CN219852973U - Auxiliary tool for installing steel pipes in sections of tunnel reinforcement pipe shed - Google Patents
Auxiliary tool for installing steel pipes in sections of tunnel reinforcement pipe shed Download PDFInfo
- Publication number
- CN219852973U CN219852973U CN202320454745.XU CN202320454745U CN219852973U CN 219852973 U CN219852973 U CN 219852973U CN 202320454745 U CN202320454745 U CN 202320454745U CN 219852973 U CN219852973 U CN 219852973U
- Authority
- CN
- China
- Prior art keywords
- clamp
- pipe shed
- pipe
- jack
- rectangular frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 62
- 239000010959 steel Substances 0.000 title claims abstract description 62
- 230000002787 reinforcement Effects 0.000 title claims abstract description 19
- 238000009434 installation Methods 0.000 claims description 7
- 230000011218 segmentation Effects 0.000 claims 1
- 238000010276 construction Methods 0.000 description 5
- 238000000034 method Methods 0.000 description 4
- 238000005452 bending Methods 0.000 description 2
- 238000009412 basement excavation Methods 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000008092 positive effect Effects 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A40/00—Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
- Y02A40/10—Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in agriculture
- Y02A40/25—Greenhouse technology, e.g. cooling systems therefor
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
The utility model discloses an auxiliary tool for installing steel pipes in sections of a tunnel reinforcement pipe shed, which comprises clamps, a beam, a pull rod, nuts and jacks, wherein the two clamps respectively clamp the ends of the steel pipes of the front section pipe shed and the rear section pipe shed; the cross beam, the pull rod and the nut form two rectangular frame structures which are symmetrically arranged on the upper side and the lower side of the steel pipe of the pipe shed; a jack is arranged between the beam at one end of the rectangular frame structure and the other clamp; when in use, the upper jack and the lower jack are connected with the ends of the steel pipes of the pipe shed through the rectangular frame and the clamp. The auxiliary tool can ensure that the connection between the steel reinforcement framework and the pipe shed steel pipe is smooth and straight, and improves the connection quality and efficiency.
Description
Technical Field
The utility model relates to an auxiliary tool for tunnel construction, in particular to a steel pipe connection auxiliary tool for section installation of a tunnel reinforcement pipe shed.
Background
In order to ensure the safety of tunnel excavation and tunnel entering construction, the greenhouse is widely applied. When the geological condition is worse, in order to improve the intensity of the pipe shed, a steel reinforcement cage is arranged in the steel pipe of the pipe shed. The current common construction method of the pipe shed adopts a down-the-hole drill to guide holes, and then uses tools such as an excavator or a loader to push the pipe shed steel pipes into the holes for installation in place; because the length of the steel pipe of the pipe shed and the steel reinforcement framework in the steel pipe is large, the rigidity is small, the installation and the positioning of the one-time integral pushing hole are difficult, and the sectional installation construction is required; when the pipe shed steel pipes and the steel bar frameworks are installed together in a segmented mode, the steel bar frameworks in the pipe shed steel pipes are required to be connected firstly, then the external pipe shed steel pipes are connected in a closing mode, the rigidity of the exposed steel bar frameworks before the pipe shed steel pipes are connected in a closing mode is smaller than that of the pipe shed steel pipes on the two sides, the exposed steel bar frameworks are easy to bend due to force application pushing at the tail portions of the pipe shed steel pipes, and therefore an auxiliary tool for connecting the pipe shed steel pipes after the connection of the steel bar frameworks is completed is required to be designed, and the connection straightness of the steel bar frameworks and the pipe shed steel pipes is guaranteed.
Disclosure of Invention
The utility model aims to overcome the problems of the prior art and provides an auxiliary tool for installing steel pipes in sections of a tunnel reinforcement pipe shed, which can prevent an exposed reinforcement cage from bending in the process of gathering the steel pipes of the pipe shed, ensure that the reinforcement cage and the steel pipes of the pipe shed are connected smoothly, and improve the connection quality and efficiency.
The utility model adopts the technical proposal for solving the technical problems in the prior art that:
the utility model relates to a steel pipe connection auxiliary tool for installing a tunnel reinforcement pipe shed section by section, which comprises two clamps which are arranged at intervals in front of and behind a coaxial line, wherein each clamp is of a hoop structure, the two clamps are respectively used for clamping the tail part of a steel pipe of a pipe shed of a front section and the front end of a steel pipe of a pipe shed of a back section, two rectangular frame structures are arranged at intervals up and down oppositely, each rectangular frame structure comprises two clamp beams which are arranged at intervals left and right oppositely, the two clamp beams are connected through two pull rods which are arranged in the front and back along the horizontal direction, and the pull rods are fixed with the clamp beams which are correspondingly connected through nuts; the upper and lower mounting lugs of the left clamp are respectively pressed against the inner walls of the upper and lower clamp cross beams on the left side in the two rectangular frame structures; the base bodies of the upper jack and the lower jack respectively press the inner wall arrangement of the upper clamp beam and the lower clamp beam on the right side in the two rectangular frame structures, the ejector rods of the upper jack and the lower jack are arranged along the horizontal direction and respectively jack up the upper mounting lug and the lower mounting lug of the clamp on the right side.
The utility model has the advantages and positive effects that: in the construction process of sectionally installing the steel reinforcement frameworks in the pipe shed steel pipes and drawing the pipe shed steel pipes together, the compression length of the steel reinforcement frameworks is shortened, the force application axis is kept consistent with the axes of the steel reinforcement frameworks and the pipe shed steel pipes, the exposed steel reinforcement frameworks are prevented from bending in the process of drawing the pipe shed steel pipes together, the connection smoothness of the steel reinforcement frameworks and the pipe shed steel pipes is ensured, and the connection quality and efficiency are improved.
Drawings
FIG. 1 is a schematic structural view of a steel pipe connection auxiliary tool for sectional installation of a tunnel reinforcement pipe shed;
fig. 2 is a schematic diagram of an application of the tool shown in fig. 1.
Detailed Description
For a further understanding of the utility model, its features and advantages, reference is now made to the following examples, which are illustrated in the accompanying drawings in which:
referring to fig. 1-2, an auxiliary tool for installing steel pipes in sections of a tunnel reinforcement pipe shed comprises two clamps 1 arranged at intervals around a coaxial line, wherein each clamp is of a hoop structure, the hoop structure is formed by joining left and right half hoops after the two half hoops are joined, the left and right half hoops are semicircular, two ends of the semicircular ring are outwards bent to form a mounting lug, and the two butted mounting lugs are fixedly connected through bolts. The two clamps 1 are respectively used for clamping the tail part of the steel pipe of the front section of the pipe shed and the front end of the steel pipe of the rear section of the pipe shed, the upper and lower intervals of the two rectangular frame structures are oppositely arranged, each rectangular frame structure comprises two clamp cross beams 2 which are oppositely arranged at intervals left and right, the two clamp cross beams are connected through two pull rods 3 which are arranged in the horizontal direction, and the pull rods are fixed with the clamp cross beams which are correspondingly connected through nuts 4.
The upper and lower mounting lugs of the left clamp are respectively pressed against the inner walls of the upper and lower clamp cross beams 2 on the left side in the two rectangular frame structures; the base bodies of the upper jack 5 and the lower jack are respectively pressed against the inner wall of the upper clamp beam 2 and the lower clamp beam 2 on the right side in the two rectangular frame structures, and the ejector rods of the upper jack and the lower jack are respectively pressed against the upper mounting lug and the lower mounting lug of the clamp on the right side along the horizontal direction.
The installation and use method of the structure is as follows:
after the connection of the pipe shed steel bar frameworks 7 is completed, the clamp is clamped at the end parts of the front section pipe shed steel pipe 6 and the rear section pipe shed steel pipe 6, and the two rectangular frame structures and the jack 5 are symmetrically installed in place according to the illustration respectively; simultaneously, the jacks 5 on the upper side and the lower side are started, the front section pipe shed steel pipe 6 end and the rear section pipe shed steel pipe 6 end are driven by the rectangular frame structure and the jacks 5 to gradually close until the front section pipe shed steel pipe 6 end and the rear section pipe shed steel pipe 6 end are closed and the pipe shed steel pipe joints are welded after the front section pipe shed steel pipe and the rear section pipe shed steel pipe 6 end are closed.
Although the preferred embodiments of the present utility model have been described above with reference to the accompanying drawings, the present utility model is not limited to the above-described embodiments, which are merely illustrative and not restrictive, and many forms may be made by those having ordinary skill in the art without departing from the spirit of the present utility model and the scope of the appended claims, which are within the scope of the present utility model.
Claims (1)
1. A tunnel reinforcement pipe canopy segmentation installation steel pipe connection appurtenance, its characterized in that: the two clamps are respectively used for clamping the tail part of the steel pipe of the pipe shed of the previous section and the front end of the steel pipe of the pipe shed of the next section, the two rectangular frame structures are oppositely arranged at intervals up and down, each rectangular frame structure comprises two clamp beams which are oppositely arranged at intervals left and right, the two clamp beams are connected through two pull rods which are arranged in the horizontal direction, and the pull rods are fixed with the clamp beams which are correspondingly connected through nuts; the upper and lower mounting lugs of the left clamp are respectively pressed against the inner walls of the upper and lower clamp cross beams on the left side in the two rectangular frame structures; the base bodies of the upper jack and the lower jack respectively press the inner wall arrangement of the upper clamp beam and the lower clamp beam on the right side in the two rectangular frame structures, the ejector rods of the upper jack and the lower jack are arranged along the horizontal direction and respectively jack up the upper mounting lug and the lower mounting lug of the clamp on the right side.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320454745.XU CN219852973U (en) | 2023-03-11 | 2023-03-11 | Auxiliary tool for installing steel pipes in sections of tunnel reinforcement pipe shed |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320454745.XU CN219852973U (en) | 2023-03-11 | 2023-03-11 | Auxiliary tool for installing steel pipes in sections of tunnel reinforcement pipe shed |
Publications (1)
Publication Number | Publication Date |
---|---|
CN219852973U true CN219852973U (en) | 2023-10-20 |
Family
ID=88348941
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202320454745.XU Active CN219852973U (en) | 2023-03-11 | 2023-03-11 | Auxiliary tool for installing steel pipes in sections of tunnel reinforcement pipe shed |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN219852973U (en) |
-
2023
- 2023-03-11 CN CN202320454745.XU patent/CN219852973U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN1884751A (en) | End plate type steel pipe concrete column-steel beam connection node | |
CN105239787B (en) | Complete spliced concrete frame bracing means and its construction method | |
CN219852973U (en) | Auxiliary tool for installing steel pipes in sections of tunnel reinforcement pipe shed | |
CN103603997A (en) | Construction method of correction by retraction of jack pipes | |
CN103104038A (en) | Rectangular tubular column jointing inner sleeve bolt connection node | |
CN109252682A (en) | A kind of rope bearing structure hound installation method | |
CN216007392U (en) | Prefabricated reinforced concrete wall body of assembly type structure and structural connection spare | |
CN206418409U (en) | Assembled steel pipe holder for cast-in-place concrete construction of bridge | |
CN204081087U (en) | A kind of reinforced concrete column and reinforcing steel bar connecting device | |
CN207714747U (en) | A kind of reinforced column formwork reinforcement fixture | |
CN215406560U (en) | Connection node of sectional type steel pipe confined concrete column and concrete beam | |
CN110886386B (en) | Building square column joint connecting structure and connecting method thereof | |
CN210817152U (en) | Pre-bending wrench for connecting reinforcing steel bars on site of reinforcing cage of bored pile | |
CN219388801U (en) | Tunnel reinforcement pipe canopy sectional installation construction tool sleeve | |
CN103104035A (en) | Bolt connection node of rectangular tubular column splicing externally-sleeved connection piece | |
CN220848728U (en) | Shaped angle steel support reinforcing member of special-shaped beam formwork | |
CN116181964A (en) | Sectional installation construction method for tunnel reinforcement pipe shed | |
CN215763635U (en) | Internal pulling installation equipment for PCCP pipeline | |
CN212224197U (en) | Automatic formula prefabricated component suitable for assembly type structure | |
CN220013994U (en) | Building steel structure with reinforced joint | |
CN218643379U (en) | Assembled steel pipe pile crown beam | |
CN218149804U (en) | Article font template reinforcing apparatus | |
CN212583714U (en) | Tunnel steel frame connecting structure | |
CN211775725U (en) | Connecting piece for reinforcing longitudinal formwork of shear wall | |
CN211660950U (en) | Device for pre-bending main reinforcement of steel bar |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |