CN219841186U - Linking equipment for installation of warm through pipe - Google Patents

Linking equipment for installation of warm through pipe Download PDF

Info

Publication number
CN219841186U
CN219841186U CN202321569982.7U CN202321569982U CN219841186U CN 219841186 U CN219841186 U CN 219841186U CN 202321569982 U CN202321569982 U CN 202321569982U CN 219841186 U CN219841186 U CN 219841186U
Authority
CN
China
Prior art keywords
sleeve
positioning
pipe
joint
warm
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321569982.7U
Other languages
Chinese (zh)
Inventor
王琳博
高跃
吴晓静
贾彦红
高爽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Hezhi Zexi New Energy Technology Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202321569982.7U priority Critical patent/CN219841186U/en
Application granted granted Critical
Publication of CN219841186U publication Critical patent/CN219841186U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

The utility model relates to the technical field of installation of a heating through pipe, in particular to a connecting device for installation of the heating through pipe, which comprises a device machine sleeve and positioning sleeves arranged on two sides of the device machine sleeve; the positioning sleeves are sleeved at two ends of the equipment machine sleeve and are respectively connected with an outer edge joint, and the outer edge joints are connected with an external pipe sleeve; the center line position of the equipment machine sleeve is provided with a middle support positioning head, an elastic abutting piece is arranged outside the middle support positioning head, and the elastic abutting piece is supported between the equipment machine sleeve and the positioning sleeve. The utility model forms a stable connection structure with the equipment machine sleeve, the positioning sleeve and the external pipe sleeve, and simultaneously designs a middle support positioning head at the center line position of the equipment machine sleeve, and the middle support positioning head is supported between the equipment machine sleeve and the positioning sleeve through the elastic supporting piece to form a peripheral buffer structure, thereby improving the buffer supporting effect.

Description

Linking equipment for installation of warm through pipe
Technical Field
The utility model relates to the technical field of installation of a heating through pipe, in particular to a connecting device for installation of the heating through pipe.
Background
In the purification system of the existing building structure, the application range of the heating and ventilation pipeline is very wide; in the laying of building heating and ventilation pipelines, the heating and ventilation pipelines are often connected in sequence, however, the connecting device has an unreasonable integral structure, so that the connecting part of the heating and ventilation pipelines is cracked or broken, air leakage or water leakage of the heating and ventilation pipelines is caused, and the trouble is brought to users.
The heating through pipe connecting structure adopted in the prior art generally comprises a first connecting piece and a second connecting piece which are symmetrically arranged left and right; the first connecting piece and the second connecting piece comprise a connecting ring and a fastening ring, the fastening ring is arranged at the end part of the inner side of the connecting ring, and the outer diameter of the fastening ring is larger than that of the connecting ring. However, the structural design has certain defects, and when the pipeline shakes or vibrates, the connecting ring and the fastening ring can influence the pipe body, so that the pipe body is impacted, and the pipe body structure is influenced.
Disclosure of Invention
The utility model aims to provide a connecting device for installing a warm through pipe, which is used for solving the problems in the background technology.
In order to achieve the above purpose, the present utility model provides the following technical solutions:
the connecting device for mounting the warm through pipe comprises a device machine sleeve and positioning sleeves arranged on two sides of the device machine sleeve;
the positioning sleeves are sleeved at two ends of the equipment machine sleeve and are respectively connected with an outer edge joint, and the outer edge joints are connected with an external pipe sleeve;
the center line position of the equipment machine sleeve is provided with a middle support positioning head, an elastic abutting piece is arranged outside the middle support positioning head, and the elastic abutting piece is supported between the equipment machine sleeve and the positioning sleeve.
As a further scheme of the utility model: the external pipe sleeve comprises a connecting branch pipe arranged on the outer edge joint, a fixed joint arranged on the periphery of the connecting branch pipe and a positioning ring arranged on the fixed joint, and a locking hoop is arranged on the periphery of the positioning ring.
As a further scheme of the utility model: the positioning sleeve comprises a connecting main sleeve, an inserting inner sleeve arranged in the connecting main sleeve and a positioning inserting column arranged in the inserting inner sleeve, and the equipment machine sleeve is inserted in the positioning inserting column and is provided with a reinforcing branch column.
As a further scheme of the utility model: the elastic interference piece comprises a supporting base block arranged at the center line of the equipment machine sleeve, a fixing protrusion arranged on the supporting base block and an installation sleeve arranged on the fixing protrusion, wherein an interference block is arranged at the periphery of the installation sleeve, and interference support pieces are arranged at two sides of the interference block.
As still further aspects of the utility model: the supporting piece is made of elastic materials and is of an arch structure, and the arch end of the supporting piece is supported at the edge of the sleeve body of the connecting main sleeve.
Compared with the prior art, the utility model has the beneficial effects that:
according to the utility model, the heating ventilation pipe is clamped into the equipment machine sleeve, the equipment machine sleeve is mutually butted, the positioning sleeve is sleeved on the heating ventilation pipe, the positioning sleeve is assembled at two ends of the equipment machine sleeve, the external pipe sleeve is sleeved on the heating ventilation pipe, the external pipe sleeve is assembled on the external joint of the positioning sleeve through the external joint, the combined butting is completed, and the equipment machine sleeve, the positioning sleeve and the external pipe sleeve form a stable connecting structure.
The middle support positioning head is arranged at the middle line position of the equipment machine sleeve, and is supported between the equipment machine sleeve and the positioning sleeve through the elastic abutting piece to form a peripheral buffer structure, so that the buffer supporting effect is improved, and the stability of the whole connecting equipment is ensured.
It is to be understood that both the foregoing general description and the following detailed description are exemplary and explanatory only and are not restrictive of the utility model as claimed.
Drawings
The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the utility model and together with the description, serve to explain the principles of the utility model. Meanwhile, these drawings and the written description are not intended to limit the scope of the inventive concept in any way, but to illustrate the inventive concept to those skilled in the art by referring to specific embodiments.
Fig. 1 is a schematic diagram of the overall structure of a joint device for installing a warm pipe according to an embodiment of the present utility model.
Fig. 2 is a schematic structural diagram of an external pipe sleeve according to an embodiment of the present utility model.
Fig. 3 is a schematic structural diagram of a positioning sleeve according to an embodiment of the present utility model.
In the figure: 11. a device holster; 12. a positioning sleeve; 13. an outer edge joint; 14. externally connecting a pipe sleeve; 15. a mid-support positioning head; 16. an elastic abutting member; 21. a locking band; 22. a positioning ring; 23. fixing the joint; 31. connecting the main sleeve; 32. inserting an inner sleeve; 33. positioning an inserting column; 34. reinforcing the support columns; 41. a fixing protrusion; 42. a mounting sleeve; 43. a collision block; 44. a supporting piece is abutted; 45. and supporting the base block.
Description of the embodiments
The technical solutions according to the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings, examples of which are shown in the accompanying drawings. When the following description refers to the accompanying drawings, like numerals in the various drawings refer to like or similar elements, unless otherwise specified.
It will be apparent that the described embodiments are only some, but not all, embodiments of the utility model. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Specific implementations of the utility model are described in detail below in connection with specific embodiments.
In one embodiment;
referring to fig. 1, a connecting device for installing a warm pipe is provided, which comprises a device casing 11 and positioning sleeves 12 arranged at two sides of the device casing 11;
the positioning sleeve 12 is sleeved at two ends of the equipment machine sleeve 11 and is respectively connected with an outer edge joint 13, and the outer edge joint 13 is connected with an external pipe sleeve 14;
the center line position of the equipment machine sleeve 11 is provided with a middle support positioning head 15, an elastic abutting piece 16 is arranged outside the middle support positioning head 15, and the elastic abutting piece 16 is supported between the equipment machine sleeve 11 and the positioning sleeve 12.
The embodiment is used for the installation treatment of a warm through pipe, the equipment machine sleeve 11 and the positioning sleeve 12 which are consistent with the warm through pipe to be connected in size are selected, the warm through pipe is clamped into the equipment machine sleeve 11, the equipment machine sleeve 11 is mutually butted, the positioning sleeve 12 is sleeved on the warm through pipe and is assembled at the two ends of the equipment machine sleeve 11, the external pipe sleeve 14 is sleeved on the warm through pipe, the external pipe sleeve is assembled on the external edge joint 13 of the positioning sleeve 12 through the external edge joint 13, the combined butting is completed, and the equipment machine sleeve 11, the positioning sleeve 12 and the external pipe sleeve 14 form a stable connecting structure.
The central line position of the equipment machine sleeve 11 is provided with a middle supporting positioning head 15, and the middle supporting positioning head is supported between the equipment machine sleeve 11 and the positioning sleeve 12 through an elastic abutting piece 16 to form a peripheral buffering structure, so that the buffering supporting effect is improved, and the stability of the whole connecting equipment is ensured.
In one embodiment;
based on the above embodiment, for the specific implementation structure of the external pipe sleeve 14, please refer to fig. 2, the design of this embodiment is as follows:
the external pipe sleeve 14 comprises a connecting branch pipe 24 arranged on the outer edge joint 13, a fixed joint 23 arranged on the periphery of the connecting branch pipe 24, and a positioning ring 22 arranged on the fixed joint 23, wherein the periphery of the positioning ring 22 is provided with a locking hoop 21.
In this embodiment, the connecting branch pipe 24 is of a hose structure, is sleeved on the surface of the warm pipe, and has a surface protection effect on the warm pipe, the fixing joint 23 is of a semi-arc-shaped hoop structure and is respectively arranged at two sides of the connecting branch pipe 24, so that the connecting branch pipe 24 and the warm pipe are fixed, and the locking hoop 21 is arranged on the positioning ring 22, so that the effect of further fixing the connecting branch pipe 24 and the warm pipe is achieved.
In one embodiment;
based on the above embodiment, for the specific implementation structure of the positioning sleeve 12, please refer to fig. 3, the design of this embodiment is as follows:
the positioning sleeve 12 comprises a connecting main sleeve 31, an inserting inner sleeve 32 arranged in the connecting main sleeve 31, and a positioning inserting column 33 arranged in the inserting inner sleeve 32, and the equipment machine sleeve 11 is inserted in the positioning inserting column 33 and is provided with a reinforcing branch column 34.
The positioning sleeve 12 and the external pipe sleeves 14 arranged on two sides of the positioning sleeve 12 form an integrated structure, the equipment sleeve 11 and the warm through pipe on the corresponding side are further connected on the basis that the equipment sleeve 11 is connected with the warm through pipe, the connecting main sleeve 31 is an outer frame body arranged on the periphery of the equipment sleeve 11, and peripheral fixation and protection are formed on the equipment sleeve 11 through the positioning insert bars 33.
In one embodiment;
based on the above embodiment, for the specific implementation structure of the elastic contact member 16, please refer to fig. 3, the design of this embodiment is as follows:
the elastic interference piece 16 comprises a supporting base block 45 arranged at the center line of the equipment machine sleeve 11, a fixing protrusion 41 arranged on the supporting base block 45 and an installation sleeve 42 arranged on the fixing protrusion 41, an interference block 43 is arranged at the periphery of the installation sleeve 42, and interference support pieces 44 are arranged at two sides of the interference block 43. The supporting piece 44 is made of elastic material and has an arch structure, and the arch end of the supporting piece 44 is supported at the edge of the main sleeve 31.
The supporting base block 45 is fixedly arranged at the center line of the equipment machine sleeve 11, the mounting sleeve 42 can be fixed on the fixing boss 41 in a bolt mounting mode, the supporting plates 44 on two sides of the mounting sleeve are made of elastic materials, the elastic buffering operation effect is achieved, the arch ends of the supporting plates 44 are supported at the sleeve body edge of the connecting main sleeve 31, the buffering effect is achieved when the positioning sleeve 12 is impacted, the influence on the heating pipe is avoided, the integral stability of the heating pipe is maintained, and accordingly the problems of breakage, separation and the like of the connecting end of the heating pipe are avoided.
It will be evident to those skilled in the art that the utility model is not limited to the details of the foregoing illustrative embodiments, and that the present utility model may be embodied in other specific forms without departing from the spirit or essential characteristics thereof. The present embodiments are, therefore, to be considered in all respects as illustrative and not restrictive, the scope of the utility model being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein.
Furthermore, it should be understood that although the present disclosure describes embodiments, not every embodiment is provided with a separate embodiment, and that this description is provided for clarity only, and that the disclosure is not limited to the embodiments described in detail below, and that the embodiments described in the examples may be combined as appropriate to form other embodiments that will be apparent to those skilled in the art.

Claims (5)

1. The connecting device for mounting the warm through pipe comprises a device machine sleeve and positioning sleeves arranged on two sides of the device machine sleeve; it is characterized in that the method comprises the steps of,
the positioning sleeves are sleeved at two ends of the equipment machine sleeve and are respectively connected with an outer edge joint, and the outer edge joints are connected with an external pipe sleeve;
the center line position of the equipment machine sleeve is provided with a middle support positioning head, an elastic abutting piece is arranged outside the middle support positioning head, and the elastic abutting piece is supported between the equipment machine sleeve and the positioning sleeve.
2. The joint device for mounting a warm pipe according to claim 1, wherein the external pipe sleeve comprises a joint branch pipe mounted on the outer edge joint, a fixed joint arranged on the periphery of the joint branch pipe, and a positioning ring arranged on the fixed joint, and a locking hoop is arranged on the periphery of the positioning ring.
3. The joint equipment for mounting the warm through pipe according to claim 2, wherein the positioning sleeve comprises a joint main sleeve, an inserting inner sleeve arranged in the joint main sleeve, and a positioning inserting fence arranged in the inserting inner sleeve, and the equipment sleeve is inserted in the positioning inserting fence and is provided with a reinforcing branch fence.
4. The joint device for mounting a warm through pipe according to claim 3, wherein the elastic interference piece comprises a supporting base block mounted on a central line of the machine sleeve of the device, a fixing protrusion mounted on the supporting base block, and a mounting sleeve arranged on the fixing protrusion, the periphery of the mounting sleeve is provided with an interference block, and both sides of the interference block are provided with interference support pieces.
5. The joint device for installing a warm pipe according to claim 4, wherein the abutting support piece is made of elastic material and is of an arch structure, and the arch end of the abutting support piece is supported at the edge of the sleeve body of the joint main sleeve.
CN202321569982.7U 2023-06-20 2023-06-20 Linking equipment for installation of warm through pipe Active CN219841186U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321569982.7U CN219841186U (en) 2023-06-20 2023-06-20 Linking equipment for installation of warm through pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321569982.7U CN219841186U (en) 2023-06-20 2023-06-20 Linking equipment for installation of warm through pipe

Publications (1)

Publication Number Publication Date
CN219841186U true CN219841186U (en) 2023-10-17

Family

ID=88305153

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321569982.7U Active CN219841186U (en) 2023-06-20 2023-06-20 Linking equipment for installation of warm through pipe

Country Status (1)

Country Link
CN (1) CN219841186U (en)

Similar Documents

Publication Publication Date Title
CN219841186U (en) Linking equipment for installation of warm through pipe
CN113206488B (en) MPP power cable protection tube of high stability
CN110873247A (en) Hydraulic engineering is with pipeline of convenient concatenation
CN214119330U (en) External corrugated pipe compensator sealing device
CN205278562U (en) Engine pipeline fixed bolster
CN109812629B (en) Improved device for high-density polyethylene double-wall corrugated pipe
CN214579667U (en) Vibration reduction support for oil-gas pipeline in petroleum processing raw material pretreatment device
CN217634371U (en) Pipeline interfacing apparatus is used in warm construction that leads to
CN216279875U (en) Pipe network seepage-proofing sealing structure
KR101911602B1 (en) Rubber Expansion Joint
CN206708558U (en) A kind of unstressed installation high-pressure oil pipe combination fastener
CN209309524U (en) Connecting pipe structure and water purifier with same
CN221348205U (en) Building construction drainage pipeline clamp
CN216923573U (en) Air duct flexible connecting structure
CN218914122U (en) Quick-assembly type anti-rotation hanging type fireplace straight pipe
CN219035951U (en) Combined device of pipeline vibration isolation flexible connection support
CN210088151U (en) Safety valve for domestic synthetic liquefied gas
CN116293134B (en) Corrosion-resistant buried plastic flexible pipeline construction device and construction method
CN215674059U (en) Pipe connected by adopting throttling socket joint type sealing rubber ring
CN216555661U (en) Suspension type gas pipeline temporary mounting rack
CN218947502U (en) Pipeline aligning device
CN214222290U (en) Air pipe convenient to concatenation
CN218480300U (en) Three-way joint
CN220228167U (en) Fire-fighting pipeline for underground station
CN221258097U (en) High-efficient partial pressure expansion joint universal ring

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20240131

Address after: 710000, Building A, Zhonggang International, No. 220 Wenjing Road, Xi'an Economic and Technological Development Zone, Shaanxi Province, 1805

Patentee after: Shaanxi Hezhi Zexi New Energy Technology Co.,Ltd.

Country or region after: China

Address before: No. 4 Lekang Hutong, Dongjia Village, Nanniu Township, Zhengding County, Shijiazhuang City, Hebei Province, 050000

Patentee before: Gao Yue

Country or region before: China

TR01 Transfer of patent right