CN219862918U - Integrated tower crane steel bearing platform foundation structure suitable for narrow space - Google Patents

Integrated tower crane steel bearing platform foundation structure suitable for narrow space Download PDF

Info

Publication number
CN219862918U
CN219862918U CN202321331261.2U CN202321331261U CN219862918U CN 219862918 U CN219862918 U CN 219862918U CN 202321331261 U CN202321331261 U CN 202321331261U CN 219862918 U CN219862918 U CN 219862918U
Authority
CN
China
Prior art keywords
steel
tower crane
platform
bearing platform
foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321331261.2U
Other languages
Chinese (zh)
Inventor
章立昌
刘成
王一辰
李佳俊
饶亮
任宇
杨雨龙
倪洲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Third Engineering Bureau General Contracting Construction Co ltd
Original Assignee
China Construction Third Engineering Bureau General Contracting Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Third Engineering Bureau General Contracting Construction Co ltd filed Critical China Construction Third Engineering Bureau General Contracting Construction Co ltd
Priority to CN202321331261.2U priority Critical patent/CN219862918U/en
Application granted granted Critical
Publication of CN219862918U publication Critical patent/CN219862918U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)

Abstract

The utility model discloses an integrated tower crane steel bearing platform foundation structure suitable for a narrow space, which comprises a steel pipe column structure, a steel bearing platform, an operation platform, a steel platform enclosure and a steel crawling ladder and a tower crane standard section; the steel pile cap is installed on steel-pipe column structure, and operating platform installs on the steel pile cap, and the steel platform encloses the fender and installs around operating platform, and the steel cat ladder is installed on operating platform side, and tower crane standard festival is installed on the steel pile cap. The utility model has the beneficial effects that: according to the utility model, the steel pipe column and the steel bearing platform enable the operation platform to have a certain height from the ground, so that the soil retaining and waterproof functions of the tower crane base are realized; the components are subjected to factory customization processing and are quickly installed on site, so that the construction efficiency is greatly improved; the foundation structure can be recycled, so that the material waste is reduced, and the green construction requirement is met; the tower crane foundation can be arranged in narrow spaces such as a fertilizer tank, and the problem that standard knots are difficult to recover after foundation pit backfilling and tower cranes are difficult to arrange in the narrow spaces is solved.

Description

Integrated tower crane steel bearing platform foundation structure suitable for narrow space
Technical Field
The utility model relates to the technical field of constructional engineering, in particular to an integrated tower crane steel bearing platform foundation structure suitable for a narrow space.
Background
The traditional tower crane foundation is generally a reinforced concrete bearing platform, a brick masonry is adopted for the base enclosure, lateral pressure of resisting soil is considered, constructional columns and ring beams are required to be arranged at proper positions, construction procedures are complex, wet operation is more, period is long, masonry materials are put into for one time and can not be circulated, water blocking effect after forming is difficult to control, water in soil can enter from gaps of brick membranes, water is required to be pumped continuously in the later stage, otherwise, accumulated water can corrode the tower crane foundation and foundation bolts, potential safety hazards are caused, and particularly when a narrow space is met, the reinforced concrete bearing platform is inconvenient in early construction operation, and water is very troublesome in later stage water drainage and pumping.
Therefore, it is necessary to provide a foundation structure for an integrated tower crane steel bearing platform, which is suitable for a narrow space.
Disclosure of Invention
Aiming at the defects in the prior art, the utility model aims to provide an integrated tower crane steel bearing platform foundation structure suitable for a narrow space so as to solve the problems.
An integrated tower crane steel bearing platform foundation structure suitable for a narrow space comprises a steel pipe column structure, a steel bearing platform, an operation platform, a steel platform enclosure, a steel crawling ladder and a tower crane standard section; the steel pile cap is installed on steel-pipe column structure, operating platform installs on the steel pile cap, the steel platform encloses the fender and installs around operating platform, the steel cat ladder is installed on operating platform side, tower crane standard festival is installed on the steel pile cap.
Preferably, the operation platform is provided with a cross slot, and the slot position of the cross slot corresponds to the steel bearing platform.
Preferably, a plurality of hinge cover plates are arranged on the side edges of the cross grooves.
Preferably, the steel bearing platform is formed by connecting two H-shaped steels in a cross shape.
Preferably, the steel bearing platform is cross-shaped.
Preferably, the operation platform comprises channel steel and a patterned steel plate, the channel steel is connected to the steel bearing platform, and the patterned steel plate is paved on the channel steel.
Preferably, the steel pipe column structure comprises a plurality of steel pipe columns and reinforcing rods, wherein the steel pipe columns are inserted on the foundation, and the reinforcing rods are connected between two adjacent steel pipe columns.
Preferably, the H-section steel is provided with a plurality of reinforcing ribs.
Preferably, the tower crane foundation base is arranged on the same vertical central line with the steel pipe column at the position of the steel bearing platform.
Compared with the prior art, the utility model has the beneficial effects that:
1. the utility model is provided with the steel pipe column, the steel bearing platform, the operation platform, the steel platform enclosure and the steel crawling ladder, the steel pipe column and the steel bearing platform enable the operation platform to have a certain height from the ground, and the soil retaining and waterproof functions of the tower crane base are realized;
2. the components of the utility model are processed in a factory and customized way, and are installed on site quickly, thus greatly improving the construction efficiency;
3. the steel bearing platform foundation structure can be recycled, so that the material waste is reduced, and the green construction requirement is met;
4. the tower crane foundation can be arranged in narrow spaces such as a fertilizer tank, and the problem that standard knots are difficult to recover after foundation pit backfilling and tower cranes are difficult to arrange in the narrow spaces is solved.
Drawings
FIG. 1 is a schematic diagram of a foundation structure of an integrated tower crane steel bearing platform applicable to a narrow space;
FIG. 2 is a basic structure diagram of an integrated tower crane steel bearing platform according to the utility model;
FIG. 3 is a view of the bottom of the steel platform fence of the present utility model;
FIG. 4 is a view of the structure of the H-beam of the present utility model;
FIG. 5 is a block diagram of an operating platform of the present utility model;
fig. 6 is a schematic view of the installation and use state of the present utility model.
The marks in the figure: 1. an integrated tower crane steel bearing platform foundation; 2. standard section of tower crane; 3. a steel platform enclosure; 4. an operating platform; 5. a steel bearing platform; 6. a steel ladder; 7. a steel pipe column structure; 8. channel steel; 9. a patterned steel plate; 10. a hinge cover plate; 11. cross slotting; 12. h-shaped steel; 13. a steel pipe column; 14. a reinforcing rod; 15. a foundation; 16. reinforcing rib plates; 17. and a tower crane foundation base.
Detailed Description
It should be noted that, without conflict, the embodiments of the present utility model and features of the embodiments may be combined with each other.
In the description of the present utility model, it should be understood that the terms "center", "longitudinal", "lateral", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, are merely for convenience in describing the present utility model and simplifying the description, and do not indicate or imply that the devices or elements referred to must have a specific orientation, be configured and operated in a specific orientation, and thus should not be construed as limiting the present utility model. Furthermore, the terms "first," "second," and the like, are used for descriptive purposes only and are not to be construed as indicating or implying a relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defining "a first", "a second", etc. may explicitly or implicitly include one or more such feature. In the description of the present utility model, unless otherwise indicated, the meaning of "a plurality" is two or more.
In the description of the present utility model, it should be noted that, unless explicitly specified and limited otherwise, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be either fixedly connected, detachably connected, or integrally connected, for example; can be mechanically or electrically connected; can be directly connected or indirectly connected through an intermediate medium, and can be communication between two elements. The specific meaning of the above terms in the present utility model can be understood by those of ordinary skill in the art in a specific case.
Embodiments of the utility model are described in detail below with reference to the attached drawings, but the utility model can be implemented in a number of different ways, which are defined and covered by the claims.
As shown in fig. 1 and combined with fig. 2 to 6, the foundation structure of the integrated tower crane steel bearing platform suitable for a narrow space comprises a steel pipe column structure 7, a steel bearing platform 5, an operation platform 4, a steel platform enclosure 3, a steel crawling ladder 6 and a tower crane standard section 2; the steel pile cap 5 is installed on steel-pipe column structure 7, operating platform 4 is installed on steel pile cap 5, steel platform encloses fender 3 and installs around operating platform 4, steel cat ladder 6 is installed on operating platform 4 a side, tower crane standard festival 2 is installed on steel pile cap 5.
Further, the operation platform 4 is provided with a cross slot 11, and the slot position of the cross slot 11 corresponds to the steel bearing platform 5.
The adoption of the further technical scheme has the beneficial effects that: the tower crane standard knot 2 and the tower crane foundation base 17 are conveniently arranged on the steel bearing platform 5.
Further, a plurality of hinge cover plates 10 are arranged on the side edges of the cross grooves 11.
The adoption of the further technical scheme has the beneficial effects that: when the standard tower crane section 2 and the foundation tower 17 are installed, the hinge cover plate 10 is opened, the standard tower crane section 2 and the foundation tower crane 17 are installed, and the installation is completed.
Furthermore, the steel bearing platform 5 is connected by two H-shaped steel 12 to form a cross shape.
Further, the operation platform 4 comprises a channel steel 8 and a patterned steel plate 9, the channel steel 8 is connected to the steel bearing platform 5, and the patterned steel plate 9 is paved on the channel steel 8.
The adoption of the further technical scheme has the beneficial effects that: the patterned steel plate 9 plays a role in skid resistance.
Further, the steel pipe column structure 7 includes a plurality of steel pipe columns 13 and reinforcing rods 14, the steel pipe columns 13 are inserted on the foundation 15, and the reinforcing rods 14 are connected between two adjacent steel pipe columns 13.
The adoption of the further technical scheme has the beneficial effects that: the reinforcement bar 14 licks the structural rigidity of the dog steel pipe column structure 7.
Further, the H-section steel 12 is provided with a plurality of reinforcing ribs 16.
Further, the tower crane foundation base 17 is installed on the same vertical central line with the steel pipe column 13 at the position of the steel bearing platform 5.
The adoption of the further technical scheme has the beneficial effects that: so that the bearing force of the tower crane is concentrated on the steel pipe column 13, and the stability is improved.
Compared with the prior art, the utility model has the beneficial effects that: the reinforcing ribs 16 increase the rigidity of the H-section steel 12.
1. The utility model is provided with the steel pipe column 7, the steel bearing platform 5, the operation platform 4, the steel platform surrounding baffle 3 and the steel crawling ladder 6, the steel pipe column 7 and the steel bearing platform 5 enable the operation platform to have a certain height from the ground, and the soil retaining and waterproof functions of the tower crane base are realized;
2. the components of the utility model are processed in a factory and customized way, and are installed on site quickly, thus greatly improving the construction efficiency;
3. the steel bearing platform foundation structure is formed by connecting and assembling bolts, is convenient to assemble and disassemble, can be used in a turnover way, reduces material waste, and meets the green construction requirement;
4. the tower steel cushion cap foundation structure can be arranged in narrow spaces such as fertilizer grooves, and the problem that standard knots are difficult to recover after foundation pit backfilling and tower cranes are difficult to arrange in the narrow spaces is solved.
Working principle:
step 1, firstly excavating soil to a designed elevation according to a tower crane foundation construction scheme, and simultaneously considering the excavation progress of the earthwork excavation and the foundation pit, the excavation and external transportation mode of the earthwork, the slope releasing proportion, the excavation depth and the like;
step 2, splicing, leveling, bolt installation and steel enclosure welding of the cross steel beam in a steel structure processing plant according to tower crane selection parameters, and finally scribing and perforating on the steel beam according to the connection form of a tower crane foundation section base sent to the steel structure plant by a tower crane manufacturer, and pre-splicing in the plant after the completion;
and 3, in order to facilitate the plane torsion of part of the steel pipe column, the direction adjustment can be carried out, the steel beam and the steel pipe column are tightly connected, and the steel pipe column is inserted into the bracket in construction.
And 4, welding and reinforcing the position with larger bearing force to ensure the connection strength.
Step 5, after the foundation structure of the integrated tower crane steel bearing platform is installed and reinforced, connecting a tower crane foundation base with the steel bearing platform, and connecting upper and lower flanges of the steel beam in an opposite penetrating manner by adopting a lengthening high-strength screw rod and a gasket; and then the standard section of the tower crane is arranged on the foundation base of the tower crane, and the standard section of the tower crane is additionally arranged according to the height requirement of the tower crane.
The installation step comprises the following steps: the steel pipe column 13 cartridge is on ground 15, is connected with stiffener 14 between two adjacent steel pipe columns 13, and steel cushion cap 5 is installed on steel pipe column structure 7, and operating platform 4 is installed on steel cushion cap 5, and steel platform encloses fender 3 and installs around operating platform 4, and steel cat ladder 6 is installed on operating platform 4 a side, and tower crane standard festival 2 is installed on steel cushion cap 5 through tower crane foundation base 17.
The foregoing description is only of the preferred embodiments of the present utility model and is not intended to limit the scope of the utility model, and all equivalent structures or equivalent processes using the descriptions and drawings of the present utility model or directly or indirectly applied to other related technical fields are included in the scope of the utility model.

Claims (8)

1. Be applicable to integrated formula tower crane steel cushion cap foundation structure in narrow and small space, its characterized in that: the steel pipe column structure comprises a steel pipe column structure (7), a steel bearing platform (5), an operation platform (4), a steel platform enclosure (3), a steel cat ladder (6) and a tower crane standard section (2); the steel pile cap (5) is installed on steel pipe column structure (7), operation platform (4) are installed on steel pile cap (5), steel platform encloses fender (3) and installs around operation platform (4), steel cat ladder (6) are installed on operation platform (4) a side, tower crane standard festival (2) are installed on steel pile cap (5) through tower crane foundation base (17).
2. The foundation structure for the integrated tower crane steel bearing platform in a small space as claimed in claim 1, wherein: the operation platform (4) is provided with a cross slot (11), and the slot position of the cross slot (11) corresponds to the steel bearing platform (5).
3. The foundation structure for the integrated tower crane steel bearing platform in a small space as claimed in claim 2, wherein: a plurality of hinge cover plates (10) are arranged on the side edges of the cross grooves (11).
4. The foundation structure for the integrated tower crane steel bearing platform in a small space as claimed in claim 1, wherein: the steel bearing platform (5) is welded into a cross shape by two H-shaped steels (12).
5. The foundation structure for the integrated tower crane steel bearing platform in a small space as claimed in claim 1, wherein: the operation platform (4) comprises channel steel (8) and pattern steel plates (9), the channel steel (8) is welded on the steel bearing platform (5), and the pattern steel plates (9) are paved and welded on the channel steel (8).
6. The foundation structure for the integrated tower crane steel bearing platform in a small space as claimed in claim 1, wherein: the steel pipe column structure (7) comprises a plurality of steel pipe columns (13) and reinforcing rods (14), wherein the steel pipe columns (13) are inserted on a foundation (15), and the reinforcing rods (14) are connected between two adjacent steel pipe columns (13).
7. The foundation structure for the integrated tower crane steel bearing platform in a small space as claimed in claim 4, wherein: the H-shaped steel (12) is provided with a plurality of reinforcing rib plates (16).
8. The foundation structure for the integrated tower crane steel bearing platform in a small space as claimed in claim 6, wherein: the tower crane foundation base (17) is arranged on the same vertical central line with the steel pipe column (13) at the position of the steel bearing platform (5).
CN202321331261.2U 2023-05-29 2023-05-29 Integrated tower crane steel bearing platform foundation structure suitable for narrow space Active CN219862918U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321331261.2U CN219862918U (en) 2023-05-29 2023-05-29 Integrated tower crane steel bearing platform foundation structure suitable for narrow space

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321331261.2U CN219862918U (en) 2023-05-29 2023-05-29 Integrated tower crane steel bearing platform foundation structure suitable for narrow space

Publications (1)

Publication Number Publication Date
CN219862918U true CN219862918U (en) 2023-10-20

Family

ID=88333558

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321331261.2U Active CN219862918U (en) 2023-05-29 2023-05-29 Integrated tower crane steel bearing platform foundation structure suitable for narrow space

Country Status (1)

Country Link
CN (1) CN219862918U (en)

Similar Documents

Publication Publication Date Title
CN101614019A (en) The multilayer underground structure next to existing building self-supporting construction method
KR102195504B1 (en) Construction method for Eearth self-retaining wall using reinforcing member and CIP construction method
JP2007051541A (en) Retaining wall and construction method therefor
US20130008125A1 (en) Construction method for new underground structure
CN112095626A (en) Foundation pit supporting structure serving as corridor underpinning pile foundation and construction method thereof
KR102195510B1 (en) Construction method for earth self-retaining wall using reinforcing member and PHC pile
CN219862918U (en) Integrated tower crane steel bearing platform foundation structure suitable for narrow space
KR102362257B1 (en) Top-down construction method
CN111270678A (en) Support system and construction method thereof
KR200492883Y1 (en) Braced wall
CN216339582U (en) Combined inclined support for foundation pit support
JP4550534B2 (en) Building basic structure
CN212801564U (en) Foundation ditch steel sheet pile supporting construction
KR102195496B1 (en) Pile for earth self-retaining wall using cast in place concrete pile with double I beam
JP3345598B2 (en) Waste landfill stock equipment
KR102194381B1 (en) Pile for Earth self-retaining wall using double I beam
JP2003268770A (en) Earth retaining construction method and reinforcing structure of sheet pile used for this construction method
JP3133598B2 (en) Construction method of small and medium-sized building with basement floor
KR102194394B1 (en) Construction method for earth self-retaining wall using reinforcing member and SCW construction method
CN217678551U (en) Upper bridge and lower tunnel combined construction structure
JP2571426B2 (en) Construction method of retaining wall
CN217758822U (en) Two-pile one-column underpinning structure in vertical synchronous reverse construction foundation pit
CN214089901U (en) Double steel-pipe pile and construction road integration supporting construction
CN218175897U (en) Combined steel platform tower crane foundation
CN218466561U (en) Assembled side slope protective structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant