CN219826076U - Construction hanging basket stabilizing device for curtain wall glass installation - Google Patents

Construction hanging basket stabilizing device for curtain wall glass installation Download PDF

Info

Publication number
CN219826076U
CN219826076U CN202320394900.3U CN202320394900U CN219826076U CN 219826076 U CN219826076 U CN 219826076U CN 202320394900 U CN202320394900 U CN 202320394900U CN 219826076 U CN219826076 U CN 219826076U
Authority
CN
China
Prior art keywords
glass
curtain wall
construction
vertical plate
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320394900.3U
Other languages
Chinese (zh)
Inventor
林翔
葛磊
南勃
孙海
曹正
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN202320394900.3U priority Critical patent/CN219826076U/en
Application granted granted Critical
Publication of CN219826076U publication Critical patent/CN219826076U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

The utility model discloses a construction hanging basket stabilizing device for curtain wall glass installation, which comprises a glass connecting frame (1) and a keel connecting frame (2), wherein the glass connecting frame (1) and the keel connecting frame (2) are arranged on a construction hanging basket (3), the glass connecting frame (1) is provided with a first fixing mechanism for fixing curtain wall glass (302), and the keel connecting frame (2) is provided with a second fixing mechanism for fixing a curtain wall upright post.

Description

Construction hanging basket stabilizing device for curtain wall glass installation
Technical Field
The utility model belongs to the field of building construction, and particularly relates to a construction hanging basket stabilizing device for curtain wall glass installation.
Background
The curtain wall is a building outer enclosure structure or a decoration structure which has certain displacement capacity by a supporting structure system relative to a main structure and does not share the action of the main structure, the glass curtain wall has two types of single-layer glass and double-layer glass, and the glass curtain wall is an attractive and novel building wall decoration method, is a remarkable characteristic of modern high-rise building times and is widely adopted in building facilities at present.
In traditional high-rise glass curtain wall work progress, generally need install vertical joist and horizontal fossil fragments at first, then install curtain glass, when installing curtain glass, need the cooperation use construction hanging flower basket, staff who is arranged in the construction hanging flower basket shifts curtain glass the building outside, then install curtain glass, because the construction hanging flower basket adopts the cable hoist and mount, can produce the rocking in the in-process of use, moreover along with building height's increase, rock can be increasingly obvious, simultaneously, because curtain glass is heavier, install curtain glass very troublesome in the construction hanging flower basket that rocks, also very dangerous, seriously influence the security of efficiency of construction and construction. For the problems in the prior art, no effective solution has been proposed at present.
The utility model patent with the bulletin number of CN212022693U discloses a stable glass curtain wall conveying device in the year 2020, 11 and 27, and the stable glass curtain wall conveying device comprises a body, wherein an opening is arranged in the center of the top of the body, openings are formed in the periphery of the opening, the right end of the top of the body is connected with a vertical plate, the vertical plate is connected with a handle, wheels are arranged at the bottom of the body, a fixed column is arranged at each opening, a spring is connected to the bottom of each fixed column, the bottom of each spring is connected with the bottom of a cavity of the body, and two vertical rods are connected to the outer wall of the lower part of each fixed column. The stable conveying device for the glass curtain wall cannot achieve the effect of being convenient for movement of construction stations, cannot improve stability of construction hanging baskets and cannot reduce safety risks.
Disclosure of Invention
The utility model aims to overcome the defects of the prior art, and provides the construction hanging basket stabilizing device for mounting curtain wall glass, which is simple to operate, convenient for construction station movement, high in stability and high in safety.
In order to achieve the above purpose, the technical scheme adopted by the utility model is as follows:
this construction hanging flower basket stabilising arrangement is used in curtain glass installation, including glass link and fossil fragments link, glass link and fossil fragments link are installed construction hanging flower basket is last, glass link has set up the first fixed establishment of fixed curtain glass, be equipped with the second fixed establishment of fixed curtain stand on the fossil fragments link.
The first fixing mechanism comprises a glass sucker, the glass connecting frame comprises a first screw rod and a first vertical plate, a threaded hole is formed in the upper end of the first vertical plate, the first screw rod is connected with the first vertical plate through threads, the glass sucker is installed at one end of the first screw rod, and a crank is fixedly connected to the other end of the first screw rod.
The second fixing mechanism comprises a hook, the keel connecting frame comprises a connecting rod and a second vertical plate, a connecting hole is formed in the second vertical plate, the connecting rod penetrates through the connecting hole, the hook is arranged at one end of the connecting rod, and an end plate is fixedly connected to the other end of the connecting rod.
The utility model discloses a support seat, including second riser, second riser bottom is equipped with the supporting seat, be equipped with the spout in the supporting seat, the second riser cooperation is installed in the spout, be equipped with the second screw rod in the spout, second riser bottom side is equipped with the screw hole, the second riser with the second screw rod passes through threaded connection, second screw rod one end runs through the supporting seat, the one end that the second screw rod passed the supporting seat is connected with the hand wheel.
The second riser top is equipped with the bolted connection hole, the second riser top is equipped with the third claw bolt, the third claw bolt with bolted connection hole cooperation, third claw bolt bottom compresses tightly on the connecting rod.
The utility model discloses a construction hanging basket, including first riser bottom fixedly connected with first mounting panel, supporting seat bottom fixedly connected with second mounting panel, first mounting panel and second mounting panel are the channel-section steel structure, first mounting panel side is equipped with first claw bolt, second mounting panel side is equipped with the second claw bolt, first mounting panel and second mounting panel are installed on the construction hanging basket, first claw bolt compresses tightly first mounting panel, second claw bolt compresses tightly the second mounting panel.
The novel vertical plate comprises a first vertical plate body, a second vertical plate body, a first support, a second support, a connecting rod and a connecting hole, wherein the first support is fixedly connected to one side of the upper end of the first vertical plate body, the second support is fixedly connected to one side of the upper end of the second vertical plate body, the first support and the second support are of L-shaped structures, threaded holes are formed in the first support, the first screw rod is connected with the first support through threads, the connecting hole is formed in the second support, and the connecting rod penetrates through the connecting hole.
The glass sucker is provided with a rotary connecting seat, and one end of the first screw rod is connected with the rotary connecting seat.
The hook is fixed with the connecting rod through welding, the supporting seat is fixed on the second mounting plate through welding, the first support is fixed at the side end of the first vertical plate through welding, and the second support is fixed at the side end of the second vertical plate through welding.
The first claw bolts and the second claw bolts are arranged in pairs.
The utility model has the technical effects that: by adopting the construction hanging basket stabilizing device for curtain wall glass installation, the construction hanging basket can be prevented from shaking during curtain wall glass installation through the use of the glass connecting frame and the keel connecting frame, the stability of the construction hanging basket is improved, the stable construction hanging basket is convenient for workers to install and construct curtain wall glass, and the construction stability and efficiency are improved. Simultaneously, glass link and fossil fragments link can be relieved the fixed to curtain glass, vertical joist and construction hanging flower basket, and the removal of the construction station of being convenient for does not influence the construction hanging flower basket and normally goes up and down, and the connection and the dismantlement step of each part of the device are simple and convenient, and the use is very convenient.
Drawings
The present specification includes the following drawings, the contents of which are respectively:
FIG. 1 is a schematic diagram of the operation of the stabilizing device of the construction basket for installing curtain wall glass of the present utility model;
FIG. 2 is a front view of a glass connecting frame of the construction basket stabilizing device for installing curtain wall glass;
FIG. 3 is a schematic view of a glass connecting frame of the construction basket stabilizing device for installing curtain wall glass;
FIG. 4 is a front view of the keel joint of the construction basket stabilizing device for installing curtain wall glass of the present utility model;
FIG. 5 is a rear view of the keel joint of the construction basket stabilizing device for curtain wall glass installation of the present utility model;
figure 6 is a top view of a keel joint of a stabilizing device for a construction basket for installing glass of a curtain wall according to the present utility model.
Marked in the figure as: 1. a glass connecting frame; 101. a first mounting plate; 102. a first vertical plate; 103. a first screw; 104. a glass sucker; 105. rotating the connecting seat; 106. a first bracket; 107. a first claw bolt; 108. a crank; 2. a keel connecting frame; 201. a second mounting plate; 202. a chute; 203. a second vertical plate; 204. a connecting rod; 205. a third claw bolt; 206. an end plate; 207. a second bracket; 208. a hook; 209. a second screw; 210. a second claw bolt; 211. a hand wheel; 212. a support base; 3. constructing a hanging basket; 301. vertical keels; 302. curtain wall glass; 303. and (5) a construction station.
Detailed Description
The following detailed description of the embodiments of the utility model, given by way of example only, is presented in the accompanying drawings to aid those skilled in the art in a more complete, accurate and thorough understanding of the inventive concepts and aspects of the utility model, and to facilitate their practice.
As shown in fig. 1 to 6, the construction basket stabilizing device for installing curtain wall glass comprises a glass connecting frame 1 and a keel connecting frame 2, wherein the glass connecting frame 1 and the keel connecting frame 2 are installed on a construction basket 3, the glass connecting frame 1 is provided with a first fixing mechanism for fixing curtain wall glass 302, and the keel connecting frame 2 is provided with a second fixing mechanism for fixing a curtain wall upright post.
This construction hanging flower basket stabilising arrangement is used in curtain wall glass installation, glass link 1 is used for fixed curtain wall glass 302, and fossil fragments link 2 are used for fixed curtain wall stand, through the use of glass link 1 and fossil fragments link 2, can avoid construction hanging flower basket 3 to produce when curtain wall glass 302 installs and rock, improved the stability of construction hanging flower basket 3, stable construction hanging flower basket 3 also makes things convenient for the staff to carry out curtain wall glass 302 installation construction, has improved construction stability and efficiency.
As shown in fig. 2 and 3, the first fixing mechanism comprises a glass sucker 104, the glass connecting frame 1 comprises a first screw 103 and a first vertical plate 102, a threaded hole is formed in the upper end of the first vertical plate 102, the first screw 103 is connected with the first vertical plate 102 through threads, the glass sucker 104 is installed at one end of the first screw 103, and a crank 108 is fixedly connected with the other end of the first screw 103. The glass sucker 104 is used for adsorbing and fixing curtain wall glass 302, and the position of the glass sucker 104 can be adjusted by rotating the crank 108 through the transmission of the first screw 103 and the first vertical plate 102.
As shown in fig. 4 to 6, the second fixing mechanism includes a hook 208, the keel connecting frame 2 includes a connecting rod 204 and a second vertical plate 203, a connecting hole is provided on the second vertical plate 203, the connecting rod 204 passes through the connecting hole, the hook 208 is provided at one end of the connecting rod 204, and the other end of the connecting rod 204 is fixedly connected with an end plate 206. The hooks 208 are used for fixing the vertical keels 301, the longitudinal positions of the hooks 208 can be adjusted through the connecting rods 204, the distance between the two ends of the hooks 208 is matched with the width of the side wall of the vertical keels 301, curtain wall glass 302 is not shielded, and the installation of the curtain wall glass 302 is not affected; the end plate 206 limits the connecting rod 204, preventing the connecting rod 204 from moving away from the second vertical plate 203.
The bottom of the second vertical plate 203 is provided with a supporting seat 212, a chute 202 is arranged in the supporting seat 212, the bottom of the second vertical plate 203 is of a T-shaped structure, the second vertical plate 203 is matched with and installed in the chute 202, a second screw 209 is arranged in the chute 202, the side surface of the bottom of the second vertical plate 203 is provided with a threaded hole, the second vertical plate 203 is connected with the second screw 209 through threads, one end of the second screw 209 penetrates through the supporting seat 212, and one end of the second screw 209 penetrating through the supporting seat 212 is connected with a hand wheel 211. The bottom end of the second vertical plate 203 is provided with a T-shaped structure, so that the second vertical plate 203 can be conveniently matched with the structure of the chute 202, and the transverse movement of the second vertical plate 203 can be regulated by rotating the hand wheel 211 through the transmission of the second vertical plate 203 and the second screw 209.
The top of the second vertical plate 203 is provided with a bolt connecting hole, the top of the second vertical plate 203 is provided with a third claw bolt 205, the third claw bolt 205 is matched with the bolt connecting hole, and the bottom of the third claw bolt 205 is pressed on the connecting rod 204. The third claw bolt 205 is connected with the second vertical plate 203 through threads, the bottom end of the third claw bolt 205 is abutted against the top surface of the connecting rod 204, the connecting rod 204 can be fixed by rotating the third claw bolt 205, the surface of the connecting rod 204 is subjected to napping treatment, friction force can be improved, and the third claw bolt 205 is convenient to fix.
As shown in fig. 2 to 5, the bottom end of the first vertical plate 102 is fixedly connected with a first mounting plate 101, the bottom end of the supporting seat 212 is fixedly connected with a second mounting plate 201, the first mounting plate 101 and the second mounting plate 201 are of channel steel structures, a first claw bolt 107 is arranged on the side surface of the first mounting plate 101, a second claw bolt 210 is arranged on the side surface of the second mounting plate 201, the first mounting plate 101 and the second mounting plate 201 are mounted on the construction hanging basket 3, the first claw bolt 107 presses the first mounting plate 101, and the second claw bolt 210 presses the second mounting plate 201. The first mounting plate 101 and the second mounting plate 201 are of channel steel structures, so that the first mounting plate 101 and the second mounting plate 201 can be conveniently mounted on the cross beam of the construction hanging basket 3, mounting holes for installing the claw bolts are formed in the first mounting plate 101 and the second mounting plate 201, and the first mounting plate 101 and the second mounting plate 201 can be pressed and fixed on the construction hanging basket 3 through the claw bolts; the glass connecting frame 1 and the keel connecting frame 2 can be fixed on the construction hanging basket 3 by screwing the first claw bolt 107 and the second claw bolt 210, and the fixation of the glass connecting frame 1 and the keel connecting frame 2 can be released by unscrewing the first claw bolt 107 and the second claw bolt 210, so that the glass connecting frame 1 and the keel connecting frame 2 can be conveniently transferred on the construction hanging basket 3.
The first support 106 is fixedly connected to one side of the upper end of the first vertical plate 102, the second support 207 is fixedly connected to one side of the upper end of the second vertical plate 203, the first support 106 and the second support 207 are of L-shaped structures, threaded holes are formed in the first support 106, the first screw 103 is connected with the first support 106 through threads, connecting holes are formed in the second support 207, and the connecting rods 204 penetrate through the connecting holes. The first bracket 106 plays an auxiliary supporting role on the first vertical plate 102, and the first bracket 106 connects and guides the first screw 103; the second bracket 207 serves as an auxiliary support for the second riser 203, and the second bracket 207 supports and guides the link 204.
As shown in fig. 2 and 3, a rotary connecting seat 105 is provided on the glass sucker 104, and one end of the first screw 103 is connected with the rotary connecting seat 105. The rotary connecting base 105 can reduce the resistance of the first screw 103 to rotate, so as to facilitate the rotation of the first screw 103.
The hook 208 is fixed with the connecting rod 204 by welding, the supporting seat 212 is fixed on the second mounting plate 201 by welding, the first bracket 106 is fixed on the upper end of the first vertical plate 102 by welding, and the second bracket 207 is fixed on the upper end of the second vertical plate 203 by welding. The welding can simplify the processing process, reduce the processing cost and improve the structural strength of the connected components.
The first and second claw bolts 107 and 210 are each provided in pairs. The first claw bolts 107 are arranged on the first mounting plate 101 in pairs, the second claw bolts 210 are arranged on the second mounting plate 201 in pairs, and the pair arrangement of the claw bolts can improve the stability of fixation.
As shown in fig. 1 to 6, in the construction basket stabilizing device for installing curtain wall glass, a glass connecting frame 1 and a keel connecting frame 2 are fixedly connected with a cross beam, close to a wall surface, on the top surface of a construction basket 3 respectively, and a glass sucker 104 is kept to be aligned with a glass curtain wall which is already installed on a construction station 303, and a hanging hook 208 is kept to be located on the side of a vertical keel 301 at the other position on the construction station 303.
When the curtain wall glass 302 is installed, a worker can rotate the crank 108 to drive the first screw 103 to move the glass sucker 104, the glass sucker 104 is enabled to suck the surface of the curtain wall glass 302 which is already constructed, so that the fixing of the curtain wall glass 302 is completed, then, the worker can unscrew the third claw bolt 205, the transverse position of the hook 208 can be adjusted through the connecting rod 204 until the hook 208 is aligned to one side of the vertical keel 301, then the third claw bolt 205 is screwed, the hand wheel 211 is rotated, the longitudinal position of the second vertical plate 203 can be adjusted through the transmission of the second screw 209, until the hook 208 is clamped with the vertical keel 301, the position adjustment of the hook 208 on the horizontal plane is realized through the joint action of the connecting rod 204 and the hand wheel 211, and the fixing of the vertical keel 301 is completed after the hook 208 is clamped with the vertical keel 301. The length of the welding position of the hook 208 and the connecting rod 204 is less than half of the width of the vertical keel front face, and the distance between the two ends of the hook 208 is matched with the width of the side wall of the vertical keel 301, so that the hook 208 does not shade the curtain wall glass 302 and the installation of the curtain wall glass 302 is not affected.
In the installation process of the curtain wall glass 302, the transfer of the construction station 303 can be realized through the movement of the crank 108, the hand wheel 211, the first claw bolt 107, the second claw bolt 210 and the third claw bolt 205. When the curtain wall glass 302 construction station 303 needs to be replaced, a worker reverses the crank 108, the fixation of the glass sucker 104 can be relieved, meanwhile, the hand wheel 211 is reversed to the hook 208 to be separated from the vertical keel 301, then the third claw bolt 205 is unscrewed, the connecting rod 204 is pulled to move backwards, the fixation of the hook 208 to the vertical keel 301 can be relieved, the glass connecting frame 1 and the keel connecting frame 2 can conveniently move integrally on the construction hanging basket 3 through unscrewing the first claw bolt 107 and the second claw bolt 210, the normal lifting of the construction hanging basket 3 is not influenced, the connecting and disassembling steps of all parts are simple and convenient, and the use process is very convenient.
This construction hanging flower basket stabilising arrangement for curtain wall glass installation is according to the characteristics of curtain wall glass 302 installation, through glass sucking disc 104 to the fixed of curtain wall glass 302 that has been under construction and couple 208 to the fixed of vertical joist, can stabilize construction hanging flower basket 3 in curtain wall glass 302 installation, avoid construction hanging flower basket 3 to rock when curtain wall glass 302 installs, reduce the security risk, simultaneously, stable construction hanging flower basket 3 also makes things convenient for the staff to carry out curtain wall glass 302 installation construction, has improved construction stability and efficiency.
The utility model is described above by way of example with reference to the accompanying drawings. It will be clear that the utility model is not limited to the embodiments described above. As long as various insubstantial improvements are made using the method concepts and technical solutions of the present utility model; or the utility model is not improved, and the conception and the technical scheme are directly applied to other occasions and are all within the protection scope of the utility model.

Claims (8)

1. Construction hanging basket stabilising arrangement is used in curtain glass installation, its characterized in that: the construction hanging basket comprises a glass connecting frame (1) and a keel connecting frame (2), wherein the glass connecting frame (1) and the keel connecting frame (2) are installed on the construction hanging basket (3), the glass connecting frame (1) is provided with a first fixing mechanism for fixing curtain wall glass (302), and the keel connecting frame (2) is provided with a second fixing mechanism for fixing a curtain wall upright post; the first fixing mechanism comprises a glass sucker (104), the glass connecting frame (1) comprises a first screw rod (103) and a first vertical plate (102), a threaded hole is formed in the upper end of the first vertical plate (102), the first screw rod (103) is connected with the first vertical plate (102) through threads, the glass sucker (104) is installed at one end of the first screw rod (103), and a crank (108) is fixedly connected with the other end of the first screw rod (103); the second fixing mechanism comprises a hook (208), the keel connecting frame (2) comprises a connecting rod (204) and a second vertical plate (203), a connecting hole is formed in the second vertical plate (203), the connecting rod (204) penetrates through the connecting hole, the hook (208) is arranged at one end of the connecting rod (204), and an end plate (206) is fixedly connected to the other end of the connecting rod (204).
2. The construction basket stabilizing apparatus for installing curtain wall glass according to claim 1, wherein: the utility model discloses a support base, including support base (212), support base (212) are internal be equipped with spout (202), second riser (203) bottom is T type structure, second riser (203) cooperation is installed in spout (202), be equipped with second screw rod (209) in spout (202), second riser (203) bottom side is equipped with the screw hole, second riser (203) with second screw rod (209) pass through threaded connection, second screw rod (209) one end runs through support base (212), the one end that second screw rod (209) passed support base (212) is connected with hand wheel (211).
3. The construction basket stabilizing apparatus for installing curtain wall glass according to claim 2, wherein: the top of the second vertical plate (203) is provided with a bolt connecting hole, the top of the second vertical plate (203) is provided with a third claw bolt (205), the third claw bolt (205) is matched with the bolt connecting hole, and the bottom of the third claw bolt (205) is tightly pressed on the connecting rod (204).
4. A construction basket stabilizing apparatus for installing curtain wall glass according to claim 3, wherein: first riser (102) bottom fixedly connected with first mounting panel (101), supporting seat (212) bottom fixedly connected with second mounting panel (201), first mounting panel (101) and second mounting panel (201) are the channel-section steel structure, first mounting panel (101) side is equipped with first claw bolt (107), second mounting panel (201) side is equipped with second claw bolt (210), first mounting panel (101) and second mounting panel (201) are installed on construction hanging basket (3), first claw bolt (107) compress tightly first mounting panel (101), second claw bolt (210) compress tightly second mounting panel (201).
5. The construction basket stabilizing apparatus for installing curtain wall glass according to claim 4, wherein: first riser (102) upper end one side fixedly connected with first support (106), second riser (203) upper end one side fixedly connected with second support (207), first support (106) and second support (207) are L type structure, be equipped with the screw hole on first support (106), first screw rod (103) with first support (106) pass through threaded connection, be equipped with the connecting hole on second support (207), connecting rod (204) pass the connecting hole.
6. The construction basket stabilizing apparatus for installing curtain wall glass according to claim 1, wherein: the glass sucker (104) is provided with a rotary connecting seat (105), and one end of the first screw (103) is connected with the rotary connecting seat (105).
7. The construction basket stabilizing apparatus for installing curtain wall glass according to claim 5, wherein: the hook (208) is fixed with the connecting rod (204) through welding, the supporting seat (212) is fixed on the second mounting plate (201) through welding, the first support (106) is fixed at the side end of the first vertical plate (102) through welding, and the second support (207) is fixed at the side end of the second vertical plate (203) through welding.
8. The construction basket stabilizing apparatus for installing curtain wall glass according to claim 4, wherein: the first claw bolts (107) and the second claw bolts (210) are arranged in pairs.
CN202320394900.3U 2023-03-06 2023-03-06 Construction hanging basket stabilizing device for curtain wall glass installation Active CN219826076U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320394900.3U CN219826076U (en) 2023-03-06 2023-03-06 Construction hanging basket stabilizing device for curtain wall glass installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320394900.3U CN219826076U (en) 2023-03-06 2023-03-06 Construction hanging basket stabilizing device for curtain wall glass installation

Publications (1)

Publication Number Publication Date
CN219826076U true CN219826076U (en) 2023-10-13

Family

ID=88245647

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320394900.3U Active CN219826076U (en) 2023-03-06 2023-03-06 Construction hanging basket stabilizing device for curtain wall glass installation

Country Status (1)

Country Link
CN (1) CN219826076U (en)

Similar Documents

Publication Publication Date Title
CN210133513U (en) Protection tool for electric pole transportation
CN115773404A (en) A pipeline gallows is synthesized to heavy construction
CN219826076U (en) Construction hanging basket stabilizing device for curtain wall glass installation
CN219863963U (en) Wall-riding hanging basket hanging frame
CN212101807U (en) Auxiliary carrying device for factory equipment maintenance
CN209831566U (en) Water heating pipeline erection bracing frame for building
CN112695999B (en) Hoist and mount protection device suitable for building outer wall operation
CN215148095U (en) Angle grinder fixing support
CN212203919U (en) Video monitoring equipment with adjustable monitoring height
CN209940321U (en) Wall-riding hoisting equipment for movable curtain wall
CN209906264U (en) Machinery maintenance is with supplementary maintenance device
CN211109710U (en) Unilateral power type bilateral bottle separating device
CN113334108A (en) Machine tool for steel pipe pole convenient to maintain
CN208251658U (en) Tall and big wallboard mounting device
CN219491675U (en) Wall-riding type reverse-pulling hanging basket device
CN219387114U (en) Building construction hanging basket convenient to dismantle and install
CN110937330A (en) Supporting device of grain belt conveyor
CN215253760U (en) Clamping device for glass curtain wall design of super high-rise building
CN114319828B (en) Fixed pull rod type vertical and oblique universal construction hanging basket and construction method thereof
CN216151307U (en) Special clamp for motorcycle damping cylinder cutting machine
CN209099752U (en) Elevating scaffold wall-attaching base
CN217924767U (en) Hanging basket mounting structure
CN110054095A (en) Movable curtain wall is sat on the fence hanging device
CN216552895U (en) Curtain wall mounting device for building construction
CN109594837A (en) It is a kind of can fast erecting electronic communication bar

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant