CN219910148U - Caulking instrument is used in installation of prefabricated wallboard - Google Patents

Caulking instrument is used in installation of prefabricated wallboard Download PDF

Info

Publication number
CN219910148U
CN219910148U CN202321321356.6U CN202321321356U CN219910148U CN 219910148 U CN219910148 U CN 219910148U CN 202321321356 U CN202321321356 U CN 202321321356U CN 219910148 U CN219910148 U CN 219910148U
Authority
CN
China
Prior art keywords
plate
baffle
curb plate
installing
caulking tool
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321321356.6U
Other languages
Chinese (zh)
Inventor
张春玲
张木一
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Cheng Yuan Industry Co ltd
Original Assignee
Shandong Cheng Yuan Industry Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Cheng Yuan Industry Co ltd filed Critical Shandong Cheng Yuan Industry Co ltd
Priority to CN202321321356.6U priority Critical patent/CN219910148U/en
Application granted granted Critical
Publication of CN219910148U publication Critical patent/CN219910148U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a caulking tool for installing a prefabricated wallboard, which relates to the technical field of building construction. The beneficial effects of the utility model are as follows: the baffle and the plastering plate are integrally arranged, so that construction is convenient.

Description

Caulking instrument is used in installation of prefabricated wallboard
Technical Field
The utility model relates to the technical field of building construction, in particular to a caulking tool for installing a prefabricated wallboard.
Background
In the hoisting process of the prefabricated wallboard, a gap of about 20mm exists between the wallboard and the floor slab or between the upper wallboard and the lower wallboard, and the gap is required to be plugged in order to facilitate grouting connection of the prefabricated wallboard in the later stage. At present, when the plugging is carried out, a strip steel plate is adopted to plug into a gap to serve as a baffle, and then plastering is carried out, so that the plugging is inconvenient.
Disclosure of Invention
The utility model aims to provide a caulking tool for installing a prefabricated wallboard, wherein a baffle plate and a plastering plate are integrally arranged.
The utility model is realized by the following measures: the utility model provides a prefabricated wallboard is caulking tool for installation, its characterized in that includes bottom plate, symmetry set up the curb plate of bottom plate both sides, be curb plate one and curb plate two respectively, the outside of curb plate one and curb plate two is connected through the riser, the inboard of curb plate one is provided with the connecting plate, the inboard of connecting plate is provided with the baffle parallel with the riser, the height of baffle and gap match and the height of connecting plate is the same with the baffle, the other end of baffle orientation curb plate two just stretches out curb plate two;
the device also comprises a pressing plate which is arranged between the two side plates in a sliding way, and the pressing plate is in contact with the inner walls of the side plates and the vertical plate.
The length of the connecting plate is generally 5-10mm, and the height of the baffle is generally 20mm.
The lower part of the outer wall of the vertical plate is symmetrically provided with a screw rod, the screw rod is sleeved with a supporting rod and fixed through a nut, and the lower end of the supporting rod is rotatably provided with a roller.
The outside of curb plate two is provided with upper end and the open receiver of inboard just the inboard surface of receiver and curb plate parallel and level.
Two ends of the pressing plate are provided with bosses, and two side plates are provided with sliding grooves matched with the bosses.
The upper part of the vertical plate is inclined outwards.
The upper end face of the pressing plate is provided with a handle.
The using mode is as follows: placing the baffle in a gap between the wallboard and the floor slab, ensuring that the upper end face and the lower end face of the baffle are respectively contacted with the wallboard and the floor slab, unscrewing the nuts, adjusting the positions of the supporting rods and the rollers, enabling the rollers to slide on the ground, taking out the pressing plates, injecting mortar between the two side plates and the floor slab, pushing a tool to walk along the ground, enabling part of the mortar to flow into the area among the baffle, the wallboard and the floor slab, and enabling the side plates II to play a trowelling role in the moving process;
in order to guarantee the emphasis of plastering, can press at the in-process that removes the clamp plate, increase the internal pressure of mortar between baffle, wallboard and the floor, realized the effect that increases the mortar, unnecessary mortar then can flow to the receiver through the clearance between curb plate two and the baffle in, the receiver is best detachable, makes things convenient for later stage clearance.
In addition, in order to ensure the strength of the plastering, a little emphasis is required, and the speed is not easy to be too high when the caulking is performed.
The technical scheme provided by the embodiment of the utility model has the beneficial effects that: the baffle and the plastering plate are integrally arranged, so that construction is convenient.
Drawings
For a clearer description of the technical solutions of the present utility model, the drawings used in the embodiments will be briefly described below, and it is obvious that the drawings listed below are only some embodiments of the present utility model, and that other drawings can be obtained according to these drawings without inventive effort for a person skilled in the art.
FIG. 1 is a schematic overall structure of an embodiment of the present utility model;
FIG. 2 is a schematic view of a structure at a different angle from that of FIG. 1;
FIG. 3 is a schematic view of a part of the structure;
fig. 4 is a usage state reference diagram.
In the drawings, the list of components represented by the various numbers is as follows: 1. a bottom plate, 2, a side plate; 3. a vertical plate; 4. a connecting plate; 5. a baffle; 6. a storage box; 7. a floor slab; 8. a wallboard; 9. a pressing plate; 10. a screw; 11. a support rod; 12. a nut; 13. a roller; 201. a chute; 901. a boss; 902. a handle; 801. and connecting the steel bars.
Detailed Description
The present utility model will be described in further detail with reference to the following examples in order to make the objects, technical solutions and advantages of the present utility model more apparent. Of course, the specific embodiments described herein are for purposes of illustration only and are not intended to limit the utility model.
Referring to fig. 1-4, a caulking tool for installing prefabricated wall boards is characterized by comprising a bottom plate 1 and side plates 2 symmetrically arranged on two sides of the bottom plate 1, wherein the side plates are a first side plate and a second side plate respectively, the outer sides of the first side plate and the second side plate are connected through a vertical plate 3, a connecting plate 4 is arranged on the inner side of the first side plate, a baffle plate 5 parallel to the vertical plate 3 is arranged on the inner side of the connecting plate 4, the height of the baffle plate 5 is matched with a gap, the height of the connecting plate 4 is the same as that of the baffle plate 5, and the other end of the baffle plate 5 faces the second side plate and extends out of the second side plate;
the utility model also comprises a pressing plate 9 which is arranged between the two side plates 2 in a sliding way, and the pressing plate 9 is contacted with the inner walls of the side plates 2 and the vertical plate 3.
The length of the connection plate 4 is typically 5-10mm.
Screw rods 10 are symmetrically arranged at the lower part of the outer wall of the vertical plate 3, supporting rods 11 are sleeved on the screw rods 10 and fixed through nuts 12, and idler wheels 13 are rotatably arranged at the lower ends of the supporting rods 11.
The outer side of the second side plate is provided with a storage box 6 with an upper end and an inner side open, and the inner side surface of the storage box 6 is flush with the side plate 2.
Two ends of the pressing plate 9 are provided with bosses 901, and two side plates 2 are provided with sliding grooves 201 matched with the bosses 901.
The upper part of the vertical plate 3 is inclined outward.
The upper end face of the pressing plate 9 is provided with a handle 902.
The using mode is as follows: placing the baffle 5 in a gap between the wallboard 8 and the floor slab 7, and generally at the outer side of the connecting steel bar 801, ensuring that the upper end face and the lower end face of the baffle 5 are respectively contacted with the wallboard 8 and the floor slab 7, unscrewing the nuts 12, adjusting the positions of the supporting rods 11 and the rollers 13, enabling the rollers 13 to slide on the ground, taking out the pressing plate 9, injecting mortar between the two side plates 2 and the vertical plates 3, pushing a tool to walk along the ground, and enabling part of mortar to flow into the area among the baffle 5, the wallboard 15 and the floor slab, wherein the second side plate can start a trowelling effect in the moving process;
in order to ensure the emphasis of plastering, the pressing plate 9 can be pressed in the moving process, the internal pressure of mortar among the baffle plate 5, the wallboard 15 and the floor slab is increased, the effect of mortar addition is realized, the redundant mortar can flow into the storage box 6 through the gap between the side plate II and the baffle plate 5, and the storage box 6 is preferably detachable, so that the later cleaning is convenient.
The foregoing description of the preferred embodiments of the utility model is not intended to limit the utility model to the precise form disclosed, and any such modifications, equivalents, and alternatives falling within the spirit and scope of the utility model are intended to be included within the scope of the utility model.

Claims (6)

1. The utility model provides a prefabricated wallboard is caulking tool for installation, its characterized in that includes bottom plate, symmetry set up the curb plate of bottom plate both sides, be curb plate one and curb plate two respectively, the outside of curb plate one and curb plate two is connected through the riser, the inboard of curb plate one is provided with the connecting plate, the inboard of connecting plate is provided with the baffle parallel with the riser, the height of baffle and gap match and the height of connecting plate is the same with the baffle, the other end of baffle orientation curb plate two just stretches out curb plate two;
the device also comprises a pressing plate which is arranged between the two side plates in a sliding way, and the pressing plate is in contact with the inner walls of the side plates and the vertical plate.
2. The caulking tool for installing prefabricated wall panels according to claim 1, wherein screw rods are symmetrically arranged at the lower part of the outer wall of the vertical plate, support rods are sleeved on the screw rods and fixed through nuts, and rollers are rotatably arranged at the lower ends of the support rods.
3. The caulking tool for installing a prefabricated wall panel according to claim 1, wherein the outer side of the second side plate is provided with a storage box having an upper end and an inner side open, and the inner side surface of the storage box is flush with the side plate.
4. The caulking tool for installing a prefabricated wall panel according to claim 1, wherein bosses are arranged at two ends of the pressing plate, and sliding grooves matched with the bosses are arranged on the two side plates.
5. The caulking tool for installing a prefabricated wall panel according to claim 1, wherein an upper portion of said riser is inclined to the outside.
6. The caulking tool for installing a prefabricated wall panel according to claim 1, wherein the upper end face of the pressing plate is provided with a handle.
CN202321321356.6U 2023-05-29 2023-05-29 Caulking instrument is used in installation of prefabricated wallboard Active CN219910148U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321321356.6U CN219910148U (en) 2023-05-29 2023-05-29 Caulking instrument is used in installation of prefabricated wallboard

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321321356.6U CN219910148U (en) 2023-05-29 2023-05-29 Caulking instrument is used in installation of prefabricated wallboard

Publications (1)

Publication Number Publication Date
CN219910148U true CN219910148U (en) 2023-10-27

Family

ID=88435676

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321321356.6U Active CN219910148U (en) 2023-05-29 2023-05-29 Caulking instrument is used in installation of prefabricated wallboard

Country Status (1)

Country Link
CN (1) CN219910148U (en)

Similar Documents

Publication Publication Date Title
CN219910148U (en) Caulking instrument is used in installation of prefabricated wallboard
CN204040450U (en) A kind of for angle connector in tools type section steel builder's jack
CN208054200U (en) A kind of building waste conveying transferring device being conducive to environmental protection
CN206552533U (en) A kind of detachable storage rack of prefabricated panel
CN106753446A (en) Combined forming die for construction of coke oven flue crown and construction method thereof
CN201125523Y (en) Concrete floating device
CN214090831U (en) Anti-drop type wall construction equipment
CN212317417U (en) Wall formula brickwork gap fills out grey device
CN220790674U (en) Building wall mortar laying device
CN209323958U (en) Dismountable aluminum alloy mould plate
CN208456101U (en) A kind of housing construction scaffold
CN207974424U (en) A kind of mounting device of strip panel
CN217537569U (en) Assembled construction grout sleeve device
CN212715997U (en) Mortar joint mortar spreading tool for building block wall construction
CN220080816U (en) Auxiliary tool for grouting construction of prefabricated wallboard
CN205558254U (en) Aluminum alloy wooden model built -up plate system template auxiliary device
CN217268978U (en) Building engineering wall builds appurtenance by laying bricks or stones
CN207436255U (en) A kind of assembling type steel structure beam slab
CN218668042U (en) Dregs regeneration type concrete block
CN216196717U (en) Cement troweling device for constructional engineering
CN204590593U (en) A kind of aluminum alloy mould plate
CN214246911U (en) Fender is enclosed in portable construction
CN214696636U (en) Floor depression bar with anti-skidding mechanism
CN212613899U (en) Leveling device for house improvement
CN208633566U (en) A kind of simple apparatus of plastering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant