CN219697156U - Pipeline overhauls cable and fixes outer frame of choosing - Google Patents
Pipeline overhauls cable and fixes outer frame of choosing Download PDFInfo
- Publication number
- CN219697156U CN219697156U CN202222984824.XU CN202222984824U CN219697156U CN 219697156 U CN219697156 U CN 219697156U CN 202222984824 U CN202222984824 U CN 202222984824U CN 219697156 U CN219697156 U CN 219697156U
- Authority
- CN
- China
- Prior art keywords
- fixed
- length
- vertical
- rod
- connecting plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000003466 welding Methods 0.000 claims abstract description 10
- 229910000831 Steel Inorganic materials 0.000 claims description 6
- 239000010959 steel Substances 0.000 claims description 6
- 238000010276 construction Methods 0.000 abstract description 32
- 238000004804 winding Methods 0.000 abstract description 3
- 230000002194 synthesizing effect Effects 0.000 description 3
- 238000005286 illumination Methods 0.000 description 2
- 238000003754 machining Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 1
Landscapes
- Laying Of Electric Cables Or Lines Outside (AREA)
Abstract
A pipeline overhaul cable fixing cantilever frame belongs to the technical field of comprehensive pipeline overhaul construction. The device comprises a U-shaped bolt, a fixed vertical plate, a connecting plate, a vertical rod, a bolt, a horizontal ram, a fixed rod and a sleeve; u-shaped bolt (1) passes fixed riser (2) fixedly, and connecting plate (3) vertical welding is on fixed riser (2), and pole setting (4) are fixed with connecting plate (3) through two bolts (5), and horizontal ram (6) vertical welding is at the top of pole setting (4), and dead lever (7) vertical welding is at the other end of horizontal ram (6), and 3-5 sleeve pipes (8) horizontal welding are fixed on dead lever (7), sleeve pipe (8) interval 200mm. The device has the advantages that the device is simple to assemble, convenient to operate, simple and practical, avoids winding of the construction cable, facilitates dragging of constructors, reduces damage of the construction cable, enables on-site construction cable management to be more regular, and reduces construction cost.
Description
Technical Field
The utility model belongs to the technical field of comprehensive pipeline overhaul construction, and particularly provides an overhaul cable fixing cantilever frame.
Background
When the comprehensive pipeline is overhauled and constructed, construction cables such as a welding handle cable, a temporary illumination cable and the like are generally directly dragged to the comprehensive pipeline from the ground, when the cables are used, the cable is often wound together and is not moved due to the fact that the disorder of the cables affects the walking of constructors, the constructors are required to comb again when the construction cables are dragged, and meanwhile, the cables are easily damaged due to the fact that the construction cables are randomly arranged.
Disclosure of Invention
The utility model aims to provide a pipeline overhaul cable fixing cantilever frame, which is characterized in that the fixing cantilever frame is fixed on an edge pipeline of a comprehensive pipeline through a U-shaped bolt, a group of fixing cantilever frames are arranged every 6m, and then a construction cable passes through a sleeve on the fixing cantilever frame, so that the construction cable is more regular and smooth, meanwhile, the operation of constructors is facilitated, and the construction cable is protected from being damaged.
The utility model comprises a U-shaped bolt 1, a fixed vertical plate 2, a connecting plate 3, a vertical rod 4, a bolt 5, a horizontal cantilever rod 6, a fixed rod 7 and a sleeve 8, wherein the U-shaped bolt 1 passes through the fixed vertical plate 2 to be fixed, the connecting plate 3 is vertically welded on the fixed vertical plate 2, the vertical rod 4 is fixed with the connecting plate 3 through two bolts 5, the horizontal cantilever rod 6 is vertically welded on the top of the vertical rod 4, the fixed rod 7 is vertically welded on the other end part of the horizontal cantilever rod 6, 3-5 sleeves 8 are horizontally welded and fixed on the fixed rod 7, and the distance between the sleeves 8 is 200mm. (see FIGS. 1 and 2).
Wherein the diameter of the U-shaped bolt 1 is 14mm, and the diameter of the arc section is 200-800mm; the fixed vertical plate 2 is formed by processing a 14mm thick steel plate, and the size is (length: width) (300-1000) ×200mm; the connecting plate 3 is formed by processing a 14mm thick steel plate, and the dimension is (length-width) (200-800) 300mm; the vertical rod 4 is formed by processing square tubes with the cross section dimension (length: width) of 200mm and the length of 1200mm; the diameter of the bolt 5 is 10mm, and the length is 250mm; the horizontal ram 6 is formed by processing square tubes with the cross section dimension (length: width) of 100mm and the length of 300mm; the fixed rod 7 is formed by processing square tubes with the cross section dimension (length: width) of 40mm and the length of 1000mm; the sleeve 8 is formed by machining a circular tube with the diameter of 40mm and the length of 200mm.
During the use, will fix the outer frame of choosing on the marginal pipeline 9 of synthesizing the pipeline through U-shaped bolt 1, every 6m sets up a set of fixed outer frame of choosing, then passes the sleeve pipe 8 on the fixed outer frame of choosing with the construction cable 10, makes the construction cable 10 more regular smooth, has made things convenient for constructor's operation simultaneously, has also protected construction cable 10 not destroyed, and the fixed outer frame of choosing that has used up can reuse (fig. 3, fig. 4).
The fixed cantilever frame is simple to assemble, convenient to operate, simple and practical, avoids winding of a construction cable, facilitates dragging of constructors, reduces damage of the construction cable, enables on-site construction cable management to be more regular, and reduces construction cost.
Drawings
Fig. 1 is a front view of a stationary cantilever.
Fig. 2 is a side view of the stationary cantilever.
Fig. 3 is a front view of the fixed cantilever in use.
Fig. 4 is a side view of the stationary cantilever in use.
In the figure, a U-shaped bolt 1, a fixed vertical plate 2, a connecting plate 3, a vertical rod 4, a bolt 5, a horizontal ram 6, a fixed rod 7, a sleeve 8, an edge pipeline 9 and a construction cable 10.
Detailed Description
Fig. 1-4 illustrate an embodiment of the present utility model. The utility model is further described below with reference to the accompanying drawings.
The fixed cantilever frame comprises a U-shaped bolt 1, a fixed vertical plate 2, a connecting plate 3, a vertical rod 4, bolts 5, horizontal cantilever rods 6, a fixed rod 7 and sleeves 8, wherein the U-shaped bolt 1 penetrates through the fixed vertical plate 2 to be fixed, the connecting plate 3 is vertically welded on the fixed vertical plate 2, the vertical rod 4 is fixed with the connecting plate 3 through the two bolts 5, the horizontal cantilever rods 6 are vertically welded on the top of the vertical rod 4, the fixed rod 7 is vertically welded on the other end part of the horizontal cantilever rods 6, 3-5 sleeves 8 are horizontally welded and fixed on the fixed rod 7, and the distance between the sleeves 8 is 200mm. Wherein the diameter of the U-shaped bolt 1 is 14mm, and the diameter of the arc section is 200-800mm; the fixed vertical plate 2 is formed by processing a 14mm thick steel plate, and the size is (length: width) (300-1000) ×200mm; the connecting plate 3 is formed by processing a 14mm thick steel plate, and the dimension is (length-width) (200-800) 300mm; the vertical rod 4 is formed by processing square tubes with the cross section dimension (length: width) of 200mm and the length of 1200mm; the diameter of the bolt 5 is 10mm, and the length is 250mm; the horizontal ram 6 is formed by processing square tubes with the cross section dimension (length: width) of 100mm and the length of 300mm; the fixed rod 7 is formed by processing square tubes with the cross section dimension (length: width) of 40mm and the length of 1000mm; the sleeve 8 is formed by machining a circular tube with the diameter of 40mm and the length of 200mm.
During the use, fix the fixed frame of encorbelmenting on the marginal pipeline 9 of synthesizing the pipeline through U-shaped bolt 1, every 6m sets up a set of fixed frame of encorbelmenting, then passes the sleeve pipe 8 on the fixed frame of encorbelmenting with the construction cable 10, makes construction cable 10 more regular smooth, has made things convenient for constructor's operation simultaneously, has also protected construction cable 10 not destroyed, and the fixed frame of encorbelmenting of finishing that uses can reuse.
In the overhaul construction of the comprehensive pipeline, an overhaul cable fixing cantilever bracket is adopted for the arrangement of construction cables such as a welding handle cable, a temporary illumination cable and the like, so that a good effect is achieved. The fixed cantilever frame comprises a U-shaped bolt, a fixed vertical plate, a connecting plate, a vertical rod, bolts, a horizontal cantilever rod, a fixing rod and sleeve pipes 8, wherein the U-shaped bolt is fixed through the fixed vertical plate, the connecting plate is vertically welded on the fixed vertical plate, the vertical rod is fixed with the connecting plate through two bolts, the horizontal cantilever rod is vertically welded at the top of the vertical rod, the fixing rod is vertically welded at the other end part of the horizontal cantilever rod, 3-5 sleeve pipes are horizontally welded and fixed on the fixing rod, and the distance between the sleeve pipes is 200mm. During the use, will fix the outer frame of choosing and fix on the marginal pipeline of synthesizing the pipeline through U-shaped bolt, every 6m sets up a set of fixed outer frame of choosing, then passes the sleeve pipe on the fixed outer frame of choosing with the construction cable, makes the construction cable more regular smooth in the same direction as, has made things convenient for constructor's operation simultaneously, has also protected the construction cable not destroyed, and the fixed outer frame of choosing that has used up can used repeatedly. The fixed cantilever frame is simple to assemble, convenient to operate, simple and practical, avoids winding of a construction cable, facilitates dragging of constructors, reduces damage of the construction cable, enables on-site construction cable management to be more regular, and reduces construction cost.
Claims (2)
1. The pipeline overhaul cable fixing cantilever bracket is characterized by comprising a U-shaped bolt (1), a fixing vertical plate (2), a connecting plate (3), a vertical rod (4), a bolt (5), a horizontal cantilever rod (6), a fixing rod (7) and a sleeve (8); u-shaped bolt (1) passes fixed riser (2) fixedly, and connecting plate (3) vertical welding is on fixed riser (2), and pole setting (4) are fixed with connecting plate (3) through two bolts (5), and horizontal ram (6) vertical welding is at the top of pole setting (4), and dead lever (7) vertical welding is at the other end of horizontal ram (6), and 3-5 sleeve pipes (8) horizontal welding are fixed on dead lever (7), sleeve pipe (8) interval 200mm.
2. The pipe overhaul cable fixing cantilever according to claim 1, wherein the diameter of the U-shaped bolt (1) is 14mm, and the diameter of the circular arc section is 200-800mm; the fixed vertical plate (2) is formed by processing a 14mm thick steel plate, and the length and the width of the fixed vertical plate are 300-1000 mm and 200mm; the connecting plate (3) is formed by processing a 14mm thick steel plate, the length and the width of the dimension are ((200-800) and 300 mm), the vertical rod (4) is formed by processing a square tube with the length and the width of 200mm and the length of 1200mm, the bolt (5) is 10mm in diameter and 250mm in length, the horizontal cantilever rod (6) is formed by processing a square tube with the length and the width of 100mm and the length of 300mm, the fixing rod (7) is formed by processing a square tube with the length and the width of 40mm and the length of 1000mm, and the sleeve (8) is formed by processing a round tube with the diameter of 40mm and the length of 200mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222984824.XU CN219697156U (en) | 2022-11-09 | 2022-11-09 | Pipeline overhauls cable and fixes outer frame of choosing |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222984824.XU CN219697156U (en) | 2022-11-09 | 2022-11-09 | Pipeline overhauls cable and fixes outer frame of choosing |
Publications (1)
Publication Number | Publication Date |
---|---|
CN219697156U true CN219697156U (en) | 2023-09-15 |
Family
ID=87971296
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202222984824.XU Active CN219697156U (en) | 2022-11-09 | 2022-11-09 | Pipeline overhauls cable and fixes outer frame of choosing |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN219697156U (en) |
-
2022
- 2022-11-09 CN CN202222984824.XU patent/CN219697156U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN219697156U (en) | Pipeline overhauls cable and fixes outer frame of choosing | |
CN201482836U (en) | Floating resistant anchor rod bending equipment and system thereof | |
CN219351191U (en) | Pipeline overhauls cable and fixes outer frame of choosing | |
CN110212456A (en) | A kind of laying method of ship shore electric cable | |
CN205857693U (en) | A kind of canalization template being applied to movement joint both sides shear wall synchronous construction | |
CN201320727Y (en) | Assembly device for PCCP pipelines | |
CN209948537U (en) | Auxiliary device for laying ship shore power cable | |
CN204139622U (en) | Adjustable segmented column steel bar positioning fixture | |
CN215948902U (en) | Cast in situ concrete post template fixing clamp | |
CN211341679U (en) | Cantilever scaffold puts up wall bolt pre-buried device | |
CN205153543U (en) | Simple and easy template reinforcing apparatus | |
CN214755189U (en) | Cable laying device suitable for trapezoidal crane span structure | |
CN211039943U (en) | A shock-resistant structure for cantilever side-mounted pipeline | |
CN203465244U (en) | Limiting device for parallelism of ultrasonic acoustic detection pipes of pile foundation | |
CN215528499U (en) | Cable bracket on H-shaped steel frame steel column | |
CN218440997U (en) | Temporary fixing support for combined installation of stand pipes | |
CN205134927U (en) | Recoverable builder's jack instrument formula bolt and fixing device | |
CN219444939U (en) | Pipeline installation auxiliary device | |
CN211286739U (en) | Device for temporarily protecting indoor elevator door opening | |
CN204983616U (en) | Scaffold is wall pole even | |
CN202127217U (en) | Power cable holder | |
CN215763635U (en) | Internal pulling installation equipment for PCCP pipeline | |
CN217071581U (en) | Pipeline displacement preventing device | |
CN211899656U (en) | Template stabilising arrangement for construction | |
CN219362774U (en) | Assembled steel strand wires pay-off |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |