CN219731965U - Pile foundation construction platform - Google Patents

Pile foundation construction platform Download PDF

Info

Publication number
CN219731965U
CN219731965U CN202321380048.0U CN202321380048U CN219731965U CN 219731965 U CN219731965 U CN 219731965U CN 202321380048 U CN202321380048 U CN 202321380048U CN 219731965 U CN219731965 U CN 219731965U
Authority
CN
China
Prior art keywords
plate
pile foundation
arc
foundation construction
platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321380048.0U
Other languages
Chinese (zh)
Inventor
戴莹
刘春辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202321380048.0U priority Critical patent/CN219731965U/en
Application granted granted Critical
Publication of CN219731965U publication Critical patent/CN219731965U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a pile foundation construction platform, which comprises a platform plate and round holes, wherein the round holes are formed in the surface of the platform plate in a penetrating way, four arc plates are equidistantly arranged on the surface of the platform plate, the bottom end edges of the arc plates are matched with the opening edges of the round holes, support rods are arranged on the outer sides of the arc plates, and a mounting assembly is arranged between the bottom ends of the support rods and the platform plate; through structures such as arc, bracing piece, metal piece, spacing groove, draw-in groove, bayonet lock, pull block of design, can make four arc play certain guide effect to the removal of pipe, four arc can form the structure of like loudspeaker form, and the pipe is at the in-process of decline, and four arc can restrict the position that the pipe descends gradually, and the bottom that finally makes the pipe is relative with the round hole, makes things convenient for the inside that the pipe passed the round hole fast, reduces staff's operation degree of difficulty.

Description

Pile foundation construction platform
Technical Field
The utility model belongs to the technical field of pile foundation construction, and particularly relates to a pile foundation construction platform.
Background
The pile foundation concrete is poured in-process and needs to be with the help of pile foundation construction platform, is provided with the construction operation hole on the pile foundation construction platform for wear to establish the pipe section, the welding has the steel ring on the outer wall of pipe section, and after the pipe section passed the construction operation hole, the steel ring card was established on the construction operation hole, thereby plays the effect of supporting spacing pipe section, makes the pipe section unsettled. When the conduit pipe section is required to be disassembled, lifting the conduit pipe section by adopting lifting equipment; the search is as follows: the pile foundation construction platform described in the prior patent of CN202120853704.9 comprises a platform plate and a round hole formed in the center of the platform plate, wherein a plurality of installation seats are uniformly arranged on the platform plate, the installation seats are uniformly distributed along the circumferential direction of the round hole and are not less than four, and threaded rods … … are connected to the installation seats in a threaded manner; what is described is a pile foundation construction platform.
When the existing pile foundation construction platform is used, the round hole on the existing pile foundation construction platform is used for penetrating the pipe section of the pipe, but the diameter of the round hole is close to that of the pipe, the pipe inconvenient and fast penetrates through the inside of the round hole, the pipe needs to be slowly moved, so that the pipe is aligned, the operation difficulty of workers is increased, the efficiency of pile foundation concrete pouring is reduced, and therefore a structure needs to be designed to solve the problem.
Disclosure of Invention
The utility model aims to provide a pile foundation construction platform for solving the problem that a conduit cannot conveniently and rapidly pass through the inside of a round hole, so that the operation difficulty of staff can be increased.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides a pile foundation construction platform, includes platform board and round hole, the round hole runs through and sets up in the surface of platform board, the surface equidistance of platform board is provided with four arc, the bottom edge of arc agrees with the opening edge of round hole mutually, the outside of arc is provided with the bracing piece, be provided with the installation component between the bottom of bracing piece and the platform board, the installation component is including metal block, spacing groove, draw-in groove, the bilateral symmetry of platform board is provided with two ejecting components.
Preferably, the metal blocks are equidistantly arranged on the surface of the platform plate, the limiting grooves are formed in the tops of the metal blocks, the bottom ends of the supporting rods are embedded into the limiting grooves, and the clamping grooves are formed in one sides of the bottom ends of the supporting rods.
Preferably, a rubber pad is arranged on the inner wall of the limiting groove, and the rubber pad is clung to the bottom end surface of the supporting rod.
Preferably, the installation component is still including bayonet lock, pull block, draw groove, sliding tray, connecting plate, metal pole, the pull block slides and sets up in one side of metal piece, the bayonet lock sets up in one side of pull block, the inside to the draw-in groove is embedded to the one end of bayonet lock, the draw groove is seted up at the one end top of pull block.
Preferably, the sliding groove is formed in one side of the metal block, the connecting plate is arranged in the sliding groove, and two ends of the connecting plate are fixedly connected with the pull block.
Preferably, the metal rod is arranged on the inner side of the connecting plate, one end of the metal rod penetrates through the inner side of the connecting plate and is fixedly connected with the inner wall of one side of the sliding groove, and a spring is sleeved on the surface of the metal rod.
Preferably, the ejection assembly comprises a supporting plate, an air cylinder, a top plate and an anti-sticking layer, wherein the supporting plate is symmetrically arranged on two sides of the platform plate, and the air cylinder is arranged at the top of the supporting plate.
Preferably, the bottom of the cylinder penetrates through the inside of the supporting plate, the top plate is arranged at the bottom of the cylinder, and the anti-sticking layer is arranged at the bottom of the top plate.
Compared with the prior art, the utility model has the beneficial effects that:
through structures such as arc, bracing piece, metal piece, spacing groove, draw-in groove, bayonet lock, pull block of design, can make four arc play certain guide effect to the removal of pipe, four arc can form the structure of like loudspeaker form, and the pipe is at the in-process of decline, and four arc can restrict the position that the pipe descends gradually, and the bottom that finally makes the pipe is relative with the round hole, makes things convenient for the inside that the pipe passed the round hole fast, reduces staff's operation degree of difficulty.
Drawings
FIG. 1 is a top view of the present utility model;
FIG. 2 is a cross-sectional view of the junction of the arcuate plate and the platform plate of the present utility model;
FIG. 3 is a cross-sectional view of the mounting assembly of the present utility model;
FIG. 4 is a schematic view of an ejector assembly according to the present utility model;
in the figure: 100. a platform plate; 200. a round hole; 300. an arc-shaped plate; 400. an ejection assembly; 401. a support plate; 402. a cylinder; 403. a top plate; 404. an anti-sticking layer; 500. a support rod; 600. a mounting assembly; 601. a metal block; 602. a limit groove; 603. a clamping groove; 604. a bayonet lock; 605. pulling blocks; 606. drawing a groove; 607. a sliding groove; 608. a connecting plate; 609. a metal rod.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Examples
Referring to fig. 1 to 4, the present utility model provides a technical solution: the utility model provides a pile foundation construction platform, including landing plate 100 and round hole 200, round hole 200 runs through and sets up in landing plate 100's surface, landing plate 100's bottom four corners department all is provided with the spliced pole, the spliced pole can imbed in earth, landing plate 100's stability is improved, landing plate 100's surface has four arc 300 for round hole 200's edge equidistance place, arc 300's bottom edge and round hole 200's opening edge agree with each other, four arc 300 play certain guide effect to the removal of pipe, four arc 300 can form loudspeaker-like structure, the pipe is in the in-process of descending, four arc 300 can restrict the position that the pipe descends gradually, finally make the bottom of pipe and round hole 200 relative position, make things convenient for the pipe to pass the inside of round hole 200 fast, reduce staff's operation degree of difficulty, arc 300's outside welded fastening has bracing piece 500, bracing piece 500 can support arc 300, be provided with installation component 600 between bottom and landing plate 100 of 500, installation component 600 conveniently damages arc 300 fast, when 300 appears, be favorable to carrying out fast replacement to arc 300; the mounting assembly 600 comprises a metal block 601, a limiting groove 602 and a clamping groove 603, wherein the metal block 601 is welded and fixed on the surface of the platform plate 100 at equal distance and is positioned on the outer side of a corresponding arc plate 300, the limiting groove 602 is arranged at the top of the metal block 601, the bottom end of a supporting rod 500 is embedded into the limiting groove 602, the arc plate 300 can be initially limited, two clamping grooves 603 are arranged at one side of the bottom end of the supporting rod 500, rubber pads are fixed on the inner wall of the limiting groove 602 through glue adhesion, the rubber pads are tightly attached to the bottom end surface of the supporting rod 500, gaps between the inner wall of the limiting groove 602 and the supporting rod 500 can be filled, the mounting assembly 600 further comprises clamping pins 604, a pulling block 605, a pulling groove 606, a sliding groove 607, a connecting plate 608 and a metal rod 609, the pulling block 605 with an L-shaped section is arranged at one side of the metal block 601 in a left-right sliding manner, the two clamping pins 604 are welded and fixed at one side of the pulling block 605, one end of the bayonet lock 604 is embedded into the corresponding clamping groove 603, thereby avoiding the bottom end of the supporting rod 500 from sliding in the limiting groove 602, further limiting the arc 300, installing the arc 300, improving the stability of the arc 300 during use, the pull groove 606 is arranged at the top of one end of the pull block 605, thereby facilitating the pulling of the pull block 605, the sliding groove 607 is arranged at one side of the metal block 601, the connecting plate 608 with a U-shaped section is arranged in the sliding groove 607, both ends of the connecting plate 608 are welded and fixed with the pull block 605, the pull block 605 can drive the connecting plate 608 to slide in the sliding groove 607, the metal rod 609 with a T-shaped section is arranged at the inner side of the connecting plate 608, one end of the metal rod 609 penetrates through the inner side of the connecting plate 608 and is welded and fixed with the inner wall of one side of the sliding groove 607, the surface of the metal rod 609 is sleeved with a spring, the spring may return the connection plate 608 to the pull block 605.
In this embodiment, preferably, two ejection assemblies 400 are symmetrically disposed on two sides of the platform plate 100, if the plug-in column needs to be pulled out of the soil, the ejection assemblies 400 can drive the platform plate 100 and the plug-in column to move upwards, so that the plug-in column is pulled out of the soil, the ejection assemblies 400 comprise a supporting plate 401, an air cylinder 402, a top plate 403 and an anti-sticking layer 404, the supporting plate 401 is symmetrically welded and fixed on two sides of the platform plate 100, the air cylinder 402 is mounted on the top of the supporting plate 401 through bolts, the bottom end of the air cylinder 402 penetrates through the inside of the supporting plate 401, the top plate 403 is mounted on the bottom end of the air cylinder 402 through bolts, the air cylinder 402 can drive the top plate 403 to push the ground, under the action of reaction force, the anti-sticking layer 404 of the polytetrafluoroethylene material member is disposed on the bottom of the top plate 403, good anti-sticking effect is achieved, and more soil can be avoided.
Other structures and working principles of the pile foundation construction platform body of the present utility model are all those of the prior art, and reference is specifically made to the patent application CN202120853704.9, which is not repeated herein.
Although embodiments of the present utility model have been shown and described in detail with reference to the foregoing detailed description, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations may be made therein without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (8)

1. The utility model provides a pile foundation construction platform, includes platform board (100) and round hole (200), round hole (200) run through and set up in the surface of platform board (100), its characterized in that: the novel multifunctional table comprises a table plate (100), wherein four arc plates (300) are arranged on the surface of the table plate (100) at equal intervals, the bottom end edge of each arc plate (300) is matched with the opening edge of a round hole (200), a supporting rod (500) is arranged on the outer side of each arc plate (300), a mounting assembly (600) is arranged between the bottom end of each supporting rod (500) and the table plate (100), each mounting assembly (600) comprises a metal block (601), a limiting groove (602) and a clamping groove (603), and two ejection assemblies (400) are symmetrically arranged on the two sides of the table plate (100).
2. The pile foundation construction platform of claim 1, wherein: the metal blocks (601) are equidistantly arranged on the surface of the platform plate (100), the limiting grooves (602) are formed in the tops of the metal blocks (601), the bottom ends of the supporting rods (500) are embedded into the limiting grooves (602), and the clamping grooves (603) are formed in one side of the bottom ends of the supporting rods (500).
3. The pile foundation construction platform of claim 1, wherein: a rubber pad is arranged on the inner wall of the limiting groove (602), and the rubber pad is tightly attached to the bottom end surface of the supporting rod (500).
4. The pile foundation construction platform of claim 1, wherein: the mounting assembly (600) further comprises a clamping pin (604), a pull block (605), a pull groove (606), a sliding groove (607), a connecting plate (608) and a metal rod (609), wherein the pull block (605) is arranged on one side of the metal block (601) in a sliding mode, the clamping pin (604) is arranged on one side of the pull block (605), one end of the clamping pin (604) is embedded into the clamping groove (603), and the pull groove (606) is formed in the top of one end of the pull block (605).
5. The pile foundation construction platform of claim 4, wherein: the sliding groove (607) is formed in one side of the metal block (601), the connecting plate (608) is arranged in the sliding groove (607), and two ends of the connecting plate (608) are fixedly connected with the pull block (605).
6. The pile foundation construction platform of claim 4, wherein: the metal rod (609) is arranged on the inner side of the connecting plate (608), one end of the metal rod (609) penetrates through the inner portion of the connecting plate (608) and is fixedly connected with the inner wall of one side of the sliding groove (607), and a spring is sleeved on the surface of the metal rod (609).
7. The pile foundation construction platform of claim 1, wherein: the ejection assembly (400) comprises a supporting plate (401), air cylinders (402), a top plate (403) and an anti-sticking layer (404), wherein the supporting plate (401) is symmetrically arranged on two sides of the platform plate (100), and the air cylinders (402) are arranged on the top of the supporting plate (401).
8. The pile foundation construction platform of claim 7, wherein: the bottom of cylinder (402) runs through the inside of backup pad (401), roof (403) set up in the bottom of cylinder (402), antiseized layer (404) set up in the bottom of roof (403).
CN202321380048.0U 2023-06-01 2023-06-01 Pile foundation construction platform Active CN219731965U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321380048.0U CN219731965U (en) 2023-06-01 2023-06-01 Pile foundation construction platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321380048.0U CN219731965U (en) 2023-06-01 2023-06-01 Pile foundation construction platform

Publications (1)

Publication Number Publication Date
CN219731965U true CN219731965U (en) 2023-09-22

Family

ID=88057201

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321380048.0U Active CN219731965U (en) 2023-06-01 2023-06-01 Pile foundation construction platform

Country Status (1)

Country Link
CN (1) CN219731965U (en)

Similar Documents

Publication Publication Date Title
KR200408256Y1 (en) Beam extract machine with wedge type clamp
CN219731965U (en) Pile foundation construction platform
CN210825171U (en) Gantry hoisting device
CN209906186U (en) Building template cross-floor transportation equipment
CN212802515U (en) Integral hoisting type hoisting platform
CN212866926U (en) Movable supporting beam dismounting device
CN114427200A (en) Suspension device for bridge engineering construction
CN218800392U (en) Ship lift pulley locking beam assembly fixture
CN219296948U (en) Installation auxiliary device
CN217420487U (en) Movable full-hall support
CN220645174U (en) C-shaped quick-dismantling positioning structure of prefabricated laminated slab aluminum alloy template
CN110748772A (en) Lifting base of large screen display
CN210033480U (en) Shield constructs quick-witted section of thick bamboo hoisting device
CN220351465U (en) Multifunctional lifting appliance for large-section rectangular pipe-jacking pipe joint
CN219032314U (en) Separating device for nickel resource regeneration processing
CN218539122U (en) Glass installation robot and electric capstan structure thereof
CN217648591U (en) A assembled system roof beam pedestal for prefabricating high-speed railway case roof beam
CN217378614U (en) Base structure is used in precast beam production
CN216105463U (en) Apply to next-door neighbour's subway deep basal pit suspended type steel platform construction elevator basis
CN114808723B (en) Concrete pouring platform for ultrahigh and overlong steel pipes
CN217680635U (en) Construction device for ultrahigh steel structure profiled bottom plate
CN113399944B (en) Construction method of shear wall three-main keel reinforcing system
CN219925765U (en) Assembled steel construction building square steel locating platform
CN215107311U (en) Hollow pier stud centre form of tunnel construction
CN214497563U (en) Concrete pile bearing platform template structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant