CN219735425U - Heating pipeline installation mechanism and device - Google Patents
Heating pipeline installation mechanism and device Download PDFInfo
- Publication number
- CN219735425U CN219735425U CN202320346719.5U CN202320346719U CN219735425U CN 219735425 U CN219735425 U CN 219735425U CN 202320346719 U CN202320346719 U CN 202320346719U CN 219735425 U CN219735425 U CN 219735425U
- Authority
- CN
- China
- Prior art keywords
- pipeline
- rod
- base
- sleeve
- heating pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000009434 installation Methods 0.000 title claims abstract description 57
- 238000010438 heat treatment Methods 0.000 title claims abstract description 55
- 230000007246 mechanism Effects 0.000 title claims abstract description 21
- 238000000034 method Methods 0.000 claims description 2
- 230000000694 effects Effects 0.000 abstract description 14
- 238000012423 maintenance Methods 0.000 description 8
- 239000011435 rock Substances 0.000 description 8
- 230000009286 beneficial effect Effects 0.000 description 2
- 230000008859 change Effects 0.000 description 2
- 230000009471 action Effects 0.000 description 1
- 238000009440 infrastructure construction Methods 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000008569 process Effects 0.000 description 1
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
The utility model discloses a heating pipeline installation mechanism and a device, comprising a placement component, a positioning component, a fixing component, a first assembly frame and a second assembly frame, a positioning ring and a positioning component, wherein the positioning component is arranged on the outer side of the base; the buffer component comprises a supporting plate arranged at the bottom of the base and a bottom plate arranged at the bottom of the supporting plate. According to the device, the installation assembly is arranged, so that the effect of installing the heating pipeline is achieved, the installation speed is convenient and efficient, the pipeline is convenient to disassemble and maintain, the buffer assembly is arranged, the effect of reducing the vibration of the pipeline installation is achieved, the stability of the heating pipeline is improved, and the problem that the pipeline is damaged due to vibration of the pipeline is avoided.
Description
Technical Field
The utility model relates to the technical field of heat supply of a heat supply network, in particular to a heating pipeline installation mechanism and a heating pipeline installation device.
Background
The heat supply network pipeline is an important civil engineering in infrastructure construction, the heat supply network pipeline installation quality directly influences the life of heat supply network pipeline and whether safe and reliable operation after putting into production, at present heating pipeline is when going on, mounting structure is comparatively fixed, when the new pipe of later maintenance installation, be inconvenient for maintaining the pipeline and change, influence pipeline maintenance and use, and the pipeline buffer function is relatively poor when the installation, the pipeline produces and rocks the condition that can lead to the pipeline damaged, influence heating, and pipeline stability is relatively poor, influence heating pipeline installation and use.
Disclosure of Invention
This section is intended to outline some aspects of embodiments of the utility model and to briefly introduce some preferred embodiments. Some simplifications or omissions may be made in this section as well as in the description of the utility model and in the title of the utility model, which may not be used to limit the scope of the utility model.
The present utility model has been made in view of the above-mentioned and/or existing problems with the heating pipe installation mechanisms.
Therefore, the utility model aims to solve the problems that the installation structure is relatively fixed when the conventional heating pipeline is in operation, the pipeline is inconvenient to maintain and replace when a new pipeline is installed in later maintenance, the buffer function of the pipeline is poor when the pipeline is installed, and the pipeline is swayed to cause the damage of the pipeline, so that the heating is affected.
In order to solve the technical problems, the utility model provides the following technical scheme: the heating pipeline installation mechanism comprises a placement component, a positioning component and a positioning component, wherein the placement component comprises a base, a limiting rod arranged on the outer side of the base, a limiting piece arranged on one side of the base, a fixing piece arranged in the base, a first assembly frame and a second assembly frame arranged on the outer side of the fixing piece, a limiting ring arranged on the outer sides of the first assembly frame and the second assembly frame, and a positioning component arranged on the outer side of the first assembly frame and the second assembly frame; the buffer component comprises a supporting plate arranged at the bottom of the base, a bottom plate arranged at the bottom of the supporting plate, and a supporting block and a supporting rod arranged at the top of the bottom plate.
As a preferable mode of the heating pipe installation mechanism of the present utility model, wherein: the limiting piece comprises a limiting frame arranged on one side of the base and a sliding rod arranged inside the limiting frame.
As a preferable mode of the heating pipe installation mechanism of the present utility model, wherein: the sliding rod comprises a limiting plate and a first spring which are arranged on the outer side, and a handle which is arranged at one end of the sliding rod.
As a preferable mode of the heating pipe installation mechanism of the present utility model, wherein: the fixing piece comprises a first fixing sleeve and a second fixing sleeve which are arranged in the inner cavity of the base, and a limiting sleeve which is arranged on the outer sides of the first fixing sleeve and the second fixing sleeve.
As a preferable mode of the heating pipe installation mechanism of the present utility model, wherein: the first fixed sleeve comprises a sliding groove arranged in the inner cavity, a connecting block arranged at the bottom of the first fixed sleeve, and the second fixed sleeve comprises a sliding block arranged at the bottom and a groove arranged in the inner cavity of the second fixed sleeve.
As a preferable mode of the heating pipe installation mechanism of the present utility model, wherein: the first assembly frame comprises a bolt and a clamping block which are arranged in the inner cavity, and the second assembly frame comprises a thread sleeve and a clamping sleeve which are arranged on the inner wall.
As a preferable mode of the heating pipe installation mechanism of the present utility model, wherein: the support block comprises a fixed rod arranged on one side and a sliding sleeve arranged on the outer side of the fixed rod.
As a preferable mode of the heating pipe installation mechanism of the present utility model, wherein: the support rod comprises a second spring arranged on the outer side, a support column arranged in the inner cavity of the support rod, and a fixed block arranged at the top of the support column, wherein the fixed block comprises a first connecting shaft arranged on the outer side, a connecting rod arranged in the inner cavity of the first connecting shaft, and a second connecting shaft arranged at one end of the connecting rod.
The heating pipeline installation mechanism has the beneficial effects that: through setting up the subassembly, reach the effect of installing heating pipeline, the installation rate is convenient high-efficient, and is convenient for dismantle the maintenance to the pipeline, through setting up buffer assembly, reaches the effect that reduces the pipeline installation and rocks, has improved heating pipeline's stability, avoids the pipeline to rock the problem that causes the pipeline to damage.
In view of the problem that the stability of the existing pipeline is poor and the installation and use of the heating pipeline are affected, the heating pipeline installation device is provided.
In order to solve the technical problems, the utility model also provides the following technical scheme: a heating pipe installation device comprises the heating pipe installation mechanism; and the supporting component comprises supporting seats arranged on two sides of the bottom plate and threaded rods arranged inside the supporting seats.
As a preferred embodiment of the heating pipe installation apparatus of the present utility model, wherein: the threaded rod comprises a rotating shaft arranged at the top.
The utility model has the following beneficial effects: through setting up supporting component, reach the effect of supporting this device, improved the stability of pipeline installation, solved the pipeline stability relatively poor, influence the problem that heating pipeline installed and used.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present utility model, the drawings that are needed in the description of the embodiments will be briefly described below, it being obvious that the drawings in the following description are only some embodiments of the present utility model, and that other drawings may be obtained according to these drawings without inventive effort for a person skilled in the art. Wherein:
fig. 1 is a schematic view of a heating pipe installation mechanism according to the present utility model.
Fig. 2 is a schematic structural view of the mounting assembly of the present utility model.
Fig. 3 is a schematic structural view of a limiting member in the present utility model.
Fig. 4 is a schematic structural view of a fixing member in the present utility model.
Fig. 5 is a schematic structural view of a first assembly frame and a second assembly frame according to the present utility model.
FIG. 6 is a schematic view of a buffer assembly according to the present utility model.
Fig. 7 is a schematic view of a heating pipe installation apparatus according to the present utility model.
Fig. 8 is a schematic structural view of a support assembly according to the present utility model.
Detailed Description
In order that the above-recited objects, features and advantages of the present utility model will become more readily apparent, a more particular description of the utility model will be rendered by reference to specific embodiments thereof which are illustrated in the appended drawings.
In the following description, numerous specific details are set forth in order to provide a thorough understanding of the present utility model, but the present utility model may be practiced in other ways other than those described herein, and persons skilled in the art will readily appreciate that the present utility model is not limited to the specific embodiments disclosed below.
Further, reference herein to "one embodiment" or "an embodiment" means that a particular feature, structure, or characteristic can be included in at least one implementation of the utility model. The appearances of the phrase "in one embodiment" in various places in the specification are not necessarily all referring to the same embodiment, nor are separate or alternative embodiments mutually exclusive of other embodiments.
Example 1
Referring to fig. 1, a first embodiment of the present utility model provides a heating pipe installation mechanism including a mounting assembly 100 and a buffer assembly 200.
Specifically, the placement component 100 includes a base 101, a limiting rod 102 disposed outside the base 101, a limiting member 103 disposed on one side of the base 101, a fixing member 104 disposed inside the base 101, a first assembly frame 105 and a second assembly frame 106 disposed outside the fixing member 104, and a limiting ring 107 disposed outside the first assembly frame 105 and the second assembly frame 106, and; the buffer assembly 200 comprises a supporting plate 201 arranged at the bottom of the base 101, a bottom plate 202 arranged at the bottom of the supporting plate 201, and a supporting block 203 and a supporting rod 204 arranged at the top of the bottom plate 202.
Wherein, through setting up and settling subassembly 100, reach the effect of installing heating pipeline, the installation rate is convenient high-efficient, and be convenient for dismantle the maintenance to the pipeline, through setting up buffer assembly 200, reach the effect that reduces the pipeline installation and rock, the stability of heating pipeline has been improved, avoid the pipeline to rock the problem that causes the pipeline to damage, the present heating pipeline is when going on has been solved, mounting structure is comparatively fixed, when new pipe of later maintenance installation, be inconvenient for maintaining the pipeline and change, influence pipeline maintenance and use, and the pipeline is relatively poor in buffer function when the installation, the pipeline produces and rocks the condition that can lead to the pipeline damaged, influence the problem of heating.
To sum up, settle subassembly 100 through setting up, reach the effect of installing heating pipeline, the installation rate is convenient high-efficient, and is convenient for dismantle the maintenance to the pipeline, through setting up buffer assembly 200, reaches the effect that reduces the pipeline installation and rocks, has improved heating pipeline's stability, avoids the pipeline to rock the problem that causes the pipeline to damage.
Example 2
Referring to fig. 1 to 6, a second embodiment of the present utility model is based on the previous embodiment.
Specifically, the limiting member 103 includes a limiting frame 103a disposed at one side of the base 101, and a sliding rod 103b disposed inside the limiting frame 103a, the sliding rod 103b includes a sliding block 104a-2 disposed at the bottom of the first fixing sleeve 104a and a sliding block 104b disposed at one end of the sliding rod 103b, the fixing member 104 includes a first fixing sleeve 104a and a second fixing sleeve 104b disposed in an inner cavity of the base 101, and a limiting sleeve 104c disposed outside the first fixing sleeve 104a and the second fixing sleeve 104b, the first fixing sleeve 104a includes a sliding groove 104a-1 disposed in the inner cavity, and a connecting block 104a-2 disposed at the bottom of the first fixing sleeve 104a, the second fixing sleeve 104b includes a sliding block 104b-1 disposed at the bottom, and a groove 104b-2 disposed in the inner cavity of the second fixing sleeve 104b, the first assembling frame 105 includes a bolt 105a and a clamping block 105b disposed in the inner cavity, and the second assembling frame 106 includes a threaded sleeve 106a and a clamping sleeve 106b disposed in the inner wall.
The support block 203 comprises a fixing rod 203a arranged at one side, a sliding sleeve 203b arranged at the outer side of the fixing rod 203a, a support rod 204 comprising a second spring 204a arranged at the outer side, a support column 204b arranged in an inner cavity of the support rod 204, and a fixing block 204c arranged at the top of the support column 204b, wherein the fixing block 204c comprises a first connecting shaft 204c-1 arranged at the outer side, a connecting rod 204c-2 arranged in the inner cavity of the first connecting shaft 204c-1, and a second connecting shaft 204c-3 arranged at one end of the connecting rod 204 c-2.
In summary, when the device is used, the first fixing sleeve 104a and the second fixing sleeve 104b are sleeved outside a pipeline through the arrangement of the arrangement assembly 100, the sliding block 104b-1 is inserted into the sliding groove 104a-1 to perform preliminary installation on the pipeline, then the handle 103b-3 is pulled, the sliding rod 103b is pulled to slide, the limiting plate 103b-1 is used for limiting the sliding rod 103b, then the first fixing sleeve 104b is placed into the base 101, the limiting sleeve 104c is used for sliding outside the limiting rod 102, the handle 103b-3 is released, the sliding rod 103b is quickly reset through the action of the first spring 103b-2, the sliding rod 103b is inserted into the connecting block 104a-2 to perform installation limiting on the pipeline, then the first assembly frame 105 and the second assembly frame 106 are clamped outside the second fixing sleeve 104b, the threaded sleeve 106a is inserted into the groove 104b-2, then the clamping block 105b is clamped inside the clamping sleeve 106b, the bolt 105a is arranged in the threaded sleeve 106a, the first assembly frame 105 and the second assembly frame 106 are fixedly arranged, the limiting ring 107 is clamped at the outer side of the limiting rod 102, so that the effect of mounting a pipeline is achieved, the installation process is convenient and efficient, when the pipeline is required to be disassembled and maintained, the bolt 105a is taken out, the first assembly frame 105 is separated from the second assembly frame 106, the handle is pulled, the slide bar 103b is separated from the connecting block 104a-2, the first fixing sleeve 104a is separated from the second fixing sleeve 104b, the effect of disassembling the pipeline can be achieved, the disassembly process is quick and simple, the disassembly and replacement of a heating pipeline are convenient, the supporting plate 201 is driven to move downwards when the pipeline shakes, the fixing block 204c and the supporting column 204b are driven to move, the supporting column 204b slides in the supporting rod 204, the second spring 204a is contracted, the sliding sleeve 203b is driven to slide outside the fixed rod 203a through the connecting rod 204c-2 and the second connecting shaft 204c-2, the second spring 204a is quickly reset, the fixed block 204c and the supporting plate 201 are driven to quickly reset, the effect of reducing the shaking of the pipeline is achieved, the stability of the heating pipeline is improved, and the problem that the pipeline is damaged due to shaking of the pipeline is avoided.
Example 3
Referring to fig. 7 to 8, in a third embodiment of the present utility model, a heating pipe installation apparatus is provided, which solves the problem that the stability of a pipe is poor, and the installation and use of a heating pipe are affected.
Specifically, the support assembly 300 includes a support base 301 disposed on two sides of the base 202, and a threaded rod 302 disposed inside the support base 301, where the threaded rod 302 includes a rotating shaft 302a disposed at the top.
Wherein, through setting up supporting component 300, reach the effect of supporting this device, improved the stability of pipeline installation, solved the pipeline stability relatively poor, influence the problem that the heating pipeline installed and used.
In summary, through setting up supporting component 300, rotate pivot 302a and drive threaded rod 302 and rotate, make threaded rod 302 bore the ground and support this device, reach the effect of supporting this device, improved the stability of pipeline installation.
It should be noted that the above embodiments are only for illustrating the technical solution of the present utility model and not for limiting the same, and although the present utility model has been described in detail with reference to the preferred embodiments, it should be understood by those skilled in the art that the technical solution of the present utility model may be modified or substituted without departing from the spirit and scope of the technical solution of the present utility model, which is intended to be covered in the scope of the claims of the present utility model.
Claims (10)
1. A heating pipe installation mechanism which is characterized in that: comprising the steps of (a) a step of,
the positioning assembly (100) comprises a base (101), a limiting rod (102) arranged on the outer side of the base (101), a limiting piece (103) arranged on one side of the base (101), a fixing piece (104) arranged inside the base (101), a first assembly frame (105) and a second assembly frame (106) arranged on the outer side of the fixing piece (104), and a limiting ring (107) arranged on the outer sides of the first assembly frame (105) and the second assembly frame (106);
the buffer assembly (200) comprises a supporting plate (201) arranged at the bottom of the base (101), a bottom plate (202) arranged at the bottom of the supporting plate (201), and a supporting block (203) and a supporting rod (204) arranged at the top of the bottom plate (202).
2. A heating pipe installation according to claim 1, wherein: the limiting piece (103) comprises a limiting frame (103 a) arranged on one side of the base (101), and a sliding rod (103 b) arranged inside the limiting frame (103 a).
3. A heating pipe installation according to claim 2, wherein: the sliding rod (103 b) comprises a first spring (103 b-2) and a handle (103 b-3) arranged at one end of the sliding rod (103 b), wherein the first spring is arranged on the outer limit plate (103 b-1).
4. A heating pipe installation according to claim 1, wherein: the fixing piece (104) comprises a first fixing sleeve (104 a) and a second fixing sleeve (104 b) which are arranged in the inner cavity of the base (101), and a limiting sleeve (104 c) which is arranged on the outer sides of the first fixing sleeve (104 a) and the second fixing sleeve (104 b).
5. A heating conduit installation mechanism as claimed in claim 4, wherein: the first fixing sleeve (104 a) comprises a sliding groove (104 a-1) arranged in the inner cavity, a connecting block (104 a-2) arranged at the bottom of the first fixing sleeve (104 a), the second fixing sleeve (104 b) comprises a sliding block (104 b-1) arranged at the bottom, and a groove (104 b-2) arranged in the inner cavity of the second fixing sleeve (104 b).
6. A heating conduit installation mechanism as claimed in claim 5, wherein: the first assembly frame (105) comprises a bolt (105 a) and a clamping block (105 b) which are arranged in the inner cavity, and the second assembly frame (106) comprises a thread sleeve (106 a) and a clamping sleeve (106 b) which are arranged on the inner wall.
7. A heating pipe installation according to claim 1, wherein: the support block (203) comprises a fixed rod (203 a) arranged on one side, and a sliding sleeve (203 b) arranged on the outer side of the fixed rod (203 a).
8. A heating conduit installation according to claim 7, wherein: the support rod (204) comprises a second spring (204 a) arranged on the outer side, a support column (204 b) arranged in the inner cavity of the support rod (204), and a fixed block (204 c) arranged at the top of the support column (204 b), wherein the fixed block (204 c) comprises a first connecting shaft (204 c-1) arranged on the outer side, a connecting rod (204 c-2) arranged in the inner cavity of the first connecting shaft (204 c-1), and a second connecting shaft (204 c-3) arranged at one end of the connecting rod (204 c-2).
9. A heating pipe installation device, characterized in that: comprising a heating pipe installation mechanism according to any one of claims 1 to 8; the method comprises the steps of,
the support assembly (300) comprises support bases (301) arranged on two sides of the bottom plate (202), and threaded rods (302) arranged inside the support bases (301).
10. A heating pipe installation as claimed in claim 9, wherein: the threaded rod (302) comprises a rotating shaft (302 a) arranged at the top.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320346719.5U CN219735425U (en) | 2023-02-27 | 2023-02-27 | Heating pipeline installation mechanism and device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320346719.5U CN219735425U (en) | 2023-02-27 | 2023-02-27 | Heating pipeline installation mechanism and device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN219735425U true CN219735425U (en) | 2023-09-22 |
Family
ID=88055917
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202320346719.5U Active CN219735425U (en) | 2023-02-27 | 2023-02-27 | Heating pipeline installation mechanism and device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN219735425U (en) |
-
2023
- 2023-02-27 CN CN202320346719.5U patent/CN219735425U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN219735425U (en) | Heating pipeline installation mechanism and device | |
CN206846090U (en) | A kind of ultra-large type GRP pipe counterpart installs interim holding card | |
CN210088383U (en) | Liquid crystal display that can install fast | |
CN113404440A (en) | Drilling device for oil exploitation | |
CN218718254U (en) | Make things convenient for bearing bracket of dismouting | |
CN113530867A (en) | Double-head high-low fan | |
CN212773638U (en) | Strutting arrangement for building engineering | |
CN208319900U (en) | A kind of badminton head adds grammes per square metre device | |
CN219020799U (en) | Curtain rod with positioning structure | |
CN221823318U (en) | Building decoration ceramic tile auxiliary support structure | |
CN221166831U (en) | Hanger structure for surface treatment | |
CN219387190U (en) | Concrete form convenient to installation is dismantled | |
CN219034056U (en) | Building templates assists dismouting equipment | |
CN220692485U (en) | Slip ring fixing support of wind generating set | |
CN221004639U (en) | Display support frame structure | |
CN214988376U (en) | Central adjusting device of vacuum shaping table | |
CN219711092U (en) | Supporting frame structure | |
CN219433178U (en) | Tunnel construction lighting equipment | |
CN220321437U (en) | Mounting structure of heat supply unit | |
CN221028766U (en) | Furnace cover guiding structure of single crystal furnace | |
CN220954727U (en) | Adjustable jig frame for manufacturing complex curved surface steel structure | |
CN219699194U (en) | Shoe hook with outward expansion supporting function | |
CN213269240U (en) | Safety protection fence is used in hydraulic engineering construction | |
CN212763294U (en) | Machine tool spindle dismounting device | |
CN221053244U (en) | Support arrangement for assembled building with stable structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |