CN210712893U - Drainage integration system falls in deep basal pit - Google Patents

Drainage integration system falls in deep basal pit Download PDF

Info

Publication number
CN210712893U
CN210712893U CN201921213492.7U CN201921213492U CN210712893U CN 210712893 U CN210712893 U CN 210712893U CN 201921213492 U CN201921213492 U CN 201921213492U CN 210712893 U CN210712893 U CN 210712893U
Authority
CN
China
Prior art keywords
precipitation
water
foundation pit
rainwater
deep foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921213492.7U
Other languages
Chinese (zh)
Inventor
韩杨杨
高辉
王凯峰
高丙山
杨红岩
张文龙
陈经纬
李卓朋
齐桂永
牛立舒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201921213492.7U priority Critical patent/CN210712893U/en
Application granted granted Critical
Publication of CN210712893U publication Critical patent/CN210712893U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a deep foundation pit dewatering and drainage integrated system, which comprises a dewatering water collection tank (1), a dewatering pipe (2), a first channel water supporting and collecting tank (3), a drainage floor drain (5), a gravity type water pipe (6) and a rainwater water collection tank (7); the precipitation water collecting tank is arranged at the bottom of the deep foundation pit and is connected with the precipitation well (11) through a precipitation pipe; the rainwater collection tank is arranged on the second support structure (10) and is connected with the rainwater collection tank through a downcomer, the drainage floor drain is arranged on the first support (9) and is connected to the rainwater collection tank through a gravity type water pipe, and the first support collection tank is arranged on the first support and is connected with the rainwater collection tank through a downcomer. The utility model can effectively solve the problem of reasonable arrangement of the precipitation pipelines in the limited space range, improve the utilization rate of the field plane and simultaneously ensure the repeated use of water resources; the method has better guiding significance for projects with narrow construction sites and large difficulty in plane conversion arrangement in the foundation pit dewatering construction stage.

Description

Drainage integration system falls in deep basal pit
Technical Field
The utility model relates to a deep basal pit dewatering construction system among the building construction field especially relates to a deep basal pit dewatering integration system.
Background
With the rapid development of economy and the acceleration of urbanization process, urban space utilization gradually tends to the excavation of three-dimensional space. More and more high-rise buildings pull out the ground in urban construction, at present, in the building construction of prior art, the problem that the construction difficulty is increased due to the narrow and small construction site is increasingly prominent in the middle of urban construction, especially in the construction process of reasonably arranging the water reducing pipeline in the foundation pit construction stage, the effective utilization of limited space and water resource is a big problem of urban construction, the waste and the space occupation of water resource in the existing construction engineering are important problems restricting the engineering construction and influencing the construction quality, and the realization of green construction is not facilitated.
Disclosure of Invention
An object of the utility model is to provide a deep basal pit falls drainage integration system can improve place plane utilization ratio, guarantees water resource used repeatedly simultaneously.
The utility model discloses a realize like this:
a deep foundation pit dewatering and drainage integrated system is arranged in a deep foundation pit, the deep foundation pit comprises an underground continuous wall, a first supporting structure, a second supporting structure, a dewatering well, a supporting vertical support pile and a plurality of supporting structures, the first supporting structure, the second supporting structure and the plurality of supporting structures are sequentially arranged between the underground continuous wall and the supporting vertical support pile from top to bottom, and the dewatering well is arranged at the bottom of the deep foundation pit;
the deep foundation pit dewatering and draining integrated system comprises a dewatering water collection tank, a dewatering pipe, a first-channel supporting water collection tank, a draining floor drain, a gravity type water pipe and a rainwater water collection tank; the precipitation water collecting tank is arranged at the bottom of the deep foundation pit and is connected with the precipitation well through a precipitation pipe; the rainwater collecting tank is arranged on the second supporting structure and is connected with the rainwater collecting tank through the downcomer, the drainage floor drain is arranged on the first support and is connected with the rainwater collecting tank through the gravity type water pipe, and the first supporting collecting tank is arranged on the first support and is connected with the rainwater collecting tank through the downcomer.
The first water supporting and collecting tank is externally connected with sewage treatment equipment.
The second support structure is provided with a plurality of rainwater collection tanks, and the plurality of rainwater collection tanks are connected through water pipes of the water collection tanks.
The second says that bearing structure be annular bearing structure, a plurality of rainwater header tank sets up along the edge that bearing structure was said to the second.
And a water suction pump is arranged on the precipitation pipe between the precipitation well and the precipitation header tank.
The utility model can effectively solve the problem of reasonable arrangement of the precipitation pipelines in the limited space range, improve the utilization rate of the field plane and simultaneously ensure the repeated use of water resources; the method has better guiding significance for projects with narrow construction sites and large difficulty in plane conversion arrangement in the foundation pit dewatering construction stage.
Drawings
FIG. 1 is a sectional view of the deep foundation pit drainage and precipitation integrated system of the present invention;
fig. 2 is the utility model discloses deep basal pit falls drainage integration system's plan view.
In the figure, 1 precipitation header tank, 2 precipitation pipes, 3 first supporting header tanks, 4 sewage treatment devices, 5 drainage floor drains, 6 gravity type water pipes, 7 rainwater header tanks, 8 underground continuous walls, 9 first supporting structures, 10 second supporting structures, 11 precipitation wells, 12 supporting vertical support piles, 13 supporting structures, 14 header tank water pipes and 15 water suction pumps.
Detailed Description
The invention will be further explained with reference to the drawings and the specific embodiments.
Referring to the attached drawing 1, the water lowering and draining integrated system is arranged in a deep foundation pit, the deep foundation pit comprises an underground diaphragm wall 8, a first supporting structure 9, a second supporting structure 10, a dewatering well 11, a supporting vertical support pile 12 and a plurality of supporting structures 13, the first supporting structure 9, the second supporting structure 10 and the plurality of supporting structures 13 are sequentially arranged between the underground diaphragm wall 8 and the supporting vertical support pile 12 from top to bottom, and the dewatering well 11 is arranged at the bottom of the deep foundation pit.
Referring to attached drawings 1 and 2, the deep foundation pit dewatering and drainage integrated system comprises a dewatering water collection tank 1, a dewatering pipe 2, a first-channel supporting water collection tank 3, a drainage floor drain 5, a gravity type water pipe 6 and a rainwater water collection tank 7; the precipitation water collecting tank 1 is arranged at the bottom of the deep foundation pit and is connected with the precipitation well 11 through a precipitation pipe 2; the rainwater collection tank 7 is arranged on the second supporting structure 10 and is connected with the rainwater collection tank 1 through the downcomer 2, the drainage floor drain 5 is arranged on the first support 9 and is connected to the rainwater collection tank 7 through the gravity type water pipe 6, and the first supporting collection tank 3 is arranged on the first support 9 and is connected with the rainwater collection tank 7 through the downcomer 2.
The first way prop the external sewage treatment device 4 of header tank 3, can be used to the purification treatment to precipitation and rainwater, ensure that the water resource of recycling can satisfy the water requirement.
The second supporting structure 10 is provided with a plurality of rainwater collecting tanks 7, and the rainwater collecting tanks 7 are connected through water collecting tank water pipes 14. Preferably, the header pipe 14 may be a galvanized pipe.
The second support structure 10 be annular support structure, a plurality of rainwater header tank 7 sets up along the edge of second support structure 10, the collection of the rainwater of being convenient for.
The caliber of the drainage floor drain 5 is 15mm, so that the smoothness of drainage is ensured, and the drainage floor drain is used for collecting rainwater.
The precipitation pipe 2 between the precipitation well 11 and the precipitation header tank 1 is provided with a water suction pump 15, so that the precipitation collected in the precipitation well 11 can be conveniently conveyed into the precipitation header tank 1.
During construction, please refer to fig. 1, after a certain foundation pit supporting structure is completed in a deep foundation pit, namely a first supporting structure 9, a second supporting structure 10 and a plurality of supporting structures 13 are sequentially arranged between an underground continuous wall 8 and a supporting vertical pile 12 from top to bottom, and the like, and after the required supporting structures are designed, please refer to fig. 2, the compass arrow direction at the upper right corner in fig. 2 is north, two precipitation water collecting tanks 1 can be respectively arranged at the north and south sides of the bottom of the deep foundation pit, and the precipitation collected in a plurality of surrounding precipitation wells 11 is conveyed into the two precipitation water collecting tanks 1 through a precipitation pipe 2 through a water suction pump 15, so that the precipitation can be collected and utilized conveniently; eight rainwater collection tanks 7 are arranged along the annular second support structure 10 at intervals, and the rainwater collection tanks 7 are connected with the rainfall collection tank 1 through the rainfall pipes 2, so that rainfall in the rainfall collection tank 1 can be conveyed into the rainwater collection tanks 7; the eight rainwater collecting tanks 7 are sequentially connected through water collecting tank water pipes 14, a first supporting water collecting tank 3 is arranged on a first supporting structure 9, sewage treatment equipment 4 is arranged on the southeast side of the outer part of the deep foundation pit, and the first supporting water collecting tank 3 is connected with the rainwater collecting tanks 7 and the sewage treatment equipment 4 through downcomer pipes 2; 20 drainage floor drains 5 with the caliber of 15mm are uniformly arranged on the first supporting structure 9, and the drainage floor drains 5 are connected with a rainwater collection tank 7 through gravity type water pipes 6 and used for collecting rainwater in rainy days. The water accessible first way of collecting in the precipitation header tank 1 props the header tank 3 output for construction water such as unearthed vehicle washes, on-the-spot civilization water use, concrete maintenance and later stage recharging well water, reaches water resource reuse's purpose, and uses after precipitation and the rainwater accessible sewage treatment device 4 purification treatment in the first way of propping the header tank 3, realizes green construction requirement.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and should not be taken as limiting the scope of the present invention, therefore, any modifications, equivalents, improvements and the like made within the spirit and principles of the present invention should be included in the scope of the present invention.

Claims (5)

1. A drainage and precipitation integrated system for a deep foundation pit is arranged in the deep foundation pit, the deep foundation pit comprises an underground diaphragm wall (8), a first supporting structure (9), a second supporting structure (10), a precipitation well (11), a supporting vertical support pile (12) and a plurality of supporting structures (13), the first supporting structure (9), the second supporting structure (10) and the plurality of supporting structures (13) are sequentially arranged between the underground diaphragm wall (8) and the supporting vertical support pile (12) from top to bottom, and the precipitation well (11) is arranged at the bottom of the deep foundation pit;
the method is characterized in that: the deep foundation pit dewatering and drainage integrated system comprises a dewatering water collection tank (1), a dewatering pipe (2), a first-channel water collection supporting tank (3), a drainage floor drain (5), a gravity type water pipe (6) and a rainwater water collection tank (7); the precipitation water collecting tank (1) is arranged at the bottom of the deep foundation pit and is connected with the precipitation well (11) through a precipitation pipe (2); rainwater header tank (7) sets up on second way bearing structure (10) and is connected with precipitation header tank (1) through downcomer (2), and drainage floor drain (5) set up on first way support (9) and are connected to rainwater header tank (7) through gravity type water pipe (6), and first way props header tank (3) and sets up on first way support (9) and is connected with rainwater header tank (7) through downcomer (2).
2. The deep foundation pit dewatering and drainage integrated system as claimed in claim 1, wherein: the first water supporting and collecting tank (3) is externally connected with a sewage treatment device (4).
3. The deep foundation pit dewatering and drainage integrated system as claimed in claim 1, wherein: the second supporting structure (10) is provided with a plurality of rainwater collecting tanks (7), and the rainwater collecting tanks (7) are connected through water collecting tank water pipes (14).
4. The deep foundation pit dewatering and drainage integrated system as claimed in claim 3, wherein: the second support structure (10) is an annular support structure, and a plurality of rainwater collection tanks (7) are arranged along the edge of the second support structure (10).
5. The deep foundation pit dewatering and drainage integrated system as claimed in claim 1, wherein: and a water suction pump (15) is arranged on the precipitation pipe (2) between the precipitation well (11) and the precipitation water collecting tank (1).
CN201921213492.7U 2019-07-30 2019-07-30 Drainage integration system falls in deep basal pit Active CN210712893U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921213492.7U CN210712893U (en) 2019-07-30 2019-07-30 Drainage integration system falls in deep basal pit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921213492.7U CN210712893U (en) 2019-07-30 2019-07-30 Drainage integration system falls in deep basal pit

Publications (1)

Publication Number Publication Date
CN210712893U true CN210712893U (en) 2020-06-09

Family

ID=70927031

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921213492.7U Active CN210712893U (en) 2019-07-30 2019-07-30 Drainage integration system falls in deep basal pit

Country Status (1)

Country Link
CN (1) CN210712893U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116254862A (en) * 2023-03-14 2023-06-13 中建八局第三建设有限公司 Foundation pit drainage system combined with deep foundation pit inner support

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116254862A (en) * 2023-03-14 2023-06-13 中建八局第三建设有限公司 Foundation pit drainage system combined with deep foundation pit inner support

Similar Documents

Publication Publication Date Title
CN203947484U (en) A kind of drainage of foundation pit and circulating water utilization system
CN102418347B (en) Drainage construction method for blind drain and sump wells in deep foundation pit
CN102116033A (en) Method and device for dewatering and draining water collecting well of blind drain of deep foundation pit
CN212896422U (en) Deep foundation pit water intercepting and draining device
CN210712893U (en) Drainage integration system falls in deep basal pit
CN207268009U (en) A kind of underground pipe gallery drainage system based on existing blowdown canal
CN203173911U (en) Precipitation device
CN110093965A (en) A kind of water discharge method of construction site
CN105569063A (en) Collecting and utilizing method for underground water on periphery of basement retaining wall and water collecting structure
CN104328836B (en) A kind of environment-friendly type prefabricated pair of case deep hole type catch pit and construction method thereof
CN217399744U (en) Basement side wall sluicing decompression structure
CN110005144A (en) A kind of drainage riser structure and its setting method suitable for upper cover exploitation
CN109763552A (en) A kind of basis is dark to apply gravity type draining regeneration application system and its construction method
CN210766884U (en) Underground cover plate ditch suitable for pipeline collection
CN212272299U (en) Water collecting and draining structure of mine method tunnel
CN211312560U (en) Simple and easy core section of thick bamboo stepping water conservancy diversion drainage structures
CN107060040A (en) A kind of underground pipe gallery drainage system based on existing blowdown canal
CN209144964U (en) A kind of efficient rainwater isolation collection device
CN207436077U (en) A kind of drainage of foundation pit structure
CN206376226U (en) A kind of accessible all standing dust falling system of contrary sequence method platform
CN202055256U (en) Concentrated water diversion and drainage device for large-area water seepage slope surface
CN217352610U (en) Shield tunnel comprehensive well enclosure structure
CN205975651U (en) Ultradeep foundation pit just strides outer wall french drain drainage structures
CN104863168A (en) Hydrophobic device on lower part of basic baseplate and usage method of same
CN219470990U (en) Multistage collecting and draining system for construction site

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant