- CN219749834U CN219749834U CN202320603182.6U CN202320603182U CN219749834U CN 219749834 U CN219749834 U CN 219749834U CN 202320603182 U CN202320603182 U CN 202320603182U CN 219749834 U CN219749834 U CN 219749834U
- Authority
- CN
- China
- Prior art keywords
- frame
- solid
- liquid
- inner bin
- moving mechanism
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000004566 building material Substances 0.000 title claims abstract description 17
- 239000007788 liquid Substances 0.000 claims abstract description 34
- 239000007787 solid Substances 0.000 claims abstract description 31
- 238000007789 sealing Methods 0.000 claims description 16
- 239000000463 material Substances 0.000 abstract description 19
- 239000011344 liquid material Substances 0.000 abstract description 8
- 230000001360 synchronised effect Effects 0.000 abstract description 7
- 238000010276 construction Methods 0.000 abstract description 6
- 239000011343 solid material Substances 0.000 abstract description 4
- 238000000034 method Methods 0.000 description 16
- 239000004570 mortar (masonry) Substances 0.000 description 5
- 239000004035 construction material Substances 0.000 description 4
- 239000011449 brick Substances 0.000 description 3
- 238000009435 building construction Methods 0.000 description 3
- 229910001294 Reinforcing steel Inorganic materials 0.000 description 2
- 239000004567 concrete Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000002146 bilateral effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses building material transferring equipment which comprises a main body moving mechanism, a liquid bearing mechanism and a solid bearing mechanism, wherein the top end of the main body moving mechanism is provided with the liquid bearing mechanism, the solid bearing mechanism is arranged below the liquid bearing mechanism, the solid bearing mechanism comprises an inner bin frame, a solid bin, a pull handle, a clamping frame, bolts and a sliding rail frame, the solid bin is arranged inside the inner bin frame, the pull handle is arranged at the bottom of one end of the inner bin frame, clamping frames are distributed on two sides of the inner bin frame, one side of each clamping frame is connected with the bolts, and the sliding rail frame is arranged below each clamping frame. Through the synchronous carrying structure of the solid-liquid double types, the operation trolley has synchronous transportation of materials in various states, and can carry out simultaneous carrying of solid and liquid materials simultaneously, thereby providing convenience for users and improving the material transfer efficiency of a construction site.
Description
Technical Field
The utility model relates to the technical field of building construction, in particular to building material transferring equipment.
Background
The building construction refers to the production activity of the engineering construction implementation stage, which is the construction process of various buildings, namely the process of changing various lines on a design drawing into real objects at a designated place, wherein in the building construction process, materials on the construction place need to be transported, and common construction material operation equipment mainly uses a cart to transport plate bricks or embedded part reinforcing steel members and the like, so that the construction and use requirements are convenient.
In the transportation process of the existing building materials through the trolley, the trolley is simple in structure, in the material transportation process, only one group of materials can be operated in one operation process, when the concrete mortar and the plate bricks or the reinforcing steel bar members are required to be operated, only solid plate bricks and the like can be transported in advance, then the transportation of the concrete mortar is carried out, and the solid-liquid state synchronous transportation process cannot be achieved.
Disclosure of Invention
The present utility model is directed to a construction material transferring apparatus for solving the above-mentioned problems of the related art.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides a building material transshipment equipment, includes main part moving mechanism, liquid mechanism and solid state bearing mechanism bear, main part moving mechanism's top is provided with liquid bearing mechanism, and liquid bearing mechanism's below is provided with solid state bearing mechanism, solid state bearing mechanism includes interior storehouse frame, solid state storehouse, pull handle, clamping frame, bolt and slide rail frame, and interior storehouse frame's inside has seted up solid state storehouse, interior storehouse frame's one end bottom is provided with the pull handle, and interior storehouse frame's both sides distribution has the clamping frame, one side of clamping frame is connected with the bolt, and the below of clamping frame is provided with the slide rail frame.
Further, the solid bin is arranged along the inner part of the inner bin frame, and the inner bin frame is in threaded connection with the main body moving mechanism through the clamping frame and the bolts.
Further, the inner bin frame forms a sliding structure with the main body moving mechanism through the sliding rail frame, and the pull handle is fixedly connected with the inner bin frame.
Further, the main body moving mechanism comprises a main frame, push rods, supporting frames and tires, wherein the push rods are distributed on two sides of one end of the main frame, the supporting frames are distributed on two sides of the bottom end of the main frame, and the tires are distributed on two sides of the main frame.
Further, the push rod, the support frame and the main frame are fixedly connected, and the tires are symmetrically distributed along two sides of the main frame.
Further, the liquid bearing mechanism comprises a liquid inner bin, a connecting funnel, a sealing cover and a screw groove, the bottom end of the liquid inner bin is connected with the connecting funnel, the sealing cover is arranged at the bottom end of the connecting funnel, and the screw groove is distributed in the periphery of the sealing cover.
Further, the liquid inner bin and the main body moving mechanism are integrated, and the liquid inner bin is connected with the connecting funnel.
Further, the connecting funnel is in threaded connection with the sealing cover, and the spiral grooves are formed in the periphery of the sealing cover at equal intervals along the inner wall.
Compared with the prior art, the utility model has the beneficial effects that:
in this building material transfer equipment, through this kind of synchronous carrying structure of solid-liquid double kind, let this operation shallow have the synchronous transportation of multiple state material, can carry on solid and liquid material simultaneously to provide the convenience for the user, promote the material transfer efficiency of job site.
The main frame cooperates with tires on two sides to form a cart structure, so that a user can conveniently move the device, and the support frame design can enable the whole main frame to keep a stable placing process, thereby facilitating the stacking and subsequent transferring of materials by the user.
The bottom of the main frame is designed in a hollowed-out manner, so that the taking process of liquid materials such as mortar and the like can be realized after the solid bearing mechanism is taken out, the operation is convenient and quick, and the processes of dumping and the like of the traditional cart are not needed.
Drawings
FIG. 1 is a schematic perspective view of the present utility model;
FIG. 2 is a schematic diagram of the internal structure of the liquid carrying mechanism according to the present utility model;
fig. 3 is a schematic perspective view of a solid state carrier according to the present utility model.
In the figure: 1. a main body moving mechanism; 101. a main frame; 102. a push rod; 103. a support frame; 104. a tire; 2. a liquid carrying mechanism; 201. a liquid inner bin; 202. a connecting funnel; 203. a cover; 204. a screw groove; 3. a solid state load bearing mechanism; 301. an inner bin rack; 302. a solid bin; 303. a pull handle; 304. a clamping frame; 305. a bolt; 306. and a slide rail frame.
Detailed Description
Example 1
As shown in fig. 1, a construction material transferring apparatus includes: a main body moving mechanism 1; the top of main part moving mechanism 1 is provided with liquid carrier mechanism 2, and the below of liquid carrier mechanism 2 is provided with solid carrier mechanism 3, main part moving mechanism 1 includes main frame 101, push rod 102, support frame 103 and tire 104, and main frame 101's one end both sides distribute and have push rod 102, main frame 101's bottom both sides distribute and have support frame 103, and main frame 101's both sides distribute and have tire 104, push rod 102, be fixed connection between support frame 103 and the main frame 101, and tire 104 distributes along main frame 101 bilateral symmetry, this main frame 101 bottom is the fretwork design, when this material operation device carries out the material transport on the building site, accessible main frame 101 cooperates both sides tire 104 to form the shallow structure, the user carries out the removal of this device, after accomplishing the transportation of building material, then can carry out temporary support through main frame 101's support frame 103 that distributes in one side of main frame 101 bottom, make whole main frame 101 can keep comparatively stable putting the process, thereby the user of facilitating the use carries out the stack and the follow-up of material.
As shown in fig. 2, a building material transferring device, the liquid carrying mechanism 2 includes a liquid inner bin 201, a connecting funnel 202, a sealing cover 203 and a screw groove 204, the bottom end of the liquid inner bin 201 is connected with the connecting funnel 202, the sealing cover 203 at the bottom end of the connecting funnel 202 is provided with the screw groove 204, the screw groove 204 is distributed around the sealing cover 203, the liquid inner bin 201 and the main body moving mechanism 1 are integrated, the liquid inner bin 201 and the connecting funnel 202 are connected, the connecting funnel 202 is connected with the sealing cover 203 through screw threads, the screw groove 204 is formed along the inner wall around the sealing cover 203, when the running device runs liquid materials, the liquid inner bin 201 formed at the top end can be used for storing and storing materials, when the storing and transferring processes need to take the internal materials, the sealing cover 203 at the bottom end of the connecting funnel 202 can be screwed off, the liquid materials flow out from the bottom to the ground through the connecting funnel 202, and the bottom of the main frame 101 does not need to be hollow design, after taking out the solid carrying mechanism 3, the process of liquid materials such as mortar can be realized, the operation is convenient and fast, and the traditional cart is used for dumping process.
Example 2
As shown in fig. 3, a building material transferring device, a solid-state bearing mechanism 3 includes an inner bin frame 301, a solid bin 302, a pull handle 303, a clamping frame 304, a bolt 305 and a sliding rail frame 306, wherein the solid bin 302 is arranged in the inner bin frame 301, the pull handle 303 is arranged at the bottom of one end of the inner bin frame 301, the clamping frames 304 are distributed on two sides of the inner bin frame 301, the bolt 305 is connected to one side of the clamping frame 304, the sliding rail frame 306 is arranged below the clamping frame 304, the solid bin 302 is arranged in the inner bin frame 301, the inner bin frame 301 is in threaded connection with the main moving mechanism 1 through the clamping frame 304 and the bolt 305, the sliding structure is formed by the sliding rail frame 306 and the main moving mechanism 1, the pull handle 303 is fixedly connected with the inner bin frame 301, when the moving device runs building materials, after the materials are put into the inner bin frame 302, the solid bin 302 is slidingly arranged in the main frame 101 through the two side of the sliding rail frames 306, after the clamping frames 304 are clamped, and then the clamping frames 305 are screwed into the two sides of the main frame 101, and the solid bin frame is synchronously moved by the two-state synchronous material transferring device, and the synchronous carrier is provided.
In summary, when the construction material transferring apparatus is used, firstly, when the material transferring apparatus transfers materials on a construction site, the main frame 101 can be matched with the tires 104 on two sides to form a cart structure, so that a user can conveniently move the apparatus, when the liquid material is transferred, the liquid inner bin 201 arranged at the top end can be used for storing and storing the materials, and the cover 203 at the bottom end of the connecting funnel 202 can be spirally unscrewed when the main frame 101 is used for taking, so that the taking process of the liquid material such as mortar can be realized, after the materials are placed into the solid bin 302, the solid bin 302 is slidably placed into the main frame 101 through the slide rail frames 306 on two sides, after the clamping is completed, the bolts 305 are screwed into two sides of the clamping frame 304 to fix the solid bin, the placing process is completed, and after the transfer destination is reached, the solid material is sequentially pulled out for taking the solid material.
Claims (6)
1. Building material transfer equipment, including main part moving mechanism (1), liquid carrier (2) and solid carrier (3), its characterized in that: the top of main part moving mechanism (1) is provided with liquid carrier (2), and the below of liquid carrier (2) is provided with solid carrier (3), solid carrier (3) are including interior storehouse frame (301), solid storehouse (302), draw handle (303), clamping frame (304), bolt (305) and slide rail frame (306), and interior storehouse (302) have been seted up to the inside of interior storehouse frame (301), the one end bottom of interior storehouse frame (301) is provided with draws handle (303), and the both sides of interior storehouse frame (301) distribute have clamping frame (304), one side of clamping frame (304) is connected with bolt (305), and the below of clamping frame (304) is provided with slide rail frame (306);
the solid bin (302) is arranged along the inside of the inner bin frame (301), and the inner bin frame (301) is in threaded connection with the main body moving mechanism (1) through the clamping frame (304) and the bolts (305);
the inner bin frame (301) and the main body moving mechanism (1) form a sliding structure through a sliding rail frame (306), and the pull handle (303) is fixedly connected with the inner bin frame (301).
2. A building material transfer apparatus according to claim 1, wherein: the main body moving mechanism (1) comprises a main frame (101), push rods (102), supporting frames (103) and tires (104), wherein the push rods (102) are distributed on two sides of one end of the main frame (101), the supporting frames (103) are distributed on two sides of the bottom end of the main frame (101), and the tires (104) are distributed on two sides of the main frame (101).
3. A building material transfer apparatus according to claim 2, wherein: the push rod (102), the support frame (103) and the main frame (101) are fixedly connected, and the tires (104) are symmetrically distributed along two sides of the main frame (101).
4. A building material transfer apparatus according to claim 1, wherein: the liquid bearing mechanism (2) comprises a liquid inner bin (201), a connecting funnel (202), a sealing cover (203) and a screw groove (204), wherein the bottom end of the liquid inner bin (201) is connected with the connecting funnel (202), the sealing cover (203) is arranged at the bottom end of the connecting funnel (202), and the screw groove (204) is distributed in the periphery of the sealing cover (203).
5. A building material transfer apparatus according to claim 4, wherein: the liquid inner bin (201) and the main body moving mechanism (1) are integrated, and the liquid inner bin (201) is connected with the connecting funnel (202).
6. A building material transfer apparatus according to claim 5, wherein: the connecting funnel (202) is in threaded connection with the sealing cover (203), and the screw grooves (204) are formed in the periphery of the sealing cover (203) at equal intervals.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320603182.6U CN219749834U (en) | 2023-03-24 | 2023-03-24 | Building material transfer equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320603182.6U CN219749834U (en) | 2023-03-24 | 2023-03-24 | Building material transfer equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN219749834U true CN219749834U (en) | 2023-09-26 |
Family
ID=88081174
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202320603182.6U Active CN219749834U (en) | 2023-03-24 | 2023-03-24 | Building material transfer equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN219749834U (en) |
-
2023
- 2023-03-24 CN CN202320603182.6U patent/CN219749834U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204369122U (en) | Buttress device beaten by stirrup | |
CN205660690U (en) | Sleeve removes transportation frame | |
CN219749834U (en) | Building material transfer equipment | |
CN116220390A (en) | Transfer positioning device for ALC light partition board construction and use method | |
CN210822344U (en) | Heavy cylinder cargo handling device for building | |
CN211765791U (en) | Cement handling device for building engineering | |
CN206984028U (en) | A kind of trolley for improving precast concrete production efficiency | |
CN213168198U (en) | Steel pipe handling device for building engineering | |
CN111055909A (en) | Cement handling device for building engineering | |
CN209956029U (en) | Light asphalt barrel transfer tool | |
CN111016534A (en) | Lifting type transformer carrying caster | |
CN205632560U (en) | Civil engineering pipe fitting placer | |
CN205237904U (en) | Mounting fixture with adjustable transformer substation storage cell is exclusively used in | |
CN215284861U (en) | Lever transport cart | |
CN216334020U (en) | Temporary transfer of cement culvert pipe steel reinforcement cage is with removing frame | |
CN216584076U (en) | Material vertical transportation device on platform | |
CN220163909U (en) | Double-deck firm stainless steel shallow | |
CN212503687U (en) | Horizontal conveying device for large spiral steel pipes | |
CN215891823U (en) | Cloth machine base with good fixing effect | |
CN218538033U (en) | Screen cabinet equipment replacement and transportation device | |
CN216918538U (en) | I-shaped steel transportation equipment for construction site | |
CN210365429U (en) | Bagged cement goods shelf convenient to assemble and disassemble | |
CN221893115U (en) | Simple steel reinforcement cage handling tool | |
CN215945712U (en) | Clamp for clamping plates | |
CN217294619U (en) | Long-section material carrying device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |