CN219773698U CN202320943838.9U CN202320943838U CN219773698U CN 219773698 U CN219773698 U CN 219773698U CN 202320943838 U CN202320943838 U CN 202320943838U CN 219773698 U CN219773698 U CN 219773698U
Authority
CN
China
Prior art keywords
wall
hole
fixedly connected
supporting
support mechanism
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320943838.9U
Other languages
Chinese (zh)
Inventor
王旭
王金超
邓占金
苗强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dezhou Special Engineering Co Ltd Of Shandong Expressway Dejian Group
Original Assignee
Dezhou Special Engineering Co Ltd Of Shandong Expressway Dejian Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dezhou Special Engineering Co Ltd Of Shandong Expressway Dejian Group filed Critical Dezhou Special Engineering Co Ltd Of Shandong Expressway Dejian Group
Priority to CN202320943838.9U priority Critical patent/CN219773698U/en
Application granted granted Critical
Publication of CN219773698U publication Critical patent/CN219773698U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to the technical field of building construction, in particular to a temporary supporting mechanism, which comprises a wall body and a supporting device, wherein the supporting device is arranged on one side of the wall body, the supporting device comprises two abutting pieces, the two abutting pieces are arranged on one side of the wall body, a rectangular sleeve is fixedly connected to one side surface of each abutting piece, a sliding block is slidably connected to the inner wall of each rectangular sleeve, a supporting rod I is fixedly connected to the surface of each sliding block, and a supporting rod II is arranged at one end of each supporting rod.

Description

Temporary supporting mechanism
Technical Field
The utility model relates to the technical field of building construction, in particular to a temporary supporting mechanism.
Background
In the building construction process, a temporary supporting framework is often used for temporarily supporting some walls, so that manual construction is facilitated.
The utility model discloses a temporary support structure for a diaphragm wall, which comprises a support rod connected to the diaphragm wall, wherein one end of the support rod far away from the diaphragm wall is connected with a bottom plate, a limit rod penetrates through the bottom plate, a limit groove is formed in the pit bottom of a foundation pit, the limit rod penetrates through the limit groove, a locating plate which is perpendicular to the direction of the wall surface of the diaphragm wall is connected to the diaphragm wall, one end of the support rod far away from the limit rod is connected with a fixing plate, the plate surface of the fixing plate is connected to the wall surface of the diaphragm wall through a mounting structure, and the top surface of the fixing plate is abutted against the locating plate.
The inventor finds that when building construction wall supports in daily work, the supporting mechanism needs to be fixed on the wall through bolts, so that the phenomenon of inconvenient operation during installation and subsequent disassembly is caused, the wall is easy to damage during the fixation through the bolts to cause a cavity, the condition of increasing the manual workload is needed to be filled in the cavity subsequently, and the problem of inconvenient use of the existing supporting mechanism is caused.
Disclosure of Invention
The utility model aims to solve the defect that the supporting mechanism is inconvenient to use in the prior art, and provides a temporary supporting mechanism.
In order to achieve the above purpose, the present utility model adopts the following technical scheme: the temporary supporting mechanism comprises a wall body and a supporting device, wherein the supporting device is arranged on one side of the wall body, the supporting device comprises two abutting pieces, the two abutting pieces are arranged on one side of the wall body, a rectangular sleeve is fixedly connected to one side surface of each abutting piece, a sliding block is slidably connected to the inner wall of each rectangular sleeve, a supporting rod I is fixedly connected to the surface of each sliding block, a supporting rod II is arranged at one end of each supporting rod I, an adjusting rod is fixedly connected to one end of each supporting rod II, a hole I is formed in the surface of each supporting rod, the adjusting rods are in threaded connection with the inner wall of the corresponding hole I, a sliding groove is formed in the surface of each sliding block, a clamping piece is slidably connected with the inner wall of each clamping groove, the abutting pieces can be attached to the wall surface, when the sliding blocks slide to the appropriate positions, the clamping pieces are inserted into the clamping grooves, the supporting rods II and the adjusting rods are rotated, and the supporting rods II can be adjusted in the supporting rods I to be supported by the ground.
Preferably, the number of the clamping grooves on the surface of the rectangular sleeve is multiple, the clamping grooves are arranged at equal intervals, and the positions of the first support rod and the second support rod can be adjusted according to the wall surface by arranging the clamping grooves through the components.
Preferably, the round hole has been seted up on the surface of slider, the round hole is linked together with slider surface spout, the inner wall of round hole rotates and is connected with the screw rod, hole two has been seted up on the surface of fastener, screw rod two and the inner wall threaded connection in hole two, through above-mentioned part, set up the screw rod, be convenient for control fastener removes, improved the constraint effect of fastener simultaneously.
Preferably, one end of the screw rod is fixedly connected with a knob, and the knob is arranged through the components, so that the screw rod can be controlled to rotate and adjust conveniently.
Preferably, an auxiliary device is arranged on one side of the second supporting rod, the auxiliary device comprises an auxiliary plate, the auxiliary plate is arranged on one side of the second supporting rod, two hollow sleeves are fixedly connected to the surface of the auxiliary plate, the second supporting rod is inserted into the inner wall of the supporting sleeve, two groups of second supporting rods are inserted into the hollow sleeves through the components, the auxiliary plate can position the two groups of supporting components, and stability during supporting is improved.
Preferably, the through hole has been seted up to the inner wall sliding connection of hollow cover, the inner wall sliding connection of through hole has the inserted bar, hole three has been seted up on the surface of bracing piece two, the inserted bar is pegged graft with the inner wall of hole three, the one end fixedly connected with bulge loop of inserted bar, the one end fixedly connected with stay cord of bulge loop, the one end and the surface fixed connection of hollow cover of stay cord, through above-mentioned part, set up the inserted bar, restriction that can bracing piece two stable is in hollow cover improves holistic stable effect, and the stay cord can fix a position the inserted bar.
Preferably, a plurality of equidistant anti-slip pieces are fixedly connected to the lower surface of the auxiliary plate, and the stability of the auxiliary plate can be improved by arranging the plurality of anti-slip pieces through the components.
Compared with the prior art, the utility model has the advantages and positive effects that:
1. according to the utility model, the supporting device is arranged, when equipment is needed to be used, the abutting piece is attached to the wall surface, the sliding block slides in the rectangular sleeve, the knob and the screw rod are rotated, the screw rod drives the clamping piece to move when the sliding block slides to a certain height, the clamping piece is inserted into the clamping groove corresponding to the surface of the rectangular sleeve, the supporting rod II and the adjusting rod are rotated, the adjusting rod rotates in the hole I of the supporting rod I, so that the position of the supporting rod II is adjusted, the supporting rod II can be used when attached to the ground, the supporting device is arranged, the wall surface is conveniently supported during construction, the phenomenon that the existing building construction is inconvenient to operate when the wall surface is supported by the supporting mechanism is needed to be fixed on the wall surface through bolts is effectively reduced, the wall surface is easy to damage through bolt fixing, the condition that the hole is subsequently needed to be filled, and the manual workload is increased is further improved, and the integral usability of the equipment is improved.
2. According to the utility model, when equipment is needed to be used, the second support rod is inserted into the hollow sleeve when the second support rod is adjusted, the two groups of support components are connected and supported by the auxiliary plate, the anti-skid effect is improved by the anti-skid piece, the inserted rods are respectively inserted into the through holes and the third holes on the surfaces of the hollow sleeve and the second support rod, the equipment can be used, the auxiliary equipment is convenient to use by arranging the auxiliary device, the conditions that the stability of the two groups of support mechanisms is poor in support and the support effect is not ideal due to movement are easily caused, and the overall stability of the equipment is improved.
Drawings
Fig. 1 is a schematic perspective view of a temporary supporting mechanism according to the present utility model;
FIG. 2 is a schematic view of the structure of FIG. 1A showing a temporary supporting mechanism according to the present utility model;
FIG. 3 is a schematic view of the structure of FIG. 1B showing a temporary support mechanism according to the present utility model;
FIG. 4 is a schematic view of a support device of the temporary support mechanism according to the present utility model in a partially cut-away configuration;
fig. 5 is a schematic structural view of an auxiliary device of the temporary supporting mechanism according to the present utility model.
Legend description:
1. a wall body; 2. a support device; 21. an abutment; 22. a rectangular sleeve; 23. a slide block; 24. a first support rod; 25. a second support rod; 26. an adjusting rod; 27. a knob; 28. a clamping piece; 29. a screw; 3. an auxiliary device; 31. an auxiliary plate; 32. a hollow sleeve; 33. a rod; 34. a pull rope; 35. a convex ring; 36. an anti-slip member.
Detailed Description
Referring to fig. 1-5, the present utility model provides a technical solution: the temporary supporting mechanism comprises a wall body 1 and a supporting device 2, wherein the supporting device 2 is arranged on one side of the wall body 1, and an auxiliary device 3 is arranged on one side of a second supporting rod 25.
The specific arrangement and function of the support means 2 and the auxiliary means 3 thereof will be described in detail below.
In this embodiment: the supporting device 2 comprises two abutting pieces 21, two abutting pieces 21 are arranged on one side of the wall body 1, a rectangular sleeve 22 is fixedly connected to one side surface of the abutting piece 21, a sliding block 23 is slidably connected to the inner wall of the rectangular sleeve 22, a first supporting rod 24 is fixedly connected to the surface of the sliding block 23, a second supporting rod 25 is arranged at one end of the first supporting rod 24, an adjusting rod 26 is fixedly connected to one end of the second supporting rod 25, a first hole is formed in the surface of the first supporting rod 24, the adjusting rod 26 is in threaded connection with the inner wall of the first hole, a sliding groove is formed in the surface of the sliding block 23, a clamping piece 28 is slidably connected to the inner wall of the clamping groove, the abutting piece 21 can be attached to the wall surface, when the sliding block 23 is slid to a proper position, the clamping piece 28 is inserted into the clamping groove, the second supporting rod 25 and the adjusting rod 26 are rotated, and the second supporting rod 25 can be supported on the ground in the first supporting rod 24, so that adjustment is performed.
Specifically, the number of the clamping grooves on the surface of the rectangular sleeve 22 is multiple, the clamping grooves are arranged at equal intervals, and the positions of the first support rod 24 and the second support rod 25 can be adjusted according to the wall surface.
Specifically, a round hole is formed in the surface of the sliding block 23 and is communicated with a sliding groove on the surface of the sliding block 23, a screw rod 29 is rotatably connected to the inner wall of the round hole, a hole II is formed in the surface of the clamping piece 28, and the screw rod 29 II is in threaded connection with the inner wall of the hole II.
In this embodiment: the screw 29 is arranged, so that the clamping piece 28 is convenient to control to move, and meanwhile, the binding effect of the clamping piece 28 is improved.
Specifically, one end of the screw 29 is fixedly connected with a knob 27, and the knob 27 is arranged to facilitate the control of the screw 29 for rotation adjustment.
In this embodiment: the auxiliary device 3 comprises an auxiliary plate 31, wherein the auxiliary plate 31 is arranged on one side of the second supporting rod 25, the surface of the auxiliary plate 31 is fixedly connected with two hollow sleeves 32, and the second supporting rod 25 is spliced with the inner wall of the supporting sleeve.
In this embodiment: the two groups of support rods II 25 are inserted into the hollow sleeve 32, and the auxiliary plate 31 can position the two groups of support components, so that the stability during support is improved.
Specifically, the through hole has been seted up to the inner wall sliding connection of hollow cover 32, the inner wall sliding connection of through hole has inserted bar 33, hole three has been seted up on the surface of bracing piece two 25, inserted bar 33 is pegged graft with the inner wall of hole three, the one end fixedly connected with bulge loop 35 of inserted bar 33, the one end fixedly connected with stay cord 34 of bulge loop 35, the one end of stay cord 34 and the fixed surface of hollow cover 32 are connected, set up inserted bar 33, can bracing piece two 25 stable restriction in hollow cover 32, improve holistic stable effect, stay cord 34 can fix a position inserted bar 33.
Specifically, a plurality of equally spaced anti-slip members 36 are fixedly attached to the lower surface of the auxiliary plate 31.
In this embodiment: providing a plurality of the slip prevention pieces 36 can improve the stability of the auxiliary plate 31.
Working principle: through setting up strutting arrangement 2, when equipment is used to needs, with abutment 21 and wall laminating, slide the position of slider 23 in rectangular cover 22, slider 23 slides to the certain high time, rotate knob 27 and screw rod 29, screw rod 29 drives fastener 28 and removes, fastener 28 inserts in the corresponding draw-in groove in rectangular cover 22 surface, rotate bracing piece two 25 and regulation pole 26, regulation pole 26 rotates in the hole one of bracing piece one 24, thereby adjust the position of bracing piece two 25, can accomplish when supporting two and ground laminating and use, through setting up strutting arrangement 2, be convenient for support the wall during the construction, can effectually reduce present construction and when supporting the wall, need pass through the bolt fastening with supporting mechanism on the wall, the phenomenon of inconvenient operation when installation and follow-up dismantlement has been reduced and has been destroyed the wall easily through bolt fastening, the follow-up needs fill the holistic easy usability of increase manual work volume of equipment, and through setting up auxiliary device 3, when equipment is used, when equipment is required, insert bracing piece two 25 in the hollow cover 32, can not be used in the hollow hole 32, the hollow plate 31 is carried out to the hollow support piece, the hollow plate 32, the hollow plate is used in the hollow plate is in the support hole is hollow plate is used to the setting up, the hollow plate is used for the hollow plate is used for the supporting device is improved, the stability is improved, and can be used for supporting equipment is improved, and can be used to the whole is improved and can be used to support device is moved to the stability.

Claims (7)

1. Temporary support mechanism, including wall body (1) and strutting arrangement (2), its characterized in that: one side of wall body (1) is provided with strutting arrangement (2), strutting arrangement (2) are including butt spare (21), the number of butt spare (21) has two, two butt spare (21) are located one side setting of wall body (1), one side fixed surface of butt spare (21) is connected with rectangle cover (22), the inner wall sliding connection of rectangle cover (22) has slider (23), the fixed surface of slider (23) has bracing piece one (24), the one end of bracing piece one (24) is provided with bracing piece two (25), the one end fixedly connected with regulation pole (26) of bracing piece two (25), hole one has been seted up on the surface of bracing piece one (24), the inner wall threaded connection of regulation pole (26) and hole one, the spout has been seted up on the surface of slider (23), the inner wall sliding connection of spout has fastener (28), the draw-in groove has been seted up on the surface of rectangle cover (22), the inner wall joint of fastener (28) and draw-in groove.
2. The temporary support mechanism of claim 1, wherein: the number of the clamping grooves on the surface of the rectangular sleeve (22) is multiple, and the clamping grooves are arranged at equal intervals.
3. The temporary support mechanism of claim 1, wherein: the surface of the sliding block (23) is provided with a round hole, the round hole is communicated with a sliding groove on the surface of the sliding block (23), the inner wall of the round hole is rotationally connected with a screw (29), the surface of the clamping piece (28) is provided with a second hole, and the second screw (29) is in threaded connection with the inner wall of the second hole.
4. A temporary support mechanism according to claim 3, wherein: one end of the screw rod (29) is fixedly connected with a knob (27).
5. The temporary support mechanism of claim 1, wherein: one side of the second supporting rod (25) is provided with an auxiliary device (3), the auxiliary device (3) comprises an auxiliary plate (31), the auxiliary plate (31) is arranged on one side of the second supporting rod (25), two hollow sleeves (32) are fixedly connected to the surface of the auxiliary plate (31), and the second supporting rod (25) is spliced with the inner wall of the supporting sleeve.
6. The temporary support mechanism of claim 5, wherein: the inner wall sliding connection of hollow cover (32) has seted up the through-hole, the inner wall sliding connection of through-hole has inserted bar (33), hole three has been seted up on the surface of bracing piece two (25), inserted bar (33) are pegged graft with the inner wall of hole three, the one end fixedly connected with bulge loop (35) of inserted bar (33), the one end fixedly connected with stay cord (34) of bulge loop (35), the one end and the surface fixed connection of hollow cover (32) of stay cord (34).
7. The temporary support mechanism of claim 5, wherein: the lower surface of the auxiliary plate (31) is fixedly connected with a plurality of equidistant anti-slip pieces (36).
CN202320943838.9U 2023-04-24 2023-04-24 Temporary supporting mechanism Active CN219773698U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320943838.9U CN219773698U (en) 2023-04-24 2023-04-24 Temporary supporting mechanism

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320943838.9U CN219773698U (en) 2023-04-24 2023-04-24 Temporary supporting mechanism

Publications (1)

Publication Number Publication Date
CN219773698U true CN219773698U (en) 2023-09-29

Family

ID=88138527

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320943838.9U Active CN219773698U (en) 2023-04-24 2023-04-24 Temporary supporting mechanism

Country Status (1)

Country Link
CN (1) CN219773698U (en)

Similar Documents

Publication Publication Date Title
CN111042340B (en) Steel house frame
CN110744725B (en) Grouted stone punching construction equipment
CN219773698U (en) Temporary supporting mechanism
CN210421963U (en) Fine adjustment device for PC building wallboard
CN218714323U (en) Assembled building truss
CN216476366U (en) Template supporting construction for construction engineering construction
CN219034156U (en) Temporary support device for demolishing house wall
CN211775780U (en) Novel template link
CN219710335U (en) Stable supporting equipment
CN219061485U (en) Adjustable maintenance ladder
CN218657821U (en) Positioning assembly for disassembling drill rod
CN115075612B (en) Steel construction engineering protective bracket convenient to equipment is dismantled
CN219931627U (en) Unilateral formwork construction device of basement outer wall
CN220732008U (en) Lightning protection device for high-rise building
CN115977439B (en) Novel connection structure of prefabricated cabin can be dismantled
CN220434206U (en) Outer side template supporting structure of basement outer wall
CN220379265U (en) Circulating pump convenient to it is fixed
CN220644870U (en) House building upright post structure
CN220847715U (en) Water-stopping steel plate fixed mounting structure convenient to install and adjust
CN111706065B (en) Can have enough to meet need outer wall scaffold frame drawknot device of use
CN221053233U (en) Built-in fitting positioner
CN219547815U (en) Construction foundation pit supporting construction is built in room
CN217999621U (en) Tunnel preliminary bracing shaped steel bow member connecting device
CN220285330U (en) Building construction template assembly
CN220504950U (en) Drilling support for constructional engineering