CN219710308U - Construction method pile guide frame device - Google Patents

Construction method pile guide frame device Download PDF

Info

Publication number
CN219710308U
CN219710308U CN202320949996.5U CN202320949996U CN219710308U CN 219710308 U CN219710308 U CN 219710308U CN 202320949996 U CN202320949996 U CN 202320949996U CN 219710308 U CN219710308 U CN 219710308U
Authority
CN
China
Prior art keywords
plate
shaped steel
clamping
construction method
fixture
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320949996.5U
Other languages
Chinese (zh)
Inventor
刘斌
樊海宏
申开明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202320949996.5U priority Critical patent/CN219710308U/en
Application granted granted Critical
Publication of CN219710308U publication Critical patent/CN219710308U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model discloses a construction method pile guide frame device, which relates to the technical field of construction method piles and comprises a trolley, wherein a balancing weight is arranged at the front part of the upper end of the trolley, a vertical plate is arranged at the rear part of the upper end of the trolley, a plurality of first clamping mechanisms are arranged at the rear end of the vertical plate, the first clamping mechanisms are in transmission connection with two clamping plates which are symmetrically arranged left and right with the vertical plate as the center, the first clamping mechanisms are used for driving the two clamping plates to move towards the direction close to each other and clamp H-shaped steel in the direction parallel to the vertical plate, a second clamping mechanism is arranged at the middle part of the rear end of the first clamping mechanism and used for clamping the H-shaped steel in the direction perpendicular to the vertical plate. According to the utility model, the H-shaped steel is clamped in multiple directions, so that the H-shaped steel is effectively prevented from shaking in the descending process, the accuracy of the angle when the H-shaped steel is inserted into concrete is ensured, the whole device is convenient to move by arranging the trolley, and the H-shaped steel lifting device is simple in structure and strong in practicability.

Description

Construction method pile guide frame device
Technical Field
The utility model relates to the technical field of construction method piles, in particular to a construction method pile guide frame device.
Background
The SMW is characterized in that H-shaped steel is inserted into a soil cement deep mixing pile wall body, a pile column type underground continuous wall body is formed after solidification, as shown in fig. 5, the characteristics of good impermeability and high rigidity of the steel are fully utilized, and through the combined action of the two, a foundation pit retaining waterproof lateral support structure is formed.
When the H-shaped steel is installed, the H-shaped steel needs to be vertically inserted into concrete, in the prior art, the H-shaped steel is firstly hung into a target approximate area through a crane, then the H-shaped steel is manually inserted into the concrete or is assisted by adopting a guide frame, but the H-shaped steel still generates slight shaking in the descending process, so that the inserting angle is deviated, and in view of the fact, the guide frame device for the construction method pile is provided.
Disclosure of Invention
The utility model mainly aims to provide a construction method pile guide frame device which can effectively solve the problems in the background technology.
In order to achieve the above purpose, the technical scheme adopted by the utility model is as follows:
the utility model provides a building method stake leading truck device, includes the dolly, the balancing weight is installed to dolly upper end front portion, the riser is installed at dolly upper end rear portion, the several first fixture is installed to riser rear end, first fixture transmission is connected with two and is bilateral symmetry and be provided with splint with the riser as the center, first fixture is used for driving two splint and moves towards the direction that is close to each other to form the centre gripping to H shaped steel in the direction that is on a parallel with the riser, first fixture rear end mid-mounting has second fixture, second fixture is used for forming the centre gripping to H shaped steel in the direction of perpendicular to riser.
Preferably, the first fixture comprises a mounting plate, mounting plate and riser fixed connection, two spouts are opened to the one end that the riser was kept away from to the mounting plate, two common swing joint has positive and negative tooth lead screw between the spout, positive and negative tooth lead screw surface screw thread alternates and is connected with two sliders that are bilateral symmetry and arrange with the riser as the center, two slider respectively with two spouts sliding connection, the motor is installed to mounting plate one end, the output and the positive and negative tooth lead screw fixed connection of motor, the extension board is installed to the one end that the mounting plate was kept away from to the slider.
Preferably, the clamping plate comprises an L-shaped plate, the L-shaped plate is fixedly connected with the extension plate, the first idler wheels are arranged on two mutually perpendicular inner side surfaces in the L-shaped plate, and the rib plates are arranged on two mutually perpendicular outer side surfaces in the L-shaped plate.
Preferably, the second clamping mechanism comprises an electric cylinder, one end of the electric cylinder is fixedly connected with the mounting plate, the output end of the electric cylinder is provided with a mounting seat, and the other end of the mounting seat is provided with a second roller.
Preferably, the first roller is vertically arranged.
Preferably, the second roller is vertically arranged.
Compared with the prior art, the utility model has the following beneficial effects:
1. the H-shaped steel is clamped in the direction parallel to the vertical plate by arranging the first clamping driving two clamping plates, and the clamping plates are internally provided with the two first rollers which are mutually perpendicular, so that the contact area between the clamping plates and the H-shaped steel is increased, the clamping direction is increased, the H-shaped steel is clamped in the direction perpendicular to the vertical plate by arranging the first clamping plates, the H-shaped steel is clamped in multiple directions, the shaking of the H-shaped steel in the descending process is effectively avoided, and the accuracy of the insertion angle of the H-shaped steel is ensured;
2. the trolley is arranged to bear the first clamping mechanism and the second clamping mechanism, and the whole device is convenient to move due to the design of the trolley, so that the practicability is improved;
3. the gravity center of the whole device is close to the trolley by arranging the balancing weight, so that the phenomenon that the trolley falls down when clamping and positioning H-shaped steel is avoided, and the safety is improved.
Drawings
Fig. 1 is a schematic structural view of the entire guide frame device proposed in the present embodiment;
fig. 2 is a schematic view showing a use state of the whole guide frame device according to the present embodiment;
fig. 3 is a schematic structural view of the first clamping mechanism, the clamping plate and the second clamping mechanism in the present embodiment;
fig. 4 is a top view showing the structure of the entire guide frame device proposed in the present embodiment;
fig. 5 is a schematic diagram of a SMW construction pile.
In the figure: 1. a trolley; 2. balancing weight; 3. a vertical plate; 4. a clamping plate; 5. a first clamping mechanism; 6. a second clamping mechanism; 7. h-shaped steel; 8. a concrete base; 41. an L-shaped plate; 42. a first roller; 43. rib plates; 51. a mounting plate; 52. a chute; 53. a motor; 54. a positive and negative tooth screw rod; 55. a slide block; 56. an extension plate; 61. an electric cylinder; 62. a mounting base; 63. and a second roller.
Detailed Description
The utility model is further described in connection with the following detailed description, in order to make the technical means, the creation characteristics, the achievement of the purpose and the effect of the utility model easy to understand.
In the description of the present utility model, it should be noted that the directions or positional relationships indicated by the terms "upper", "lower", "inner", "outer", "front", "rear", "both ends", "one end", "the other end", etc. are based on the directions or positional relationships shown in the drawings, are merely for convenience of describing the present utility model and simplifying the description, and do not indicate or imply that the devices or elements referred to must have a specific direction, be configured and operated in the specific direction, and thus should not be construed as limiting the present utility model. Furthermore, the terms "first," "second," and the like, are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present utility model, it should be noted that, unless explicitly specified and limited otherwise, the terms "mounted," "provided," "connected," and the like are to be construed broadly, and may be fixedly connected, detachably connected, or integrally connected, for example; can be mechanically or electrically connected; can be directly connected or indirectly connected through an intermediate medium, and can be communication between two elements. The specific meaning of the above terms in the present utility model will be understood in specific cases by those of ordinary skill in the art.
As shown in fig. 1-4, a construction method pile guide frame device comprises a trolley 1, as a specific implementation manner, three wheels, two directional wheels and one universal wheel are arranged at the lower end of the trolley 1 in this embodiment, a handrail is installed at the upper end of the trolley 1, a balancing weight 2 is installed at the front part of the upper end of the trolley 1, a vertical plate 3 is installed at the rear part of the upper end of the trolley 1, a plurality of first clamping mechanisms 5 are installed at the rear end of the vertical plate 3, clamping plates 4 are symmetrically arranged on the left side and the right side of the vertical plate 3 in a transmission manner, the first clamping mechanisms 5 are used for driving the two clamping plates 4 to move towards directions close to each other, clamping H-shaped steel is formed in directions parallel to the vertical plate 3, a second clamping mechanism 6 is installed at the middle part of the rear end of the first clamping mechanisms 5, and the second clamping mechanisms 6 are used for clamping the H-shaped steel in directions perpendicular to the vertical plate 3.
Specifically, the first clamping mechanism 5 includes mounting panel 51, mounting panel 51 and riser 3 fixed connection, two spouts 52 are opened to the one end that riser 3 was kept away from to mounting panel 51, two common swing joint has positive and negative tooth lead screw 54 between the spout 52, positive and negative tooth lead screw 54 surface screw thread alternate is connected with two and is the slider 55 that bilateral symmetry arranged with riser 3 as the center, two slider 55 respectively with two spouts 52 sliding connection, motor 53 is installed to mounting panel 51 one end, the output and positive and negative tooth lead screw 54 fixed connection of motor 53, extension board 56 is installed to the one end that mounting panel 51 was kept away from to slider 55. In this embodiment, taking two sliders 55 approaching each other as an example: the motor 53 drives the positive and negative screw rod 54 to rotate, and the positive and negative screw rod 54 drives the two sliding blocks 55 to synchronously move close to each other.
Specifically, the clamping plate 4 includes an L-shaped plate 41, the L-shaped plate 41 is fixedly connected with the extension plate 56, and two mutually perpendicular inner sides of the L-shaped plate 41 are respectively provided with the first roller 42. By means of the two first rollers 42 perpendicular to each other, the contact area of the clamping plate 4 with the H-section steel is increased and the clamping direction is increased.
In order to improve the strength of the L-shaped plate 41, in this embodiment, the two mutually perpendicular outer side surfaces of the L-shaped plate 41 are commonly provided with ribs 43.
Specifically, the second clamping mechanism 6 includes an electric cylinder 61, one end of the electric cylinder 61 is fixedly connected with the mounting plate 51, an installation seat 62 is installed at the output end of the electric cylinder 61, and a second roller 63 is installed at the other end of the installation seat 62. The output end of the electric cylinder 61 stretches to drive the mounting seat 62 to move, and the mounting seat 62 drives the second roller 63 to move until the second roller 63 contacts with the H-shaped steel.
Specifically, the first roller 42 is disposed vertically. The H-shaped steel is convenient to descend.
Specifically, the second roller 63 is disposed vertically. The H-shaped steel is convenient to descend.
It should be noted that, when the utility model is a construction method pile guide frame device, the whole device is moved to the vicinity of H-shaped steel through the trolley 1, then the motor 53 is started, the motor 53 drives the positive and negative screw rod 54 to rotate, the positive and negative screw rod 54 drives the two sliding blocks 55 to synchronously move close to each other, the two sliding blocks 55 drive the two clamping plates 4 to synchronously move close to each other until the clamping plates 4 are contacted with the H-shaped steel, the electric cylinder 61 is started again, the output end of the electric cylinder 61 stretches and drives the mounting seat 62 to move, the mounting seat 62 drives the second roller 63 to move until the second roller 63 is contacted with the H-shaped steel, the H-shaped steel is clamped in multiple directions, shaking of the H-shaped steel in the descending process is effectively avoided, and the accuracy of the insertion angle of the H-shaped steel is ensured.
The foregoing has shown and described the basic principles and main features of the present utility model and the advantages of the present utility model. It will be understood by those skilled in the art that the present utility model is not limited to the embodiments described above, and that the above embodiments and descriptions are merely illustrative of the principles of the present utility model, and various changes and modifications may be made without departing from the spirit and scope of the utility model, which is defined in the appended claims. The scope of the utility model is defined by the appended claims and equivalents thereof.

Claims (6)

1. The utility model provides a building method stake leading truck device, is including dolly (1), its characterized in that: the balancing weight (2) is installed at dolly (1) upper end front portion, riser (3) is installed at dolly (1) upper end rear portion, riser (3) rear end is installed several first fixture (5), first fixture (5) transmission is connected with two and is bilateral symmetry and be provided with splint (4) with riser (3) as the center, first fixture (5) are used for driving two splint (4) and move towards the direction that is close to each other to form the centre gripping to H shaped steel in the direction that is on a parallel with riser (3), second fixture (6) are installed to first fixture (5) rear end mid-mounting, second fixture (6) are used for forming the centre gripping to H shaped steel in the direction that is perpendicular to riser (3).
2. A construction method pile guide frame device according to claim 1, characterized in that: the first clamping mechanism (5) comprises a mounting plate (51), the mounting plate (51) is fixedly connected with the vertical plate (3), two sliding grooves (52) are formed in one end, far away from the vertical plate (3), of the mounting plate (51), a positive and negative screw rod (54) is movably connected between the sliding grooves (52), two sliding blocks (55) which are symmetrically arranged left and right are arranged with the vertical plate (3) as the center are connected to the outer surface of the positive and negative screw rod (54) in a threaded penetrating mode, the two sliding blocks (55) are respectively connected with the two sliding grooves (52) in a sliding mode, a motor (53) is arranged at one end of the mounting plate (51), the output end of the motor (53) is fixedly connected with the positive and negative screw rod (54), and an extension plate (56) is arranged at one end, far away from the mounting plate (51), of the sliding blocks (55).
3. A construction method pile guide frame device according to claim 2, characterized in that: the clamping plate (4) comprises an L-shaped plate (41), the L-shaped plate (41) is fixedly connected with the extension plate (56), first rollers (42) are respectively arranged on two mutually perpendicular inner side surfaces of the L-shaped plate (41), and rib plates (43) are jointly arranged on two mutually perpendicular outer side surfaces of the L-shaped plate (41).
4. A construction method pile guide frame device according to claim 2, characterized in that: the second clamping mechanism (6) comprises an electric cylinder (61), one end of the electric cylinder (61) is fixedly connected with the mounting plate (51), a mounting seat (62) is mounted at the output end of the electric cylinder (61), and a second roller (63) is mounted at the other end of the mounting seat (62).
5. A construction pile guide according to claim 3, characterised in that: the first roller (42) is vertically arranged.
6. A construction method pile guide frame device according to claim 4, wherein: the second roller (63) is vertically arranged.
CN202320949996.5U 2023-04-24 2023-04-24 Construction method pile guide frame device Active CN219710308U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320949996.5U CN219710308U (en) 2023-04-24 2023-04-24 Construction method pile guide frame device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320949996.5U CN219710308U (en) 2023-04-24 2023-04-24 Construction method pile guide frame device

Publications (1)

Publication Number Publication Date
CN219710308U true CN219710308U (en) 2023-09-19

Family

ID=87978481

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320949996.5U Active CN219710308U (en) 2023-04-24 2023-04-24 Construction method pile guide frame device

Country Status (1)

Country Link
CN (1) CN219710308U (en)

Similar Documents

Publication Publication Date Title
CN219710308U (en) Construction method pile guide frame device
CN212387617U (en) Tower crane base convenient for bidirectional combination reinforcement
CN211945936U (en) Pipeline hoist and mount portal frame of tunnel utility tunnel construction usefulness
CN112282021A (en) Based on municipal works road laying structure
CN111453642A (en) Steel sheet pile transports lifting device for water conservancy construction
CN217231494U (en) Assembly quality of bridge concrete placement template
CN217299690U (en) Plastering machine for inner wall
CN210885076U (en) Water conservancy water and electricity pipeline laying and lifting device convenient for clamping pipeline
CN215160436U (en) Pipeline laying device for municipal construction
CN214302909U (en) A support body platform structure for floor pouring construction for housing construction
CN212865944U (en) Cast-in-place concrete pile filling device
CN111576859A (en) Floor laying-out opening template supporting structure
CN112682650A (en) Remote intelligent grading system for scrap steel
CN216886341U (en) Adjustable outdoor charging pile
CN215164831U (en) Culvert pipe sinking device for tunnel laying
CN218508739U (en) Shaped steel post and wall post reinforcing bar connection structure
CN218290141U (en) Steel-pipe pile hoisting machine
CN219547868U (en) Prefabricated assembled cable well
CN219279407U (en) H-shaped steel lifting device
CN217204046U (en) Quick pile extension device of drilling bored concrete pile
CN116835435B (en) Multifunctional lifting hook for integral lifting trolley
CN214833274U (en) Municipal administration road drainage pipe angle adjusting device
CN220813839U (en) Pile driving structure for construction engineering
CN218268309U (en) Multifunctional detection device
CN211395324U (en) Height limiting device for road and bridge building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant