CN219802975U - Novel instrument and meter for electric power construction - Google Patents

Novel instrument and meter for electric power construction Download PDF

Info

Publication number
CN219802975U
CN219802975U CN202321251990.7U CN202321251990U CN219802975U CN 219802975 U CN219802975 U CN 219802975U CN 202321251990 U CN202321251990 U CN 202321251990U CN 219802975 U CN219802975 U CN 219802975U
Authority
CN
China
Prior art keywords
fixedly connected
instrument
meter
box
electric power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321251990.7U
Other languages
Chinese (zh)
Inventor
庞进胜
李博
刘建坤
高进
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Changxing Construction Group Co ltd
Original Assignee
Henan Changxing Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Changxing Construction Group Co ltd filed Critical Henan Changxing Construction Group Co ltd
Priority to CN202321251990.7U priority Critical patent/CN219802975U/en
Application granted granted Critical
Publication of CN219802975U publication Critical patent/CN219802975U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Cooling Or The Like Of Electrical Apparatus (AREA)

Abstract

The utility model relates to the technical field of power equipment, in particular to a novel instrument and meter for power construction, which comprises a box body, wherein two filter screens are fixedly connected to the outer surface of the box body, four reinforcing rods are fixedly connected to the inner surface of the box body, two motors are fixedly connected to the inner surface of the box body, rotating shafts are fixedly connected to the output ends of the two motors, and fans are fixedly connected to one ends of the two rotating shafts. The utility model has the advantages that: through the setting of fan, can dispel the heat to instrument and meter through last heating panel, when temperature sensor detects the inside high temperature of box, can automatic control open the water pump, the water pump can circulate the coolant liquid in the cooling tube, absorbs heating panel absorbing heat down to fully dispel the heat to instrument and meter, through the setting of filter screen, because the mesh of filter screen is thin enough, can effectively keep apart outside dust and get into the box, avoid causing equipment trouble because of the dust is piled up.

Description

Novel instrument and meter for electric power construction
Technical Field
The utility model relates to the technical field of power equipment, in particular to a novel instrument and meter for power construction.
Background
Instruments are instruments or devices for detecting, measuring, observing, and calculating various physical quantities, substance components, physical properties, and the like. Vacuum leak detector, manometer, length measuring instrument, microscope, multiplier etc. all belong to instrument and meter. In a broad sense, the instruments and meters can also have functions of automatic control, alarm, signal transmission, data processing and the like, such as pneumatic regulation meters and electric regulation meters used in the automatic control of industrial production processes, and the distributed instrument control system also belongs to the instruments and meters.
The existing instrument is simple in structure, the heat is generally dissipated by adopting a heat dissipation mode, when the heat dissipation mode cannot meet the heat dissipation requirement, the working temperature of the instrument is too high, potential safety hazards exist, various dust and particles floating in the air enter the upper surface of an instrument part and the instrument, heat dissipation is not facilitated, the accuracy is also affected, various faults of instrument equipment are caused when the heat dissipation mode is severe, and the service life of the instrument is prolonged.
In this regard, the utility model provides a novel instrument for electric power construction, which solves the problems.
Disclosure of Invention
The object of the present utility model is to solve at least one of the technical drawbacks.
Therefore, an object of the present utility model is to provide a novel instrument for electric power construction, which solves the problems mentioned in the background art and overcomes the shortcomings existing in the prior art.
In order to achieve the above object, an embodiment of an aspect of the present utility model provides a novel electric power construction instrument, which comprises a box body, two filter screens are fixedly connected to an outer surface of the box body, four reinforcing rods are fixedly connected to an inner surface of the box body, two motors are fixedly connected to an inner surface of the box body, two output ends of the motors are fixedly connected with rotating shafts, one ends of the two rotating shafts are fixedly connected with fans, an inner surface of the box body is fixedly connected with the instrument, an outer surface of the instrument is fixedly connected with four fixing plates, an outer surface of the instrument is fixedly connected with two upper radiating plates through bolts, a lower radiating plate is fixedly connected to a bottom of the instrument through bolts, a water pump is fixedly connected to an inner surface of the box body, a radiating pipe is fixedly connected to the outer surface of the water pump, the radiating pipe penetrates through the lower radiating plate and is fixedly connected with the lower radiating plate, a temperature sensor is fixedly connected to an inner surface of the box body, and an operation panel is fixedly connected to a top of the box body.
In any of the above embodiments, it is preferable that an instrument panel is provided on an outer surface of the instrument.
By any of the above schemes, preferably, a knob is fixedly connected to the outer surface of the instrument.
By any of the above schemes, preferably, the outer surface of the instrument is fixedly connected with two connecting seats.
By any of the above schemes, it is preferable that the outer surface of the case is fixedly hinged with a case door.
By any of the above schemes, preferably, the outer surface of the box door is fixedly connected with an observation window.
The technical effect achieved by adopting the scheme is as follows: the operating personnel can observe the working condition inside the box body.
By any of the above schemes, preferably, a handle is fixedly connected to the outer surface of the box door.
By any of the above schemes, preferably, the bottom of the box body is fixedly connected with four supporting feet.
The technical effect achieved by adopting the scheme is as follows: so that the device is more stable when placed.
Compared with the prior art, the utility model has the following advantages and beneficial effects:
1. through the setting of fan, can dispel the heat to instrument and meter through last heating panel, when temperature sensor detects the inside high temperature of box, can automatic control open the water pump, the water pump can circulate the coolant liquid in the cooling tube, absorbs heating panel absorbing heat down to fully dispel the heat to instrument and meter.
2. Through the setting of filter screen, because the mesh of filter screen is thin enough, can effectively isolate outside dust to get into the box, avoid causing equipment trouble because of the dust is piled up.
Additional aspects and advantages of the utility model will be set forth in part in the description which follows and, in part, will be obvious from the description, or may be learned by practice of the utility model.
Drawings
The foregoing and/or additional aspects and advantages of the utility model will become apparent and may be better understood from the following description of embodiments taken in conjunction with the accompanying drawings in which:
FIG. 1 is a schematic diagram of a main structure according to an embodiment of the present utility model;
FIG. 2 is a schematic view of an internal first view structure according to an embodiment of the present utility model;
FIG. 3 is a schematic view of an internal second view structure according to an embodiment of the present utility model;
fig. 4 is a schematic view of an internal third view structure according to an embodiment of the present utility model.
In the figure: 1-box, 2-filter screen, 3-stiffener, 4-motor, 5-pivot, 6-fan, 7-instrument and meter, 8-fixed plate, 9-upper heating panel, 10-lower heating panel, 11-water pump, 12-cooling tube, 13-temperature sensor, 14-panel, 15-knob, 16-operating panel, 17-chamber door, 18-observation window, 19-handle, 20-supporting legs, 21-connecting seat.
Detailed Description
As shown in fig. 1 to 4, a novel instrument and meter for electric power construction comprises a box body 1, two filter screens 2 are fixedly connected with the outer surface of the box body 1, four reinforcing rods 3 are fixedly connected with the inner surface of the box body 1, two motors 4 are fixedly connected with the inner surface of the box body 1, rotating shafts 5 are fixedly connected with the output ends of the two motors 4, fans 6 are fixedly connected with one ends of the two rotating shafts 5, the instrument and meter 7 is fixedly connected with the inner surface of the box body 1, four fixing plates 8 are fixedly connected with the outer surface of the instrument and meter 7, two upper radiating plates 9 are fixedly connected with the outer surface of the instrument and meter 7 through bolts, a lower radiating plate 10 is fixedly connected with the bottom of the instrument and meter 7 through bolts, a water pump 11 is fixedly connected with the inner surface of the water pump 11, radiating pipes 12 penetrate through the lower radiating plate 10 and are fixedly connected with the lower radiating plate 10, a temperature sensor 13 is fixedly connected with the inner surface of the box body 1, and an operation panel 16 is fixedly connected with the top of the box body 1.
The instrument panel 14 is provided on the outer surface of the instrument 7.
The outer surface of the instrument 7 is fixedly connected with a knob 15.
The outer surface of the instrument 7 is fixedly connected with two connecting seats 21.
The outer surface of the box body 1 is fixedly hinged with a box door 17, and sealing rubber strips are arranged at the frame of the box door 17 to prevent external dust from entering the box body.
The outer surface of the box door 17 is fixedly connected with an observation window 18.
The outer surface of the box door 17 is fixedly connected with a handle 19.
Four supporting feet 20 are fixedly connected to the bottom of the box body 1.
The utility model provides a novel instrument and meter of electric power construction, theory of operation is as follows: the operating personnel is at the internal surface of electric power job site with instrument and meter 7 through four mounting panel 8 fixed connection at box 1, connect the device that awaits measuring with connecting seat 21, later pass through the bolt with last heating panel 9 and lower heating panel 10 fixed connection at the surface of instrument and meter 7, close chamber door 17 afterwards, open motor 4 through operating panel 16, motor 4 drives pivot 5 and rotates, the pivot 5 rotates and drives fan 6 and rotate, fan 6 rotates and can fully dispel the heat to two last heating panels, the wind can follow the filter screen 2 of box 1 both sides and discharge, also can prevent outside dust entering box 1 in, temperature sensor 13 can monitor the temperature in the box 1 in real time, when the temperature in the box 1 is too high to be monitored, can automatic control open water pump 11, water pump 11 can circulate the coolant liquid in cooling tube 12, absorb the heat that lower heating panel 10 absorbs and dispel, four stiffener 3 can support the inside of box 1, take place high altitude weight object or the device when falling, can protect instrument and meter 7 effectively, the safety, the personnel is not damaged, also can observe the condition through operating window 18 to the inside of box 1.
Compared with the prior art, the utility model has the following beneficial effects compared with the prior art:
1. through the setting of fan 6, can dispel the heat to instrument and meter 7 through last heating panel 9, when temperature sensor 13 detects the inside high temperature of box 1, can automatic control open water pump 11, water pump 11 can circulate the coolant liquid in cooling tube 12, absorbs the heat of heating panel 10 absorption down to fully dispel the heat to instrument and meter 7.
2. Through the setting of filter screen 2, because the mesh of filter screen 2 is thin enough, can effectively isolate outside dust to get into box 1, avoid causing equipment trouble because of the dust is piled up.

Claims (8)

1. Novel instrument and meter of electric power construction, its characterized in that: including box (1), the surface fixedly connected with two filter screens (2) of box (1), four stiffener (3) of internal surface fixedly connected with of box (1), the internal surface fixedly connected with of box (1) two motors (4), two the equal fixedly connected with pivot (5) of output of motor (4), two the equal fixedly connected with fan (6) of one end of pivot (5), the internal surface fixedly connected with instrument (7) of box (1), the surface fixedly connected with four fixed plates (8) of instrument (7), the surface of instrument (7) is through two last heating panel (9) of bolt fixedly connected with, the bottom of instrument (7) is through heating panel (10) under the bolt fixedly connected with, the internal surface fixedly connected with water pump (11) of box (1), the surface fixedly connected with pipe (12) of water pump (11), pipe (12) run through under heating panel (10) and with heating panel (10) down, the surface fixedly connected with temperature sensor panel (16) of box (1) of internal surface fixedly connected with top sensor (16).
2. The novel instrument and meter for electric power construction according to claim 1, wherein: an instrument panel (14) is arranged on the outer surface of the instrument (7).
3. The novel instrument and meter for electric power construction according to claim 2, wherein: the outer surface of the instrument (7) is fixedly connected with a knob (15).
4. The novel instrument and meter for electric power construction according to claim 3, wherein: the outer surface of the instrument (7) is fixedly connected with two connecting seats (21).
5. The novel instrument and meter for electric power construction according to claim 4, wherein: the outer surface of the box body (1) is fixedly hinged with a box door (17).
6. The novel instrument and meter for electric power construction according to claim 5, wherein: the outer surface of the box door (17) is fixedly connected with an observation window (18).
7. The novel instrument and meter for electric power construction according to claim 6, wherein: the outer surface of the box door (17) is fixedly connected with a handle (19).
8. The novel instrument and meter for electric power construction according to claim 7, wherein: the bottom of the box body (1) is fixedly connected with four supporting feet (20).
CN202321251990.7U 2023-05-23 2023-05-23 Novel instrument and meter for electric power construction Active CN219802975U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321251990.7U CN219802975U (en) 2023-05-23 2023-05-23 Novel instrument and meter for electric power construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321251990.7U CN219802975U (en) 2023-05-23 2023-05-23 Novel instrument and meter for electric power construction

Publications (1)

Publication Number Publication Date
CN219802975U true CN219802975U (en) 2023-10-03

Family

ID=88181137

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321251990.7U Active CN219802975U (en) 2023-05-23 2023-05-23 Novel instrument and meter for electric power construction

Country Status (1)

Country Link
CN (1) CN219802975U (en)

Similar Documents

Publication Publication Date Title
CN109696288A (en) A kind of simulation tests in environment wind tunnel device and its experiment detection method
CN105675172B (en) A kind of calibration equipment of transformer thermometer
CN106769466A (en) A kind of temperature control triaxial test system
CN219802975U (en) Novel instrument and meter for electric power construction
CN212328329U (en) Temperature, humidity and vibration three-comprehensive test box
CN214102168U (en) Power communication equipment box convenient to maintain
CN213995918U (en) High-low temperature damp-heat alternating test room
CN210385895U (en) High-low temperature test box
CN207866489U (en) A kind of shower service life and temperature shock test machine
CN211982411U (en) Heat dissipation device of electric power detection instrument
CN114334373A (en) Automatic protection type multi-output power transformation device
CN206322021U (en) A kind of equipment for evaluating and testing temperature controller temperature accuracy
CN208009548U (en) A kind of energy saving detection device of building engineering construction
CN115275800A (en) Automatically controlled cabinet with function of making an uproar is fallen
CN208350579U (en) A kind of novel adjustable pipeline dust investigating
CN201616977U (en) Intelligent radiating protection device for water-supply control system
CN213211720U (en) Dustproof device for instrument and meter
RU57325U1 (en) POST ENVIRONMENTAL CONTROL OF THE ENVIRONMENT
CN219201113U (en) Heat-resistant detection equipment for flame-retardant plastic
CN213280427U (en) Electric control cabinet of pig farm
CN215379607U (en) Liquid cooling system for precision test instrument
CN216846308U (en) Environment detection equipment with built-in rotating mechanism
CN220248373U (en) Ionic water transmission pump for biological acid production
CN220326096U (en) Heat abstractor of biochemical instrument
CN217605302U (en) Testing device for performance of ground source heat pump unit