CN219826062U - Construction platform of high-rise building overhanging structural layer - Google Patents
Construction platform of high-rise building overhanging structural layer Download PDFInfo
- Publication number
- CN219826062U CN219826062U CN202320537338.5U CN202320537338U CN219826062U CN 219826062 U CN219826062 U CN 219826062U CN 202320537338 U CN202320537338 U CN 202320537338U CN 219826062 U CN219826062 U CN 219826062U
- Authority
- CN
- China
- Prior art keywords
- pulley
- construction platform
- connecting plate
- rise building
- fixed mounting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 25
- 230000003014 reinforcing effect Effects 0.000 claims description 8
- 238000009434 installation Methods 0.000 claims description 4
- 241000282326 Felis catus Species 0.000 claims description 2
- 238000000034 method Methods 0.000 description 4
- 230000009471 action Effects 0.000 description 3
- 238000009435 building construction Methods 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 238000004804 winding Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000009194 climbing Effects 0.000 description 1
- 230000009193 crawling Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Landscapes
- Ladders (AREA)
Abstract
The utility model discloses a construction platform of a cantilever structure layer of a high-rise building, which comprises the following components: the building comprises a building body and a base, wherein the base is fixedly arranged on the building body, a support column is fixedly arranged at the top of the base, a connecting plate is rotatably arranged at the top end of the support column, a hanging basket is fixedly arranged on the outer wall of one side of the connecting plate, two offset components which are convenient for processing a high-rise cantilever structure are arranged on the building body, each offset component comprises a sliding groove, a sliding rod, a moving block, a U-shaped block I, a pulley I, a U-shaped block II, a pulley II, a servo motor and a connecting belt, the sliding groove is formed in the outer wall of one side of the connecting plate, the sliding rod is fixedly arranged in the sliding groove, the moving block is slidably arranged on the sliding rod, and the U-shaped block I is hinged to the moving block. The construction platform of the cantilever structure layer of the high-rise building has the advantages of being convenient for constructing the cantilever edge of the high-rise building and reducing the construction danger of workers.
Description
Technical Field
The utility model relates to the technical field of building construction tools, in particular to a construction platform for a cantilever structural layer of a high-rise building.
Background
Overhanging is a technical term of building construction, a building member achieves an effect by using a guy cable structure or other structures, the overhanging structure is one of common structural forms in engineering structures, such as a awning, a cornice, an outer balcony, a gallery and the like in building engineering, the structure is an overhanging beam or plate from a main body structure to form a cantilever structure, and the cantilever structure is basically still a beam plate structure.
However, in the prior art, when constructing the bottom of encorbelmenting of high-rise building, the hanging flower basket inconvenient removal is operated the edge of encorbelmenting, and it is dangerous to carry out the operation of construction through the operation of stretching out the hanging flower basket with the body of the majority.
Disclosure of Invention
The utility model aims to provide a construction platform for a cantilever structural layer of a high-rise building, which has the advantages of facilitating construction of the cantilever edge of the high-rise building and reducing construction danger of workers so as to solve the problems in the prior art.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides a construction platform of high-rise building structure layer of encorbelmenting, includes building body and base, base fixed mounting is on the building body, the top fixed mounting of base has the pillar, the top of pillar rotates and installs the connecting plate, fixed mounting has the hanging basket on one side outer wall of connecting plate, be provided with two offset components that are convenient for carry out processing to high-rise structure of encorbelmenting on the building body, offset components includes spout, slide bar, movable block, U-shaped piece I, pulley I, U-shaped piece II, pulley II, servo motor and connecting band, the spout is seted up on one side outer wall of connecting plate, slide bar fixed mounting is in the spout, movable block slidable mounting is on the slide bar, U-shaped piece I articulates and installs on the movable block, pulley one rotation is installed on U-shaped piece I, U-shaped piece II fixed mounting is on the building body, servo motor fixed mounting is on one side outer wall of U-shaped piece II, servo motor's output shaft and two fixed connection's one end and two fixed connection's the pulley II, the other end and the fixed connection of pulley II.
Further, a sleeve block is rotatably installed on the support column, two first installation blocks are fixedly installed on the outer wall of one side of the sleeve block, and two second installation blocks are fixedly installed at the bottom of the hanging basket.
Further, a reinforcing rod is fixedly installed on the outer wall of one side, close to each other, of each mounting block I through a screw I, and the reinforcing rod is fixedly connected with the two mounting blocks II through a screw II.
Further, a sliding rail is fixedly arranged at the top of the base, a T-shaped sliding block is slidably arranged in the sliding rail, and the top of the T-shaped sliding block is fixedly connected with the bottom of the connecting plate.
Further, a cat ladder is fixedly arranged on the outer wall of one side of the connecting plate.
Further, two balls are movably embedded on the outer wall of one side of each moving block, and four balls are respectively connected with the corresponding sliding rod in a sliding manner.
Further, one side of the hanging basket is provided with an opening, and the top of the connecting plate is provided with anti-skid patterns.
In summary, the beneficial effects of the utility model are as follows due to the adoption of the technology:
according to the utility model, the offset assembly is arranged, the servo motor is started in the opposite direction, namely, one side is used for winding the connecting belt, the other side is used for lengthening the connecting belt, at the moment, the T-shaped sliding block slides in the sliding rail, and the connecting plate drives the hanging basket to rotate, so that the utility model has the advantages of convenience for construction of the overhanging edge of the high-rise building and reduction of the construction danger of workers.
Drawings
FIG. 1 is a schematic view of the overall structure of a construction platform of a cantilever structure layer of a high-rise building;
FIG. 2 is a schematic view of a basket according to the present utility model;
FIG. 3 is a schematic view of the structure of the jacket block according to the present utility model;
FIG. 4 is a schematic view of a ladder stand according to the present utility model;
FIG. 5 is a schematic side view and cross-sectional view of a construction platform of a overhanging structural layer of a high-rise building according to the utility model;
FIG. 6 is a schematic top cross-sectional view of a construction platform for a overhanging structural layer of a high-rise building according to the utility model;
fig. 7 is a schematic view of an assembly structure in the present utility model.
In the figure: 1. a building body; 2. a base; 3. a support post; 4. a connecting plate; 5. a hanging basket; 6. a chute; 7. a slide bar; 8. a moving block; 9. u-shaped block I; 10. a pulley I; 11. u-shaped block II; 12. a second pulley; 13. a servo motor; 14. a connecting belt; 15. sleeving blocks; 16. a first mounting block; 17. a second mounting block; 18. a reinforcing rod; 19. a slide rail; 20. a T-shaped slider; 21. a ladder stand; 22. high-rise overhanging structure.
Detailed Description
For the purpose of making the objects, technical solutions and advantages of the embodiments of the present utility model more apparent, the technical solutions of the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model, and it is apparent that the described embodiments are some embodiments of the present utility model, but not all embodiments. All other embodiments, based on the embodiments of the utility model, which are apparent to those of ordinary skill in the art without inventive faculty, are intended to be within the scope of the utility model. Thus, the following detailed description of the embodiments of the utility model, as presented in the figures, is not intended to limit the scope of the utility model, as claimed, but is merely representative of selected embodiments of the utility model. All other embodiments, based on the embodiments of the utility model, which are apparent to those of ordinary skill in the art without inventive faculty, are intended to be within the scope of the utility model.
The utility model provides a construction platform for a cantilever structure layer of a high-rise building, which is shown in figures 1-7, and comprises a building body 1 and a base 2, wherein the base 2 is fixedly arranged on the building body 1, a support column 3 is fixedly arranged at the top of the base 2, a connecting plate 4 is rotatably arranged at the top end of the support column 3, a hanging basket 5 is fixedly arranged on the outer wall of one side of the connecting plate 4, two offset components which are convenient for processing the cantilever structure of the high-rise building are arranged on the building body 1, each offset component comprises a sliding groove 6, a sliding rod 7, a moving block 8, a first U-shaped block 9, a pulley 10, a second U-shaped block 11, a pulley 12, a servo motor 13 and a connecting belt 14, the sliding groove 6 is arranged on the outer wall of one side of the connecting plate 4, the sliding rod 7 is fixedly arranged in the sliding groove 6, the moving block 8 is slidably arranged on the sliding rod 7, the first U-shaped block 9 is hinged and is fixedly arranged on the moving block 8, the pulley 10 is rotatably arranged on the first U-shaped block 9, the second U-shaped block 11 is fixedly arranged on the moving block 1, the second U-shaped block 11 is fixedly arranged on the pulley 12, the second U-shaped block 12 is fixedly arranged on the outer wall of the connecting belt 12, one end of the sliding block 13 is fixedly connected with the second U-shaped block 12, and the second end of the sliding block 13 is fixedly arranged on the other end of the sliding belt 14, and fixedly connected with one end of the sliding pulley 13.
In some embodiments, the support 3 is rotatably provided with a sleeve block 15, two first mounting blocks 16 are fixedly mounted on an outer wall of one side of the sleeve block 15, and two second mounting blocks 17 are fixedly mounted at the bottom of the hanging basket 5, and more specifically, the sleeve block 15 facilitates mounting of the first mounting blocks 16.
In some embodiments, the outer wall of one side, which is close to the first mounting block 16, is fixedly provided with a reinforcing rod 18 through a first screw, and the reinforcing rod 18 is fixedly connected with the second mounting block 17 through a second screw, and more specifically, the reinforcing rod 18 provides supporting force for the hanging basket 5.
In some embodiments, a sliding rail 19 is fixedly installed at the top of the base 2, a T-shaped sliding block 20 is slidably installed in the sliding rail 19, and the top of the T-shaped sliding block 20 is fixedly connected with the bottom of the connecting plate 4, more specifically, may provide a supporting force for the connecting plate 4.
In some embodiments, a ladder stand 21 is fixedly installed on an outer wall of one side of the connection board 4, and more particularly, a worker is facilitated to mount the connection board 4.
In some embodiments, two balls are movably embedded on the outer wall of one side of each of the two moving blocks 8, and four balls are respectively slidably connected with the corresponding sliding rod 7, more specifically, the balls can reduce friction force generated when the moving block 8 moves on the sliding rod 7.
In some embodiments, one side of the hanging basket 5 is provided with an opening, and the top of the connecting plate 4 is provided with anti-skidding patterns, more specifically, the hanging basket is convenient for a worker to walk and prevents the worker from skidding.
Working principle:
step one: the construction platform is fixedly arranged on the building body 1, and workers enter the hanging basket 5 to construct the cantilever structure of the high-rise building after climbing the connecting plate 4 through the crawling ladder 21.
Step two: when the edge of the cantilever structure of the high-rise building is to be constructed, the servo motor 13 is started in the opposite direction, namely, one side is used for winding the connecting belt 14, the other side is used for lengthening the connecting belt 14, the moving block 8 slides on the sliding rod 7, the U-shaped block 9 and the pulley 10 are subjected to angle deflection, the T-shaped sliding block 20 slides in the sliding rail 19 at the moment, and the connecting plate 4 drives the hanging basket 5 to rotate, so that the edge of the cantilever structure of the high-rise building can be constructed.
The foregoing is only a preferred embodiment of the present utility model, but the scope of the present utility model is not limited thereto, and any person skilled in the art, who is within the scope of the present utility model, should make equivalent substitutions or modifications according to the technical scheme of the present utility model and the inventive concept thereof, and should be covered by the scope of the present utility model.
It is noted that relational terms such as first and second, and the like are used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Moreover, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Claims (7)
1. The utility model provides a construction platform of high-rise building structural layer that encorbelments, includes building body and base, its characterized in that: the base fixed mounting is on the building body, the top fixed mounting of base has the pillar, the top of pillar rotates installs the connecting plate, fixed mounting has the hanging flower basket on one side outer wall of connecting plate, be provided with two offset components that are convenient for carry out processing to high-rise cantilever structure on the building body, offset components includes spout, slide bar, movable block, U-shaped piece one, pulley one, U-shaped piece two, pulley two, servo motor and connecting band, the spout is seted up on one side outer wall of connecting plate, slide bar fixed mounting is in the spout, movable block slidable mounting is on the slide bar, U-shaped piece one articulates and installs on the movable block, pulley one rotation is installed on U-shaped piece one, U-shaped piece two fixed mounting is on the building body, pulley two rotation is installed on U-shaped piece two, servo motor fixed mounting is on one side outer wall of U-shaped piece two, servo motor's output shaft and pulley two's one end fixed connection, the one end fixed mounting of connecting band is on pulley two, the other end fixed mounting of connecting band is on pulley one end, one fixed connection with pulley.
2. The construction platform for a cantilever structure layer of a high-rise building according to claim 1, wherein: the support column is rotatably provided with a sleeve block, one side outer wall of the sleeve block is fixedly provided with two first mounting blocks, and the bottom of the hanging basket is fixedly provided with two second mounting blocks.
3. The construction platform for a cantilever structure layer of a high-rise building according to claim 2, wherein: the outer walls of one sides of the two first installation blocks, which are close to each other, are fixedly provided with reinforcing rods through screws I, and the reinforcing rods are fixedly connected with the two second installation blocks through screws II.
4. The construction platform for a cantilever structure layer of a high-rise building according to claim 1, wherein: the top fixed mounting of base has the slide rail, slidable mounting has T shape slider in the slide rail, the top of T shape slider and the bottom fixed connection of connecting plate.
5. The construction platform for a cantilever structure layer of a high-rise building according to claim 1, wherein: and a cat ladder is fixedly arranged on the outer wall of one side of the connecting plate.
6. The construction platform for a cantilever structure layer of a high-rise building according to claim 1, wherein: two balls are movably embedded on the outer wall of one side of each moving block, and four balls are respectively connected with the corresponding sliding rod in a sliding manner.
7. The construction platform for a cantilever structure layer of a high-rise building according to claim 1, wherein: one side of the hanging basket is provided with an opening, and the top of the connecting plate is provided with anti-skidding lines.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320537338.5U CN219826062U (en) | 2023-03-17 | 2023-03-17 | Construction platform of high-rise building overhanging structural layer |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320537338.5U CN219826062U (en) | 2023-03-17 | 2023-03-17 | Construction platform of high-rise building overhanging structural layer |
Publications (1)
Publication Number | Publication Date |
---|---|
CN219826062U true CN219826062U (en) | 2023-10-13 |
Family
ID=88245831
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202320537338.5U Active CN219826062U (en) | 2023-03-17 | 2023-03-17 | Construction platform of high-rise building overhanging structural layer |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN219826062U (en) |
-
2023
- 2023-03-17 CN CN202320537338.5U patent/CN219826062U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202755627U (en) | Wall plaster troweling machine | |
CN219826062U (en) | Construction platform of high-rise building overhanging structural layer | |
CN109281470B (en) | System and process for quickly disassembling aluminum template | |
CN211524061U (en) | Anticreep creeping formwork switching-over box | |
CN112762392A (en) | Intelligent lamp pole installation method for traffic guidance system based on intelligent lamp pole | |
CN216142528U (en) | Safety warning device is used in building engineering construction | |
CN110980505B (en) | Crane lifting device based on accurate positioning for assembly building construction | |
CN112622002B (en) | Prefabricated reinforced concrete air-conditioning plate and production process thereof | |
CN211998709U (en) | Building moving platform | |
CN220705119U (en) | Mobilizable outer wall construction platform | |
CN111794483A (en) | Scaffold for building engineering based on height-adjustable festival formula | |
CN112523488A (en) | Construction hanging basket with parking safety device for electric-based construction | |
CN212503686U (en) | Construction equipment of prefabricated building based on BIM | |
CN218264752U (en) | Indoor finish decoration furred ceiling jib pore-forming device | |
CN213622939U (en) | Material lifting device for building engineering | |
CN220611811U (en) | Aluminum veneer bending equipment | |
CN2435463Y (en) | Integral climbing and split lowering scaffold | |
CN218176564U (en) | Climbing frame for building construction | |
CN2143647Y (en) | Movable multifunction form device | |
CN216105555U (en) | Adjustable assembly type building stair component hoisting tool | |
JPS63103161A (en) | High place working stand apparatus | |
KR100488467B1 (en) | Up and down turnning apparatus for auto maintenance trolley | |
CN211664682U (en) | Work elevating platform is used to fitment convenient to remove and stable | |
CN219863980U (en) | Steel construction canopy construction platform | |
CN218748610U (en) | Drilling tool for concrete floor |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |