CN219973911U - Building construction template anchor clamps - Google Patents

Building construction template anchor clamps Download PDF

Info

Publication number
CN219973911U
CN219973911U CN202321333172.1U CN202321333172U CN219973911U CN 219973911 U CN219973911 U CN 219973911U CN 202321333172 U CN202321333172 U CN 202321333172U CN 219973911 U CN219973911 U CN 219973911U
Authority
CN
China
Prior art keywords
wall
rod
block
snap ring
building construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321333172.1U
Other languages
Chinese (zh)
Inventor
齐秀丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Yeguo Construction Engineering Co ltd
Original Assignee
Anhui Yeguo Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Yeguo Construction Engineering Co ltd filed Critical Anhui Yeguo Construction Engineering Co ltd
Priority to CN202321333172.1U priority Critical patent/CN219973911U/en
Application granted granted Critical
Publication of CN219973911U publication Critical patent/CN219973911U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a building construction template clamp, which relates to the technical field of building construction and comprises a clamp main body and positioning assemblies, wherein the positioning assemblies for positioning a cylindrical mold are arranged on the front side and the rear side of the clamp main body, a rotating shaft is sleeved in an auxiliary rod, the outer wall of the rotating shaft is rotationally connected with a connecting block, the outer wall of the connecting block is fixedly connected with a clamping ring, two clamping rings are arranged, the outer wall of the clamping ring is adhered with an anti-slip pad, the outer wall of the top end of the clamping ring on the front side is provided with a fixing clamping groove, the outer wall of the top end of the clamping ring on the rear side is provided with a clamping block, and the clamping ring on the front side is in clamping connection with the clamping ring on the rear side. This construction template anchor clamps pass through installation locating component, can enough fix the rectangle mould, also can adapt to cylindrical mould simultaneously, can change the operating condition of anchor clamps in a flexible way according to actual demand, have realized more functions with simple structure, make the application scope of anchor clamps wider.

Description

Building construction template anchor clamps
Technical Field
The utility model relates to the technical field of building construction, in particular to a building construction template clamp.
Background
The building form is a temporary supporting structure, which is manufactured according to the design requirement, so that the concrete structure and the components are formed according to the specified position and geometric dimension, the correct position of the concrete structure and the components is kept, and the self weight of the building form and the external load acted on the building form are borne. The purpose of carrying out the template engineering is to guarantee concrete engineering quality and construction safety, accelerate construction progress and reduce engineering cost, and the building templates need to be fixed with template clamps on the installation.
The utility model of application number CN202022080285.8 discloses a construction template clamp, which comprises a first clamp, a second clamp, a third clamp and a fourth clamp, wherein a first connecting plate and a second connecting plate are arranged on the first clamp, a third connecting plate and a fourth connecting plate are arranged on the second clamp, a fifth connecting plate and a sixth connecting plate are arranged on the third clamp, a seventh connecting plate and an eighth connecting plate are arranged on the fourth clamp, the second connecting plate is fixedly connected with the third connecting plate through a first tightening screw, the fourth connecting plate is fixedly connected with the fifth connecting plate through a second tightening screw, the sixth connecting plate is fixedly connected with the seventh connecting plate through a third tightening screw, and the eighth connecting plate is fixedly connected with the first connecting plate through a fourth tightening screw.
Building construction formwork clamps similar to the above application currently have the following disadvantages:
1. the template clamp is only suitable for limiting a rectangular template, when the template clamp faces a cylindrical template, a large number of gaps are reserved when the template clamp is fixed, so that the possibility that raw materials are splashed in the pouring process is increased due to the fact that the mould is easy to shake, the application range is narrow, and raw materials are easy to waste.
2. The height of the building construction template clamp is fixed, the building construction template clamp does not have the functions of stretching or adding, when facing a higher die, the clamp can only fix the lower half part of the die, the upper half part still easily shakes during pouring, the stability is poor, and the application range has certain limitation.
Accordingly, in view of the above, research and improvement are made on the existing structure and the existing defects, and a construction template clamp is proposed to achieve the purpose of higher practical value.
Disclosure of Invention
The utility model aims to provide a building construction template clamp for solving the problems in the background technology.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides a construction template anchor clamps, includes anchor clamps main part and locating component, both sides all are provided with the locating component that is used for fixing a position cylindricality mould around the anchor clamps main part, locating component includes auxiliary rod, pivot, connecting block, snap ring, slipmat, fixed draw-in groove and block, the inside cover of auxiliary rod is equipped with the pivot, the outer wall of pivot rotates and is connected with the connecting block, the outer wall fixedly connected with snap ring of connecting block, the snap ring is provided with two, and the snap ring outer wall bonds there is the slipmat, and the front side fixed draw-in groove has been seted up to the snap ring top outer wall, the rear side the snap ring top outer wall is provided with the block, the front side the snap ring with the rear side the snap ring block is connected.
Further, the top end of the clamp main body is provided with an auxiliary block, the inner wall of the auxiliary block is sleeved with a fixing rod, the outer wall of the fixing rod is of a threaded structure, and the fixing rod is in threaded connection with the auxiliary block.
Further, be provided with the extension subassembly that is used for increasing anchor clamps height above the auxiliary block, the extension subassembly includes inserted bar and extension rod, the outer wall cover of inserted bar is equipped with the extension rod.
Further, the extension assembly further comprises a sleeve and a fixing bolt, the sleeve is sleeved on the outer wall of the extension rod, and the fixing bolt is arranged on the outer wall of the sleeve.
Further, the fixture main part below fixed connection supports the base, support base top outer wall and be provided with the base bolt.
Further, the outer wall fixedly connected with link of auxiliary block one side of keeping away from the dead lever.
Furthermore, limit nuts are arranged at the left end and the right end of the fixing rod, and the limit nuts are in threaded connection with the fixing rod.
Compared with the prior art, the utility model has the following beneficial effects:
1. according to the utility model, the rectangular die can be fixed and the cylindrical die can be adapted by installing the positioning assembly, so that the working state of the clamp can be flexibly changed according to actual requirements, more functions are realized by a simple structure, and the application range is wider;
2. the utility model is provided with the extension component, can increase the height of the clamp and adapt to the dies with different heights, so that the upper half part and the lower half part of the clamp can be kept stable in the pouring process, the overall stability of the clamp is increased, and the use requirements of the dies with different heights are adapted.
Drawings
FIG. 1 is a schematic view of a part of a three-dimensional structure of a clamp for a construction template of the present utility model;
FIG. 2 is a schematic diagram of the front view of a construction formwork clamp;
FIG. 3 is a schematic top view of a construction formwork clamp;
FIG. 4 is a schematic view of a structure of a positioning assembly of a template clamp for construction of a building;
FIG. 5 is an enlarged schematic view of the construction template clamp of FIG. 2;
fig. 6 is an enlarged schematic view of the construction template clamp in fig. 3 at the position B.
In the figure: 1. a clamp body; 2. a fixed rod; 3. a positioning assembly; 301. an auxiliary lever; 302. a rotating shaft; 303. a connecting block; 304. a clasp; 305. an anti-slip pad; 306. a fixing slot; 307. a clamping block; 4. an extension assembly; 401. a rod; 402. an extension rod; 403. a sleeve; 404. a fixing bolt; 5. an auxiliary block; 6. hanging rings; 7. a limit nut; 8. a support base; 9. and a base bolt.
Detailed Description
Embodiments of the present utility model are described in further detail below with reference to the accompanying drawings and examples. The following examples are illustrative of the utility model but are not intended to limit the scope of the utility model.
As shown in fig. 3-6, a building construction template clamp comprises a clamp main body 1 and a positioning assembly 3, wherein the front side and the rear side of the clamp main body 1 are respectively provided with the positioning assembly 3 for positioning a cylindrical mold, the positioning assembly 3 comprises an auxiliary rod 301, a rotating shaft 302, a connecting block 303, a clamping ring 304, a non-slip pad 305, a fixing clamping groove 306 and a clamping block 307, the rotating shaft 302 is sleeved in the auxiliary rod 301, the connecting block 303 is connected with the outer wall of the rotating shaft 302 in a rotating manner, the clamping rings 304 are fixedly connected with the outer walls of the connecting block 303, the two clamping rings 304 are arranged, the outer walls of the clamping rings 304 are adhered with non-slip pads 305, the outer walls of the top ends of the front clamping rings 304 are provided with the fixing clamping grooves 306, the outer walls of the top ends of the rear clamping rings 304 are provided with the clamping blocks 307, and the front clamping rings 304 are in clamping connection with the rear clamping rings 304;
the positioning assembly 3 is used when a cylindrical mold is required to be fixed, the clamping ring 304 on the outer wall of the connecting block 303 is rotated, the clamping ring 304 is rotated to a proper position along the rotating shaft 302, the fixing clamping groove 306 of the front clamping ring 304 is clamped and connected with the clamping block 307 of the rear clamping ring 304, the front clamping ring 304 and the rear clamping ring 304 are further fixed, the cylindrical mold is placed on the inner walls of the clamping rings 304 on the two sides, and then pouring is carried out.
As shown in fig. 1-2, an extension assembly 4 for increasing the height of the clamp is arranged above the auxiliary block 5, the extension assembly 4 comprises a plug rod 401 and an extension rod 402, the extension rod 402 is sleeved on the outer wall of the plug rod 401, the extension assembly 4 further comprises a sleeve 403 and a fixing bolt 404, the sleeve 403 is sleeved on the outer wall of the extension rod 402, and the fixing bolt 404 is arranged on the outer wall of the sleeve 403.
The utility model specifically comprises the following steps that when a higher die is required to be fixed, an extension rod 402 is used, the extension rod 402 is of a hollow structure, the extension rod 402 is sleeved on the outer wall of an inserting rod 401, then a fixing bolt 404 on the outer wall of a sleeve 403 is screwed down, the extension rod 402 is fixedly connected with the inserting rod 401, and then a fixing rod 2 is added according to the requirement.
Working principle: when the building construction formwork clamp is used, firstly, the clamp body 1 is moved to a proper position, the supporting base 8 is placed on a proper ground, then the supporting base 8 is fixed on the ground through the base bolt 9, when a die which needs to be fixed is rectangular, the die is placed inside the clamp body 1, then the fixing rod 2 is inserted into the auxiliary block 5, the fixing rod 2 is in threaded connection with the auxiliary block 5 through a threaded structure of the outer wall of the fixing rod 2, the fixing rod 2 is made to be attached to the rectangular die through the fixing rod 2, the limiting nuts 7 at the two ends of the fixing rod 2 are screwed simultaneously to prevent the fixing rod 2 from sliding down, when a cylindrical die needs to be fixed, the locating component 3 is used, the clamping ring 304 on the outer wall of the connecting block 303 is rotated, the clamping ring 304 is rotated to a proper position along the rotating shaft 302, the fixing clamping groove 306 of the front clamping ring 304 is clamped with the clamping block 307 on the rear clamping ring 304, then the front side and the rear side clamping ring 304 are clamped, the cylindrical template is placed on the inner wall of the clamping ring 304 on the two sides, then the casting is performed, when a higher die needs to be fixed, the extending rod 402 is made to be in a hollow structure, the extending rod 402 is sleeved on the outer wall of the inserting rod 403, the fixing rod 403 is made, the fixing sleeve is made to be fastened, the fixing sleeve is made to be the fixing sleeve, the fixing rod is made to be the fixing rod is required, the fixing rod is fastened, the fixing rod is made, the fixing sleeve is required to be the fixing rod 2, the fixing clamp is required to be fastened by the rope, and the formwork clamp is pulled.
The embodiments of the utility model have been presented for purposes of illustration and description, and are not intended to be exhaustive or limited to the utility model in the form disclosed. Many modifications and variations will be apparent to those of ordinary skill in the art. The embodiments were chosen and described in order to best explain the principles of the utility model and the practical application, and to enable others of ordinary skill in the art to understand the utility model for various embodiments with various modifications as are suited to the particular use contemplated.

Claims (7)

1. The utility model provides a construction template anchor clamps, includes anchor clamps main part (1) and locating component (3), its characterized in that, both sides all are provided with locating component (3) that are used for fixing a position cylindricality mould around anchor clamps main part (1), locating component (3) are including auxiliary rod (301), pivot (302), connecting block (303), snap ring (304), slipmat (305), fixed draw-in groove (306) and block (307), auxiliary rod (301) inside cover is equipped with pivot (302), the outer wall rotation of pivot (302) is connected with connecting block (303), outer wall fixedly connected with snap ring (304) of connecting block (303), snap ring (304) are provided with two, and snap ring (304) outer wall bonding has slipmat (305), and the front side fixed draw-in groove (306) have been seted up to snap ring (304) top outer wall, the front side snap ring (304) top outer wall is provided with block (307), the front side snap ring (304) and rear side snap ring (304) block connection.
2. The building construction formwork clamp according to claim 1, wherein an auxiliary block (5) is arranged at the top end of the clamp main body (1), a fixing rod (2) is sleeved on the inner wall of the auxiliary block (5), the outer wall of the fixing rod (2) is of a threaded structure, and the fixing rod (2) is in threaded connection with the auxiliary block (5).
3. The building construction formwork clamp according to claim 2, wherein an extension assembly (4) for increasing the height of the clamp is arranged above the auxiliary block (5), the extension assembly (4) comprises a plug rod (401) and an extension rod (402), and the extension rod (402) is sleeved on the outer wall of the plug rod (401).
4. A construction formwork clamp according to claim 3, wherein the extension assembly (4) further comprises a sleeve (403) and a fixing bolt (404), the sleeve (403) is sleeved on the outer wall of the extension rod (402), and the fixing bolt (404) is arranged on the outer wall of the sleeve (403).
5. The building construction formwork clamp according to claim 1, wherein a supporting base (8) is fixedly connected below the clamp main body (1), and a base bolt (9) is arranged on the outer wall above the supporting base (8).
6. The building construction formwork clamp according to claim 2, wherein the outer wall of the side of the auxiliary block (5) far away from the fixed rod (2) is fixedly connected with a hanging ring (6).
7. The building construction formwork clamp according to claim 2, wherein limit nuts (7) are arranged at the left end and the right end of the fixing rod (2), and the limit nuts (7) are in threaded connection with the fixing rod (2).
CN202321333172.1U 2023-05-30 2023-05-30 Building construction template anchor clamps Active CN219973911U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321333172.1U CN219973911U (en) 2023-05-30 2023-05-30 Building construction template anchor clamps

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321333172.1U CN219973911U (en) 2023-05-30 2023-05-30 Building construction template anchor clamps

Publications (1)

Publication Number Publication Date
CN219973911U true CN219973911U (en) 2023-11-07

Family

ID=88578595

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321333172.1U Active CN219973911U (en) 2023-05-30 2023-05-30 Building construction template anchor clamps

Country Status (1)

Country Link
CN (1) CN219973911U (en)

Similar Documents

Publication Publication Date Title
CN112900753A (en) Anti-deviation structure for vertical steel bars of constructional engineering and construction method
CN207048318U (en) A kind of aluminum alloy pattern plate bracing device
CN219973911U (en) Building construction template anchor clamps
CN211078298U (en) Hoisting accessory is used in thermal power plant's maintenance
CN210216164U (en) Template fastener is used in high-efficient construction of road bridge
CN215848853U (en) Auxiliary installation device for exposed embedded part in prefabricated part
CN214993184U (en) Template supporting device for building bridge construction
CN214005723U (en) Steel pipe support concrete foundation structure
CN212764002U (en) Assembled bearing beam mould
CN211286655U (en) Connecting and locking device for building template
CN213205038U (en) Building reinforced structure
CN220705164U (en) Template fixing device
CN218623318U (en) Device capable of adjusting holes of embedded pipes on cross section of through frame beam
CN220555910U (en) Easy-to-detach building template
CN111691703A (en) Supporting device for aluminum alloy template
CN213449499U (en) Formwork support device for building construction
CN219158400U (en) Fixed column hoop of concrete pouring template and template reinforcing device
CN220224977U (en) Tower column steel-wood combined template
CN219080988U (en) Frame post template structure
CN212866853U (en) Floor reservation hole instrument formula template bearing structure
CN215926693U (en) Building engineering construction pouring template
CN218581178U (en) Support combination for aluminum formwork pouring balcony
CN217204664U (en) Pre-buried furred ceiling screw rod anchor assembly structure of aluminium mould
CN116220350A (en) Lap joint sleeve structure of steel column die and aluminum alloy die plate
CN207526111U (en) A kind of pillar type column template carrying bearing

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant