CN219862175U - Assembled interim ground of construction - Google Patents

Assembled interim ground of construction Download PDF

Info

Publication number
CN219862175U
CN219862175U CN202321287383.6U CN202321287383U CN219862175U CN 219862175 U CN219862175 U CN 219862175U CN 202321287383 U CN202321287383 U CN 202321287383U CN 219862175 U CN219862175 U CN 219862175U
Authority
CN
China
Prior art keywords
plate
ear
board
sideboard
steel plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321287383.6U
Other languages
Chinese (zh)
Inventor
黄鹏
王长征
陈力郡
尹正希
毛存
黄泽鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Top Construction Group Co ltd
Original Assignee
Guangdong Top Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Top Construction Group Co ltd filed Critical Guangdong Top Construction Group Co ltd
Priority to CN202321287383.6U priority Critical patent/CN219862175U/en
Application granted granted Critical
Publication of CN219862175U publication Critical patent/CN219862175U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model discloses an assembled temporary ground for building construction, which uses a steel structure as the temporary ground, the steel structure is split, a main board and a sideboard can be disassembled and spliced at will, the temporary ground with different sizes is assembled, and a drainage ditch capable of being matched with the sideboard is configured, so that the drainage requirement in building construction is met. After the use is finished, all the components are disassembled and recycled, so that the concrete temporary floor can be recycled, the ground breaking process is omitted compared with the original concrete temporary floor, the generation of building rubbish is reduced, the concrete temporary floor is superior to the traditional reinforced concrete floor in the aspects of construction cost, energy conservation and environmental protection, and the concrete temporary floor meets the development concepts of current technological buildings and green construction.

Description

Assembled interim ground of construction
Technical Field
The utility model relates to the technical field of construction temporary floors, in particular to an assembled temporary floor for building construction.
Background
In the construction industry, the construction area needs to be paved with a smooth temporary ground during temporary construction, the temporary ground is formed by pouring concrete in the prior art, the concrete cannot be changed after being shaped, the concrete cannot be reused, the construction area needs to be broken and detached, a drainage ditch is paved in some cases, and the concrete is difficult to pour for one-step forming.
Disclosure of Invention
Therefore, in order to solve the above-mentioned problem, an object of the present utility model is to provide an assembled temporary ground for building construction, which comprises a main board, a side board and a drainage ditch, wherein a first ear board is arranged at one end of the main board, which is close to the side board, a second ear board is arranged at both ends of the side board, a first ear board is arranged at one end of the drainage ditch, which is close to the side board, and the first ear board and the second ear board are mutually matched, so that the main board, the side board and the drainage ditch are spliced in sequence to form the temporary ground.
Preferably, the main board comprises a first frame, the first frame comprises an upper steel plate, a lower steel plate and a plurality of channel steel, the upper end and the lower end of the channel steel are respectively connected with the upper steel plate and the lower steel plate, the side board comprises a second frame, and the second frame is identical to the first frame in structure.
Preferably, the upper steel plate is a 6mm thick checkered plate.
Preferably, the lower steel plate is a 3mm thick steel plate.
Preferably, be equipped with slope board and slope regulating plate in the escape canal, one of them one end of slope board can block on the slope regulating plate of different co-altitude, and then adjusts the slope.
Preferably, one end of the main board far away from the side board is provided with a first lug plate/a second lug plate, and the plurality of main boards are mutually matched and spliced together through the first lug plate and the second lug plate.
Preferably, the first ear plate is higher than the second ear plate, and when the first ear plate is matched with the second ear plate, the lower end of the first ear plate abuts against the upper end of the second ear plate.
The beneficial effects of the utility model are as follows:
use steel construction as interim ground, with steel construction split, mainboard and sideboard can dismantle the concatenation wantonly, assemble into the interim ground of equidimension not, and the configuration can with sideboard complex escape canal, satisfy the drainage requirement when the building construction. After the use, each part is disassembled and recycled, so that the concrete temporary floor can be recycled, the process of breaking the floor is avoided compared with the original concrete temporary floor, and the generation of construction waste is reduced.
Drawings
In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings that are required in the embodiments or the description of the prior art will be briefly described, it being obvious that the drawings in the following description are only some embodiments of the utility model, and that other drawings may be obtained according to these drawings without inventive effort for a person skilled in the art.
FIG. 1 is a schematic diagram of the structure of the present utility model;
FIG. 2 is a schematic view of the structure of the present utility model prior to assembly;
FIG. 3 is a schematic view of the assembled structure of the present utility model;
FIG. 4 is a schematic cross-sectional view of the drain;
reference numerals illustrate: 1. a main board; 2. a side plate; 3. a drainage ditch; 31. a slope plate; 32. a gradient adjusting plate; 4. a first ear plate; 5. a second ear plate; 6. a first frame; 7. a second frame; 8. a steel plate is arranged; 81. a lower steel plate; 82. channel steel.
The achievement of the objects, functional features and advantages of the present utility model will be further described with reference to the accompanying drawings, in conjunction with the embodiments.
Detailed Description
The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model.
In the description of the present utility model, it should be noted that the directions or positional relationships indicated by the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc. are based on the directions or positional relationships shown in the drawings, are merely for convenience of describing the present utility model and simplifying the description, and do not indicate or imply that the devices or elements referred to must have a specific orientation, be configured and operated in a specific orientation, and thus should not be construed as limiting the present utility model. Furthermore, the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
Unless specifically stated or limited otherwise, the terms "mounted," "connected," and "coupled" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; can be directly connected or indirectly connected through an intermediate medium, and can be communication between two elements. The specific meaning of the above terms in the present utility model will be understood in specific cases by those of ordinary skill in the art.
Examples:
fig. 1-4 show an assembled temporary floor for building construction, which is provided by the utility model, and comprises a main board 1, side boards 2 and a drainage ditch 3, wherein the number of the main boards 1 is configured according to the size of the temporary floor which is actually required, two ends of the main board 1 are provided with first ear boards 4/second ear boards 5 according to the requirement, two ends of the side boards 2 are provided with second ear boards 5, the drainage ditch 3 is connected with the side boards 2, one end of the drainage ditch 3 is provided with the first ear boards 4, the end is close to the side boards 2, the first ear boards 4 on the drainage ditch 3 are matched with the second ear boards 5 at one end of the side boards 2 during installation, the first ear boards 4 on the main board 1 are directly connected with the side boards 2, and the ends are close to the side boards 2 and are matched with the second ear boards 5 at one end, far away from the drainage ditch 3, of the side boards 2.
The drainage ditch 3, the sideboard 2 and the main board 1 form a complete temporary ground after being spliced as required, a worker can tread on the sideboard 2 or the main board 1, and the drainage ditch 3 is used for discharging wastewater in construction.
The main board 1 and the sideboard 2 are both composed of frames of steel structures, specifically, the main board 1 comprises a first frame 6, the first frame 6 comprises an upper steel plate 8, a lower steel plate 81 and channel steel 82, the channel steel 82 is arranged between the upper steel plate 8 and the lower steel plate 81 and is respectively connected with the upper steel plate 8 and the lower steel plate 81, the sideboard 2 comprises a second frame 7, the second frame 7 is identical to the first frame 6 in structure, and the main board 1 and the sideboard 2 are different in that the two sides are provided with a first lug plate 4 or a second lug plate 5.
The upper steel plate 8 is a 6mm thick checkered plate, the lower steel plate 81 is a 3mm thick steel plate, the thicknesses and materials of the upper steel plate 8 and the lower steel plate 81 are 6mm and 3mm after being tested according to actual conditions, and other sizes meeting the use requirements can be adopted.
The slope board 31 and the slope regulating board 32 are arranged in the drainage ditch 3, the slope board 31 has a certain inclination angle relative to the ground, and the slope regulating boards 32 with different heights can be used for clamping the slope board 31, so that the slope board 31 can regulate the inclination angle, namely the slope.
The first ear plate 4 is arranged at a high position, the height is higher than that of the second ear plate 5, the second ear plate 5 is arranged at a low position, the first ear plate
When the ear plate is matched with the second ear plate 5, the lower end of the first ear plate 4 is abutted against the upper end of the second ear plate 5.
Working principle:
when the temporary ground is paved, the number of the main boards 1 is correspondingly configured in advance according to the size of the required ground, the drainage hooks, the side boards 2 and the main boards 1 are spliced and combined together through the mutual matching of the first ear boards 4 and the second ear boards 5 to form a complete construction temporary ground with a side road drainage function, and the main boards 1 and the side boards 2 are all of steel structures and are reliable and durable. After the construction is completed, the drainage ditch 3, the sideboard 2 and the main board 1 are detached and can be recycled and reused in other construction sites.
The foregoing description is only of the optional embodiments of the present utility model, and is not intended to limit the scope of the utility model, and all the equivalent structural changes made by the description of the present utility model and the accompanying drawings or the direct/indirect application in other related technical fields are included in the scope of the utility model.

Claims (7)

1. The utility model provides a construction assembled interim ground, its characterized in that, includes mainboard (1), sideboard (2) and escape canal (3), mainboard (1) is close to the one end of sideboard (2) is equipped with first otic placode (4), sideboard (2) both ends all are equipped with second otic placode (5), the one end that escape canal (3) is close to sideboard (2) is equipped with first otic placode (4), first otic placode (4) mutually support with second otic placode (5), make mainboard (1), sideboard (2) and escape canal (3) splice gradually and form interim ground.
2. The building construction assembled temporary floor according to claim 1, wherein the main board (1) comprises a first frame (6), the first frame (6) comprises an upper steel plate (8), a lower steel plate (81) and a plurality of channel steels (82), the upper end and the lower end of the channel steels (82) are respectively connected with the upper steel plate (8) and the lower steel plate (81), the side boards (2) comprise a second frame (7), and the second frame (7) and the first frame (6) are identical in structure.
3. The building construction assembled temporary floor according to claim 2, characterized in that the upper steel plate (8) is a 6mm thick checkered plate.
4. The building construction assembled temporary floor according to claim 2, wherein the lower steel plate (81) is a 3mm thick steel plate.
5. The building construction assembled temporary ground according to claim 1, wherein a gradient plate (31) and a gradient adjusting plate (32) are arranged in the drainage ditch (3), and one end of the gradient plate (31) can be clamped on the gradient adjusting plate (32) with different heights so as to adjust the gradient.
6. The building construction assembled temporary ground according to claim 1, wherein one end of the main board (1) far away from the side board (2) is provided with a first ear board (4)/a second ear board (5), and the plurality of main boards (1) are mutually matched and spliced together through the first ear board (4) and the second ear board (5).
7. The building construction assembled temporary floor according to claim 1, wherein the first ear plate (4) is higher than the second ear plate (5), and when the first ear plate (4) is matched with the second ear plate (5), the lower end of the first ear plate (4) is abutted against the upper end of the second ear plate (5).
CN202321287383.6U 2023-05-24 2023-05-24 Assembled interim ground of construction Active CN219862175U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321287383.6U CN219862175U (en) 2023-05-24 2023-05-24 Assembled interim ground of construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321287383.6U CN219862175U (en) 2023-05-24 2023-05-24 Assembled interim ground of construction

Publications (1)

Publication Number Publication Date
CN219862175U true CN219862175U (en) 2023-10-20

Family

ID=88316808

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321287383.6U Active CN219862175U (en) 2023-05-24 2023-05-24 Assembled interim ground of construction

Country Status (1)

Country Link
CN (1) CN219862175U (en)

Similar Documents

Publication Publication Date Title
CN109403627A (en) A kind of building aluminum dipping form back cord yin-yang angle reinforces link system
CN210657852U (en) Prefabricated road deck and temporary road structure
CN110067321B (en) Flexible connecting device for assembled shear wall and construction method thereof
CA2797192A1 (en) Building block, system and method
CN219862175U (en) Assembled interim ground of construction
CN208380099U (en) Concrete casting device
CN211993513U (en) Steel bench for beam slab prefabricating field
CN211899665U (en) Building engineering construction building templates
CN215406634U (en) Cast-in-place area leak protection thick liquid device of superimposed sheet
CN213732386U (en) Prefabricated template is used in highway construction convenient to installation
CN213418182U (en) Combined template for multi-ribbed beam
CN210552005U (en) Wallboard type assembled side form structure
CN210482635U (en) Concrete pillar reinforcing structure at lower part of shock insulation support
CN210289105U (en) Movable building aluminum template component
CN103216087B (en) A kind of two-way self-bearing type construction formwork system
CN206607689U (en) Precast beam and wallboard connecting structure and building
CN215519700U (en) Steel buckle terrace
CN214819471U (en) End post ring beam member moulded die
CN214658858U (en) Fixing device for supporting integral building template
CN210483016U (en) Aluminum template corner mechanism for wall shrinkage
CN213359379U (en) Sink pond aluminum mould board in bathroom
CN220414443U (en) Drainage ditch template
CN217500478U (en) Open ditch cast-in-situ combined die
CN218373300U (en) Steel concrete combination decking and steel girder connection structure
CN215211128U (en) Prefabricated cushion cap mould buttress of assembled

Legal Events

Date Code Title Description
GR01 Patent grant