CN219864116U - Movable precast shear wall grouting device - Google Patents

Movable precast shear wall grouting device Download PDF

Info

Publication number
CN219864116U
CN219864116U CN202321064051.1U CN202321064051U CN219864116U CN 219864116 U CN219864116 U CN 219864116U CN 202321064051 U CN202321064051 U CN 202321064051U CN 219864116 U CN219864116 U CN 219864116U
Authority
CN
China
Prior art keywords
grouting
movable
shear wall
precast shear
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321064051.1U
Other languages
Chinese (zh)
Inventor
常征
尚陈
陈夕纯
陈兵
汪波
汪卫郭
许培志
唐伟
尹钥
徐方东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Construction Engineering Wandong Construction Investment Co ltd
Original Assignee
Anhui Construction Engineering Wandong Construction Investment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Construction Engineering Wandong Construction Investment Co ltd filed Critical Anhui Construction Engineering Wandong Construction Investment Co ltd
Priority to CN202321064051.1U priority Critical patent/CN219864116U/en
Application granted granted Critical
Publication of CN219864116U publication Critical patent/CN219864116U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model relates to the technical field of building construction, in particular to a movable precast shear wall grouting device, which comprises a movable trolley, a mounting assembly, a motor, a hydraulic pump and a grouting cylinder, wherein a diesel generator is arranged on the movable trolley; the movable trolley comprises a front wheel, a front axle, a rear wheel, a rear axle, two triangular brackets and a connecting shaft, wherein the two triangular brackets are respectively connected to the front axle and the rear axle, and the connecting shaft is arranged at the top of the two triangular brackets; the mounting assembly comprises a positioning plate, a supporting frame and a connecting plate, wherein the positioning plate is vertically arranged on the left side planes of the two triangular brackets, the supporting frame is vertically arranged on the right side planes of the two triangular brackets, and the connecting plate is arranged on the left side planes of the two triangular brackets; the motor is installed on the support frame, the hydraulic pump is installed on the locating plate, the grouting barrel is installed on the connecting plate, the grouting barrel is integrated in the movable trolley through motor hydraulic pressure and a small diesel generator, and the grouting barrel can realize multi-hole simultaneous grouting, can move at will and has high grouting speed.

Description

Movable precast shear wall grouting device
Technical Field
The utility model relates to the technical field of building construction, in particular to a movable precast shear wall grouting device.
Background
In the field of construction engineering, fabricated concrete structures are one of the main structural types of buildings. The prefabricated concrete components (hereinafter referred to as prefabricated components for short) are main components of the prefabricated house, and the prefabricated components are finished concrete components manufactured in a factory by a component processing unit, and are assembled, connected and partially cast in situ on a construction site to form a reinforced concrete frame structure of the building body. For prefabricated components, the connection quality of the steel bar nodes plays a decisive role in the safety of the structure, and the vertical connection of the assembled concrete shear wall and the frame structure in China is mostly realized by adopting grouting sleeve connection inserted steel bars.
Because the grouting sleeve is embedded in the member, and the sleeve grouting belongs to the concealing engineering, the grouting plumpness directly influences the connection firmness degree of the prefabricated member, and then influences the earthquake resistance and the stress performance of the building. The existing scheme is manual grouting, grouting pressure is small, grouting speed is low when grouting is needed, cost of artificial materials is high, and time and labor are wasted. Or simple grouting device, need the manual work to move when the slip casting, receive outside influence greatly, need connect electric etc. and consume time long, slip casting inefficiency.
Disclosure of Invention
To above-mentioned problem, provide a portable precast shear wall cementer, through set up diesel generator on travelling car, generate electricity for the motor through diesel generator, through motor drive hydraulic pump, the stirring frame that the hydraulic pump is connected stirs in the grout section of thick bamboo, through the honeycomb duct of grout section of thick bamboo bottom, pour into precast shear wall with grouting material, the motor can connect the wheel equally, drives the wheel simultaneously and rotates, labour saving when moving, can realize porous grout simultaneously, can remove at will, grout speed is fast.
In order to solve the problems in the prior art, the movable precast shear wall grouting device comprises a movable trolley, a mounting assembly, a motor, a hydraulic pump and a grouting cylinder, wherein a diesel generator is arranged on the movable trolley; the movable trolley comprises two front wheels, a front axle, two rear wheels, a rear axle, two triangular brackets and a connecting shaft, wherein mounting frames are arranged on the two front wheels, the mounting frames are arranged below the front axle, mounting frames are arranged on the two rear wheels, the mounting frames are arranged below the rear axle, the two triangular brackets are respectively connected to the front axle and the rear axle, the connecting shaft is arranged at the top of the two triangular brackets, and handles are arranged at the continuation positions of the two sides of the connecting shaft; the mounting assembly comprises a positioning plate, a supporting frame and a connecting plate, wherein the positioning plate is vertically arranged on the left side planes of the two triangular brackets, the supporting frame is vertically arranged on the right side planes of the two triangular brackets, the connecting plate is arranged on the left side planes of the two triangular brackets, the connecting plate is provided with a supporting plate, and the supporting plate is provided with a positioning hole; the motor is arranged on the support frame, a fixed base is arranged at the bottom of the hydraulic pump, the fixed base is fixedly arranged on the positioning plate, the hydraulic pump is connected with a stirring frame, and the front end of the stirring frame penetrates through the positioning plate; the grouting cylinder is arranged on the connecting plate, a flow guide pipe is arranged at the bottom of the grouting cylinder, the flow guide pipe penetrates through the positioning hole, and the stirring frame is positioned inside the grouting cylinder.
Preferably, auxiliary wheels are arranged on two sides of the front axle.
Preferably, a valve is arranged in the guide pipe.
Preferably, the stirring blade is arranged on the front end of the stirring frame, and the stirring blade is spirally arranged on the stirring frame.
Preferably, the movable trolley is provided with a fixed shaft, and the fixed shaft is arranged between the two triangular frames.
Preferably, an elastic brake pad is arranged on the rear wheel and is arranged on the mounting frame.
Compared with the prior art, the utility model has the beneficial effects that:
1. according to the utility model, the diesel generator is arranged on the movable trolley, the diesel generator is used for generating power to the motor, the motor is used for driving the hydraulic pump, the stirring frame connected with the hydraulic pump is used for stirring in the grouting cylinder, grouting material is poured into the prefabricated shear wall through the flow guide pipe at the bottom of the grouting cylinder, the motor can be connected with the wheels, and meanwhile, the wheels are driven to rotate, so that labor is saved during movement, and the multi-hole simultaneous grouting can be realized, the grouting can be randomly moved, and the grouting speed is high.
2. According to the utility model, the auxiliary wheels are arranged, so that the moving stability of the trolley can be effectively maintained during moving, and the trolley can be prevented from moving randomly during grouting operation, so that the grouting operation is prevented from being hindered.
3. According to the utility model, by arranging the valve, the grouting speed and quantity can be effectively controlled, and simultaneously, the grouting material can be fully stirred in the grouting barrel and then poured into the prefabricated shear wall, so that the grouting efficiency is improved.
4. According to the utility model, the elastic brake pad is arranged, so that the advancing speed of the mobile trolley can be effectively controlled under the friction action of the elastic brake pad and the rear wheels when the mobile trolley advances, and potential safety hazards caused by the fact that the speed of the mobile trolley is too high are prevented.
Drawings
FIG. 1 is a schematic perspective view of a movable precast shear wall grouting apparatus.
FIG. 2 is an elevation view of a movable precast shear wall grouting apparatus.
Fig. 3 is a right side view of a movable precast shear wall grouting apparatus.
FIG. 4 is a right side perspective view of a movable precast shear wall grouting apparatus.
Fig. 5 is a top view of a movable precast shear wall grouting apparatus.
FIG. 6 is a schematic view of a grouting barrel structure of a movable precast shear wall grouting device.
The reference numerals in the figures are: 1-a mobile trolley; 11-front wheels; 111-mounting rack; 12-front axle; 121-auxiliary wheels; 13-rear wheels; 131-an elastic brake pad; 14-rear axle; 15-connecting shafts; 151-handle; 16-a fixed shaft; 17-a tripod; 2-positioning plates; 3-supporting frames; 4-connecting plates; 41-supporting plates; 411-positioning holes; 5-a motor; 6-a hydraulic pump; 61-a stirring frame; 611-stirring blade; 62-fixing a base; 7-grouting cylinder; 71-a flow guiding pipe; 711-valve; 8-diesel generator.
Detailed Description
The utility model will be further described in detail with reference to the drawings and the detailed description below, in order to further understand the features and technical means of the utility model and the specific objects and functions achieved.
Referring to fig. 1 to 6, there is shown: the movable precast shear wall grouting device comprises a movable trolley 1, a mounting assembly, a motor 5, a hydraulic pump 6 and a grouting barrel 7, wherein a diesel generator 8 is arranged on the movable trolley 1; the mobile trolley 1 comprises two front wheels 11, a front axle 12, two rear wheels 13, a rear axle 14, two triangular brackets 17 and a connecting shaft 15, wherein mounting frames 111 are arranged on the two front wheels 11, the mounting frames 111 are arranged below the front axle 12, the mounting frames 111 are arranged on the two rear wheels 13, the mounting frames 111 are arranged below the rear axle 14, the two triangular brackets 17 are respectively connected to the front axle 12 and the rear axle 14, the top parts of the two triangular brackets 17 are provided with the connecting shaft 15, and handles 151 are arranged at the continuation positions of the two sides of the connecting shaft 15; the mounting assembly comprises a positioning plate 2, a supporting frame 3 and a connecting plate 4, wherein the positioning plate 2 is vertically arranged on the left side planes of the two triangular brackets 17, the supporting frame 3 is vertically arranged on the right side planes of the two triangular brackets 17, the connecting plate 4 is arranged on the left side planes of the two triangular brackets 17, the connecting plate 4 is provided with a supporting plate 41, and the supporting plate 41 is provided with a positioning hole 411; the motor 5 is arranged on the support frame 3, a fixed base 62 is arranged at the bottom of the hydraulic pump 6, the fixed base 62 is fixedly arranged on the positioning plate 2, the hydraulic pump 6 is connected with a stirring frame 61, and the front end of the stirring frame 61 penetrates through the positioning plate 2; the grouting barrel 7 is arranged on the connecting plate 4, a flow guide pipe 71 is arranged at the bottom of the grouting barrel 7, the flow guide pipe 71 penetrates through the positioning hole 411, and the stirring frame 61 is positioned inside the grouting barrel 7.
The installation component and the A-frame 17 are all fixed mounting, and the installation mode includes bolt fastening, welded fastening etc., diesel generator 8 links to each other with motor 5 through the wire, motor 5 control is connected hydraulic pump 6, and when the staff need carry out the grout operation to prefabricated shear force wall, will remove the dolly 1 through pushing handle 151 on the dolly 1 and push away the assigned position, generate electricity through diesel generator 8 on the dolly 1, the electricity generation gives motor 5, through motor 5 drive hydraulic pump 6, motor 5 can connect the wheel equally, drive the wheel simultaneously and rotate, labour saving when moving, the carriage 61 that hydraulic pump 6 connects stirs in the grout section of thick bamboo 7, through the honeycomb duct 71 of grout section of thick bamboo 7 bottom, pour into prefabricated shear force wall with grouting material. The movable trolley 1 integrated with the motor 5 hydraulic pressure and the small diesel generator 8 can realize multi-hole simultaneous grouting, can move at will and has high grouting speed.
Referring to fig. 1, it is shown that: auxiliary wheels 121 are provided on both sides of the front axle 12.
By providing the auxiliary wheels 121, the stability of the movement of the trolley can be maintained during the movement, and the phenomenon that the trolley does not move during the grouting operation can be maintained.
Referring to fig. 6, it is shown: a valve 711 is disposed in the guide pipe 71.
The speed and the quantity of grouting can be controlled by arranging the valve 711, and simultaneously, the grouting material can be fully stirred in the grouting barrel 7 and then poured into the prefabricated shear wall.
Referring to fig. 2 and 5, it is shown that: the front end of the stirring frame 61 is provided with stirring blades 611, and the stirring blades 611 are spirally arranged on the stirring frame 61.
Through setting up stirring leaf 611, can obtain abundant stirring with the grouting material in the grout barrel 7, avoid because grouting material stirs inadequately, influence prefabricated shear wall's filling engineering. Meanwhile, the stirring blades 611 are spirally designed, and grouting can be realized by pushing grouting materials through a spiral structure.
Referring to fig. 3 and 5, it is shown that: the mobile trolley 1 is provided with a fixed shaft 16, and the fixed shaft 16 is arranged between two triangular frames.
By arranging the fixed shaft 16, the stability of the movable trolley 1 is reinforced, the trolley is prevented from shaking in the power generation process of the diesel engine and under the working condition of the hydraulic pump 6, and the service life of the movable trolley 1 is prolonged.
Referring to fig. 1 and 4, it is shown that: the rear wheels 13 are provided with elastic brake pads 131, and the elastic brake pads 131 are mounted on the mounting frame 111.
Through setting up elasticity brake block 131, when travelling car 1 advances, through the friction effect of elasticity brake block 131 and rear wheel 13, the forward speed of control travelling car 1 prevents travelling car 1 speed too fast, causes the potential safety hazard.
The foregoing examples merely illustrate one or more embodiments of the utility model, which are described in greater detail and are not to be construed as limiting the scope of the utility model. It should be noted that it will be apparent to those skilled in the art that several variations and modifications can be made without departing from the spirit of the utility model, which are all within the scope of the utility model. Accordingly, the scope of protection of the present utility model is to be determined by the appended claims.

Claims (6)

1. The movable precast shear wall grouting device comprises a movable trolley (1), a mounting assembly, a motor (5), a hydraulic pump (6) and a grouting cylinder (7), and is characterized in that a diesel generator (8) is arranged on the movable trolley (1);
the movable trolley (1) comprises two front wheels (11), a front axle (12), two rear wheels (13), a rear axle (14), two triangular supports (17) and a connecting shaft (15), wherein mounting frames (111) are arranged on the two front wheels (11), the mounting frames (111) are arranged below the front axle (12), mounting frames (111) are arranged on the two rear wheels (13), the mounting frames (111) are arranged below the rear axle (14), the two triangular supports (17) are respectively connected to the front axle (12) and the rear axle (14), the tops of the two triangular supports (17) are provided with the connecting shaft (15), and handles (151) are arranged at the continuation positions of two sides of the connecting shaft (15);
the mounting assembly comprises a positioning plate (2), a supporting frame (3) and a connecting plate (4), wherein the positioning plate (2) is vertically arranged on the left side planes of two triangular brackets (17), the supporting frame (3) is vertically arranged on the right side planes of the two triangular brackets (17), the connecting plate (4) is arranged on the left side planes of the two triangular brackets (17), a supporting plate (41) is arranged on the connecting plate (4), and a positioning hole (411) is formed in the supporting plate (41);
the motor (5) is arranged on the support frame (3), a fixed base (62) is arranged at the bottom of the hydraulic pump (6), the fixed base (62) is fixedly arranged on the positioning plate (2), the hydraulic pump (6) is connected with a stirring frame (61), and the front end of the stirring frame (61) penetrates through the positioning plate (2); the grouting device is characterized in that the grouting barrel (7) is arranged on the connecting plate (4), a flow guide pipe (71) is arranged at the bottom of the grouting barrel (7), the flow guide pipe (71) penetrates through the positioning hole (411), and the stirring frame (61) is located inside the grouting barrel (7).
2. A movable precast shear wall grouting apparatus according to claim 1, wherein auxiliary wheels (121) are provided on both sides of the front axle (12).
3. A movable precast shear wall grouting apparatus according to claim 1, characterized in that a valve (711) is provided in the guide pipe (71).
4. The movable precast shear wall grouting device according to claim 1, wherein stirring blades (611) are arranged on the front end of the stirring frame (61), and the stirring blades (611) are spirally arranged on the stirring frame (61).
5. The movable precast shear wall grouting apparatus according to claim 1, wherein a fixed shaft (16) is provided on the traveling carriage (1), and the fixed shaft (16) is installed between two triangular frames.
6. A movable precast shear wall grouting device according to claim 1, characterized in that the rear wheels (13) are provided with elastic brake pads (131), the elastic brake pads (131) being mounted on a mounting frame (111).
CN202321064051.1U 2023-05-06 2023-05-06 Movable precast shear wall grouting device Active CN219864116U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321064051.1U CN219864116U (en) 2023-05-06 2023-05-06 Movable precast shear wall grouting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321064051.1U CN219864116U (en) 2023-05-06 2023-05-06 Movable precast shear wall grouting device

Publications (1)

Publication Number Publication Date
CN219864116U true CN219864116U (en) 2023-10-20

Family

ID=88335044

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321064051.1U Active CN219864116U (en) 2023-05-06 2023-05-06 Movable precast shear wall grouting device

Country Status (1)

Country Link
CN (1) CN219864116U (en)

Similar Documents

Publication Publication Date Title
CN112878690A (en) A vibration device for floor concrete construction
CN102182180B (en) Rotary extrusion sleeve anchor rod and construction method thereof
CN219864116U (en) Movable precast shear wall grouting device
CN214532784U (en) Lifting anchoring slope protection drilling machine
CN202441062U (en) Mobile pouring machine of concrete pouring pipe
CN209761335U (en) Horizontal directional drilling machine
CN217400818U (en) Road drilling equipment for municipal works
CN212249253U (en) A vibration device for floor concrete construction
CN210238970U (en) Extrusion of waterproofing membrane is caught up with bubble device
CN209941659U (en) Foundation pit ramming device for earthquake-resistant construction of building
CN216275636U (en) A drill bit for cast in situ concrete tubular pile
CN210597357U (en) Wind power plant fan foundation concrete curved surface floating equipment
CN201428378Y (en) Drill for recycling tower crane foundation screws
CN215441854U (en) Foundation engineering tamping equipment
CN218803066U (en) Concrete pipe pile forming device
CN211616158U (en) Connecting tool for steel column and reinforced concrete beam
CN214600685U (en) River course cleaning device is used in hydraulic engineering construction
CN218253891U (en) A supplementary fixing device for steel processing
CN216108486U (en) Piling equipment for ocean engineering
CN216298596U (en) Steel construction engineering is with angle steel corner cut mechanical device who is equipped with guide rail set spare
CN216341016U (en) Light crawler-type concrete vibrating and leveling device
CN216552129U (en) Piping lane inner wall crackle detects prosthetic devices
CN218745753U (en) Bridge electric welding platform support
CN219010830U (en) Self-compaction pouring device for plate-type ballastless track
CN207829810U (en) A kind of cast-in-situ bored pile rapid construction device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant