CN210597357U - Wind power plant fan foundation concrete curved surface floating equipment - Google Patents
Wind power plant fan foundation concrete curved surface floating equipment Download PDFInfo
- Publication number
- CN210597357U CN210597357U CN201921432001.8U CN201921432001U CN210597357U CN 210597357 U CN210597357 U CN 210597357U CN 201921432001 U CN201921432001 U CN 201921432001U CN 210597357 U CN210597357 U CN 210597357U
- Authority
- CN
- China
- Prior art keywords
- connecting ring
- curved surface
- floating
- basis
- concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
A wind power plant fan foundation concrete curved surface floating device comprises a first connecting ring, a second connecting ring, track supporting rods, a sliding rail and an automatic floating device, wherein the first connecting ring is fixedly arranged on the outer wall of the edge of the lower portion of an upper template of a fan foundation; the utility model discloses an automatic floating device that sets up trowels concrete along slide rail reciprocating motion, through the position of adjusting the slide rail and being connected with the track vaulting pole, can make automatic floating device trowel the domatic different positions of fan basis concrete, and the floating of carrying out foundation ditch concrete surface that can be quick has saved the manpower, has improved construction speed and efficiency.
Description
Technical Field
The utility model relates to a floating equipment technical field of concrete especially relates to a floating equipment of wind-powered electricity generation field fan basis concrete curved surface.
Background
Binding the foundation pit of the wind power plant by using reinforcing steel bars before pouring, pouring concrete in a reinforcing steel bar gap by using a pump truck, and tamping the concrete of the foundation pit by using a vibrating bar to bear the weight of a motor hub; after concrete vibrates in the work progress in the past, set up plank or other supports on the foundation ditch through the manual work, then the workman stands and carries out manual floating concrete surface with the trowel on plank or support, because of the concrete is earlier than the concrete of normally remaining the appearance at the time of the on-the-spot construction initial set of mountain region, so just need consume great manpower and go the concrete floating on the foundation ditch fast, consume the manpower promptly, and construction speed is also slower.
Disclosure of Invention
In view of the above, there is a need for a curved surface trowelling device for wind turbine foundation concrete of a wind farm.
A concrete curved surface floating device for a wind power plant fan foundation is arranged on the fan foundation, the fan foundation comprises a lower part foundation and an upper part foundation arranged on the lower part foundation, an upper template used for concrete pouring and forming is arranged on the upper part foundation, a lower template used for concrete pouring and forming is arranged on the lower part foundation, the device comprises a first connecting ring, a second connecting ring, a track supporting rod, a sliding rail and an automatic floating device, the first connecting ring is fixedly arranged on the outer wall of the lower part edge of the upper template of the fan foundation, the second connecting ring is fixedly arranged on the outer wall of the upper part edge of the lower template of the fan foundation, the track supporting rod is arranged along the concrete slope surface of the fan foundation, one end of the track supporting rod is fixedly connected with the first connecting ring, the other end of the track supporting rod is fixedly connected with the second connecting ring, and two ends of the sliding rail are respectively connected with two adjacent track supporting rods, the automatic floating device is arranged on the sliding rail and can move relatively along the sliding rail.
Preferably, the automatic floating device comprises a driving part and a floating mechanism, the driving part is mounted on the sliding rail and can relatively move along the sliding rail, and the floating mechanism is fixedly arranged at the lower part of the driving part.
Preferably, the floating mechanism comprises a connecting rod, a pushing and dispersing plate and a floating part, the upper end of the connecting rod is fixedly connected with the lower part of the driving part, the lower end of the connecting rod is fixedly connected with the pushing and dispersing plate, and the floating part is fixedly arranged at the bottom of the pushing and dispersing plate.
Preferably, the floating component comprises a fixed column and a floating device, one end of the fixed column is fixedly connected with the bottom of the pushing and dispersing plate, the other end of the fixed column is fixedly connected with the floating device, and the bottom of the floating device is parallel to the bottom of the pushing and dispersing plate.
Preferably, the troweling device is arranged in a splayed shape.
Preferably, the track support rod is provided with a pin hole for connecting with a slide rail.
Preferably, the first connecting ring and the second connecting ring are connected with the track brace through bolts.
Preferably, the scattering plate is W-shaped, and a surface of the scattering plate contacting the concrete is arc-shaped.
Preferably, the slide rail is arc-shaped.
Preferably, first go-between, second go-between are the ring form, and first go-between, second go-between are assembled by at least two connecting pieces that are circular-arc, set up the bolt hole on every connecting piece, compress tightly through two upper and lower mounting plates between every connecting piece head and the tail to pass through the bolt-up.
The utility model adopts the above technical scheme, its beneficial effect lies in: the utility model discloses an including first connecting ring, second go-between, the track vaulting pole, a slide rail, automatic floating device, first connecting ring is fixed to be set up on the outer wall at fan basis cope match-plate pattern lower part border, the second connecting ring is fixed to be set up on the outer wall at fan basis lower bolster upper portion border, the track vaulting pole sets up along fan basis concrete slope, one end and the first connecting ring fixed connection of track vaulting pole, the other end and the second connecting ring fixed connection of track vaulting pole, the both ends of slide rail are connected with two adjacent track vaulting poles respectively, automatic floating device installs on the slide rail, and automatic floating device can relatively move along the slide rail; the utility model discloses an automatic floating device that sets up is along slide rail reciprocating motion to floating the concrete, through the position of adjusting the slide rail and being connected with the track vaulting pole, can make automatic floating device float the domatic different positions of fan basis concrete, can be quick carry out foundation ditch concrete surface floating, saved the manpower, improved construction speed and efficiency.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a schematic mechanism diagram of the floating mechanism of the present invention.
Fig. 3 is a schematic structural diagram of the first connecting ring of the present invention.
Fig. 4 is a schematic structural view of a second connection ring according to the present invention.
In the figure: the concrete floating device comprises a first connecting ring 01, a connecting piece 11, a fastening plate 12, a second connecting ring 02, a track support rod 03, a sliding rail 04, an automatic floating device 05, a driving part 51, a floating mechanism 52, a connecting rod 521, a pushing plate 522, a floating part 523, a fixing column 5231, a floating device 5232, an upper template 06, a lower template 07 and a concrete slope surface 08.
Detailed Description
Referring to fig. 1 to 4, an embodiment of the present invention provides a concrete curved surface trowelling device for a wind turbine foundation of a wind farm, the device is installed on a wind turbine foundation, the wind turbine foundation includes a lower foundation and an upper foundation disposed on the lower foundation, an upper template 06 for concrete pouring and forming is installed on the upper foundation, a lower template 07 for concrete pouring and forming is installed on the lower foundation, the device includes a first connection ring 01, a second connection ring 02, a track brace 03, a slide rail 04, and an automatic trowelling device 05, the first connection ring 01 is fixedly disposed on an outer wall of a lower edge of the upper template 06 of the wind turbine foundation, the second connection ring 02 is fixedly disposed on an outer wall of an upper edge of the lower template 07 of the wind turbine foundation, the track brace 03 is disposed along a concrete slope 08 of the wind turbine foundation, one end of the track brace 03 is fixedly connected to the first connection ring 01, the other end of the track brace 03 is fixedly connected to the second connection ring 02, two ends of the sliding rail 04 are respectively connected with the two adjacent rail supporting rods 03, and the sliding rail 04 is arc-shaped. The automatic floating device 05 is installed on the sliding rail 04, and the automatic floating device 05 can relatively move along the sliding rail 04.
The automatic floating device 05 comprises a driving part 51 and a floating mechanism 52, the driving part 51 is mounted on the sliding rail 04, the driving part 51 can move relatively along the sliding rail 04, and the driving part 51 can be composed of a traveling mechanism of an electric hoist. The troweling mechanism 52 is fixedly provided below the driving member 51.
The floating mechanism 52 comprises a connecting rod 521, a pushing and dispersing plate 522 and a floating part 523, wherein the upper end of the connecting rod 521 is fixedly connected with the lower part of the driving part 51, the lower end of the connecting rod 521 is fixedly connected with the pushing and dispersing plate 522, the pushing and dispersing plate 522 is W-shaped, and the surface of the pushing and dispersing plate 522, which is contacted with concrete, is arc-shaped; the floating member 523 is fixedly disposed at the bottom of the push-dispersing plate 522. The troweling member 523 includes a fixing column 5231 and a troweling device 5232, one end of the fixing column 5231 is fixedly connected with the bottom of the pushing and dispersing plate 522, the other end of the fixing column 5231 is fixedly connected with the troweling device 5232, the bottom of the troweling device 5232 is parallel to the bottom of the pushing and dispersing plate 522, the pushing and dispersing plate 522 pushes away the surplus concrete slurry, and the troweling device 5232 trowels the concrete surface. The troweling device 5232 is in a splayed shape, and when the troweling device 5232 reciprocates on the concrete surface, the troweling device can scrape the concrete slurry flowing downwards upwards, so that the concrete slurry is prevented from flowing downwards and damaging the leveled concrete surface.
Offer the pinhole that is used for being connected with slide rail 04 on the track vaulting pole 03, alright realize floating the domatic 08 different positions of fan basis concrete through trowelling device 5232 with the position through adjusting slide rail 04 when using like this to the more quick floating of carrying out foundation ditch concrete surface has saved the manpower, has improved construction speed and efficiency.
The first connecting ring 01 and the second connecting ring 02 are both connected with the rail brace 03 through bolts.
First go-between 01, second go-between 02 are the ring form, and first go-between 01, second go-between 02 are assembled by at least two connecting pieces 11 that are circular-arc, set up the bolt hole on every connecting piece 11, compress tightly through two upper and lower mounting plates 12 between every connecting piece 11 head and the tail to through the bolt-up, both can play fixed cope match-plate pattern 06, lower bolster 07's effect like this, convenient dismantlement installation again.
The utility model discloses an operating mode is as follows, through the pump truck with concrete placement in the reinforcing bar gap, fill up fan foundation's cope match-plate pattern 06 when the concrete, behind the lower bolster 07, start drive assembly 51, drive assembly 51 drives and pushes away board 522, trowelling device 5232 is along slide rail 04 reciprocating motion, the action of imitative workman's arm round trip movement trowelling, it pushes away unnecessary concrete to push away board 522, and trowelling device 5232 then can be quick trowelling the concrete surface, then adjust slide rail 04's position, make trowelling mechanism 52 trowelling the different positions of fan foundation concrete domatic 08, thereby quick trowelling the domatic 08 of fan foundation concrete.
While the invention has been described with reference to a preferred embodiment, it will be understood by those skilled in the art that various changes in form and details may be made therein without departing from the spirit and scope of the invention.
Claims (10)
1. The utility model provides a floating equipment of wind-powered electricity generation field fan basis concrete curved surface, this equipment is installed on fan basis, and fan basis includes lower part basis and sets up the upper portion basis on the lower part basis, and the installation is used for the cope match-plate pattern that concrete placement shaping was used for on the upper portion basis, and the installation is used for the lower bolster that concrete placement shaping was used for on the lower part basis, its characterized in that: the equipment comprises a first connecting ring, a second connecting ring, a track supporting rod, a sliding rail and an automatic floating device, wherein the first connecting ring is fixedly arranged on the outer wall of the lower edge of an upper template on the basis of a fan, the second connecting ring is fixedly arranged on the outer wall of the upper edge of a lower template on the basis of the fan, the track supporting rod is arranged along the concrete slope of the basis of the fan, one end of the track supporting rod is fixedly connected with the first connecting ring, the other end of the track supporting rod is fixedly connected with the second connecting ring, two ends of the sliding rail are respectively connected with two adjacent track supporting rods, the automatic floating device is installed on the sliding rail, and the automatic floating device can move relative to the sliding rail.
2. The wind farm wind turbine foundation concrete curved surface screeding equipment according to claim 1, characterized in that: the automatic floating device comprises a driving part and a floating mechanism, the driving part is installed on the sliding rail and can move relatively along the sliding rail, and the floating mechanism is fixedly arranged on the lower portion of the driving part.
3. The wind farm wind turbine foundation concrete curved surface screeding equipment according to claim 2, characterized in that: the floating mechanism comprises a connecting rod, a pushing and dispersing plate and a floating part, the upper end of the connecting rod is fixedly connected with the lower part of the driving part, the lower end of the connecting rod is fixedly connected with the pushing and dispersing plate, and the floating part is fixedly arranged at the bottom of the pushing and dispersing plate.
4. The wind farm wind turbine foundation concrete curved surface screeding equipment according to claim 3, characterized in that: the floating component comprises a fixed column and a floating device, one end of the fixed column is fixedly connected with the bottom of the pushing and dispersing plate, the other end of the fixed column is fixedly connected with the floating device, and the bottom of the floating device is parallel to the bottom of the pushing and dispersing plate.
5. The wind farm wind turbine foundation concrete curved surface screeding equipment according to claim 4, characterized in that: the troweling device is arranged in a splayed shape.
6. The wind farm wind turbine foundation concrete curved surface screeding equipment according to claim 1, characterized in that: and the track support rod is provided with a pin hole for connecting with the slide rail.
7. The wind farm wind turbine foundation concrete curved surface screeding equipment according to claim 1, characterized in that: the first connecting ring and the second connecting ring are connected with the track support rod through bolts.
8. The wind farm wind turbine foundation concrete curved surface screeding equipment according to claim 3, characterized in that: the pushing and scattering plate is W-shaped, and one surface of the pushing and scattering plate, which is contacted with concrete, is arc-shaped.
9. The wind farm wind turbine foundation concrete curved surface screeding equipment according to claim 1, characterized in that: the slide rail is arc-shaped.
10. The wind farm wind turbine foundation concrete curved surface screeding device of claim 7, characterized in that: the first connecting ring and the second connecting ring are circular, the first connecting ring and the second connecting ring are assembled by at least two connecting pieces which are circular arc-shaped, a bolt hole is formed in each connecting piece, and the head and the tail of each connecting piece are compressed tightly through an upper fastening plate and a lower fastening plate and are fastened through bolts.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921432001.8U CN210597357U (en) | 2019-08-30 | 2019-08-30 | Wind power plant fan foundation concrete curved surface floating equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921432001.8U CN210597357U (en) | 2019-08-30 | 2019-08-30 | Wind power plant fan foundation concrete curved surface floating equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210597357U true CN210597357U (en) | 2020-05-22 |
Family
ID=70718206
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921432001.8U Active CN210597357U (en) | 2019-08-30 | 2019-08-30 | Wind power plant fan foundation concrete curved surface floating equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210597357U (en) |
-
2019
- 2019-08-30 CN CN201921432001.8U patent/CN210597357U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204435179U (en) | A kind of automatic leveling head of laser and evener | |
CN105587097B (en) | A kind of adjustable plane earth aerial construction | |
CN201747544U (en) | Mounting pedestal of wind-driven generator and wind-driven generator | |
CN215329719U (en) | Slope cloth paver | |
CN110904969A (en) | High steep slope slab corridor structure concrete placement slipform system | |
CN210597357U (en) | Wind power plant fan foundation concrete curved surface floating equipment | |
CN214272172U (en) | Wind power plant fan tower foundation repairing and reinforcing structure | |
CN2841833Y (en) | Plaster-applying machine | |
CN204982673U (en) | Continuous steel of high mound of hollow thin wall structure 0# section binds and pre -compaction support in 100 -meter dash | |
CN209260715U (en) | A kind of sliding form apparatus pouring small area and small size inclination concrete slab | |
CN202627483U (en) | Pressure weight type railless slip form | |
CN209958387U (en) | Reinforcing apparatus of land-based wind-powered electricity generation field fan pylon basis | |
CN106602980A (en) | Desert land root-type photovoltaic panel solar power generation device | |
CN110344421A (en) | A kind of high slope Vierendeel girder concrete construction method | |
CN205711980U (en) | A kind of chute cast-in-place construction device | |
CN209941659U (en) | Foundation pit ramming device for earthquake-resistant construction of building | |
CN212105891U (en) | A steel mould platform truck for tailing storehouse water drainage tank concrete is integrally cast | |
CN209243755U (en) | A kind of heliostat support device | |
CN207960018U (en) | Jack up rotary climbing ladder | |
CN111778815A (en) | Concatenation formula road surface construction equipment | |
CN210453234U (en) | Highway is road bed raw materials mixing arrangement for bridge construction | |
CN207160052U (en) | A kind of skewback for connecting arcuate bead steel construction | |
CN219864116U (en) | Movable precast shear wall grouting device | |
CN209780265U (en) | concrete pouring leveling device | |
CN220014475U (en) | Building site is with template demolishs device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |