CN215763635U - Internal pulling installation equipment for PCCP pipeline - Google Patents

Internal pulling installation equipment for PCCP pipeline Download PDF

Info

Publication number
CN215763635U
CN215763635U CN202120282996.5U CN202120282996U CN215763635U CN 215763635 U CN215763635 U CN 215763635U CN 202120282996 U CN202120282996 U CN 202120282996U CN 215763635 U CN215763635 U CN 215763635U
Authority
CN
China
Prior art keywords
steel pipe
hollow steel
movable rod
beam frame
rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120282996.5U
Other languages
Chinese (zh)
Inventor
王震
刘雨雨
胡新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zaoyang Xinda Tongxing Building Materials Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202120282996.5U priority Critical patent/CN215763635U/en
Application granted granted Critical
Publication of CN215763635U publication Critical patent/CN215763635U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses internal-pulling installation equipment for a PCCP pipeline, which comprises a beam frame I, a movable rod I, a hollow steel pipe I and a buckling piece, wherein the two sides of the beam frame I are respectively provided with a beam frame II and a beam frame III through a tension rope I and a tension rope II, the bottoms of the movable rod I, the movable rod II and the movable rod III are respectively installed in the tops of the hollow steel pipe I, the hollow steel pipe II and the hollow steel pipe III in a penetrating way, and the two ends of the beam frame I, the beam frame II and the beam frame III are respectively provided with the buckling piece in a penetrating way through installation bolts for matching use. The first electric telescopic rod and the second electric telescopic rod which are arranged on the two sides of the beam frame drive the first tension rope and the second tension rope, the first tension rope and the second tension rope drive the second beam frame and the third beam frame which are arranged on the two sides to move, and then the two sections of PCCP pipelines are butt-jointed and installed towards the middle.

Description

Internal pulling installation equipment for PCCP pipeline
Technical Field
The utility model relates to the technical field of PCCP pipeline installation, in particular to an internal pulling installation device of a PCCP pipeline.
Background
Prestressed Concrete Cylinder Pipe (PCCP) is a water Pipe made by winding circumferential Prestressed steel wire on a high-strength Concrete Pipe core with a steel Cylinder and spraying a compact cement mortar protective layer on the Prestressed Concrete Pipe core, and is widely applied to long-interval water main lines, pressure inverted siphons, urban water supply projects, industrial pressure water conveying lines, sewage pipelines of power plant circulating water projects, pressure sewage drainage main pipes and the like. When the PCCP pipeline is installed in a butt joint mode, two embodiments of an outward pulling method and an inward pulling method are generally used.
On one hand, the pulling force of components on two sides of the traditional internal pulling installation equipment of the PCCP pipeline is not uniform in actual use, so that the integral internal pulling use effect of the device is influenced;
on the other hand, the traditional internal pulling installation equipment of the PCCP pipeline cannot adapt to PCCP pipelines with different volumes in actual use, and the overall practical effect of the device is reduced.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a PCCP (prestressed concrete cylinder pipe) pipe internally-pulling installation device, which solves the problem that the internally-pulling installation device in the background art is poor in usability.
In order to achieve the purpose, the utility model provides the following technical scheme: an inner pull installation device of a PCCP pipeline comprises a beam frame I, a movable rod I, a hollow steel pipe I and a buckling piece, wherein an electric telescopic rod I and an electric telescopic rod II are respectively installed on two sides of the beam frame I, one sides of the electric telescopic rod I and the electric telescopic rod II are respectively provided with a beam frame II and a beam frame III through a tension rope I and a tension rope II, the bottoms of the beam frame II and the beam frame III are respectively provided with a hollow steel pipe I and a hollow steel pipe II which are used in a matched mode through the movable rod I and the movable rod II, the bottom of the beam frame I is provided with a middle plate II through a supporting rod, the bottom of the middle plate II is provided with a movable rod III through a bottom frame plate, the bottom of the movable rod III is provided with a hollow steel pipe III which is used in a matched mode, and the bottoms of the movable rod I, the movable rod II and the movable rod III are respectively installed in the tops of the hollow steel pipe I, the hollow steel pipe II and the hollow steel pipe III in a penetrating mode through the bottom of the movable rod III, the two ends of the beam frame I, the beam frame II and the beam frame III are provided with abutting pieces which are matched for use through mounting bolts in a penetrating mode, mounting holes II which are matched for use of the mounting bolts are formed in the abutting pieces, and one ends of the abutting pieces are provided with binding heads which are matched for use.
Preferably, the first movable rod, the second movable rod and the third movable rod are all provided with a first mounting hole, and the first hollow steel pipe, the second hollow steel pipe and the third hollow steel pipe are all provided with a fastening bolt penetrating through the first mounting hole.
Preferably, the first hollow steel pipe and the second hollow steel pipe are provided with a first vertical rod and a second vertical rod through a first intermediate plate, the first bottom support plate and the second bottom support plate are respectively arranged at the bottoms of the first vertical rod and the second vertical rod, a first inclined support rod matched with the first vertical rod and the second vertical rod is arranged between one side of the first vertical rod and the second vertical rod and the top of the first bottom support plate and the top of the second bottom support plate, and a first moving wheel matched with the first bottom support plate and the second bottom support plate are arranged at the bottoms of the first bottom support plate and the second bottom support plate.
Preferably, a second diagonal brace is arranged between the top of the second middle plate and one side of the strut and used in a matched mode.
Preferably, the bottom of the hollow steel pipe III is provided with a second moving wheel used in a matched mode through a third bottom support plate.
Compared with the prior art, the utility model has the beneficial effects that: this interior installation of drawing equipment of PCCP pipeline is rational in infrastructure, has following advantage:
(1) the electric telescopic rod I and the electric telescopic rod II which are matched with the beam frame I are respectively arranged on two sides of the beam frame I, the beam frame II and the beam frame III which are matched with the beam frame I are respectively arranged at one ends of the electric telescopic rod I and the electric telescopic rod II through the tension rope I and the tension rope II, when the PCCP pipeline is pulled inwards to be installed and used, the tension rope I and the tension rope II drive the tension rope I and the tension rope II to move, the beam frame II and the beam frame III on two sides are driven to move, then two sections of PCCP pipelines are butt-jointed and installed towards the middle, and the integral uniform tension effect in the device is also improved;
(2) the movable rod I and the movable rod II are respectively arranged at the bottoms of the beam frame II and the beam frame III, the hollow steel pipe I and the hollow steel pipe II which are used in a matched mode are arranged at the bottoms of the movable rod I and the movable rod II, the middle plate II is arranged at the bottom of the beam frame I through a supporting rod, the movable rod III is arranged at the bottom of the middle plate II through a bottom frame plate, the hollow steel pipe III which is used in a matched mode is arranged at the bottom of the movable rod III, the movable rod I, the movable rod II and the movable rod III are all installed in the hollow steel pipe I, the hollow steel pipe II and the hollow steel pipe III in a penetrating mode, and when the movable rod I, the movable rod II and the movable rod III are installed in the hollow steel pipe I, the hollow steel pipe II and the hollow steel pipe III in a penetrating mode, the height positions of the movable rod I, the movable rod II and the movable rod III in the hollow steel pipe I, the hollow steel pipe II and the hollow steel pipe III are adjusted, so that the size of different pipelines can be adapted, and the overall practical effect of the device is improved;
(3) through at roof beam structure one, the fastener that supports that the cooperation was used is all installed at roof beam structure two and roof beam structure three both ends, and the one end that supports the fastener is equipped with the ligature head that the cooperation was used, be equipped with multiunit mounting hole two that the cooperation was used on supporting the fastener, when carrying out the interior installation of drawing of PCCP pipeline and using, adjust the volume size that the mounted position can make the roof beam structure subassembly adapt to different pipelines through mounting hole two, and the ligature head that supports fastener one end can fasten roof beam structure one effectively, roof beam structure two and the position of roof beam structure three in the pipeline, thereby holistic practical effect in the device has been improved.
Drawings
FIG. 1 is a schematic front sectional view of the present invention;
FIG. 2 is a schematic view of a first/second structure of the hollow steel pipe of the present invention;
FIG. 3 is a schematic structural view of a second intermediate plate according to the present invention;
fig. 4 is a schematic view of a beam frame one/two/three structure of the utility model.
In the figure: 1. a first beam frame; 101. a beam frame II; 102. a beam frame III; 2. a first movable rod; 201. a second movable rod; 202. a first mounting hole; 203. a third movable rod; 3. a first hollow steel pipe; 301. a hollow steel pipe II; 302. fastening a bolt; 303. a hollow steel pipe III; 304. a first middle plate; 4. a first vertical rod; 401. a second vertical rod; 402. a first inclined strut; 5. a first bottom support plate; 501. a bottom support plate II; 502. moving the first wheel; 503. a bottom support plate III; 504. a second moving wheel; 6. a second middle plate; 601. a strut; 602. a second diagonal brace; 603. a chassis plate; 7. electrically connecting the first telescopic rod; 701. a second electric telescopic rod; 702. a tension rope I; 703. a tension rope II; 8. a fastener is abutted; 801. a binding head is arranged; 802. installing a bolt; 803. and a second mounting hole.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-4, an embodiment of the present invention is shown: an internal pulling installation device of a PCCP pipeline comprises a beam frame I1, a movable rod I2, a hollow steel pipe I3 and a buckling piece 8, wherein an electric telescopic rod I7 and an electric telescopic rod II 701 are respectively installed on two sides of the beam frame I1, one sides of the electric telescopic rod I7 and the electric telescopic rod II 701 are respectively provided with a beam frame II 101 and a beam frame III 102 through a tension rope I702 and a tension rope II 703, the electric telescopic rod I7 and the electric telescopic rod II 701 which are used in a matched mode are respectively installed on two sides of the beam frame I1, one ends of the electric telescopic rod I7 and the electric telescopic rod II 701 are respectively provided with the beam frame II 101 and the beam frame III 102 which are used in the matched mode I1 through the tension rope I702 and the tension rope II 703, and when the PCCP pipeline is installed and used in an internal pulling mode, the tension rope I702 and the tension rope II 703 are driven through the electric telescopic rods I7 and the electric telescopic rods 701 on two sides of the beam frame I1, the first tensile rope 702 and the second tensile rope 703 drive the second beam frame 101 and the third beam frame 102 on two sides to move in position, so that two sections of PCCP pipelines are butted and installed towards the middle, and the integral uniform tensile effect in the device is improved;
specifically, the bottom of the beam frame II 101 and the bottom of the beam frame III 102 are respectively provided with a first hollow steel pipe 3 and a second hollow steel pipe 301 which are matched with each other for use through a first movable rod 2 and a second movable rod 201, the bottom of the beam frame I1 is provided with a second intermediate plate 6 through a support rod 601, a second diagonal support rod 602 which is matched with each other for use is arranged between the top of the second intermediate plate 6 and one side of the support rod 601, and the bottom of the second intermediate plate 6 is provided with a third movable rod 203 through a bottom frame plate 603;
specifically, a hollow steel pipe III 303 matched with the movable rod III 203 is installed at the bottom of the movable rod III 203, a movable wheel II 504 matched with the movable rod III 303 is installed at the bottom of the hollow steel pipe III 303 through a bottom support plate III 503, the bottoms of the movable rod I2, the movable rod II 201 and the movable rod III 203 are respectively installed in the tops of the hollow steel pipe I3, the hollow steel pipe II 301 and the hollow steel pipe III 303 in a penetrating manner, mounting holes I202 are respectively formed in the movable rod I2, the movable rod II 201 and the movable rod III 203, and fastening bolts 302 penetrating the mounting holes I202 are respectively arranged on the hollow steel pipe I3, the hollow steel pipe II 301 and the hollow steel pipe III 303;
specifically, a first movable rod 2 and a second movable rod 201 are respectively arranged at the bottoms of a second beam frame 101 and a third beam frame 102, a first hollow steel pipe 3 and a second hollow steel pipe 301 which are matched with each other for use are arranged at the bottoms of the first movable rod 2 and the second movable rod 201, a second middle plate 6 is arranged at the bottom of the first beam frame 1 through a support rod 601, a third movable rod 203 is arranged at the bottom of the second middle plate 6 through a bottom frame plate 603, a third hollow steel pipe 303 which is matched with each other for use is arranged at the bottom of the third movable rod 203, the first movable rod 2, the second movable rod 201 and the third movable rod 203 are all arranged in the first hollow steel pipe 3, the second hollow steel pipe 301 and the third hollow steel pipe 303 in a penetrating manner, and when the installation and use are carried out, the size of different pipelines is adapted by adjusting the height positions of the first movable rod 2, the second movable rod 201 and the third movable rod 203 in the first hollow steel pipe 3, the second hollow steel pipe 301 and the third hollow steel pipe 303, the integral practical effect in the device is also improved;
specifically, the bottoms of the first hollow steel pipe 3 and the second hollow steel pipe 301 are respectively provided with a first vertical rod 4 and a second vertical rod 401 through a first intermediate plate 304, the bottoms of the first vertical rod 4 and the second vertical rod 401 are respectively provided with a first bottom supporting plate 5 and a second bottom supporting plate 501, a first inclined supporting rod 402 which is matched with the first vertical rod 4 and the second vertical rod 401 is arranged between one side of the first vertical rod 4 and one side of the second vertical rod 401 and the tops of the first bottom supporting plate 5 and the second bottom supporting plate 501, and the bottoms of the first bottom supporting plate 5 and the second bottom supporting plate 501 are respectively provided with a first moving wheel 502 which is matched with the second moving wheel;
specifically, the two ends of the beam frame I1, the beam frame II 101 and the beam frame III 102 are all provided with a matched abutting piece 8 through installation bolts 802 in a penetrating manner, the abutting piece 8 is provided with a second installation hole 803 matched with the installation bolts 802, and one end of the abutting piece 8 is provided with a matched binding head 801;
concretely, through at roof beam structure one 1, the fastener 8 that supports that the cooperation was used is all installed at roof beam structure two 101 and the both ends of roof beam structure three 102, and the one end that supports fastener 8 is equipped with the ligature head 801 that the cooperation was used, be equipped with the multiunit mounting hole two 803 that the cooperation was used on supporting fastener 8, when carrying out the interior pulling installation of PCCP pipeline and use, adjust the volume size that the mounted position can make the roof beam structure subassembly adapt to different pipelines through mounting hole two 803, and support the ligature head 801 of fastener 8 one end and can fasten roof beam structure one 1 effectively, roof beam structure two 101 and the position of roof beam structure three 102 in the pipeline, thereby holistic practical effect in the device has been improved.
The working principle is as follows: when the PCCP pipeline is used, firstly, an electric telescopic rod I7 and an electric telescopic rod II 701 which are matched with each other are respectively arranged on two sides of a beam frame I1, a beam frame II 101 and a beam frame III 102 which are matched with the beam frame I1 are respectively arranged at one end of the electric telescopic rod I7 and one end of the electric telescopic rod II 701 through a tension rope I702 and a tension rope II 703, when the PCCP pipeline is internally pulled and installed, the electric telescopic rods I7 and the electric telescopic rods II 701 on the two sides of the beam frame I1 drive the tension rope I702 and the tension rope II 703, the tension rope I702 and the tension rope II 703 drive the beam frame II 101 and the beam frame III 102 on the two sides to move in position, and then two sections of PCCP pipelines are butted and installed towards the middle;
then, the abutting pieces 8 matched with each other are arranged at the two ends of the beam frame I1, the beam frame II 101 and the beam frame III 102, the binding heads 801 matched with each other are arranged at one ends of the abutting pieces 8, the plurality of groups of mounting holes II 803 matched with each other are arranged on the abutting pieces 8, when the PCCP pipeline is pulled inwards to be mounted and used, the beam frame assembly can adapt to the sizes of different pipelines by adjusting the mounting positions through the mounting holes II 803, and the binding heads 801 at one ends of the abutting pieces 8 can effectively fasten the positions of the beam frame I1, the beam frame II 101 and the beam frame III 102 in the pipelines;
finally, the first movable rod 2 and the second movable rod 201 are respectively arranged at the bottom of the second beam frame 101 and the third beam frame 102, the bottom parts of the first movable rod 2 and the second movable rod 201 are provided with a first hollow steel pipe 3 and a second hollow steel pipe 301 which are matched, a second middle plate 6 is arranged at the bottom of the first beam frame 1 through a supporting rod 601, a third movable rod 203 is arranged at the bottom of the second middle plate 6 through a bottom frame plate 603, the bottom of the third movable rod 203 is provided with a third hollow steel pipe 303 which is matched with the third movable rod 203, the first movable rod 2, the second movable rod 201 and the third movable rod 203 are all arranged in the first hollow steel pipe 3, the second hollow steel pipe 301 and the third hollow steel pipe 303 in a penetrating way, when the device is installed and used, the height positions of the first movable rod 2, the second movable rod 201 and the third movable rod 203 in the first hollow steel pipe 3, the second hollow steel pipe 301 and the third hollow steel pipe 303 are adjusted, and then the device can adapt to the sizes of different pipelines.
It will be evident to those skilled in the art that the utility model is not limited to the details of the foregoing illustrative embodiments, and that the present invention may be embodied in other specific forms without departing from the spirit or essential attributes thereof. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the utility model being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (5)

1. The utility model provides a PCCP pipeline draw erection equipment in, includes roof beam structure (1), movable rod (2), hollow steel pipe (3) and supports fastener (8), its characterized in that: electric property telescopic link one (7) and electric property telescopic link two (701) are installed respectively to the both sides of roof beam structure one (1), roof beam structure two (101) and roof beam structure three (102) are installed respectively through pull rope one (702) and pull rope two (703) to one side of electric property telescopic link one (7) and electric property telescopic link two (701), hollow steel pipe one (3) and hollow steel pipe two (301) that the cooperation was used are installed respectively through movable rod one (2) and movable rod two (201) to the bottom of roof beam structure two (101) and roof beam structure three (102), intermediate plate two (6) are installed through branch (601) to the bottom of intermediate plate two (6), movable rod three (203) is installed through end frame plate (603) in the bottom of movable rod three (203), hollow steel pipe three (303) that the cooperation was used are installed to the bottom of movable rod three (203), and movable rod one (2), The bottom of two (201) and three (203) movable rods runs through respectively and installs in the top of hollow steel pipe (3), hollow steel pipe two (301) and hollow steel pipe three (303), the both ends of roof beam structure (1), roof beam structure two (101) and roof beam structure three (102) are all run through mounting bolt (802) and are installed the cooperation and use and support fastener (8), and support and be equipped with mounting hole two (803) that cooperation mounting bolt (802) used on fastener (8), the one end of supporting fastener (8) is equipped with the ann and pricks head (801) that the cooperation was used.
2. The apparatus of claim 1, wherein: the first movable rod (2), the second movable rod (201) and the third movable rod (203) are all provided with a first mounting hole (202), and the first hollow steel pipe (3), the second hollow steel pipe (301) and the third hollow steel pipe (303) are all provided with a fastening bolt (302) penetrating through the first mounting hole (202).
3. The apparatus of claim 1, wherein: the bottom of the hollow steel pipe I (3) and the bottom of the hollow steel pipe II (301) are provided with a first vertical rod (4) and a second vertical rod (401) through a first intermediate plate (304), the bottoms of the first vertical rod (4) and the second vertical rod (401) are respectively provided with a first bottom supporting plate (5) and a second bottom supporting plate (501), a first inclined supporting rod (402) matched with the first bottom supporting plate (5) and the second bottom supporting plate (501) is arranged between one side of the first vertical rod (4) and the second vertical rod (401) and the top of the first bottom supporting plate (5) and the second bottom supporting plate (501), and the bottoms of the first bottom supporting plate (5) and the second bottom supporting plate (501) are respectively provided with a first moving wheel (502) matched with the second bottom supporting plate.
4. The apparatus of claim 1, wherein: and a second diagonal brace (602) matched with the support rod (601) is arranged between the top of the second middle plate (6) and one side of the support rod.
5. The apparatus of claim 1, wherein: and a second moving wheel (504) matched with the third hollow steel pipe (303) is installed at the bottom of the third hollow steel pipe (303) through a third bottom support plate (503).
CN202120282996.5U 2021-02-01 2021-02-01 Internal pulling installation equipment for PCCP pipeline Active CN215763635U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120282996.5U CN215763635U (en) 2021-02-01 2021-02-01 Internal pulling installation equipment for PCCP pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120282996.5U CN215763635U (en) 2021-02-01 2021-02-01 Internal pulling installation equipment for PCCP pipeline

Publications (1)

Publication Number Publication Date
CN215763635U true CN215763635U (en) 2022-02-08

Family

ID=80071768

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120282996.5U Active CN215763635U (en) 2021-02-01 2021-02-01 Internal pulling installation equipment for PCCP pipeline

Country Status (1)

Country Link
CN (1) CN215763635U (en)

Similar Documents

Publication Publication Date Title
CN110230262B (en) Half-integral hoisting structure and butt joint method for main arch rib of basket type steel pipe arch bridge
CN215763635U (en) Internal pulling installation equipment for PCCP pipeline
CN207618963U (en) It is a kind of using fork truck at the top of basement pipe laying device
CN111350345A (en) Pull-rod-free template reinforcing system for outer wall of buried sewage treatment plant and installation method
CN107476334B (en) Prefabricated pipe joint assembling equipment and construction method thereof
CN211776192U (en) Steel structure factory building
CN213061799U (en) Vehicle restriction device for bridge engineering
CN209941691U (en) Electrodynamic type template supports reinforcement equipment
CN209942078U (en) Large-span even strides factory building roof boarding installation dolly
CN108365800B (en) Inhaul cable pre-pressing photovoltaic bracket
CN109537623B (en) Pipe gallery installation method
CN213294502U (en) A hoisting support for installation of mine pipeline
CN212924291U (en) Forklift type electromechanical engineering pipeline installation lifting device
CN215908659U (en) Pipeline dismounting robot for trenchless repairing of pipeline
CN215249228U (en) Simple large-scale pipeline installation adjusting device
CN215055557U (en) Steel construction safety rope fixing device
CN215760392U (en) Bottom fixing device for overhanging outer frame upright rod of building construction scaffold
CN219444939U (en) Pipeline installation auxiliary device
CN217398221U (en) Auxiliary tool for hoisting large flue in limited space
CN220904958U (en) Trolley device for ground concrete pouring construction of railway passenger and finishing station
CN219411839U (en) Casting frame capable of being recycled
CN218015030U (en) Steel pipe shaping device
CN214737292U (en) Telescopic sliding formwork device for prefabricating steel-concrete composite beam
CN219510273U (en) Efficient butt joint device for double-wall corrugated pipe
CN218438222U (en) Reinforcing tool for post-pouring strip template of top plate of garage

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20220811

Address after: South Section of Renmin Road, Zaoyang City, Xiangyang City, Hubei Province 441200

Patentee after: Zaoyang Xinda Tongxing building materials Co.,Ltd.

Address before: 030000 Huimin community, North Zhonghuan street, Heping North Road, Wanbailin District, Taiyuan City, Shanxi Province

Patentee before: Wang Zhen

TR01 Transfer of patent right
PP01 Preservation of patent right

Effective date of registration: 20230509

Granted publication date: 20220208

PP01 Preservation of patent right