CN219999011U - Lightning receiving belt configuration gauge stand - Google Patents
Lightning receiving belt configuration gauge stand Download PDFInfo
- Publication number
- CN219999011U CN219999011U CN202321516618.4U CN202321516618U CN219999011U CN 219999011 U CN219999011 U CN 219999011U CN 202321516618 U CN202321516618 U CN 202321516618U CN 219999011 U CN219999011 U CN 219999011U
- Authority
- CN
- China
- Prior art keywords
- plate body
- air
- bending
- fixed
- termination strip
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
Abstract
本实用新型公开了一种接闪带配置规位架,涉及接闪带用具技术领域;接闪带的下端置入女儿墙中内部,接闪带的上端延伸出女儿墙的上端面外部,规位架的内底部与接闪带连接,规位架固定安装在女儿墙上,内板体的底部与接闪带相连接,内板体的两侧均设置有向下的折弯体;本实用新型通过规位架来实现固定,同时便于后期维修安装,且维修时不易破坏防水层,能够提高整体的稳定性,提高了整体的强度,并且在受力后不易变形、折断,同时提高美观度;接闪带长时间使用后不易出现与规位架脱离的现象,能够延长使用寿命;便于根据实际情况进行快速维修以及安装接闪带,方便施工。
The utility model discloses a standard frame for arranging air-termination strips, and relates to the technical field of air-termination strip appliances; the lower end of the air-termination strip is placed inside the parapet, and the upper end of the air-termination strip extends out of the upper end surface of the parapet wall, and the standard frame is The inner bottom of the position frame is connected with the air-termination strip, the gauge frame is fixedly installed on the parapet, the bottom of the inner plate body is connected with the air-termination strip, and both sides of the inner plate body are provided with downward bending bodies; The utility model is fixed through a gauge frame, which is convenient for later maintenance and installation, and the waterproof layer is not easily damaged during maintenance. It can improve the overall stability and strength, and is not easy to deform or break after being stressed, while improving the appearance. degree; after long-term use, the air-termination strip is not easy to separate from the gauge frame, which can extend the service life; it is convenient for quick maintenance and installation of the air-termination strip according to the actual situation, and construction is convenient.
Description
技术领域Technical field
本实用新型属于接闪带用具技术领域,具体涉及一种接闪带配置规位架。The utility model belongs to the technical field of air-terminating tape appliances, and specifically relates to a standard rack for configuring air-terminating tapes.
背景技术Background technique
接闪带是防雷接地系统中的避雷器,和接闪杆一样都属于是接闪器的一种类型;但是现有的女儿墙上避雷装置在使用时会出现一些弊端,集中出现的问题为:The air-termination tape is a lightning arrester in the lightning protection grounding system. It is a type of air-termination device just like the air-termination rod. However, there are some disadvantages when using the existing parapet lightning protection devices. The most common problems are: :
一、避雷网在长时间使用时容易出现生锈、损坏而断裂的情况,后期在维修时不方便快速固定,而且在固定时容易出现损坏墙体的防水层。1. The lightning protection net is prone to rust, damage and breakage when used for a long time. It is inconvenient to fix quickly during later maintenance, and the waterproof layer of the wall is easily damaged during fixation.
二、现有的避雷网露在外面的杆体因外界环境的腐蚀风化影响而出现折断的现象,导致避雷作用失效,且不易及时发现。2. The exposed rods of the existing lightning protection nets are broken due to the corrosion and weathering of the external environment, causing the lightning protection function to fail and making it difficult to detect in time.
三、现有的避雷网在受力后容易出现弯曲,脱离原位或偏移出楼体而产生安全隐患。3. The existing lightning protection net is prone to bending, detaching from the original position or shifting out of the building after being stressed, causing safety hazards.
四、避雷网的连接处采用焊接,而且焊接处裸露在外边,长时间容易出现氧化,导致焊接处脱焊、脱离。4. The connection points of the lightning protection net are welded, and the welding points are exposed, which is prone to oxidation for a long time, causing the welding points to desolder and detach.
实用新型内容Utility model content
为解决背景技术中的问题;本实用新型的目的在于提供一种接闪带配置规位架,便于稳定固定,延长使用寿命,且提高了受力性,不易弯曲。In order to solve the problems in the background technology, the purpose of this utility model is to provide a gauging frame configured with lightning strips, which facilitates stable fixation, prolongs the service life, improves the stress resistance, and is not easy to bend.
本实用新型的一种接闪带配置规位架,包括内板体、外板体、自隔离螺栓、连接螺栓和夹持垫板;内板体的底部与接闪带相连接,内板体的两侧均设置有向下的折弯体,内板体的外侧折弯体的末端设置有向外的折弯固定体,外板体的两侧均设置有向下的折弯体,内板体与外板体内侧的折弯体通过自隔离螺栓连接,外板体外侧的折弯体末端设置有向内的固定折弯板,夹持垫板设置在折弯固定体与固定折弯板之间,连接螺栓依次穿设在固定折弯板、夹持垫板、折弯固定体之间,夹持垫板固定安装在女儿墙的外侧壁上。The utility model provides an air-termination strip configuration gauge frame, which includes an inner plate body, an outer plate body, self-isolating bolts, connecting bolts and a clamping pad; the bottom of the inner plate body is connected to the air-termination strip, and the inner plate body Both sides of the inner plate body are provided with downward bending bodies. The ends of the outer bending bodies of the inner plate body are provided with outward bending fixed bodies. Both sides of the outer plate body are provided with downward bending bodies. The inner plate body is provided with downward bending bodies. The plate body and the bending body inside the outer plate body are connected by self-isolating bolts. The end of the bending body outside the outer plate body is provided with an inward fixed bending plate. The clamping pad is arranged between the bending fixed body and the fixed bending plate. Between the plates, the connecting bolts are passed through the fixed bending plates, the clamping pads and the bending fixed bodies in sequence, and the clamping pads are fixedly installed on the outer wall of the parapet.
作为优选,还包括侧板体与侧板固定钉,侧板体的上端设置有向外的折弯固定端,折弯固定端通过侧板固定钉固定在女儿墙上,且折弯固定端设置在外板体的内侧。Preferably, it also includes a side plate body and a side plate fixing nail. The upper end of the side plate body is provided with an outward bending fixed end. The bending fixed end is fixed on the parapet through the side plate fixing nail, and the bending fixed end is provided with On the inside of the outer body.
作为优选,所述外板体的外侧壁上开设有导水槽,导水槽为弧形,外板体内侧的折弯体末端设置有向外倾斜的导水体,导水体与外板体内侧的折弯体的角度为130-170°。Preferably, the outer wall of the outer plate body is provided with a water guide groove, the water guide groove is arc-shaped, and an outwardly inclined water guide body is provided at the end of the bending body inside the outer plate body. The angle of the bent body is 130-170°.
作为优选,所述内板体的外上端均匀的安装有数个支撑柱,数个支撑柱的上端与外板体的内侧壁相接触。Preferably, several support columns are evenly installed on the outer upper end of the inner plate body, and the upper ends of the several support columns are in contact with the inner side wall of the outer plate body.
作为优选,所述支撑柱包括固定圆盘、支撑圆柱;固定圆盘的上端连接有支撑圆柱,支撑圆柱的外侧壁上均匀的设置有数个内凹的切割槽,所述支撑圆柱为橡胶圆柱。Preferably, the support column includes a fixed disc and a support cylinder; the upper end of the fixed disc is connected to a support cylinder, and several concave cutting grooves are evenly provided on the outer wall of the support cylinder, and the support cylinder is a rubber cylinder.
作为优选,所述内板体前侧的折弯体内侧壁上均匀的安装有数个调节支撑体,数个调节支撑体与女儿墙相接触。Preferably, several adjusting supports are evenly installed on the inner wall of the bending body on the front side of the inner plate body, and the several adjusting supports are in contact with the parapet.
作为优选,所述调节支撑体包括调节螺杆、调节螺套体、支撑片;调节螺杆通过螺纹连接在调节螺套体的内螺纹内,调节螺套体的外端面连接有支撑片,调节螺套体的外侧壁上设置有对称的拧动平面,所述支撑片的外侧壁上设置有防滑滚花。Preferably, the adjusting support body includes an adjusting screw rod, an adjusting screw sleeve body, and a support piece; the adjusting screw rod is threadedly connected in the internal thread of the adjusting screw sleeve body, and the outer end surface of the adjusting screw sleeve body is connected with a support piece, and the adjusting screw sleeve The outer side wall of the body is provided with a symmetrical twisting plane, and the outer side wall of the support piece is provided with anti-slip knurling.
作为优选,所述自隔离螺栓包括固定螺栓体、隔套;固定螺栓体的外侧套接有隔套,所述隔套设置在内板体与外板体之间。Preferably, the self-isolating bolt includes a fixed bolt body and a spacer sleeve; a spacer sleeve is sleeved on the outside of the fixed bolt body, and the spacer sleeve is arranged between the inner plate body and the outer plate body.
作为优选,所述夹持垫板为直角支架,夹持垫板上开设有穿接孔,穿接孔的外侧设置有减震圈,减震圈安装在夹持垫板上,夹持垫板的侧面开设有固定通孔。Preferably, the clamping pad is a right-angle bracket, a penetration hole is provided on the clamping pad, and a shock-absorbing ring is provided outside the penetration hole. The shock-absorbing ring is installed on the clamping pad. The clamping pad There are fixed through holes on the side.
与现有技术相比,本实用新型的有益效果为:Compared with the existing technology, the beneficial effects of this utility model are:
通过内板体、外板体、自隔离螺栓、连接螺栓和夹持垫板之间相互配合形成的规位架为内外双层的多点位固定的架体形式,多点位为自隔离螺栓和连接螺栓前、后穿接配合连接,为内板体、外板体在连接装配的自形成配合接闪带用空隙,利于接闪带在规位架配合下合理布位。本实用新型架设稳定,且安装对防水层无破坏,无创口。The gauge frame formed by the cooperation between the inner plate body, the outer plate body, the self-isolating bolts, the connecting bolts and the clamping pad is a multi-point fixed frame with an inner and outer double layer, and the multi-points are self-isolating bolts. It is connected with the front and back threading of the connecting bolts to form a gap for the inner plate body and the outer plate body to match the air-termination strip during the connection assembly, which is conducive to the reasonable placement of the air-termination strip under the cooperation of the gauge frame. The utility model is stable in erection, and the installation does not damage the waterproof layer and causes no wounds.
二、规位架的自身结构能够有效配合女儿墙的外形,布置长度根据接闪带的长度具体而定,规位架具有受压、抗拉的使用性能,规位架自身结构合理,在受力后不易变形、折断,整体强度稳定。2. The structure of the gauge frame can effectively match the shape of the parapet. The layout length is determined according to the length of the lightning strip. The gauge frame has the performance of compression and tensile resistance. The gauge frame itself has a reasonable structure and can be used under stress. It is not easy to deform or break after applying force, and the overall strength is stable.
三、规位架为接闪带提供内置隐蔽设置位置,确保不影响接闪带正常使用性能的同时,还能够规位架为接闪带提供支撑和防护效果,避免接闪带与原位剥离的情况发生,使用性能持久,接闪带一旦发生剥离也能够通过规位架周向空间的限制作用而限制其偏移幅度,使接闪带始终处于规位架内。3. The gauge frame provides a built-in concealed setting position for the air-termination strap to ensure that it does not affect the normal performance of the air-termination strap. At the same time, the gauge frame can also provide support and protection for the air-termination strap to prevent the air-termination strap from peeling off in place. If the situation occurs, the performance is long-lasting. Once the air-termination strip is peeled off, its deflection range can be limited by the restriction of the circumferential space of the gauge frame, so that the air-termination strip is always within the gauge frame.
四、本实用新型便于根据实际情况进行快速维修以及安装接闪带,方便施工。4. This utility model facilitates rapid maintenance and installation of flash strips according to actual conditions, and facilitates construction.
附图说明Description of the drawings
为了易于说明,本实用新型由下述的具体实施及附图作以详细描述。For ease of explanation, the present invention is described in detail by the following specific implementations and drawings.
图1为本实用新型的结构示意图;Figure 1 is a schematic structural diagram of the utility model;
图2为本实用新型中规位架的结构示意图;Figure 2 is a schematic structural diagram of the gauge frame of the utility model;
图3为本实用新型中支撑柱的结构示意图;Figure 3 is a schematic structural diagram of the support column in the present utility model;
图4为本实用新型中调节支撑体的结构示意图;Figure 4 is a schematic structural diagram of the adjusting support body in the present utility model;
图5为本实用新型中自隔离螺栓的结构示意图;Figure 5 is a schematic structural diagram of the self-isolating bolt in the present utility model;
图6为本实用新型中外板体的侧视图;Figure 6 is a side view of the outer plate body of the utility model;
图7为本实用新型中夹持垫板的结构示意图;Figure 7 is a schematic structural diagram of the clamping pad in the utility model;
图8为本实用新型中施工后的俯视图。Figure 8 is a top view of the utility model after construction.
图中:1-接闪带;2-规位架;3-侧板体;4-侧板固定钉;5-女儿墙;In the picture: 1-air-terminating strip; 2-gauge frame; 3-side panel body; 4-side panel fixing nails; 5-parapet;
21-内板体;22-外板体;23-自隔离螺栓;24-连接螺栓;25-支撑柱;26-调节支撑体;27-夹持垫板;21-inner plate body; 22-outer plate body; 23-self-isolation bolt; 24-connecting bolt; 25-support column; 26-adjusting support body; 27-clamping pad;
211-折弯固定体;211-Bending fixed body;
221-固定折弯板;222-导水体;223-导水槽;221-Fixed bending plate; 222-Water guide body; 223-Guide channel;
231-固定螺栓体;232-隔套;231-Fixing bolt body; 232-Spacer sleeve;
251-固定圆盘;252-支撑圆柱;253-切割槽;251-fixed disc; 252-support cylinder; 253-cutting groove;
261-调节螺杆;262-调节螺套体;263-支撑片;2621-拧动平面;261-Adjusting screw; 262-Adjusting screw sleeve body; 263-Support piece; 2621-Twist plane;
271-穿接孔;272-固定通孔;273-减震圈;271-Threading hole; 272-Fixing through hole; 273-Shock absorbing ring;
具体实施方式Detailed ways
为使本实用新型的目的、技术方案和优点更加清楚明了,下面通过附图中示出的具体实施例来描述本实用新型。但是应该理解,这些描述只是示例性的,而并非要限制本实用新型的范围。本说明书附图所绘示的结构、比例、大小等,均仅用以配合说明书所揭示的内容,以供熟悉此技术的人士了解与阅读,并非用以限定本实用新型可实施的限定条件,故不具技术上的实质意义,任何结构的修饰、比例关系的改变或大小的调整,在不影响本实用新型所能产生的功效及所能达成的目的下,均应仍落在本实用新型所揭示的技术内容能涵盖的范围内。此外,在以下说明中,省略了对公知结构和技术的描述,以避免不必要地混淆本实用新型的概念。In order to make the purpose, technical solutions and advantages of the present utility model clearer, the utility model will be described below through the specific embodiments shown in the drawings. However, it should be understood that these descriptions are only exemplary and are not intended to limit the scope of the present invention. The structures, proportions, sizes, etc. shown in the drawings of this specification are only used to coordinate with the content disclosed in the specification and are for the understanding and reading of those familiar with this technology. They are not used to limit the conditions for the implementation of the present invention. Therefore, it has no technical substantive significance. Any modification of structure, change of proportional relationship or adjustment of size shall still fall within the scope of this utility model as long as it does not affect the effect that the utility model can produce and the purpose that can be achieved. Within the scope of the disclosed technical content. Furthermore, in the following description, descriptions of well-known structures and techniques are omitted to avoid unnecessarily confusing the concepts of the present invention.
在此,还需要说明的是,为了避免因不必要的细节而模糊了本实用新型,在附图中仅仅示出了与根据本实用新型的方案密切相关的结构和/或处理步骤,而省略了与本实用新型关系不大的其他细节。Here, it should also be noted that, in order to avoid obscuring the present utility model with unnecessary details, only the structures and/or processing steps closely related to the solution according to the present utility model are shown in the drawings, and are omitted. Other details that have little to do with the present utility model are included.
如图1所示,本具体实施方式采用规位架来实现固定,具体技术方案为:包括规位架为组合架,其与接闪带1相配合的过程为:接闪带1的下端置入女儿墙5中内部,接闪带1的上端延伸出女儿墙5的上端面外部,规位架2的内底部与接闪带1连接,规位架2固定安装在女儿墙5上,通过规位架2来实现与接闪带1连接,同时当需要维修时,将原有的接闪带1与规位架2来实现连接,同时维修时无需要整体维修,可以在需要维修的地方进行固定规位架2,或者在雷击的地方进行安装。As shown in Figure 1, this specific implementation uses a gauge frame to achieve fixation. The specific technical solution is: the gauge frame is a combined frame, and the process of matching it with the air-termination strip 1 is: the lower end of the air-termination strip 1 is placed Entering the interior of the parapet 5, the upper end of the air-termination strip 1 extends out of the upper end surface of the parapet 5. The inner bottom of the gauge frame 2 is connected to the air-termination strip 1. The gauge frame 2 is fixedly installed on the parapet 5. The gauge frame 2 is used to realize the connection with the air-termination strip 1. At the same time, when maintenance is needed, the original air-termination strip 1 is connected to the gauge frame 2. At the same time, there is no need for overall maintenance during maintenance. It can be repaired at the place where it is needed. Fix the gauge frame 2, or install it in a lightning strike location.
进一步的,规位架2为三面围合架体,三面分别为配合女儿墙5的外侧面、顶面和内侧面,顶面为倾斜面,顶面由女儿墙5外侧面至内侧面依次倾斜设置,顶面靠近女儿墙5外侧面的一侧为高侧,顶面靠近女儿墙5内侧面的一侧为低侧。顶面倾斜的规位架2利于对接闪带1实现规范位置以及顶面防护的效果。Further, the gauge frame 2 is an enclosed frame body with three sides. The three sides are respectively the outer side, the top side and the inner side of the parapet 5. The top surface is an inclined surface, and the top surface is inclined sequentially from the outer side to the inner side of the parapet 5. It is set that the side of the top surface close to the outer side of the parapet 5 is the high side, and the side of the top surface close to the inner side of the parapet 5 is the low side. The gauge frame 2 with an inclined top surface is conducive to the docking flash strip 1 to achieve a standardized position and top surface protection effect.
如图1所示,同时本具体实施方式中在女儿墙的内侧也可以连接防雷装置,其还包括侧板体3与侧板固定钉4,侧板体3的上端设置有向外的折弯固定端,折弯固定端通过侧板固定钉4固定在女儿墙5上,且折弯固定端设置在规位架2的外板体22的内侧,且侧板体3与接闪带1连接,其可以全部铺设或在雷击的地方进行铺设。As shown in Figure 1, at the same time, in this specific embodiment, a lightning protection device can also be connected to the inside of the parapet. It also includes a side plate body 3 and a side plate fixing nail 4. The upper end of the side plate body 3 is provided with an outward fold. The bent fixed end is fixed on the parapet 5 through the side plate fixing nails 4, and the bent fixed end is arranged on the inside of the outer plate body 22 of the gauge frame 2, and the side plate body 3 and the lightning strip 1 connections, which can be laid all over or where lightning strikes.
如图2所示,本具体实施方式中采用规位架2来实现防水与安装,具体的方案为:所述规位架2包括内板体21、外板体22、自隔离螺栓23、连接螺栓24、夹持垫板27;内板体21的底部与接闪带1相连接,内板体21的两侧均设置有向下的折弯体,内板体21的外侧折弯体的末端设置有向外的折弯固定体211,外板体22的两侧均设置有向下的折弯体,内板体21与外板体22内侧的折弯体通过自隔离螺栓23连接,采用内板体21与外板体22的组合的方式来实现,便于快速组合且能够实现防水,外板体22外侧的折弯体末端设置有向内的固定折弯板221,固定折弯板221能够实现安装,夹持垫板27设置在折弯固定体211与固定折弯板221之间,连接螺栓24从下至上依次穿设在固定折弯板221、夹持垫板27、折弯固定体211之间,连接螺栓24将三者依次穿设连接,实现多层夹持固定过程,夹持垫板27的纵向截面形状为L形,夹持垫板27的水平端通过连接螺栓24与固定折弯板221的上端面和折弯固定体211的下端面相贴紧,夹持垫板27的竖直端固定安装在女儿墙5的外侧壁上,通过夹持垫板27来实现内板体与外板体前侧的固定,同时两者之间能够实现防水,如图5所示,所述自隔离螺栓23包括固定螺栓体231、隔套232;固定螺栓体231的外侧套接有隔套232,所述隔套232设置在内板体21与外板体22之间,其通过隔套将内板体21与外板体22之间分隔,防止在拧紧时内板体与外板体出现变形。As shown in Figure 2, in this specific embodiment, a gauge frame 2 is used to achieve waterproofing and installation. The specific solution is: the gauge frame 2 includes an inner plate body 21, an outer plate body 22, self-isolating bolts 23, connecting Bolts 24, clamping pad 27; the bottom of the inner plate body 21 is connected to the lightning strip 1, both sides of the inner plate body 21 are provided with downward bending bodies, and the outer bending bodies of the inner plate body 21 are The end is provided with an outward bending fixed body 211, and both sides of the outer plate body 22 are provided with downward bending bodies. The inner plate body 21 and the inner bending body of the outer plate body 22 are connected by self-isolating bolts 23. It is realized by combining the inner plate body 21 and the outer plate body 22, which is convenient for quick assembly and can achieve waterproofing. The end of the bending body outside the outer plate body 22 is provided with an inward fixed bending plate 221. The fixed bending plate 221 can be installed. The clamping pad 27 is arranged between the bending fixed body 211 and the fixed bending plate 221. The connecting bolts 24 are inserted through the fixed bending plate 221, the clamping pad 27, and the bending plate 221 from bottom to top. Between the fixed bodies 211, connecting bolts 24 are inserted and connected in sequence to realize the multi-layer clamping and fixing process. The longitudinal cross-sectional shape of the clamping pad 27 is L-shaped, and the horizontal end of the clamping pad 27 passes through the connecting bolt 24. The upper end surface of the fixed bending plate 221 and the lower end surface of the bending fixed body 211 are in close contact with each other. The vertical end of the clamping pad 27 is fixedly installed on the outer wall of the parapet 5. By clamping the pad 27, the internal The plate body and the front side of the outer plate body are fixed, and at the same time, waterproofing can be achieved between the two. As shown in Figure 5, the self-isolating bolt 23 includes a fixed bolt body 231 and a spacer 232; the outer side of the fixed bolt body 231 is sleeved There is a spacer 232. The spacer 232 is arranged between the inner plate body 21 and the outer plate body 22. It separates the inner plate body 21 and the outer plate body 22 through the spacer sleeve to prevent the inner plate body and the outer plate body 22 from being tightened. The outer panel body is deformed.
如图2所示,本具体实施方式中为了提高内板体与外板体之间的强度与稳定性采用的方案为:在所述内板体21的外上端均匀的安装有数个支撑柱25,数个支撑柱25的上端与外板体22的内侧壁相接触,通过支撑柱来实现支撑两个金属板之间,能够提高强度,如图3所示,支撑柱25采用可切割的方式来实现,所述支撑柱25包括固定圆盘251、支撑圆柱252;固定圆盘251的上端连接有支撑圆柱252,固定圆盘251能够实现固定,支撑圆柱252的外侧壁上均匀的设置有数个内凹的切割槽253,同时切割槽253能够根据支撑的高度进行切割,所述支撑圆柱252为橡胶圆柱。As shown in Figure 2, in this specific embodiment, the solution adopted in order to improve the strength and stability between the inner plate body and the outer plate body is: several support columns 25 are evenly installed on the outer upper end of the inner plate body 21. , the upper ends of several support columns 25 are in contact with the inner wall of the outer plate body 22, and the support columns are used to support the two metal plates, which can improve the strength. As shown in Figure 3, the support columns 25 are cuttable. To achieve this, the support column 25 includes a fixed disk 251 and a support cylinder 252; the upper end of the fixed disk 251 is connected to a support cylinder 252, the fixed disk 251 can achieve fixation, and several evenly arranged on the outer wall of the support cylinder 252 The cutting groove 253 is concave, and the cutting groove 253 can be cut according to the height of the support. The support cylinder 252 is a rubber cylinder.
如图2所示,为了保证内板体前端与女儿墙之间支撑的稳定采用如下技术方案,所述内板体21前侧的折弯体内侧壁上均匀的安装有数个调节支撑体26,数个调节支撑体26与女儿墙5相接触,通过调节支撑体26来支撑在女儿墙的外侧壁上,同时,调节支撑体采用可调节长度式,方便现场调节,如图4所示,所述调节支撑体26包括调节螺杆261、调节螺套体262、支撑片263;调节螺杆261通过螺纹连接在调节螺套体262的内螺纹内,调节螺套体262的外端面连接有支撑片263,支撑片263方便支撑在女儿墙的外侧壁上,调节螺套体262的外侧壁上设置有对称的拧动平面2621,在调节时,通过转动调节螺套体262来实现调节,其拧动平面2621能够实现配合扳手进行拧动,所述支撑片263的外侧壁上设置有防滑滚花。As shown in Figure 2, in order to ensure the stability of the support between the front end of the inner panel body and the parapet, the following technical solution is adopted. Several adjusting supports 26 are evenly installed on the inner wall of the bending body on the front side of the inner panel body 21. Several adjusting supports 26 are in contact with the parapet 5, and are supported on the outer side wall of the parapet 5 through the adjusting supports 26. At the same time, the adjusting supports adopt an adjustable length type to facilitate on-site adjustment, as shown in Figure 4, so The adjusting support body 26 includes an adjusting screw rod 261, an adjusting screw sleeve body 262, and a support piece 263; the adjusting screw rod 261 is threadedly connected to the internal thread of the adjusting screw sleeve body 262, and the outer end surface of the adjusting screw sleeve body 262 is connected to a support piece 263 , the support piece 263 is conveniently supported on the outer wall of the parapet, and a symmetrical twisting plane 2621 is provided on the outer wall of the adjusting screw sleeve body 262. During adjustment, adjustment is achieved by rotating the adjusting screw sleeve body 262. The flat surface 2621 can be screwed with a wrench, and the outer wall of the support piece 263 is provided with anti-slip knurling.
如图6所示,本具体实施方式为了实现快速导水,其设置了导水槽,具体的方案为:所述外板体22的外侧壁上开设有导水槽223,导水槽223为弧形,导水槽能够实现导水,通过导水槽223能够快速导水。As shown in Figure 6, in order to achieve rapid water conduction, this specific embodiment is provided with a water conduit groove. The specific solution is: a water conduit groove 223 is provided on the outer wall of the outer plate body 22, and the water conduit groove 223 is arc-shaped. The water guide channel 223 can conduct water quickly.
同时如图1、图2所示,外板体22的内侧通过导水体来实现导水,其主要是为了配合侧板体,外板体22内侧的折弯体末端设置有向外倾斜的导水体222,导水体222与外板体22内侧的折弯体的角度为130-170°。At the same time, as shown in Figures 1 and 2, the inner side of the outer plate body 22 realizes water conduction through a water conductor, which is mainly to cooperate with the side plate body. The end of the bent body on the inner side of the outer plate body 22 is provided with an outwardly inclined guide. The angle between the water body 222, the water guide body 222 and the bent body inside the outer plate body 22 is 130-170°.
如图7所示,本具体实施方式中采用了直角的夹持垫板进行组合式支架前侧的固定,其技术方案为:所述夹持垫板27为直角支架,夹持垫板27上开设有穿接孔271,穿接孔271的外侧设置有减震圈273,减震圈273安装在夹持垫板27上,在固定时,其连接螺栓24穿接在固定折弯板221的固定孔、夹持垫板27的穿接孔、折弯固定体211的固定孔,或者在折弯固定板211的固定孔内侧焊接螺母,连接螺栓24直接与螺母连接,夹持垫板27的侧面开设有固定通孔272,固定通孔能够通过螺栓固定在女儿墙上。As shown in Figure 7, in this specific embodiment, a right-angle clamping pad is used to fix the front side of the combined bracket. The technical solution is: the clamping pad 27 is a right-angle bracket, and the clamping pad 27 is A through hole 271 is provided, and a shock absorbing ring 273 is provided outside the through hole 271. The shock absorbing ring 273 is installed on the clamping pad 27. When fixed, its connecting bolt 24 is connected to the fixed bending plate 221. The fixing hole, the through hole of the clamping pad 27, the fixing hole of the bending fixing body 211, or a nut is welded inside the fixing hole of the bending fixing plate 211, the connecting bolt 24 is directly connected to the nut, and the clamping pad 27 A fixing through hole 272 is provided on the side, and the fixing through hole can be fixed on the parapet by bolts.
本具体实施方式在后期施工时分为如下几种情况:This specific implementation method is divided into the following situations during later construction:
一、原有防雷及接地装置可有效利用的建筑物:1. Buildings whose original lightning protection and grounding devices can be effectively utilized:
对建筑原有接闪带、接闪网、防雷引下线缺失及破损者进行修补,通过规位架进行与原有的接闪带可靠连接,通过规位架进行固定在女儿墙上。Repair the missing or damaged original air-termination strips, air-termination nets, and lightning protection down conductors of the building, reliably connect them to the original air-termination strips through gauge frames, and fix them on the parapet wall through gauge frames.
二、原有防雷及接地装置无法利用的建筑物:2. Buildings whose original lightning protection and grounding devices cannot be used:
第一:接闪器采用接闪带与接闪网混合方式,接闪带采用40*4热镀锌扁钢,沿屋顶女儿墙,凸出物边缘及四周外边缘等易受雷击的部位敷设,贴近女儿墙顶敷设在女儿墙金属压板下。接闪网采用40*4热镀锌扁钢暗设,屋面接闪网格不大于20mx20m或24mx16m,立面改造的金属造型及金属屋面均与防雷装置相连,其安装后如图8所示。First: The air-termination device uses a hybrid method of air-termination tape and air-termination net. The air-termination tape is made of 40*4 hot-dip galvanized flat steel and is laid along the roof parapet, the edges of protrusions and the surrounding outer edges and other parts that are susceptible to lightning strikes. , laid close to the top of the parapet wall under the metal pressure plate of the parapet wall. The air-termination network is concealed using 40*4 hot-dip galvanized flat steel. The roof air-termination grid is no larger than 20mx20m or 24mx16m. The metal shape of the facade modification and the metal roof are connected to the lightning protection device. After installation, it is shown in Figure 8. .
第二:防雷引下线利用原有引下线位置,采用∅10热镀锌圆钢,墙体抹灰层内暗敷设,不能破坏墙体保温层,与接闪网及接地装置相连,每根引下线距地1.0m处均装设断接卡及接地电阻测试盒,其中50%引下线按利用原有考虑,50%引下线按新增考虑,实际工程量以现场实际发生为准。Second: The lightning protection down conductor utilizes the original down conductor position and uses ∅10 hot-dip galvanized round steel. It is laid secretly inside the plaster layer of the wall without damaging the wall insulation layer. It is connected to the lightning network and grounding device. Each down-conductor is equipped with a disconnect card and a ground resistance test box 1.0m away from the ground. 50% of the down-conductors are considered to be original and 50% are considered to be newly added. The actual engineering volume is based on what actually happened on site. shall prevail.
第三:引下线至室外地面下1米后与水平接地体(40X4热镀锌扁钢)引出建筑物散水外1米,后与垂直接地体(50X5X2500热镀锌角钢)连接,每个引下线设置两个垂直接地体,接地体间距5m。Third: The down conductor reaches 1 meter below the outdoor ground and then connects to the horizontal grounding body (40X4 hot-dip galvanized flat steel) and leads 1 meter outside the building's water distribution, and then connects to the vertical grounding body (50X5X2500 hot-dip galvanized angle steel). Each lead Set up two vertical grounding bodies on the downline, with a spacing of 5m between the grounding bodies.
第四:接地装置采用人工接地体,每根专设引下线的冲击接地电阻不大于30欧姆。Fourth: The grounding device uses an artificial grounding body, and the impact grounding resistance of each dedicated down conductor is not greater than 30 ohms.
第五:防接触电压和跨步电压措施:需在引下线3m范围内敷设5cm厚沥青层或15cm厚砾石层。Fifth: Measures to prevent contact voltage and step voltage: a 5cm thick asphalt layer or a 15cm thick gravel layer needs to be laid within 3m of the down conductor.
对于本领域技术人员而言,显然本实用新型不限于上述示范性实施例的细节,而且在不背离本实用新型的精神或基本特征的情况下,能够以其他的具体形式实现本实用新型。因此,无论从哪一点来看,均应将实施例看作是示范性的,而且是非限制性的,本实用新型的范围由所附权利要求而不是上述说明限定,因此旨在将落在权利要求的等同要件的含义和范围内的所有变化囊括在本实用新型内。It is obvious to those skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and the present invention can be implemented in other specific forms without departing from the spirit or basic characteristics of the present invention. Therefore, from any point of view, the embodiments should be regarded as exemplary and non-restrictive. The scope of the present invention is defined by the appended claims rather than the above description, and it is therefore intended that all claims falling within the rights All changes within the meaning and scope of the required equivalent elements are included in the present invention.
此外,应当理解,虽然本说明书按照实施方式加以描述,但并非每个实施方式仅包含一个独立的技术方案,说明书的这种叙述方式仅仅是为清楚起见,本领域技术人员应当将说明书作为一个整体,各实施例中的技术方案也可以经适当组合,形成本领域技术人员可以理解的其他实施方式。In addition, it should be understood that although this specification is described in terms of implementations, not each implementation only contains an independent technical solution. This description of the specification is only for the sake of clarity, and those skilled in the art should take the specification as a whole. , the technical solutions in each embodiment can also be appropriately combined to form other implementations that can be understood by those skilled in the art.
Claims (9)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202321516618.4U CN219999011U (en) | 2023-06-14 | 2023-06-14 | Lightning receiving belt configuration gauge stand |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202321516618.4U CN219999011U (en) | 2023-06-14 | 2023-06-14 | Lightning receiving belt configuration gauge stand |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN219999011U true CN219999011U (en) | 2023-11-10 |
Family
ID=88619312
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202321516618.4U Expired - Fee Related CN219999011U (en) | 2023-06-14 | 2023-06-14 | Lightning receiving belt configuration gauge stand |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN219999011U (en) |
-
2023
- 2023-06-14 CN CN202321516618.4U patent/CN219999011U/en not_active Expired - Fee Related
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN201260056Y (en) | Distributed anti-dancing spacing rod | |
| CN219999011U (en) | Lightning receiving belt configuration gauge stand | |
| CN105298205B (en) | A kind of power network electric pole reinforces heightening device and its construction method | |
| CN202840371U (en) | Portable tool for replacing tension wire shockproof hammers in outage | |
| CN205806706U (en) | Fastening-type wall bushing | |
| CN207474915U (en) | It is a kind of that the lightning rod stablized convenient for adjustment length is installed | |
| CN204809641U (en) | Ball pin type lightning rod suitable for high -rise building | |
| CN106025963A (en) | Anti-leakage overhead incoming line combination fixing apparatus for 10kV distribution room | |
| CN107732665A (en) | It is a kind of that the stable lightning rod for being easy to adjustment length is installed | |
| CN206922353U (en) | A kind of cable testing bridge | |
| CN212462736U (en) | Low-voltage line vertical arrangement stringing device | |
| CN104499655A (en) | Lightning protection device of building roof | |
| CN205791352U (en) | The 10kV switchgear house service drop combination fastener of antiseep | |
| CN209344741U (en) | A kind of ladder lead type ground wire grounding structure for weather-proof steel tube tower | |
| CN206401869U (en) | It is a kind of to be used for the lightning-arrest support on green assembled architecture roof | |
| CN201754434U (en) | Ground wire device capable of quickly lacerating oxide layer and ice layer on surface of transmission line | |
| CN204112824U (en) | A kind of high-tension pole increases lightning protection device | |
| CN219414218U (en) | A maintenance linkage device for reservoir water level station | |
| CN209344740U (en) | It is a kind of for drawing formula ground wire grounding structure in the weather-proof steel material angle steel tower of residential area and area with less lightning activities environment | |
| CN109861013B (en) | A temporary grounding fixture for transmission line towers | |
| CN206418682U (en) | It is a kind of to be used for the lightning-arrest support on green assembled architecture roof | |
| CN207376984U (en) | A kind of rain pipe fixing piece suitable for Passive low-energy building | |
| CN209875042U (en) | Lightning conductor drainage crawling ladder suitable for weather-resistant steel pipe tower | |
| CN207069293U (en) | One kind uses distribution framework made of composite insulating material | |
| CN205123211U (en) | Transmission of electricity corridor is with multi -functional shaft tower of lightning protection |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20231110 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |