
Family
ID=88743757
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202320794665.9U Active CN220033719U (en) | 2023-04-12 | 2023-04-12 | High-altitude building construction material lifting device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN220033719U (en) |
-
2023
- 2023-04-12 CN CN202320794665.9U patent/CN220033719U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103334755B (en) | Slope hoisting and crushing system for deep open-pit mine | |
CN220033719U (en) | High-altitude building construction material lifting device | |
CN212543189U (en) | Cable bridge installation auxiliary device for power engineering | |
CN201458328U (en) | Novel scraper conveyer suspended chute | |
CN201785003U (en) | Bucket elevator | |
CN106081951B (en) | A kind of window sluice gate machine | |
CN102910463B (en) | Vibration breaking-down shovel | |
CN205471704U (en) | Batcher of weighing for coal mine | |
CN208631697U (en) | A kind of coal leveling device for train | |
CN101021152B (en) | Damping feed machine | |
CN202490670U (en) | Semi-fixed crushing station | |
CN210418301U (en) | Fixed-point discharging conveyor for coal mine | |
CN202156886U (en) | Lifting system and tunnel lining trolley comprising same | |
CN109883204B (en) | Automatic feeding system of regenerated copper smelting furnace | |
CN103640903B (en) | The hinged adjustable weight arm of bucket-wheel stacker reclaimer pull bar | |
CN205114315U (en) | Prevent lifting machine that chain pine takes off | |
CN212769612U (en) | Material conveying and lifting equipment for bridge construction in field of bridge engineering | |
CN212475883U (en) | Lifting machine convenient to dismantle for building | |
CN215046241U (en) | Mining spiral conveying device capable of movably lifting | |
CN205471247U (en) | Lifting machine for building engineering | |
CN102785862B (en) | Door opener of single bucket elevator | |
CN204568856U (en) | Side formula folding arm scraper reclaimer | |
CN202897450U (en) | Material lifting framework | |
CN218088595U (en) | Movable is interior cargo handling machine for fitment | |
CN201458327U (en) | Novel scraper conveyer hanging chute |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |