CN219753873U - Large-area ceiling integrated dry-hanging construction device - Google Patents

Large-area ceiling integrated dry-hanging construction device Download PDF

Info

Publication number
CN219753873U
CN219753873U CN202320956302.0U CN202320956302U CN219753873U CN 219753873 U CN219753873 U CN 219753873U CN 202320956302 U CN202320956302 U CN 202320956302U CN 219753873 U CN219753873 U CN 219753873U
Authority
CN
China
Prior art keywords
groups
hanging construction
construction device
integrated dry
telescopic rods
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320956302.0U
Other languages
Chinese (zh)
Inventor
陈晓亮
闵华
陈肯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Shengzhe Construction Group Co ltd
Original Assignee
Zhejiang Shengzhe Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Shengzhe Construction Group Co ltd filed Critical Zhejiang Shengzhe Construction Group Co ltd
Priority to CN202320956302.0U priority Critical patent/CN219753873U/en
Application granted granted Critical
Publication of CN219753873U publication Critical patent/CN219753873U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to the technical field of suspended ceiling construction auxiliary devices, in particular to a large-area suspended ceiling integrated dry hanging construction device which can lift and fix a suspended ceiling more conveniently and improve the efficiency and safety of suspended ceiling dry hanging construction.

Description

Large-area ceiling integrated dry-hanging construction device
Technical Field
The utility model relates to the technical field of suspended ceiling construction auxiliary devices, in particular to a large-area suspended ceiling integrated dry-hanging construction device.
Background
Suspended ceilings are well known as a type of decoration for the top of the living environment of a house. In short, it is a decoration of a ceiling, which is one of important parts of interior decoration, and when a large-area ceiling plate is integrally constructed, a dry-hanging construction method is required to fix the ceiling plate integrally, so that the method is widely used in the field of ceiling construction.
When the existing suspended ceiling board is in dry hanging construction, the fixed keels of the suspended ceiling board are fixedly installed, and then the suspended ceiling board is lifted to the lower sides of the keels to fix the suspended ceiling board by using screws.
The existing suspended ceiling board is found in the dry hanging construction, when the existing suspended ceiling board is subjected to integrated dry hanging construction, the construction difficulty of the existing suspended ceiling board is increased along with the size of the suspended ceiling board, the existing suspended ceiling board is lifted and then fixed manually when the existing suspended ceiling board is subjected to dry hanging construction, the efficiency of the dry hanging construction is low, and certain dangers exist, so that the practicability is poor.
Disclosure of Invention
In order to solve the technical problems, the utility model provides the large-area ceiling plate integrated dry hanging construction device which can lift and fix the ceiling plate more conveniently and improve the efficiency and safety of the dry hanging construction of the ceiling, thereby enhancing the practicability.
The utility model discloses a large-area ceiling plate integrated dry-hanging construction device which comprises four groups of electric telescopic rods, four groups of telescopic rods, a working plate and a supporting plate, wherein the four groups of electric telescopic rods are respectively arranged on the left front side and the right rear side of the bottom ends of the working plate and the supporting plate, the four groups of telescopic rods are respectively arranged on the left rear side and the right front side of the bottom ends of the working plate and the supporting plate, and the top end of the working plate is respectively connected with the bottom ends of the two groups of electric telescopic rods and the two groups of telescopic rods at the bottom ends of the supporting plate.
According to the large-area ceiling integrated dry-hanging construction device, the middle of the top end of the supporting plate is provided with the operation hole.
The utility model relates to a large-area ceiling plate integrated dry-hanging construction device, which also comprises a rubber pad, wherein the rubber pad is arranged at the top end of a supporting plate.
The utility model relates to a large-area ceiling plate integrated dry-hanging construction device, which also comprises a plurality of groups of hooks, wherein the groups of hooks are respectively arranged at the rear side of the bottom end of a supporting plate.
The utility model relates to a large-area ceiling plate integrated dry-hanging construction device, which also comprises four groups of adjusting support legs, wherein the four groups of adjusting support legs are respectively arranged at the bottom ends of two groups of electric telescopic rods at the lower side and two groups of telescopic rods at the lower side.
The utility model relates to a large-area ceiling plate integrated dry-hanging construction device, which also comprises four groups of rubber sleeves, wherein the four groups of rubber sleeves are respectively arranged at the outer ends of four groups of adjusting support legs.
According to the large-area ceiling integrated dry-hanging construction device, four groups of jacks are uniformly formed in the top end of the working plate, and the bottom ends of the two groups of electric telescopic rods on the upper side and the bottom ends of the two groups of telescopic rods on the upper side are respectively connected with the two groups of jacks in a sliding mode.
According to the large-area ceiling plate integrated dry-hanging construction device, the output ends of the four groups of electric telescopic rods and the output ends of the four groups of telescopic rods are hinged with the bottom ends of the working plate and the supporting plate respectively.
Compared with the prior art, the utility model has the beneficial effects that: when the integrated dry hanging construction device for the large-area suspended ceiling plate is used, the suspended ceiling plate can be placed at the top end of the supporting plate, then a worker can stand at the top end of the working plate, simultaneously, four groups of electric telescopic rods are operated to synchronously output and drive the suspended ceiling plate to be lifted to a working position, and then the suspended ceiling plate can be fixed after the position of the suspended ceiling plate is simply adjusted; through the device, lifting and fixing can be carried out to the furred ceiling board more conveniently, the efficiency and the security of the construction of hanging futilely of furred ceiling are improved to the practicality has been strengthened.
Drawings
FIG. 1 is a schematic diagram of the structure of the present utility model;
FIG. 2 is a schematic top view of the present utility model;
FIG. 3 is a schematic view of the bottom structure of the folding support plate of the present utility model;
FIG. 4 is a schematic view of the bottom construction of the folding work plate of the present utility model;
the reference numerals in the drawings: 1. an electric telescopic rod; 2. a telescopic rod; 3. a work plate; 4. a support plate; 5. an operation hole; 6. a rubber pad; 7. a hook; 8. adjusting the support legs; 9. a rubber sleeve; 10. and a jack.
Description of the embodiments
The following describes in further detail the embodiments of the present utility model with reference to the drawings and examples. The following examples are illustrative of the utility model and are not intended to limit the scope of the utility model.
As shown in fig. 1 to 4, the large-area ceiling plate integrated dry-hanging construction device comprises four groups of electric telescopic rods 1, four groups of telescopic rods 2, a working plate 3 and a supporting plate 4, wherein the four groups of electric telescopic rods 1 are respectively arranged at the left front side and the right rear side of the bottom ends of the working plate 3 and the supporting plate 4, the four groups of telescopic rods 2 are respectively arranged at the left rear side and the right front side of the bottom ends of the working plate 3 and the supporting plate 4, and the top end of the working plate 3 is respectively connected with the bottom ends of the two groups of electric telescopic rods 1 and the two groups of telescopic rods 2 at the bottom end of the supporting plate 4; when the integrated dry hanging construction device for the large-area suspended ceiling plate is used, the suspended ceiling plate can be placed at the top end of the supporting plate, then a worker can stand at the top end of the working plate, simultaneously, four groups of electric telescopic rods are operated to synchronously output and drive the suspended ceiling plate to be lifted to a working position, and then the suspended ceiling plate can be fixed after the position of the suspended ceiling plate is simply adjusted; through the device, lifting and fixing can be carried out to the furred ceiling board more conveniently, the efficiency and the security of the construction of hanging futilely of furred ceiling are improved to the practicality has been strengthened.
According to the large-area ceiling integrated dry-hanging construction device, the middle part of the top end of the supporting plate 4 is provided with an operation hole 5; the operation hole can be more convenient for the staff to carry out position adjustment and fixed to the furred ceiling board to the practicality has been strengthened.
The large-area ceiling integrated dry-hanging construction device further comprises a rubber pad 6, wherein the rubber pad 6 is arranged at the top end of the supporting plate 4; the friction force between the supporting plate and the suspended ceiling plate can be effectively improved by the rubber pad, so that the practicability is enhanced.
The utility model relates to a large-area ceiling integrated dry-hanging construction device, which also comprises a plurality of groups of hooks 7, wherein the groups of hooks 7 are respectively arranged at the rear side of the bottom end of a supporting plate 4; the multiunit couple can be convenient for the staff more hang the instrument of using often, is convenient for take to the practicality has been strengthened.
The utility model relates to a large-area ceiling integrated dry-hanging construction device, which also comprises four groups of adjusting support legs 8, wherein the four groups of adjusting support legs 8 are respectively arranged at the bottom ends of two groups of electric telescopic rods 1 at the lower side and two groups of telescopic rods 2 at the lower side; the four groups of adjusting support legs can be used for leveling the whole device preferentially when the dry-hanging construction device is used, so that the device is stable in the working process, and the practicability is enhanced.
The utility model relates to a large-area ceiling plate integrated dry-hanging construction device, which also comprises four groups of rubber sleeves 9, wherein the four groups of rubber sleeves 9 are respectively arranged at the outer ends of four groups of adjusting support legs 8; the friction force between the device and the ground can be effectively improved, and the stability is improved, so that the practicability is enhanced.
According to the large-area ceiling integrated dry-hanging construction device, four groups of jacks 10 are uniformly formed in the top end of a working plate 3, and the bottom ends of two groups of electric telescopic rods 1 on the upper side and two groups of telescopic rods 2 on the upper side are respectively connected with the two groups of jacks 10 in a sliding manner; can be more convenient when carrying out the assembly of hanging construction equipment futilely insert four sets of jacks with backup pad downside subassembly to the practicality has been strengthened.
According to the large-area ceiling integrated dry-hanging construction device, the output ends of the four groups of electric telescopic rods 1 and the output ends of the four groups of telescopic rods 2 are hinged with the bottom ends of the working plate 3 and the supporting plate 4 respectively; when carrying out the transport of hanging construction equipment futilely, can unpack apart backup pad and working plate earlier, then fold up four sets of electric telescopic handle and four sets of telescopic handle simultaneously, be convenient for accomodate and transport to the practicality has been strengthened.
When the large-area ceiling integrated dry-hanging construction device is used in working, the ceiling can be placed at the top end of the supporting plate, then a worker can stand at the top end of the working plate, four groups of electric telescopic rods are operated to synchronously output and drive the ceiling to lift to a working position, and then the ceiling can be fixed after the position of the ceiling is simply adjusted.
The terms "vertical," "horizontal," "left," "right," and the like are used herein for illustrative purposes only.
The terms "first," "second," and "third" in this specification do not denote a particular quantity or order, but rather are used for distinguishing between similar or identical items.
The foregoing is merely a preferred embodiment of the present utility model, and it should be noted that it will be apparent to those skilled in the art that modifications and variations can be made without departing from the technical principles of the present utility model, and these modifications and variations should also be regarded as the scope of the utility model.

Claims (8)

1. The utility model provides a construction equipment is hung futilely to large tracts of land furred ceiling board integration, a serial communication port, including four electric telescopic handle (1), four telescopic handle (2), work board (3) and backup pad (4), four electric telescopic handle (1) are installed respectively in the left front side and the right rear side of work board (3) and backup pad (4) bottom, four telescopic handle (2) are installed respectively in the left rear side and the right front side of work board (3) and backup pad (4) bottom, the top of work board (3) is connected with the bottom of two electric telescopic handle (1) of backup pad (4) bottom and two sets of telescopic handle (2) respectively.
2. A large-area ceiling integrated dry hanging construction device as claimed in claim 1, characterized in that the middle of the top end of the support plate (4) is provided with an operation hole (5).
3. A large area ceiling integrated dry hanging construction apparatus as claimed in claim 2, further comprising a rubber pad (6), the rubber pad (6) being mounted on top of the support plate (4).
4. A large-area ceiling integrated dry-hanging construction device as claimed in claim 3, further comprising a plurality of sets of hooks (7), wherein the plurality of sets of hooks (7) are respectively mounted at the rear side of the bottom end of the support plate (4).
5. The large-area ceiling integrated dry hanging construction device according to claim 4, further comprising four groups of adjusting support legs (8), wherein the four groups of adjusting support legs (8) are respectively arranged at the bottom ends of the two groups of electric telescopic rods (1) at the lower side and the two groups of telescopic rods (2) at the lower side.
6. The large-area ceiling integrated dry hanging construction device according to claim 5, further comprising four groups of rubber sleeves (9), wherein the four groups of rubber sleeves (9) are respectively arranged at the outer ends of the four groups of adjusting support legs (8).
7. The large-area ceiling integrated dry hanging construction device according to claim 6, wherein four groups of jacks (10) are uniformly arranged at the top end of the working plate (3), and the bottom ends of the upper two groups of electric telescopic rods (1) and the upper two groups of telescopic rods (2) are respectively connected with the two groups of jacks (10) in a sliding manner.
8. The large-area ceiling integrated dry-hanging construction device according to claim 7, wherein the output ends of the four groups of electric telescopic rods (1) and the output ends of the four groups of telescopic rods (2) are hinged with the bottom ends of the working plate (3) and the supporting plate (4) respectively.
CN202320956302.0U 2023-04-25 2023-04-25 Large-area ceiling integrated dry-hanging construction device Active CN219753873U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320956302.0U CN219753873U (en) 2023-04-25 2023-04-25 Large-area ceiling integrated dry-hanging construction device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320956302.0U CN219753873U (en) 2023-04-25 2023-04-25 Large-area ceiling integrated dry-hanging construction device

Publications (1)

Publication Number Publication Date
CN219753873U true CN219753873U (en) 2023-09-26

Family

ID=88073925

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320956302.0U Active CN219753873U (en) 2023-04-25 2023-04-25 Large-area ceiling integrated dry-hanging construction device

Country Status (1)

Country Link
CN (1) CN219753873U (en)

Similar Documents

Publication Publication Date Title
CN201228207Y (en) Portable window hoister
CN204000345U (en) A kind of Combined-type clothes horse
CN219753873U (en) Large-area ceiling integrated dry-hanging construction device
CN206188276U (en) Hoist and mount of horizontal equipment, equipment are with removing frame
CN204864614U (en) Telescopic safety belt hook support
CN203530737U (en) Lifting type multi-functional clothes airing rod
CN203262585U (en) Folding hanging desk
CN205842495U (en) A kind of comprehensive lifting work lamp
CN206268756U (en) television and mounting device
CN204528908U (en) Portable conducting wire roller fixed mount
CN103950872A (en) Upright tube hoisting multifunctional tool of substation altitude plant
CN210236961U (en) Suspended ceiling lifting device
CN208807739U (en) A kind of e-commerce performance report portable conference table
CN215423398U (en) Support for architectural engineering drawing
CN218699671U (en) X-shaped bench saw support
CN220851334U (en) Topography exploration device for building engineering design
CN221211590U (en) Landscaping operation tool storage table
CN214822288U (en) Portable sketch paper fixing frame
CN210366900U (en) Electrical construction fixing device
CN218246620U (en) Architectural drawing hanging equipment
CN215514738U (en) Adjustable storage device for blood of hematology department
CN216190609U (en) Suspension device for steel structure production
CN215213306U (en) Crawling ladder for electric power construction
CN211059696U (en) Lifting folding type support
CN219306303U (en) Auxiliary hanging rack for teaching aid

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant