CN219772910U - Construction device for dyke construction for water conservancy dam - Google Patents

Construction device for dyke construction for water conservancy dam Download PDF

Info

Publication number
CN219772910U
CN219772910U CN202321149096.9U CN202321149096U CN219772910U CN 219772910 U CN219772910 U CN 219772910U CN 202321149096 U CN202321149096 U CN 202321149096U CN 219772910 U CN219772910 U CN 219772910U
Authority
CN
China
Prior art keywords
fixedly connected
drain pipe
water conservancy
construction
conservancy dam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321149096.9U
Other languages
Chinese (zh)
Inventor
王建伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202321149096.9U priority Critical patent/CN219772910U/en
Application granted granted Critical
Publication of CN219772910U publication Critical patent/CN219772910U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/11Hard structures, e.g. dams, dykes or breakwaters

Landscapes

  • Revetment (AREA)

Abstract

The utility model provides a construction device for embankment construction for a water conservancy dam. The construction device for the construction of the embankment for the water conservancy dam comprises: a drain pipe; waterproof box, two waterproof box fixed connection is at the inner wall of drain pipe, the positive one end fixedly connected with leak protection circle of waterproof box, the equal fixedly connected with mounting plate in the back of waterproof box inner wall, the equal fixedly connected with telescopic link of another side of mounting plate, the other end fixedly connected with mounting bracket of telescopic link, four gim bolts of back fixedly connected with of mounting bracket. When the water conservancy dam construction device provided by the utility model needs to use the drain pipe in the water conservancy dam construction process, the drain pipe is unsmooth due to the fact that sludge exists in the drain pipe, and only the installation frame is pushed out of the inside of the drain pipe by the telescopic rod only when the drain rod is started for draining in the internal drainage process of the drain pipe which is not drained for a long time, so that a worker only needs to clean the filter screen.

Description

Construction device for dyke construction for water conservancy dam
Technical Field
The utility model relates to the technical field of water conservancy dams, in particular to a construction device for embankment construction for a water conservancy dam.
Background
The dam refers to a water blocking dam for intercepting a river, a water blocking dam for a reservoir, a river and the like, and the general reservoir dam mainly comprises a main dam, an auxiliary dam, a normal spillway, a very spillway, a newly added very spillway, a smart canal culvert pipe and a power station.
The hydraulic dam mainly controls water flow, prevents flood disasters, regulates and distributes water quantity to meet the needs of people living and production on water resources, and hydraulic engineering needs to build different types of hydraulic buildings such as dams, dykes, spillways, sluice gates, water inlets, channels, rafts, fishways and the like so as to achieve the aim.
The water conservancy dam is built or the water conservancy dam is built and then is required to be installed with the water outlet, and some water outlets are not used for a long time, and sludge is easy to accumulate in the unused process, so that a drain pipe is blocked to influence the drainage of the dam, and the safety construction of the dam can be endangered.
Accordingly, it is necessary to provide a construction device for constructing a water conservancy dam dike, which solves the above-mentioned problems.
Disclosure of Invention
The utility model provides a construction device for embankment construction for a water conservancy dam, which solves the problem that drain pipes in a drain outlet are not frequently used in the process of building the water conservancy dam, and sludge is easy to accumulate to cause drain pipe blockage so as to endanger the safety construction of the dam.
In order to solve the technical problems, the construction device for the construction of the embankment for the water conservancy dam provided by the utility model comprises the following components: a drain pipe;
the waterproof box is fixedly connected to the inner wall of the drain pipe, one end of the front face of the waterproof box is fixedly connected with a leakage-proof ring, the back face of the inner wall of the waterproof box is fixedly connected with a mounting plate, the other face of the mounting plate is fixedly connected with a telescopic rod, the other end of the telescopic rod is fixedly connected with a mounting frame, the back face of the mounting frame is fixedly connected with four fixing bolts, and the other face of the fixing bolts is fixedly connected with a fixing ring;
the pivot, pivot fixed connection is in the front of mounting bracket, the outside of pivot rotates and is connected with the drainage fan, the positive fixedly connected with of mounting bracket connects the bolt, the other end fixedly connected with guard ring of connecting the bolt prevents mainly that the drainage fan from injuring the staff when the clearance filter screen, and the mounting bracket is cross, and the leak protection circle is in order to prevent water or silt inflow to the inside of waterproof box, and the drainage fan is electric through rotating the velocity of flow that increases water, is through bolt fixed connection between fixed ring and the mounting bracket, and the guard ring is a circular shape but front and back are communicating.
Preferably, the inner wall fixedly connected with two baffles of drain pipe, the outside position fixedly connected with two first connecting blocks that are close to positive one end of drain pipe, baffle are connected with the back one end of waterproof box and mainly play a guide's effect, prevent that rivers from directly striking waterproof box.
Preferably, four mounting holes are formed in the back face of the fixing ring, a filter screen is fixedly connected to the back face of the fixing ring, gaps of the filter screen are large, the enlarged sundries are prevented from damaging the water discharge fan, and the mounting holes are used for fixing the fixing ring on the mounting frame.
Preferably, the front faces of the first connecting blocks are fixedly connected with second connecting blocks, a fixing frame is fixedly connected between the second connecting blocks, the fixing frame is circular, and the front faces and the back faces are communicated.
Preferably, the mounting groove is formed in a position, close to the top, of the outer portion of the fixing frame, a baffle is arranged in the mounting groove, and the baffle seals the drain pipe when the drain pipe is not used at ordinary times.
Preferably, the front of the fixing frame is close to the top and is fixedly connected with two springs, one end of each spring is fixedly connected with a clamping rod, the clamping rods are located at the positions, close to the two sides of the top, of the front of the fixing frame, and the clamping rods are used for fixing the baffle plate in the installation groove.
Compared with the related art, the construction device for the construction of the embankment for the water conservancy dam has the following beneficial effects:
the utility model provides a construction device for embankment construction for a water conservancy dam, which is characterized in that when a drain pipe is needed in the construction process of the water conservancy dam, sludge in the drain pipe is met to cause unsmooth drainage, a mounting frame is pushed out of the inside of the drain pipe only by a drainage starting telescopic rod in the internal drainage process of the drain pipe without draining for a long time, a worker only needs to clean a filter screen, if excessive sludge is in the inside of the drain pipe, the drainage fan is started only in the drainage process after the cleaning is finished, so that the drainage flow rate is increased, the flushing of residual sludge in the drain pipe can be accelerated, the cleaning is convenient when the sludge is in the drain pipe through the device, the water flow rate can be increased in the drainage process, the cleaning of the sludge can be accelerated, the drain pipe can be smoothly drained, and the construction of the dam is prevented from being endangered by excessive water.
Drawings
Fig. 1 is a schematic view of a construction device for building a water conservancy dam dike provided by the utility model;
FIG. 2 is a schematic view of a waterproof case according to the present utility model;
FIG. 3 is a schematic view of a telescopic rod according to the present utility model;
FIG. 4 is a schematic diagram of a filter screen provided by the present utility model;
fig. 5 is a schematic view of a mounting groove provided by the utility model.
Reference numerals in the drawings: 1. the water draining pipe comprises a water draining pipe body, wherein the water draining pipe body comprises a water draining pipe body, a water draining pipe 2, a mounting rack 3, a rotating shaft 4, a water draining fan 5, a clamping rod 6, a filter screen 7, a baffle plate 8, a waterproof box 9, a fixing ring 10, a fixing bolt 11, a first connecting block 12, a baffle plate 13, a protecting ring 14, a fixing frame 15, a connecting bolt 16, a second connecting block 17, a spring 18, a mounting groove 19, a telescopic rod 20, a mounting piece 21, a leak-proof ring 22 and a mounting hole.
Description of the embodiments
The utility model will be further described with reference to the drawings and embodiments.
Referring to fig. 1, fig. 2, fig. 3, fig. 4 and fig. 5 in combination, fig. 1 is a schematic diagram of a construction device for building a dike for a water conservancy dam according to the present utility model; FIG. 2 is a schematic view of a waterproof case according to the present utility model; FIG. 3 is a schematic view of a telescopic rod according to the present utility model; FIG. 4 is a schematic diagram of a filter screen provided by the present utility model; fig. 5 is a schematic view of a mounting groove provided by the utility model. The construction device for the construction of the embankment for the water conservancy dam comprises: a drain pipe 1;
the waterproof box 8, two waterproof boxes 8 are fixedly connected to the inner wall of the drain pipe 1, one end of the front face of each waterproof box 8 is fixedly connected with a leakage preventing ring 21, the back face of each waterproof box 8 inner wall is fixedly connected with a mounting plate 20, the other faces of the mounting plates 20 are fixedly connected with telescopic rods 19, the other ends of the telescopic rods 19 are fixedly connected with mounting frames 2, the back face of each mounting frame 2 is fixedly connected with four fixing bolts 10, and the other faces of the fixing bolts 10 are fixedly connected with fixing rings 9;
the pivot 3, pivot 3 fixed connection is in the front of mounting bracket 2, the outside of pivot 3 rotates and is connected with drainage fan 4, the front fixedly connected with of mounting bracket 2 connects bolt 15, the other end fixedly connected with protection ring 13 of connection bolt 15, protection ring 13 mainly prevents when clearance filter screen 6 that drainage fan 4 from injuring the staff, and mounting bracket 2 is cross, and leak protection ring 21 is in order to prevent water or silt inflow to the inside of waterproof box 8, and drainage fan 4 is electric increases the velocity of flow of water through rotating, is through bolt fixed connection between fixed ring 9 and the mounting bracket 2, and protection ring 13 is a circular shape but front and back are communicating.
The inner wall fixedly connected with two baffles 7 of drain pipe 1, the outside position fixedly connected with two first connecting blocks 11 that are close to positive one end of drain pipe 1, baffle 7 is connected with the back one end of waterproof box 8 and mainly plays a guiding effect, prevents that rivers from directly striking waterproof box 8.
Four mounting holes 22 are formed in the back face of the fixing ring 9, the filter screen 6 is fixedly connected to the back face of the fixing ring 9, the gap between the filter screen 6 is large, the enlarged sundries are mainly prevented from damaging the water discharge fan 4, and the mounting holes 22 are used for fixing the fixing ring 9 on the mounting frame 2.
The front faces of the first connecting blocks 11 are fixedly connected with second connecting blocks 16, fixing frames 14 are fixedly connected between the second connecting blocks 16, the fixing frames 14 are round, and the front faces and the back faces are communicated.
The outside of mount 14 is close to the position of top and has been seted up mounting groove 18, the inside of mounting groove 18 is provided with baffle 12, and baffle 12 is the drain pipe 1 when not using at ordinary times and seals it.
Two springs 17 are fixedly connected to the front surface of the fixing frame 14 near the top, one end of each spring 17 is fixedly connected with a clamping rod 5, the clamping rods 5 are located at the positions, near the two sides of the top, of the front surface of the fixing frame 14, and the clamping rods 5 are used for fixing the baffle 12 in the mounting groove 18.
The working principle of the construction device for the embankment construction for the water conservancy dam provided by the utility model is as follows:
the inside that has silt to cause the drainage to be unsmooth in meetting drain pipe 1 only needs in the inside drainage process of drain pipe 1 of long-time non-drainage, only needs to promote mounting bracket 2 from the inside of drain pipe 1 at drainage start telescopic link 19, and the staff only need clear up filter screen 6, and if there is too much silt in the inside of drain pipe 1 also can clear up, only need start drain fan 4 at the in-process of drainage after the clearance is accomplished to this velocity of flow that increases the drainage can accelerate to wash out the inside remaining silt of drain pipe 1.
Compared with the related art, the construction device for the construction of the embankment for the water conservancy dam has the following beneficial effects:
when the drain pipe 1 is needed to be used in the water conservancy dam construction process, the drain pipe 1 is not smooth due to the fact that sludge exists in the drain pipe 1, only the inside of the drain pipe 1 which is not drained for a long time is needed in the drainage process, only the installation frame 2 is pushed out of the inside of the drain pipe 1 through the drain starting telescopic rod 19, staff only needs to clean the filter screen 6, if excessive sludge exists in the inside of the drain pipe 1, only the drain fan 4 is needed to be started in the drainage process after the cleaning is finished, so that the drainage flow rate is increased, the flushing of residual sludge in the drain pipe 1 can be accelerated, the sludge in the drain pipe 1 can be conveniently cleaned through the device, the water flow rate can be increased in the drainage process, the smooth drainage of the drain pipe 1 can be ensured due to the fact that the water accumulation endangers dam construction is avoided.
The foregoing description is only illustrative of the present utility model and is not intended to limit the scope of the utility model, and all equivalent structures or equivalent processes or direct or indirect application in other related technical fields are included in the scope of the present utility model.

Claims (6)

1. Construction equipment is used in dyke construction for water conservancy dam, its characterized in that includes: a drain pipe;
the waterproof box is fixedly connected to the inner wall of the drain pipe, one end of the front face of the waterproof box is fixedly connected with a leakage-proof ring, the back face of the inner wall of the waterproof box is fixedly connected with a mounting plate, the other face of the mounting plate is fixedly connected with a telescopic rod, the other end of the telescopic rod is fixedly connected with a mounting frame, the back face of the mounting frame is fixedly connected with four fixing bolts, and the other face of the fixing bolts is fixedly connected with a fixing ring;
the rotary shaft is fixedly connected to the front face of the mounting frame, the water discharge fan is connected to the outer portion of the rotary shaft in a rotary mode, two connecting bolts are fixedly connected to the front face of the mounting frame, and a protecting ring is fixedly connected to the other end of each connecting bolt.
2. The construction device for building a water conservancy dam according to claim 1, wherein two baffles are fixedly connected to the inner wall of the drain pipe, and two first connecting blocks are fixedly connected to the outer portion of the drain pipe at positions close to one end of the front face.
3. The construction device for building a water conservancy dam according to claim 1, wherein four mounting holes are formed in the back surface of the fixing ring, and a filter screen is fixedly connected to the back surface of the fixing ring.
4. The construction device for building the embankment for the water conservancy dam according to claim 2, wherein the front surfaces of the first connecting blocks are fixedly connected with second connecting blocks, and a fixing frame is fixedly connected between the second connecting blocks.
5. The construction device for building a water conservancy dam according to claim 4, wherein a mounting groove is formed in a position, close to the top, of the outer portion of the fixing frame, and a baffle is arranged in the mounting groove.
6. The construction device for building a water conservancy dam according to claim 4, wherein two springs are fixedly connected to the front surface of the fixing frame near the top, and a clamping rod is fixedly connected to one end of each spring.
CN202321149096.9U 2023-05-15 2023-05-15 Construction device for dyke construction for water conservancy dam Active CN219772910U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321149096.9U CN219772910U (en) 2023-05-15 2023-05-15 Construction device for dyke construction for water conservancy dam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321149096.9U CN219772910U (en) 2023-05-15 2023-05-15 Construction device for dyke construction for water conservancy dam

Publications (1)

Publication Number Publication Date
CN219772910U true CN219772910U (en) 2023-09-29

Family

ID=88130793

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321149096.9U Active CN219772910U (en) 2023-05-15 2023-05-15 Construction device for dyke construction for water conservancy dam

Country Status (1)

Country Link
CN (1) CN219772910U (en)

Similar Documents

Publication Publication Date Title
CN219772910U (en) Construction device for dyke construction for water conservancy dam
JP2013249584A (en) Water gate
JP2023155609A (en) Backwater countermeasure waterway system
CN206693187U (en) A kind of spillway structure
CN113123294A (en) A buffering energy dissipation subassembly for water conservancy dykes and dams
CN213538900U (en) Desilting and sand-discharging device for steel dam
CN210507586U (en) Sludge tank welded by steel plates
CN210140870U (en) Small-flow pipeline water taking arrangement structure
CN221030008U (en) Drainage diversion vortex breaker
CN221000833U (en) Hydraulic engineering flood control dyke
CN217811450U (en) Water supply and drainage engineering building seepage prevention structure
JP3957213B2 (en) Sand removal structure of floating undulating gate facility
CN211752858U (en) Ditch debris filter equipment for irrigation and water conservancy project
CN215165752U (en) One-way flap control device capable of automatically blocking and draining water
CN216999572U (en) Self-draining, pumping and dirt-flushing cleaning device for rubber dam
CN220767896U (en) Dykes and dams
CN220767902U (en) Energy dissipation structure for outlet section of drainage groove
CN220057788U (en) Seepage-proofing hydraulic engineering embankment structure
CN217399530U (en) Slope protection structure for hydraulic engineering
CN216446011U (en) Drainage equipment is used in hydraulic engineering maintenance
CN212156255U (en) Hydraulic engineering is with preventing stifled pipeline
CN214089713U (en) Novel concrete dam is around oozing stagnant water structure
CN216075446U (en) Interim drainage structures of construction are built in room
CN219623537U (en) Anti-blocking pipeline for water conservancy construction
CN216339923U (en) Water conservancy water and electricity construction drainage device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant