CN219825527U CN202320520305.XU CN202320520305U CN219825527U CN 219825527 U CN219825527 U CN 219825527U CN 202320520305 U CN202320520305 U CN 202320520305U CN 219825527 U CN219825527 U CN 219825527U
Authority
CN
China
Prior art keywords
inspection well
hole
extension
extension tube
height
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320520305.XU
Other languages
Chinese (zh)
Inventor
滕茂瑞
谢元勋
郑有恒
屈道新
吴秋明
韦荣弟
李为
郜江晶
凌思逸
谢植敦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN202320520305.XU priority Critical patent/CN219825527U/en
Application granted granted Critical
Publication of CN219825527U publication Critical patent/CN219825527U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)

Abstract

The utility model relates to a height-connecting structure of an inspection well, wherein a plurality of threaded holes are formed in the top of the inspection well, and the height-connecting structure comprises: an extension tube arranged at the top of the inspection well, wherein a through hole is formed in the extension tube corresponding to the threaded hole; and wear to locate the screw hole with the connecting bolt of through-hole, connecting bolt with screw hole threaded connection is higher than traditional mode of brickwork, is fixed in through the extension pipe the upper portion load of inspection shaft has stronger tolerance, and to constructor simple to operate practices thrift a large amount of engineering time.

Description

Height-connecting structure of inspection well
Technical Field
The utility model relates to the technical field of inspection well installation, in particular to a height-connecting structure of an inspection well.
Background
The rain and sewage inspection well is an inspection well which is arranged on a drainage pipeline system for inspecting and cleaning pipelines. And also plays a role in ventilation of the connecting pipe section and the pipeline system. The pipe sections between two adjacent wells are on the same straight line, so inspection wells are required to be arranged at the sections of the pipeline, the slopes, the intersections and the elevations, and the inspection wells are also required to be arranged on the overlong straight line pipe sections in sections (the section spacing is regulated according to the diameter of the pipeline, the type of rain and sewage). The traditional rain sewage inspection well mainly adopts a bricked form, and in recent years, more and more rain sewage inspection wells adopt a prefabricated reinforced concrete form due to popularization of assembly type buildings in the development of industry. However, the prefabricated reinforced concrete rain sewage well has a disadvantage that the prefabricated reinforced concrete rain sewage well is formed in a factory, and the specification and the size are difficult to change after leaving the factory. Once the site height of the construction site changes, the elevation of the wellhead of the precast reinforced concrete rain sewage well is difficult to adjust. The traditional mode of heightening the precast reinforced concrete rain sewage well mainly adopts a bricked mode, but the bricked position of heightening the rain sewage well often has fatal defects, namely, the heightened part is easy to break due to the action of upper load.
Disclosure of Invention
The utility model aims to overcome the defects of the prior art, and provides a height-connecting structure of an inspection well, which is characterized in that an extension pipe is arranged at the top of the inspection well, the top of the inspection well after the extension pipe is stacked is matched with the surface of the ground, then the extension pipe is fixedly connected with the inspection well through a connecting bolt, the height-connecting structure is higher than the traditional brickwork, the load on the upper part of the inspection well through the extension pipe is stronger in bearing capacity, the installation is convenient for constructors, and a large amount of construction time is saved.
The technical scheme who realizes above-mentioned purpose is a high structure that connects of inspection shaft, a plurality of screw holes have been seted up at the top of inspection shaft, connect high structure includes:
an extension tube arranged at the top of the inspection well, wherein a through hole is formed in the extension tube corresponding to the threaded hole; and
and the connecting bolt penetrates through the threaded hole and the through hole, and is in threaded connection with the threaded hole.
Furthermore, a nut is arranged at the end part of the through hole, and the connecting bolt is in threaded connection with the nut and penetrates through the through hole.
Further, the outer contour surface of the extension tube and the outer contour surface of the inspection well are positioned on the same vertical line.
Further, the inner wall of the extension tube and the inner wall of the inspection well are positioned on the same vertical line.
Further, the extension tube is of a concrete structure.
Further, the number of the extension pipes is confirmed according to the extension height of the inspection well.
Compared with the prior art, the utility model has the following beneficial effects:
through set up the extension pipe at the top of inspection shaft, pile up the top of the inspection shaft of extension pipe, the whole height of inspection shaft rises, later will through connecting bolt the extension pipe with inspection shaft fixed connection, compare in traditional mode of laying bricks increases, is fixed in through the extension pipe the upper portion load of inspection shaft has stronger tolerance, and to constructor simple to operate practices thrift a large amount of engineering time.
Drawings
Fig. 1 is a schematic structural view of a height-connection structure of an inspection well according to the present utility model.
Legend description: 1. an inspection well; 2. a tube extension; 3. a threaded hole; 4. and a through hole.
Detailed Description
The utility model will be further described with reference to the drawings and the specific examples.
Referring to fig. 1, a height-connecting structure of an inspection well, a plurality of threaded holes 3 are formed in the top of the inspection well 1, and the height-connecting structure comprises: an extension tube 2 arranged at the top of the inspection well 1, wherein a through hole 4 is formed in the extension tube 2 corresponding to the threaded hole 3; and the connecting bolt penetrates through the threaded hole 3 and the through hole 4, and is in threaded connection with the threaded hole 3.
In the present utility model, a preferred embodiment is: the inspection well 1 is reserved with a space for the threaded holes 3 before pouring, preferably, 4 threaded holes 3 are arranged at intervals at the top of the inspection well 1, and the threaded holes 3 are uniformly arranged along the top of the inspection well 1.
Furthermore, a nut is arranged at the end part of the through hole, and the connecting bolt is in threaded connection with the nut and penetrates through the through hole. Preferably, the through hole 4 is embedded with two nuts, the two nuts are respectively arranged on the top surface of the extension tube 2 and the bottom surface of the extension tube 2, the nuts are in threaded connection with the connecting bolts, so that the extension tube 2 cannot incline during installation, and the end surface of the outermost side of the nuts is flush with the end surface of the extension tube 2.
Further, the outer contour surface of the extension pipe 2 and the outer contour surface of the inspection well 1 are positioned on the same vertical line.
Further, the inner wall of the extension pipe 2 and the inner wall of the inspection well 1 are positioned on the same vertical line.
Further, the extension tube 2 is a concrete structure.
Further, the number of the extension pipes 2 is confirmed according to the extension height of the inspection well, and the through holes of the plurality of extension pipes 2 are connected end to end. Preferably, a plurality of extension pipes 2 are arranged at the top of the inspection well so as to increase the height of the inspection well; when the manhole 1 with the overlapped extension pipes 2 cannot reach the preset height, stacking another extension pipe 2 on the top of the extension pipe 2, aligning the through hole of the other extension pipe 2 with the through hole of the extension pipe 2 on the bottom, and repeating the above operation until the heights of the overlapped extension pipes reach the preset height, and then fixing the extension pipes 2 and the manhole by using bolts.
The following describes a use process of the height-connection structure of the inspection well.
Arranging the extension tube 2 at the top of the inspection well 1, aligning the threaded holes 3 of the inspection well 1 with the through holes 4 of the extension tube 2, preferably, increasing the number of the extension tubes 2 to connect the inspection well 1, when the inspection well 1 overlapped with the extension tube 2 cannot reach the preset height, continuing to stack another extension tube 2 at the top of the extension tube 2, aligning the through holes of the other extension tube 2 with the through holes of the extension tube 2 at the bottom, repeating the above operation until the heights overlapped with a plurality of extension tubes reach the preset height, screwing the bolts into the through holes 4 from the top of the extension tube 2, penetrating through a plurality of the extension tubes 2 and screwing into the threaded holes 3, penetrating the bolts through the inspection well 1 and the extension tube 2, so that the extension tube 2 is fixed at the top of the inspection well 1, and the connecting bolts provide shearing resistance for the inspection well 1 and the extension tube 2.
The present utility model has been described in detail with reference to the embodiments of the drawings, and those skilled in the art can make various modifications to the utility model based on the above description. Accordingly, certain details of the illustrated embodiments are not to be taken as limiting the utility model, which is defined by the appended claims.

Claims (6)

1. The utility model provides a connect high structure of inspection shaft, a plurality of screw holes, characterized by have been seted up at the top of inspection shaft: the height-connecting structure comprises:
an extension tube arranged at the top of the inspection well, wherein a through hole is formed in the extension tube corresponding to the threaded hole; and
and the connecting bolt penetrates through the threaded hole and the through hole, and is in threaded connection with the threaded hole.
2. The access structure of an inspection well of claim 1, wherein: the end part of the through hole is provided with a nut, and the connecting bolt is in threaded connection with the nut and penetrates through the through hole.
3. The access structure of an inspection well of claim 1, wherein: the outer contour surface of the extension tube and the outer contour surface of the inspection well are positioned on the same vertical line.
4. The access structure of an inspection well of claim 1, wherein: the inner wall of the extension tube and the inner wall of the inspection well are positioned on the same vertical line.
5. The access structure of an inspection well of claim 1, wherein: the extension tube is of a concrete structure.
6. The access structure of an inspection well of claim 1, wherein: the number of the extension pipes is confirmed according to the extension height of the inspection well.
CN202320520305.XU 2023-03-15 2023-03-15 Height-connecting structure of inspection well Active CN219825527U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320520305.XU CN219825527U (en) 2023-03-15 2023-03-15 Height-connecting structure of inspection well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320520305.XU CN219825527U (en) 2023-03-15 2023-03-15 Height-connecting structure of inspection well

Publications (1)

Publication Number Publication Date
CN219825527U true CN219825527U (en) 2023-10-13

Family

ID=88281601

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320520305.XU Active CN219825527U (en) 2023-03-15 2023-03-15 Height-connecting structure of inspection well

Country Status (1)

Country Link
CN (1) CN219825527U (en)

Similar Documents

Publication Publication Date Title
CN201232197Y (en) Combined inspection well
CN2546500Y (en) Precast assembling concrete manhole
CN104389315A (en) Consolidation grouting drilled pile wall and construction method thereof
CN105756087A (en) Assembling-type anchoring structure for adjacent plates of prefabricated comprehensive pipe rack
CN1131912C (en) Variable supporting-plate club-footed embedded pile and its forming method
CN219825527U (en) Height-connecting structure of inspection well
CN111173033A (en) Prefabricated pipe gallery structure and pipe jacking method construction method thereof
CN212835499U (en) Assembled utility tunnel convenient to cast-in-place
CN214755296U (en) Prefabricated concrete cable row pipe for on-site assembly construction
CN214695953U (en) Domestic sewage drainage pipe that municipal works were used
CN111877315B (en) Local prefabricated diaphragm wall guide wall under underground facility and construction method
CN114293804A (en) Underpinning structure and method for masonry load-bearing wall opening
CN210712893U (en) Drainage integration system falls in deep basal pit
CN110984139A (en) Grouting type steel pipe screw pile and construction method thereof
CN207633335U (en) Telescopic madjack pipe for Pile end post grouting construction
CN112726784A (en) Fully-prefabricated PC sewer inspection well component assembly type structure and construction method
CN211898551U (en) Prefabricated pipe gallery structure
CN111560982A (en) Installation method of cable prefabricated well
CN111502038A (en) Assembly type PC building structure and construction method thereof
CN104908150A (en) Piping shaft manufacturing formwork and industrialized piping shaft production method
CN204298834U (en) Consolidation grouting boring piling wall
CN111535582A (en) Shaped bridge frame embedded box and construction method thereof
CN218952224U (en) Separated open caisson structure
CN210238713U (en) Assembled steel system drainage inspection shaft
CN220100396U (en) Prefabricated assembled concrete column structure of grout telescopic inspection pit in storehouse