CN216075446U - Interim drainage structures of construction are built in room - Google Patents

Interim drainage structures of construction are built in room Download PDF

Info

Publication number
CN216075446U
CN216075446U CN202122081505.3U CN202122081505U CN216075446U CN 216075446 U CN216075446 U CN 216075446U CN 202122081505 U CN202122081505 U CN 202122081505U CN 216075446 U CN216075446 U CN 216075446U
Authority
CN
China
Prior art keywords
drainage
filter screen
mounting panel
header tank
spring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122081505.3U
Other languages
Chinese (zh)
Inventor
李文贵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202122081505.3U priority Critical patent/CN216075446U/en
Application granted granted Critical
Publication of CN216075446U publication Critical patent/CN216075446U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Sewage (AREA)

Abstract

The utility model provides a temporary drainage structure for building construction, which belongs to the technical field of building construction and comprises a water collecting tank and a plurality of drainage channels, wherein the drainage channels are sequentially and fixedly installed end to end; according to the utility model, water in the drainage channel flows into the second filter screen in the water collection tank, as the mounting plate and the second filter screen are inclined, at the moment, crushed stone slides into the material collection area through the blocking of the second filter screen, the second cover plate on the water collection tank is opened during cleaning, the adjacent drainage channels are separated, and then the drainage channel on the right side is rotated to the right side around the rotating shaft to clean impurities in the material collection area, so that larger impurities are prevented from entering and blocking the pipeline, and the drainage effect is improved.

Description

Interim drainage structures of construction are built in room
Technical Field
The utility model relates to the technical field of house construction, in particular to a temporary drainage structure for house construction.
Background
Once a large amount of rainfall exists in the house construction process, the whole foundation is soaked, and after long-term soaking, foundation settlement may exceed the requirements of the regulations, so that the whole building has great potential safety hazards, and therefore, the temporary drainage work on the construction site is particularly important, the economic loss is reduced to the maximum extent for scientifically developing the drainage work in the flood season, the construction safety is ensured, and effective drainage measures are specially made according to the actual conditions on the site.
When the existing house building facilities are built, a drainage ditch digging mode is generally adopted, concrete is filled between the outer groove wall of the drainage ditch and the inner groove wall of the foundation groove, and a plurality of groups of drainage ditch units are connected end to end for drainage. But because debris and rubble are more when the building construction, make it get into the escape canal easily, drop into practicality for a long time, great impurity gets into and blocks up the pipeline, influences the drainage effect.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a temporary drainage structure for building construction, which aims to solve the problems in the background technology.
The technical scheme of the utility model is as follows: the utility model provides a temporary drainage structures of construction is built in room, includes header tank and a plurality of drainage canal, and is a plurality of drainage canal head and the tail fixed mounting in proper order, the mounting panel of the inside right side fixedly connected with slope of header tank, the header tank is formed with district and the district that gathers materials through the mounting panel, seted up the mouth of leaking on the mounting panel, one on right side the drainage canal rotates the inside of connecting at the header tank, the below on drainage canal right side is provided with filter assembly, filter assembly is located the mouth of leaking and passes through elastic component and mounting panel swing joint, the right side intercommunication of header tank has the drain pipe.
Further, the upper surface mounting of drainage canal has first apron, the upper surface mounting of header tank has the second apron, evenly seted up a plurality of slot holes on the first apron.
Furthermore, a rectangular hole is formed in the mounting plate and located below the water leaking port, and a first filter screen is fixedly connected in the rectangular hole.
Further, a placing groove is formed in the left side of the water collecting tank and matched with the water draining channel, rotating shafts are connected to the inner walls of the front side and the rear side of the water collecting tank in a rotating mode, and the other end of each rotating shaft is fixedly connected with the water draining channel.
Further, filtering component includes rectangle frame and second filter screen, second filter screen fixed connection is in the rectangle frame, the through-hole has all been seted up in the four corners of rectangle frame.
Further, elastic component includes four guide posts, spring and stopper, the one end and the mounting panel fixed connection of guide post, the other end of guide post run through the through-hole and with stopper fixed connection, guide post and through-hole looks adaptation, the surface at the guide post is established to the spring housing, the one end and the rectangle frame fixed connection of spring, the other end and the mounting panel fixed connection of spring.
The utility model provides a temporary drainage structure for building construction through improvement, and compared with the prior art, the temporary drainage structure has the following improvements and advantages:
1. when rainwater impacts the second filter screen, the rectangular frame can be driven to slide on the guide post, the spring can be extruded by the rectangular frame in the sliding process, and the impact on the second filter screen is buffered through the expansion and contraction of the spring, so that the service life of the second filter screen is longer;
2. on the rivers of water drainage in the canal go into the second filter screen in the header tank, because the mounting panel is the slope form together with the second filter screen, the rubble through the second filter screen block the landing to gather materials the district in, open the second apron on the header tank during clearance, with adjacent water drainage canal separation, then rotate the water drainage canal on right side and revolute the rotation of axes and can clear up the debris in the district that gathers materials to avoid great impurity to get into and block up the pipeline, improved drainage effect.
Drawings
The utility model is further explained below with reference to the figures and examples:
FIG. 1 is a schematic perspective view of the present invention;
FIG. 2 is a schematic view of the structure of the water collecting tank of the present invention;
FIG. 3 is a schematic diagram of a formal cross-sectional structure of the present invention;
fig. 4 is a schematic structural diagram of the mounting plate of the present invention.
Description of reference numerals: 1-a water collecting tank; 2-a drainage channel; 3, mounting a plate; 4-a material collection area; 5-a water collecting area; 6-water leakage port; 7-a filter assembly; 8-an elastic component; 9-a drain pipe; 10-a first cover plate; 11-a second cover plate; 12-long holes; 301-rectangular hole; 302-a first filter; 101-a placement groove; 102-a rotating shaft; 701-a rectangular frame; 702-a second filter; 801-guide post; 802-spring; 803-limiting block.
Detailed Description
The present invention will be described in detail below with reference to the drawings in the embodiments of the present invention, and the technical solutions in the embodiments of the present invention will be clearly and completely described. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-4, the utility model provides a temporary drainage structure for building construction, which comprises a water collection tank 1 and a plurality of drainage channels 2, wherein the drainage channels 2 are sequentially and fixedly installed end to end, an inclined installation plate 3 is fixedly connected to the right side inside the water collection tank 1, a material collection area 4 and a water collection area 5 are formed on the water collection tank 1 through the installation plate 3, a water leakage port 6 is formed in the installation plate 3, one drainage channel 2 on the right side is rotatably connected to the inside of the water collection tank 1, a filter assembly 7 is arranged below the right side of the drainage channel 2, the filter assembly 7 is positioned at the water leakage port 6 and is movably connected with the installation plate 3 through an elastic assembly 8, and the right side of the water collection tank 1 is communicated with a drainage pipe 9.
Wherein as shown in fig. 1 and 2, the upper surface mounting of drainage channel 2 has first apron 10, and the upper surface mounting of header tank 1 has second apron 11, has evenly seted up a plurality of slot holes 12 on the first apron 10, and in the rainwater carried the rubble got into drainage channel 2 through slot hole 12 on the first apron 10 during the use, second apron 11 avoided the rainwater directly to get into header tank 1.
As shown in fig. 2 and 3, a rectangular hole 301 is formed in the mounting plate 3, the rectangular hole 301 is located below the drain port 6, a first filter screen 302 is fixedly connected to the inside of the rectangular hole 301, redundant rainwater flows into the water collection area 5 from the rectangular hole 301, and the first filter screen 302 prevents broken stones from entering the water collection area 5.
Wherein as shown in fig. 2 and fig. 3, a placing groove 101 is provided on the left side of the water collecting tank 1, the placing groove 101 is adapted to the drainage channel 2, the inner walls of the front and rear sides of the water collecting tank 1 are rotatably connected with a rotating shaft 102, the other end of the rotating shaft 102 is fixedly connected with the drainage channel 2, the adjacent drainage channels 2 are separated, and then the drainage channel 2 on the right side is rotated to rotate around the rotating shaft 102 to the right side, so that sundries in the material collecting area 4 can be cleaned.
Wherein as shown in fig. 1, fig. 2 and fig. 3, the filtering component 7 comprises a rectangular frame 701 and a second filter screen 702, the second filter screen 702 is fixedly connected in the rectangular frame 701, through holes are formed at four corners of the rectangular frame 701, and at the moment, the gravel slides into the collecting area 4 through the blocking of the second filter screen 702 because the mounting plate 3 and the second filter screen 702 are inclined.
Wherein as shown in fig. 3 and 4, elastic component 8 includes four guide posts 801, spring 802 and stopper 803, the one end and the mounting panel 3 fixed connection of guide post 801, the other end of guide post 801 runs through the through-hole and with stopper 803 fixed connection, guide post 801 and through-hole looks adaptation, spring 802 cover is established at the surface of guide post 801, the one end and the rectangular frame 701 fixed connection of spring 802, the other end and the mounting panel 3 fixed connection of spring 802, can drive rectangular frame 701 and slide on guide post 801 when rainwater strikes second filter screen 702, rectangular frame 701 can extrude spring 802 at gliding in-process, the impact to second filter screen 702 is cushioned through the flexible of spring 802.
The working principle is as follows: when the rainwater collection and collection device is installed, a plurality of groups of drainage channels 2 are connected in an initial position, the rightmost drainage channel 2 is rotatably installed in the water collection tank 1 through the rotating shaft 102, rainwater carries broken stones to enter the drainage channels 2 through the long holes 12 on the first cover plate 10, then the rainwater flows into the second filter screen 702 in the water collection tank 1 from the right side, as the installation plate 3 and the second filter screen 702 are inclined, the broken stones slide into the collection area 4 through the blocking of the second filter screen 702, redundant rainwater flows into the collection area 5 from the rectangular holes 301, the water in the collection area 5 is discharged from the drainage pipe 9, the second cover plate 11 on the water collection tank 1 is opened during cleaning, the adjacent drainage channels 2 are separated, then the drainage channels 2 on the right side are rotated to the right side around the rotating shaft 102 to clean sundries in the collection area 4, and the rectangular frame 701 can be driven to slide on the guide column 801 when the rainwater impacts the second filter screen 702, the rectangular frame 701 can press the spring 802 in the sliding process, and the impact on the second filter screen 702 is buffered through the extension and contraction of the spring 802, so that the service life of the second filter screen 702 is longer.
The previous description of the disclosed embodiments is provided to enable any person skilled in the art to make or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other embodiments without departing from the spirit or scope of the utility model. Thus, the present invention is not intended to be limited to the embodiments shown herein but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

Claims (6)

1. The utility model provides a temporary drainage structures of construction is built in room which characterized in that: including header tank (1) and a plurality of drainage canal (2), it is a plurality of drainage canal (2) end to end fixed mounting in proper order, mounting panel (3) of the inside right side fixedly connected with slope of header tank (1), header tank (1) is formed with district (4) and catchment district (5) of gathering materials through mounting panel (3), seted up on mounting panel (3) and leaked mouth (6), one on right side drainage canal (2) rotate the inside of connecting in header tank (1), the below on drainage canal (2) right side is provided with filtering component (7), filtering component (7) are located the mouth of leaking (6) and locate and pass through elastic component (8) and mounting panel (3) swing joint, the right side intercommunication of header tank (1) has drain pipe (9).
2. The temporary drainage structure for house construction according to claim 1, wherein: the upper surface mounting of drainage canal (2) has first apron (10), the upper surface mounting of header tank (1) has second apron (11), evenly seted up a plurality of slot holes (12) on first apron (10).
3. The temporary drainage structure for house construction according to claim 1, wherein: rectangular hole (301) have been seted up on mounting panel (3), rectangular hole (301) are located the below of leaking mouth of a river (6), first filter screen (302) of fixedly connected with in rectangular hole (301).
4. The temporary drainage structure for house construction according to claim 1, wherein: the water collecting tank is characterized in that a placing groove (101) is formed in the left side of the water collecting tank (1), the placing groove (101) is matched with the drainage channel (2), the inner walls of the front side and the rear side of the water collecting tank (1) are rotatably connected with a rotating shaft (102), and the other end of the rotating shaft (102) is fixedly connected with the drainage channel (2).
5. The temporary drainage structure for house construction according to claim 1, wherein: the filter assembly (7) comprises a rectangular frame (701) and a second filter screen (702), the second filter screen (702) is fixedly connected in the rectangular frame (701), and through holes are formed in four corners of the rectangular frame (701).
6. The temporary drainage structure for house construction according to claim 1, wherein: elastic component (8) include four guide posts (801), spring (802) and stopper (803), the one end and mounting panel (3) fixed connection of guide post (801), the other end of guide post (801) run through the through-hole and with stopper (803) fixed connection, guide post (801) and through-hole looks adaptation, the surface at guide post (801) is established in spring (802) cover, the one end and the rectangle frame (701) fixed connection of spring (802), the other end and mounting panel (3) fixed connection of spring (802).
CN202122081505.3U 2021-08-31 2021-08-31 Interim drainage structures of construction are built in room Active CN216075446U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122081505.3U CN216075446U (en) 2021-08-31 2021-08-31 Interim drainage structures of construction are built in room

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122081505.3U CN216075446U (en) 2021-08-31 2021-08-31 Interim drainage structures of construction are built in room

Publications (1)

Publication Number Publication Date
CN216075446U true CN216075446U (en) 2022-03-18

Family

ID=80673374

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122081505.3U Active CN216075446U (en) 2021-08-31 2021-08-31 Interim drainage structures of construction are built in room

Country Status (1)

Country Link
CN (1) CN216075446U (en)

Similar Documents

Publication Publication Date Title
CN112392113B (en) Sponge city holds water piping and prevents blockking up structure
CN216075446U (en) Interim drainage structures of construction are built in room
CN213114871U (en) Road drainage structure
CN212925972U (en) Ecological water conservancy irrigation canals and ditches convenient to clearance debris
CN212548460U (en) Drain filter device for construction site
CN210263298U (en) Underground garage drainage structure
CN212078175U (en) Connecting structure of new and old wells with rainwater square ditches
CN212104449U (en) Water conservancy water and electricity construction drainage device
CN113718805A (en) Geotechnical engineering side slope drainage structure
CN111851410A (en) Hydraulic engineering ecological slope protection and construction method
CN212103917U (en) Novel water conservancy and hydropower engineering diversion channel structure
CN209457026U (en) Geotechnical engineering side slope drainage structure
CN211472426U (en) Overhauling system of large-water-depth scoop type stilling pool
CN112627440A (en) Waterproof construction at building outer wall top
CN113684802A (en) Hydraulic and hydroelectric engineering equipment of decontaminating
CN221000833U (en) Hydraulic engineering flood control dyke
CN111778939A (en) A water conservancy diversion drainage structures for in hydraulic and hydroelectric engineering hole
CN218266018U (en) Water guiding groove for coal mine drainage
CN216304563U (en) Hydraulic engineering bank protection
CN217678855U (en) River course is administered and is used bank protection dykes and dams
CN211849295U (en) Environmental protection irrigation canals and ditches debris retention device
CN221545461U (en) Hydraulic engineering drainage equipment capable of preventing water flow from being broken by impact
CN218667809U (en) Drainage structure on highway pavement
CN218643099U (en) Roadbed slope protection structure
CN216865371U (en) Prevent waterproof drainage device of hydraulic engineering construction of jam

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant