- CN220014663U CN220014663U CN202321683645.0U CN202321683645U CN220014663U CN 220014663 U CN220014663 U CN 220014663U CN 202321683645 U CN202321683645 U CN 202321683645U CN 220014663 U CN220014663 U CN 220014663U
- Authority
- CN
- China
- Prior art keywords
- mounting
- stabilizing
- tower structure
- sleeve
- piece
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000000087 stabilizing effect Effects 0.000 claims abstract description 26
- 238000009434 installation Methods 0.000 claims abstract description 19
- 238000005266 casting Methods 0.000 claims 1
- 238000012423 maintenance Methods 0.000 abstract description 3
- 230000002035 prolonged effect Effects 0.000 abstract description 2
- 238000003780 insertion Methods 0.000 abstract 2
- 230000037431 insertion Effects 0.000 abstract 2
- 239000003381 stabilizer Substances 0.000 description 9
- 229910000831 Steel Inorganic materials 0.000 description 5
- 239000010959 steel Substances 0.000 description 5
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 230000005540 biological transmission Effects 0.000 description 2
- 239000000243 solution Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000003628 erosive effect Effects 0.000 description 1
- 238000002347 injection Methods 0.000 description 1
- 239000007924 injection Substances 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
Landscapes
- Suspension Of Electric Lines Or Cables (AREA)
Abstract
The utility model relates to the technical field of electric devices, in particular to a novel electric power tower structure, wherein a fixing pipe sleeve is sleeved on the outer wall of the lower side of a supporting column, a stabilizing column is fixedly arranged at the lower end of the fixing pipe sleeve, an installation shaft sleeve is sleeved on the outer wall of the upper side of the stabilizing column, an installation part main body is fixedly arranged on the outer side of the middle part of the installation shaft sleeve, four insertion grooves are formed in the inner side of the installation part main body in an annular mode, and four stabilizing parts are arranged at the positions of the installation part main body, located in the insertion grooves. According to the utility model, through the structure provided with the fixed pipe sleeve, the stabilizing piece, the mounting piece main body and the mounting shaft sleeve, after long-time use, the stabilizing piece support piece is rusted, the fixing bolts at the side edges of the fixed pipe sleeve can be detached, and the fixed pipe sleeve is taken up, so that the stabilizing piece inserted in the inserting groove through the inserting plate is detached, and the whole stabilizing piece is replaced, so that the stabilizing piece can be continuously and stably supported, the maintenance is convenient, and the service life is prolonged.
Description
Technical Field
The utility model relates to the technical field of power devices, in particular to a novel power tower structure.
Background
The electric power tower is called an electric power tower, the transmission and transformation line iron tower is an indispensable part of an electric power transmission system, and can be used for overhead, protection and supporting of electric wires.
The utility model discloses a power tower structure (grant bulletin number CN 205713397U), the power tower structure comprises a steel pipe, a reinforcing pipe is arranged in the steel pipe, a lightning rod is arranged at the top of the power tower structure, the lightning rod is connected with the steel pipe through a fastener, the bottom of the steel pipe is positioned on a bearing platform, stiffening plates are arranged between the two sides of the steel pipe and the bearing platform, the stiffening plates are fixed on the bearing platform, the bearing platform is close to the lower surfaces of the two sides, the handles are connected with handles through fixing buckles, a base is arranged on the lower surface of the bearing platform and between the two handles, the upper surface of the base is fixed on the bearing platform, and a power cabinet is arranged in the base. Accordingly, a person skilled in the art provides a novel power tower structure to solve the problems set forth in the background art.
Disclosure of Invention
The utility model aims to provide a novel power tower structure for solving the problems in the background technology.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides a novel electric power tower structure, includes the support column, the downside outer wall cover of support column is equipped with fixed pipe box, fixed pipe box's lower extreme fixed mounting has the stability post, the upside outer wall cover of stability post is equipped with the installation axle sleeve, the middle part outside fixed mounting of installation axle sleeve has the installed part main part, four cartridge slots are seted up to the inboard annular of installed part main part, the installed part main part is located the position of cartridge slot and is provided with four stabilizing pieces, the side of stabilizing piece is provided with the cartridge board, connect through fixed connection spare between stabilizing piece and the cartridge board, the downside fixed mounting of installed part main part has the pouring bottom plate, the pouring slot has been seted up to the side of pouring the bottom plate.
As a further aspect of the present utility model: the upper side symmetry of support column is provided with three electric power support, electric power support keeps away from the one end fixed mounting of support column has electric power locating part, a plurality of mounting hole has been seted up to electric power support's side, the top fixed mounting of support column has the fixed cap.
As a further aspect of the present utility model: the middle part of fixed pipe box has been seted up and has been had the logical groove that corresponds with the support column, the stability groove has been seted up to the downside inner wall of fixed pipe box.
As a further aspect of the present utility model: the side equidistance annular of fixed pipe box is provided with three fixing bolt, the fixed orifices that corresponds with fixing bolt has been seted up to the side of installation axle sleeve.
As a further aspect of the present utility model: the mounting part main body and the middle part of the pouring bottom plate are provided with through grooves corresponding to the stabilizing columns.
As a further aspect of the present utility model: and three mounting bolts are annularly arranged on the upper side of the pouring bottom plate.
Compared with the prior art, the utility model has the beneficial effects that: according to the utility model, through the structure provided with the fixed pipe sleeve, the stabilizing piece, the mounting piece main body and the mounting shaft sleeve, after long-time use, the stabilizing piece support piece is rusted, the fixing bolts at the side edges of the fixed pipe sleeve can be detached, and the fixed pipe sleeve is taken up, so that the stabilizing piece inserted in the inserting groove through the inserting plate is detached, and the whole stabilizing piece is replaced, so that the stabilizing piece can be continuously and stably supported, the maintenance is convenient, and the service life is prolonged.
Drawings
FIG. 1 is a schematic diagram of a novel power tower structure;
FIG. 2 is a fragmentary view of a stabilizer position structure in a novel power tower structure;
fig. 3 is a cross-sectional view of a fixing socket in a novel power tower structure.
In the figure: 1. a mounting hole; 2. an electric power limiting member; 3. a power bracket; 4. installing a bolt; 5. a stabilizing column; 6. pouring a bottom plate; 7. a fixing cap; 8. a support column; 9. a fixed pipe sleeve; 10. a fixing bolt; 11. a stabilizer; 12. pouring a groove; 13. an inserting plate; 14. fixing the connecting piece; 15. a plug-in groove; 16. installing a shaft sleeve; 17. a fixing hole; 18. a mounting body; 19. a stabilizing trough.
Detailed Description
Referring to fig. 1 to 3, in the embodiment of the utility model, a novel power tower structure comprises a support column 8, wherein a fixing sleeve 9 is sleeved on the outer wall of the lower side of the support column 8, three power brackets 3 are symmetrically arranged on the upper side of the support column 8, a power limiting part 2 is fixedly arranged at one end of the power bracket 3 far away from the support column 8, a plurality of mounting holes 1 are formed in the side edge of the power bracket 3, a fixing cap 7 is fixedly arranged at the top end of the support column 8, electric equipment to be mounted can be erected and mounted on the power bracket 3, a stabilizing column 5 is fixedly arranged at the lower end of the fixing sleeve 9, a through groove corresponding to the support column 8 is formed in the middle of the fixing sleeve 9, a stabilizing groove 19 is formed in the inner wall of the lower side of the fixing sleeve 9, and the fixing sleeve 9 can slide up and down on the side edge of the support column 8;
the upper outer wall cover of stable post 5 is equipped with installation axle sleeve 16, the side equidistance annular of fixed pipe sleeve 9 is provided with three fixing bolt 10, fixing hole 17 corresponding with fixing bolt 10 has been seted up to the side of installation axle sleeve 16, fixing bolt 10 and fixing hole 17 threaded connection, fixing bolt 10 can be fixed pipe sleeve 9 and installation axle sleeve 16 position, the middle part outside fixed mounting of installation axle sleeve 16 has installed mounting main part 18, the through groove corresponding with stable post 5 has all been seted up at mounting main part 18 and pouring bottom plate 6 middle part, stable post 5 passes mounting main part 18 and pouring bottom plate 6, insert in the earth of below, can make whole fixed more stable, four cartridge grooves 15 are seted up to the inboard annular of mounting main part 18, the position that mounting main part 18 is located cartridge grooves 15 is provided with four stabilizer 11, the side of stabilizer 11 is provided with cartridge plate 13, be connected through fixed connection piece 14 between stabilizer 11 and the cartridge 13, the downside fixed mounting of mounting main part 18 has bottom plate 6, the upside annular of bottom plate 6 is provided with three and pours bottom plate 6, the bottom plate 6 is convenient to pour, the side plate 12 is provided with fixed slot to pour 6.
The working principle of the utility model is as follows: the installation personnel dig the pit body at the present mounted position, afterwards set up pouring bottom plate 6 at the pit bottom, set up fixed pipe box 9 at the lower lateral wall of support column 8, afterwards pass the logical groove in the middle part of installation axle sleeve 16 with the steady post 5 of support column 8 downside, until the lower extreme of steady post 5 passes the bottom of pouring bottom plate 6, use concrete injection diapire pouring groove 12, thereby pour the whole fixed pouring of pouring bottom plate 6, the side of stabilizer 11 has plug-in plate 13 through fixed connection piece 14 fixed mounting, lift fixed pipe box 9 upwards slip, plug-in plate 13 from top to bottom along plug-in groove 15 installation, after all installing plug-in plate 13 in four plug-in grooves 15 that the side was seted up of mounting main part 18, slide fixed pipe box 9 downwards, make installation axle sleeve 16 insert in the stabilizer groove 19 that the inboard was seted up of fixed pipe box 9, fixing bolt 10 passes fixed pipe box 9 and insert the internal thread fixed, afterwards fill out soil at the side of stabilizer 11 and consolidate, thereby accomplish whole installation, after long-time use, stabilizer 11 is because of the rainwater erosion deformation, pull down the fixed pipe box 10, can be removed to the stability 11, can be replaced the whole easy to install the utility model, can be replaced the easy to replace the utility model, can be easily, the whole can be replaced and the steady maintenance part is easy.
The foregoing description is only a preferred embodiment of the present utility model, but the scope of the present utility model is not limited thereto, and any person skilled in the art, who is within the scope of the present utility model, should make equivalent substitutions or modifications according to the technical solution of the present utility model and the inventive concept thereof, and should be covered by the scope of the present utility model.
Claims (6)
1. The utility model provides a novel electric power tower structure, includes support column (8), its characterized in that, the downside outer wall cover of support column (8) is equipped with fixed pipe box (9), the lower extreme fixed mounting of fixed pipe box (9) has stable post (5), the upside outer wall cover of stable post (5) is equipped with installation axle sleeve (16), the middle part outside fixed mounting of installation axle sleeve (16) has installed mounting main part (18), four cartridge groove (15) are seted up to the inboard annular of mounting main part (18), the position that mounting main part (18) are located cartridge groove (15) is provided with four stabilizing piece (11), the side of stabilizing piece (11) is provided with cartridge board (13), be connected through fixed connection spare (14) between stabilizing piece (11) and cartridge board (13), the downside fixed mounting of mounting main part (18) has pouring bottom plate (6), pour groove (12) have been seted up to the side of pouring bottom plate (6).
2. The novel power tower structure according to claim 1, wherein three power brackets (3) are symmetrically arranged on the upper side of the supporting column (8), one end, away from the supporting column (8), of the power bracket (3) is fixedly provided with a power limiting part (2), a plurality of mounting holes (1) are formed in the side edge of the power bracket (3), and a fixing cap (7) is fixedly arranged on the top end of the supporting column (8).
3. The novel power tower structure according to claim 1, wherein the middle part of the fixed pipe sleeve (9) is provided with a through groove corresponding to the support column (8), and the inner wall of the lower side of the fixed pipe sleeve (9) is provided with a stabilizing groove (19).
4. The novel power tower structure according to claim 1, wherein three fixing bolts (10) are annularly arranged on the side edge of the fixing sleeve (9) at equal intervals, and fixing holes (17) corresponding to the fixing bolts (10) are formed on the side edge of the mounting sleeve (16).
5. The novel power tower structure according to claim 1, wherein through grooves corresponding to the stabilizing columns (5) are formed in the middle portions of the mounting piece main body (18) and the pouring bottom plate (6).
6. A novel power tower structure according to claim 1, characterized in that the upper side of the casting bottom plate (6) is annularly provided with three mounting bolts (4).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202321683645.0U CN220014663U (en) | 2023-06-29 | 2023-06-29 | Novel electric power tower structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202321683645.0U CN220014663U (en) | 2023-06-29 | 2023-06-29 | Novel electric power tower structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN220014663U true CN220014663U (en) | 2023-11-14 |
Family
ID=88676406
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202321683645.0U Active CN220014663U (en) | 2023-06-29 | 2023-06-29 | Novel electric power tower structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN220014663U (en) |
-
2023
- 2023-06-29 CN CN202321683645.0U patent/CN220014663U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103132766B (en) | Truss for lifting power transmission line tower connecting leg and erection method | |
CN212002599U (en) | Electric power iron tower consolidates support with diversified fixed base | |
CN211312531U (en) | Strenghthened type deep basal pit supporting construction | |
CN220014663U (en) | Novel electric power tower structure | |
CN211849011U (en) | Reinforced structure for bridge | |
CN208112083U (en) | A kind of preassembled transformer station being easily installed | |
CN212516334U (en) | Electric power warning sign convenient to adjust | |
CN205178966U (en) | Solar cell panel frame joint structure | |
CN203222810U (en) | Steel column and base structure system | |
CN112030996A (en) | A construction platform for foundation ditch crown beam upper portion | |
CN201280722Y (en) | Suspension type steel upright post hoisting guiding rail | |
CN219808794U (en) | Safe energy-saving annular concrete pole | |
CN220855968U (en) | Transmission line pole number sign mounting bracket | |
CN217399471U (en) | Height-adjustable traffic sign vertical mark structure | |
CN220336586U (en) | Novel concrete pole structure | |
CN203453716U (en) | Standardized steel frame foundation for communication device outdoor base station | |
CN210068385U (en) | Buried bearing framework for assembling wind power base | |
CN220520009U (en) | Upper support of tower crane | |
CN212198273U (en) | Portable tower footing wall-attached frame inner support | |
CN219487979U (en) | Novel section roof beam transportation support frame | |
CN202978141U (en) | Combination support | |
CN221118502U (en) | Hanging tool and mounting structure for mounting steel support and steel enclosing purlin | |
CN219067658U (en) | Box-type substation of quick installation | |
CN217758387U (en) | Prefabricated pier stud installation location fixing device of assembled bridge | |
CN210598368U (en) | Telecommunication communication tower built-in fitting convenient to installation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |