CN219825597U - Assembly type green building structure - Google Patents

Assembly type green building structure Download PDF

Info

Publication number
CN219825597U
CN219825597U CN202223311160.7U CN202223311160U CN219825597U CN 219825597 U CN219825597 U CN 219825597U CN 202223311160 U CN202223311160 U CN 202223311160U CN 219825597 U CN219825597 U CN 219825597U
Authority
CN
China
Prior art keywords
cross beam
stand column
building structure
green building
top cover
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202223311160.7U
Other languages
Chinese (zh)
Inventor
高颖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202223311160.7U priority Critical patent/CN219825597U/en
Application granted granted Critical
Publication of CN219825597U publication Critical patent/CN219825597U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses an assembled green building structure which comprises a bottom plate, a bottom cylinder, a stand column, a cross beam, a quick connection fixing device, a top cover and a locking device, wherein the bottom cylinder is arranged on the bottom plate, the stand column is inserted into the bottom cylinder, the cross beam is lapped on the stand column, the quick connection fixing device is connected with the top cover and the stand column and is simultaneously connected with the cross beam, and the locking device is arranged in the stand column and can lock the cross beam. The utility model belongs to the technical field of assembly type buildings, and particularly relates to an assembly type green building structure which can be used for quickly connecting and fixing components, improves construction efficiency and is convenient for later disassembly.

Description

Assembly type green building structure
Technical Field
The utility model belongs to the technical field of assembly type buildings, and particularly relates to an assembly type green building structure.
Background
Building structures refer to systems that are capable of withstanding various actions in a building construction, consisting of various components. The effect refers to various factors which can cause internal force and deformation of a system, such as load, earthquake, temperature change, foundation settlement and the like, a building structure is a framework structure which is formed by building components such as plates, beams, columns, walls and foundations, has a certain space function and can safely bear various normal load effects of a building, in order to improve quick construction of a factory building, the factory building is assembled and constructed in a popular manner at present, the construction period of the factory building can be greatly saved, and the working efficiency is improved, however, the steel structure of the conventional assembly type factory building is basically fastened through bolts, a large number of bolts are required to be fastened when connecting all the components, the difficulty of factory building construction can be improved to a certain extent, the investment of labor force can be increased, the factory building construction period can be prolonged, and the post disassembly is also unfavorable, and the improvement is required based on the construction period.
Disclosure of Invention
In order to solve the problems, the utility model provides an assembled green building structure which can be used for quickly connecting and fixing components, improves the construction efficiency and is convenient for later disassembly.
In order to realize the functions, the technical scheme adopted by the utility model is as follows: the assembled green building structure comprises a bottom plate, a bottom cylinder, a stand column, a beam, a quick connection fixing device, a top cover and a locking device, wherein the bottom cylinder is arranged on the bottom plate, the stand column is inserted and arranged in the bottom cylinder, the beam is lapped and arranged on the stand column, the quick connection fixing device is connected with the top cover and the stand column and is simultaneously connected with the beam, and the locking device is arranged in the stand column and can lock the beam; the quick connection fixing device comprises a screw barrel, a screw rod, a nut II, a sleeve, a connecting column, a pin rod and a nut I, wherein the screw barrel is arranged at the lower end of the top cover, the screw rod is simultaneously in threaded connection with the screw barrel and the upright post, the nut II is fixedly connected to the screw rod, the sleeve is arranged at the lower end of the top cover, the connecting column is inserted into the sleeve and penetrates through the cross beam, the pin rod penetrates through the sleeve and the connecting column, the nut I is in threaded connection with the lower end of the connecting column, the connecting column can be fixed on the cross beam through the nut I, and the upright post and the top cover can be quickly connected through the screw rod, so that the aim of quick installation and connection is achieved.
Further, locking means includes bolt, locking pole, limiting plate and spring, in bolt from last down inserting crossbeam and stand, the lateral wall of stand is located to the locking pole slip and can be inserted in the bolt, the outer end of locking pole is located to the limiting plate, the spring cup joints and locates on the locking pole, on the limiting plate was located to the one end of spring and the other end was located the stand, can be with crossbeam and stand tight link together through locking means.
Preferably, the screw rod is arranged in two sections and can be screwed in the screw cylinder and the upright post simultaneously.
Preferably, the spring always has a force on the locking lever that is directed towards the latch.
Preferably, the connection part of the upright post and the cross beam is arranged in a step shape.
The utility model adopts the structure to obtain the beneficial effects as follows: according to the assembled green building structure provided by the utility model, the rapid connection and fixation of the top cover, the upright posts and the cross beams can be realized through the rapid connection device, the installation efficiency is improved, the assembly and disassembly in the later stage are convenient, the fixation between the cross beams and the upright posts can be realized through the locking device, and the whole is more stable.
Drawings
FIG. 1 is a schematic view of the overall structure of an assembled green building structure of the present utility model;
fig. 2 is a partial enlarged view of fig. 1 at a.
Wherein, 1, a bottom plate, 2, a bottom cylinder, 3, an upright post, 4, a cross beam, 5, a quick connection fixing device, 6, a top cover, 7, a locking device, 8, a wire cylinder, 9 and a screw rod, 10, a second nut, 11, a sleeve, 12, a connecting column, 13, a pin rod, 14, a first nut, 15, a bolt, 16, a locking rod, 17, a limiting plate, 18 and a spring.
Detailed Description
The following description of the embodiments of the present utility model will be made apparent and fully in view of the accompanying drawings, in which some, but not all embodiments of the utility model are shown. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
In the description of the present utility model, it should be noted that the directions or positional relationships indicated by the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc. are based on the directions or positional relationships shown in the drawings, are merely for convenience of describing the present utility model and simplifying the description, and do not indicate or imply that the devices or elements referred to must have a specific orientation, be configured and operated in a specific orientation, and thus should not be construed as limiting the present utility model. Furthermore, the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance. The present utility model will be described in further detail with reference to the accompanying drawings.
As shown in fig. 1-2, the assembled green building structure comprises a bottom plate 1, a bottom cylinder 2, a stand column 3, a cross beam 4, a quick connection fixing device 5, a top cover 6 and a locking device 7, wherein the bottom cylinder 2 is arranged on the bottom plate 1, the stand column 3 is inserted and arranged in the bottom cylinder 2, the cross beam 4 is lapped on the stand column 3, the quick connection fixing device 5 is connected with the top cover 6 and the stand column 3 and is simultaneously connected with the cross beam 4, and the locking device 7 is arranged in the stand column 3 and can lock the cross beam 4; the quick connection fixing device 5 comprises a wire barrel 8, a screw rod 9, a nut II 10, a sleeve 11, a connecting column 12, a pin 13 and a nut I14, wherein the wire barrel 8 is arranged at the lower end of the top cover 6, the screw rod 9 is simultaneously in threaded connection with the wire barrel 8 and the top cover 3, the nut II 10 is fixedly connected to the screw rod 9, the sleeve 11 is arranged at the lower end of the top cover 6, the connecting column 12 is inserted into the sleeve 11 and penetrates through the cross beam 4, the pin 13 penetrates through the sleeve 11 and the connecting column 12, the nut I14 is in threaded connection with the lower end of the connecting column 12, the connecting column 12 can be fixed on the cross beam 4 through the nut I14, and the top cover 3 and the top cover 6 can be quickly connected through the screw rod 9, so that the purpose of quick installation connection is achieved.
The locking device 7 comprises a bolt 15, a locking rod 16, a limiting plate 17 and a spring 18, wherein the bolt 15 is inserted into the cross beam 4 and the upright post 3 from top to bottom, the locking rod 16 is arranged on the side wall of the upright post 3 in a sliding mode and can be inserted into the bolt 15, the limiting plate 17 is arranged at the outer end of the locking rod 16, the spring 18 is sleeved on the locking rod 16, one end of the spring 18 is arranged on the limiting plate 17, the other end of the spring 18 is arranged on the upright post 3, and the cross beam 4 and the upright post 3 can be tightly connected together through the locking device 7.
The screw rod 9 is arranged in two sections and can meet the requirement that the screw rod 9 is screwed in the screw cylinder 8 and the upright post 3 simultaneously.
The spring 18 always has a force on the locking lever 16 that snaps towards the latch 15.
The joint of the upright post 3 and the cross beam 4 is arranged in a step shape.
When the connecting rod is specifically used, during installation, the upright post 3 is inserted into the bottom cylinder 2, the cross beam 4 is lapped on the upright post 3, the locking rod 16 is pulled, the bolt 15 is inserted into the cross beam 4, the bolt 15 penetrates through the cross beam 4 and is inserted into the upright post 3, then the locking rod 16 is loosened, under the action of the spring 18, the locking rod 16 is inserted into the bolt 15 to complete locking of the bolt 15, the cross beam 4 and the upright post 3 at the moment form a whole, the screw rod 9 is screwed into the upright post 3 through the screw rod 10, the screw rod 8 on the top cover 6 is also screwed into the screw rod 9 at the same time, the levelness of the top cover 6 is adjusted through the screw rods 9 at two ends, finally the connecting column 12 is inserted from the lower end of the cross beam 4 until the sleeve 11 is inserted, the bolt 13 is used for pinning, the screw rod 14 is screwed into the lower end of the connecting column 12 until the connecting column 12 is tightly fixed on the cross beam 4, and at the moment, the whole installation is completed, and the connecting rod is convenient and quick.
The utility model and its embodiments have been described above with no limitation, and the actual construction is not limited to the embodiments of the utility model as shown in the drawings. In summary, if one of ordinary skill in the art is informed by this disclosure, a structural manner and an embodiment similar to the technical solution should not be creatively devised without departing from the gist of the present utility model.

Claims (5)

1. Assembled green building structure, its characterized in that: the device comprises a bottom plate, a bottom cylinder, a stand column, a cross beam, a quick connection fixing device, a top cover and a locking device, wherein the bottom cylinder is arranged on the bottom plate, the stand column is inserted into the bottom cylinder, the cross beam is arranged on the stand column in a lap joint mode, the quick connection fixing device is connected with the top cover and the stand column and is simultaneously connected with the cross beam, and the locking device is arranged in the stand column and can lock the cross beam; the quick connection fixing device comprises a screw barrel, a screw rod, a nut II, a sleeve, a connecting column, a pin rod and a nut I, wherein the screw barrel is arranged at the lower end of the top cover, the screw rod is simultaneously in threaded connection with the screw barrel and the upright column, the nut II is fixedly connected to the screw rod, the sleeve is arranged at the lower end of the top cover, the connecting column is inserted into the sleeve and penetrates through the cross beam, the pin rod penetrates through the sleeve and the connecting column, and the nut I is in threaded connection with the lower end of the connecting column.
2. The fabricated green building structure according to claim 1, wherein: the locking device comprises a bolt, a locking rod, a limiting plate and a spring, wherein the bolt is inserted into the cross beam and the stand column from top to bottom, the locking rod is slidably arranged on the side wall of the stand column and can be inserted into the bolt, the limiting plate is arranged at the outer end of the locking rod, the spring is sleeved on the locking rod, and one end of the spring is arranged on the limiting plate and the other end of the spring is arranged on the stand column.
3. The fabricated green building structure according to claim 2, wherein: the screw rod is arranged in two sections and can be screwed in the screw cylinder and the upright post simultaneously.
4. A fabricated green building structure according to claim 3, wherein: the spring always has a force for buckling the latch to the locking rod.
5. The fabricated green building structure according to claim 4, wherein: the connection part of the upright post and the cross beam is arranged in a step shape.
CN202223311160.7U 2022-12-10 2022-12-10 Assembly type green building structure Active CN219825597U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223311160.7U CN219825597U (en) 2022-12-10 2022-12-10 Assembly type green building structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223311160.7U CN219825597U (en) 2022-12-10 2022-12-10 Assembly type green building structure

Publications (1)

Publication Number Publication Date
CN219825597U true CN219825597U (en) 2023-10-13

Family

ID=88244505

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223311160.7U Active CN219825597U (en) 2022-12-10 2022-12-10 Assembly type green building structure

Country Status (1)

Country Link
CN (1) CN219825597U (en)

Similar Documents

Publication Publication Date Title
CN109138155A (en) Steel house frame
CN111894307A (en) Fully-assembled standardized temporary support structure and construction method
CN209211626U (en) It is a kind of avoid bottom dew angle lower rib on ring beam Column border node
CN219825597U (en) Assembly type green building structure
CN113175255A (en) Brick filling wood frame based on steel cable reinforced structure
CN215563303U (en) Exempt from to support assembled concrete beam column connection structure
CN115506480A (en) Bottom layer frame of light steel assembled house
CN210946527U (en) Composite assembling type bridge cantilever construction bracket
CN210827850U (en) Quick detachable temporary building fixed knot constructs
CN113216388A (en) Support-free assembled concrete beam column connecting structure and assembling method
CN209742074U (en) assembled frame beam column connected node
CN106436907B (en) Tower crown steel and shear wall reinforced bar structure plug-in connection method and connection structure
CN109322391A (en) It is a kind of avoid bottom dew angle lower rib on ring beam Column border node
CN110629683A (en) Composite assembling type bridge cantilever construction bracket
CN219527936U (en) Prefabricated solid post boots connection structure
CN219316037U (en) Concrete oblique beam and box steel skeleton column connecting node
CN215330422U (en) Steel construction and concrete structure's assembled building structure that combines together
CN221256137U (en) Temporary supporting device for floor support plate
CN220058310U (en) Assembled steel structure frame
CN212613913U (en) Building structure's reinforcement connecting device
CN220267286U (en) Steel construction engineering reinforcing block
CN215829714U (en) Opening structure of steel plate shear wall
CN212359287U (en) Steep slope iron tower leg heightening structure
CN211572514U (en) Scalable regulation outer wall scaffold frame
CN209353480U (en) A kind of connecting node of steel bar truss floor support plate and concrete filled steel tube combined special-shaped column

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant