CN215926693U - Building engineering construction pouring template - Google Patents
Building engineering construction pouring template Download PDFInfo
- Publication number
- CN215926693U CN215926693U CN202122330245.9U CN202122330245U CN215926693U CN 215926693 U CN215926693 U CN 215926693U CN 202122330245 U CN202122330245 U CN 202122330245U CN 215926693 U CN215926693 U CN 215926693U
- Authority
- CN
- China
- Prior art keywords
- building engineering
- engineering construction
- backup pad
- plate
- threaded
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 20
- 238000007664 blowing Methods 0.000 claims description 5
- 238000007599 discharging Methods 0.000 claims description 3
- 229910000831 Steel Inorganic materials 0.000 claims description 2
- 239000010959 steel Substances 0.000 claims description 2
- 238000000034 method Methods 0.000 abstract description 4
- 238000009415 formwork Methods 0.000 description 5
- 230000004075 alteration Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a construction pouring template for construction engineering, which comprises two supporting plates and two connecting plates, wherein a plurality of placing grooves are formed in the upper surfaces of the supporting plates, placing blocks are fixedly arranged on the two side surfaces of the connecting plates, the surfaces of the placing blocks are connected with the inner walls of the placing grooves in a sliding mode, supporting equipment is arranged on the surfaces, far away from each other, of the two supporting plates, the supporting equipment comprises a connecting block, the side surface of the connecting block is fixedly connected with the side surface of each supporting plate through a connecting bolt, and the surface of the connecting block is rotatably connected with a telescopic sleeve through a rotating shaft. This template is pour in building engineering construction blocks of placing on two connecting plates block respectively into the standing groove in the backup pad, and then utilizes the agreeable relation of placing piece and standing groove, makes two backup pads fix the connecting plate, and is relative, and two connecting plates are more easily detached with the backup pad to replaced traditional method that utilizes bolt fixed die plate, facilitate for later stage template's the work of demolising.
Description
Technical Field
The utility model relates to the technical field of concrete pouring formworks, in particular to a construction engineering pouring formwork.
Background
The concrete form refers to a whole set of structural system of a newly cast concrete formed form and a supporting form, and the concrete forms are usually fixed and formed through connecting bolts.
Although the templates can be relatively fixed by utilizing the connecting bolts, the specification standard of the poured concrete block is guaranteed, the later-stage template removing process is very difficult and complicated, and therefore the building engineering construction pouring template is provided.
Disclosure of Invention
The utility model aims to provide a construction pouring template for building engineering to solve the problems in the background technology.
In order to achieve the purpose, the utility model provides the following technical scheme: the utility model provides a template is pour in building engineering construction, including two backup pads and two connecting plates, a plurality of standing groove has been seted up to the upper surface of backup pad, the both sides face fixed mounting of connecting plate has the piece of placing, the surface of placing the piece and the inner wall sliding connection of standing groove, the one side that two backup pads kept away from each other all is provided with the support equipment, the support equipment includes the connecting block, the side fixed connection of connecting bolt and backup pad is passed through to the side of connecting block, the surface of connecting block is rotated through the pivot and is connected with the telescope tube, telescope tube's inner wall sliding connection has flexible post, the side of pivot and backup pad is rotated through the upper end of flexible post and is connected.
Preferably, the two connecting plates are both arranged between the two supporting plates.
Preferably, the front and the back of the supporting plate are fixedly provided with connecting plates, the surface of each connecting plate is in threaded connection with a threaded column, the threaded end of each threaded column is rotatably connected with a pressing plate through a bearing, and the surface of each pressing plate is in lap joint with the surface of each connecting plate.
Preferably, the side surface of the telescopic sleeve is in threaded connection with a threaded jackscrew, and a threaded end of the threaded jackscrew extends to the inner wall of the telescopic sleeve and is in lap joint with the surface of the telescopic column.
Preferably, a clamping and connecting plate is arranged above the supporting plate, and a discharging hopper is fixedly mounted on the upper surface of the clamping and connecting plate.
Preferably, the inner wall of the discharge hopper is provided with a plurality of steel wire ropes which are perpendicular to each other.
Advantageous effects
The utility model provides a construction pouring template for constructional engineering, which has the following beneficial effects:
1. this template is pour in building engineering construction, place the piece through the setting, in the standing groove in the backup pad is blocked respectively to the piece of placing on with two connecting plates, then utilize the support equipment of backup pad side, make backup pad and ground keep relatively fixed, and then utilize the agree with relation of placing piece and standing groove, make two backup pads fix the connecting plate, it is relative, two connecting plates are more easily pulled apart with the backup pad, thereby replaced the traditional method that utilizes bolt fastening template, facilitate the work of demolising of later stage template.
2. This template is pour in building engineering construction supports the clamp plate through setting up, uses the backup pad to fix the back to the connecting plate, rotates the screw thread post and can make and support the clamp plate and remove, and then supports the pressure to the connecting plate, has improved the stability of two connecting plates when pouring the concrete, has reduced the negative pressure of placing piece and connecting plate upper end part, prevents that the connecting plate from taking place to warp.
Drawings
FIG. 1 is a schematic front view of the present invention;
FIG. 2 is a perspective view of the support plate;
FIG. 3 is a schematic perspective view of the discharge hopper;
FIG. 4 is a front view of the connection plate;
fig. 5 is a schematic top view of the discharge hopper.
In the figure: 1 backup pad, 2 connecting plates, 3 place piece, 4 connecting blocks, 5 telescopic sleeves, 6 telescopic columns, 7 screw post, 8 support clamp plate, 9 joint boards, 10 blowing fill, 11 wire rope.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-5, the present invention provides a technical solution: the utility model provides a template is pour in building engineering construction, including two backup pads 1 and two connecting plates 2, a plurality of standing groove has been seted up to backup pad 1's upper surface, the both sides face fixed mounting of connecting plate 2 has place piece 3, the inner wall sliding connection who places piece 3's surface and standing groove, two connecting plates 2 all set up between two backup pads 1, the one side that two backup pads 1 kept away from each other all is provided with the support equipment, the support equipment includes connecting block 4, connecting bolt and backup pad 1's side fixed connection is passed through to the side of connecting block 4.
The surface of the connecting bolt connecting block 4 is rotationally connected with a telescopic sleeve 5 through a rotating shaft, the inner wall of the telescopic sleeve 5 is connected with a telescopic column 6 in a sliding way, when the supporting plate 1 is not used, the supporting equipment is fixed on the side surface of the supporting plate 1 by using the connecting bolt, so that the occupied space of the supporting equipment can be reduced, and when the supporting plate 1 is used, utilize connecting bolt can be quick fix connecting block 4 and ground, telescope tube 5 and flexible post 6 are under the supporting role on connecting block 4 and ground, can support backup pad 1, telescope tube 5's side threaded connection has the screw thread jackscrew, the screw thread end of screw thread jackscrew extend to telescope tube 5's inner wall and with the overlap joint of the surface of flexible post 6, it can restrict flexible post 6 and slide at telescope tube 5 inner wall to screw up the screw thread jackscrew, the side rotation of pivot and backup pad 1 is connected in the upper end of flexible post 6.
Place piece 3 through the setting, in putting the standing groove on the backup pad 1 with placing piece 3 on two connecting plates 2 respectively card, then utilize the support equipment of backup pad 1 side, make backup pad 1 and ground keep relatively fixed, and then utilize the agree with relation of placing piece 3 and standing groove, make two backup pads 1 fix connecting plate 2, it is relative, two connecting plates 2 and backup pad 1 are more easily pulled apart, thereby replaced the traditional method that utilizes bolt fastening template, it facilitates the work of demolising of later stage template.
The front and the back of backup pad 1 all fixed mounting have a linkage plate, the surperficial threaded connection of linkage plate has screw thread post 7, the screw thread end of screw thread post 7 rotates through the bearing and is connected with and supports clamp plate 8, support the surface of clamp plate 8 and the surperficial overlap joint of connecting plate 2, through setting up support clamp plate 8, use backup pad 1 to fix the back to connecting plate 2, it can make and support clamp plate 8 to remove to rotate screw thread post 7, and then support to press connecting plate 2, the stability of two connecting plates 2 when pouring concrete has been improved, the negative pressure of placing piece 3 and connecting plate 2 upper end part has been reduced, prevent that connecting plate 2 from taking place to warp.
The top of backup pad 1 is provided with joint board 9, the last fixed surface of joint board 9 installs blowing fill 10, the inner wall of blowing fill 10 is provided with a plurality of mutually perpendicular's wire rope 11, in two protruding clamps with joint board 9 lower extreme advance the standing groove, through blowing fill 10, can be convenient quick pour into the concrete into the template frame in, when the concrete passes through wire rope 11, can be cut off into the small strip by wire rope 11, thereby the inside most air of concrete has been emitted, prevent to pour the inside formation cavity of fashioned concrete piece.
The working principle is as follows: when the formwork is used for pouring concrete, firstly, the left supporting plate 1 is vertically placed on the construction ground, the supporting plate 1 is fixed with the ground by using supporting equipment, then two connecting plates 2 are placed into the length of a concrete block according to the requirement, the supporting plate 1 is placed on the right side surface of the supporting plate 1 in the front-back direction, the placing block 3 is clamped into the inner wall of the corresponding placing groove, then the right supporting plate 1 is placed on the right side surface of the connecting plate 2, the placing groove is clamped with the placing block 3, the right supporting plate 1 is fixedly connected with the ground by using the supporting equipment, then the threaded column 7 is rotated to move the pressing plate 8, further the two connecting plates 2 are pressed, the stability of the two connecting plates 2 in pouring concrete is improved, finally, the concrete is poured into the formwork frame by using the discharging hopper 10, pouring work is finished, when the formwork is dismounted, only the two supporting equipment need to be separated from the ground, two backup pads 1 and connecting plate 2 can be dismantled fast.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. The utility model provides a template is pour in building engineering construction, includes two backup pads (1) and two connecting plates (2), its characterized in that: a plurality of standing groove has been seted up to the upper surface of backup pad (1), the both sides face fixed mounting of connecting plate (2) has places piece (3), the surface of placing piece (3) and the inner wall sliding connection of standing groove, the one side of keeping away from each other of two backup pads (1) all is provided with the support equipment, the support equipment includes connecting block (4), the side fixed connection of connecting bolt and backup pad (1) is passed through to the side of connecting block (4), the surface of connecting block (4) is rotated through the pivot and is connected with telescope tube (5), the inner wall sliding connection of telescope tube (5) has flexible post (6), the upper end of flexible post (6) is rotated through the pivot and is connected with the side of backup pad (1).
2. The building engineering construction pouring template according to claim 1, characterized in that: two the connecting plate (2) all sets up between two backup pads (1).
3. The building engineering construction pouring template according to claim 1, characterized in that: the front and the back of the supporting plate (1) are fixedly provided with connecting plates, the surface of each connecting plate is in threaded connection with a threaded column (7), the threaded end of each threaded column (7) is rotatably connected with a pressing plate (8) through a bearing, and the surface of each pressing plate (8) is in lap joint with the surface of the connecting plate (2).
4. The building engineering construction pouring template according to claim 1, characterized in that: the side surface of the telescopic sleeve (5) is in threaded connection with a threaded jackscrew, and the threaded end of the threaded jackscrew extends to the inner wall of the telescopic sleeve (5) and is in lap joint with the surface of the telescopic column (6).
5. The building engineering construction pouring template according to claim 1, characterized in that: the top of backup pad (1) is provided with joint board (9), and the last fixed surface of joint board (9) installs blowing fill (10).
6. The building engineering construction pouring template according to claim 5, characterized in that: the inner wall of the discharging hopper (10) is provided with a plurality of steel wire ropes (11) which are vertical to each other.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122330245.9U CN215926693U (en) | 2021-09-26 | 2021-09-26 | Building engineering construction pouring template |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122330245.9U CN215926693U (en) | 2021-09-26 | 2021-09-26 | Building engineering construction pouring template |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215926693U true CN215926693U (en) | 2022-03-01 |
Family
ID=80414319
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202122330245.9U Expired - Fee Related CN215926693U (en) | 2021-09-26 | 2021-09-26 | Building engineering construction pouring template |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215926693U (en) |
-
2021
- 2021-09-26 CN CN202122330245.9U patent/CN215926693U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210217148U (en) | Novel civil engineering pours template support with adjustable | |
CN112900753B (en) | Anti-deviation structure for vertical steel bars of constructional engineering and construction method | |
CN111472538B (en) | Aluminum alloy template installation structure of exempting from to plaster | |
CN205314542U (en) | Construction liquid die plate device that climbs | |
CN207608925U (en) | Piping lane box type telescopic internal model | |
CN215926693U (en) | Building engineering construction pouring template | |
CN209620596U (en) | Device preventing tilting is used in a kind of support of building template | |
CN207583391U (en) | One kind two serves as a contrast plug steel end mould | |
CN206844643U (en) | Post-cast strip independence braced wing support combination unit | |
CN214993184U (en) | Template supporting device for building bridge construction | |
CN215669650U (en) | Steel plate and wood formwork combined supporting device for secondary grouting of fan anchor bolt foundation | |
CN215803206U (en) | Framework column formwork structure | |
CN211775706U (en) | Aluminum template device with fixing structure and convenient to adjust for building | |
CN213710371U (en) | Concrete beam section increases template support system | |
CN210370700U (en) | Self-locking type tunnel secondary lining trolley end plugging template | |
CN221194285U (en) | Pouring model plate convenient to assemble and disassemble | |
CN2344147Y (en) | Length adjustable prefabricated shear column die | |
CN216810987U (en) | Building aluminum mould template support of adjustable installation | |
CN208009269U (en) | A kind of bridge steel template of Fast Installation supporting rod | |
CN211548772U (en) | Special formwork fixing device for crown beam | |
CN207862975U (en) | A kind of corridor tube assembling type template | |
CN218029017U (en) | A template connecting device for construction is built in room | |
CN220848081U (en) | Water-stopping steel plate fixing device | |
CN210032580U (en) | Shear wall half-tunnel formwork | |
CN217924874U (en) | A high formwork angle brace mechanism for construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20220301 |