CN219690578U - Independent column pier type double-layer plate construction elevator concrete foundation structure - Google Patents

Independent column pier type double-layer plate construction elevator concrete foundation structure Download PDF

Info

Publication number
CN219690578U
CN219690578U CN202321376786.8U CN202321376786U CN219690578U CN 219690578 U CN219690578 U CN 219690578U CN 202321376786 U CN202321376786 U CN 202321376786U CN 219690578 U CN219690578 U CN 219690578U
Authority
CN
China
Prior art keywords
plate structure
column
concrete
type double
bottom plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321376786.8U
Other languages
Chinese (zh)
Inventor
张磊
王贤桂
刘春国
王寅志
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Construction Engineering Third Construction Group Co ltd
Original Assignee
Anhui Sanjian Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Sanjian Engineering Co Ltd filed Critical Anhui Sanjian Engineering Co Ltd
Priority to CN202321376786.8U priority Critical patent/CN219690578U/en
Application granted granted Critical
Publication of CN219690578U publication Critical patent/CN219690578U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a concrete foundation structure of an independent column pier type double-layer plate construction lifter, which comprises a bottom plate structure, a top plate structure and a frame column structure, wherein the bottom plate structure is a plate structure formed by integrally pouring longitudinal and transverse reinforcing steel meshes and concrete, the top plate structure is a plate structure formed by integrally pouring longitudinal and transverse reinforcing steel meshes and concrete, the frame column structure comprises a vertical frame column and a column top oblique haunch, the top plate structure and the bottom plate structure are respectively fixed at the top end and the bottom end of the vertical frame column, and the column top oblique haunch is connected between the lower side surface of the top plate structure and the upper end of the vertical frame column. According to the utility model, a part of backfill depth is replaced through the reinforced concrete independent column pier type double-layer plate structure, and the self stability of the concrete structure is utilized, so that uneven settlement caused by direct construction of a foundation on the backfill is avoided, the foundation safety is improved, and a new foundation form is provided for a construction lifter.

Description

Independent column pier type double-layer plate construction elevator concrete foundation structure
Technical Field
The utility model relates to the technical field of foundation construction devices of construction elevators, in particular to an independent column pier type double-layer plate construction elevator concrete foundation structure.
Background
The construction elevator is a vertical conveying machine for materials in engineering construction and is mainly used in various buildings of urban high-rise and super high-rise. The self weight of the equipment is changed, and the safety requirement coefficient is high. Especially the foundation of the standard section and the buffer base of the fixed equipment is the key for ensuring the stability, safety and use function of the construction lifter.
A common construction hoist foundation is a natural foundation slab foundation. The foundation is constructed on a standard joint of a construction lifter and a buffer base plate type structure, the plate type structure is directly constructed on a force-holding soil layer, and foundation treatment is carried out on the foundation positioned at a backfill position, so that certain potential safety hazards exist.
Disclosure of Invention
The utility model aims to make up the defects of the prior art, and provides an independent column pier type double-layer plate construction elevator concrete foundation structure so as to solve the safety problem of the existing tower crane foundation.
The utility model is realized by the following technical scheme:
the utility model provides an independent pier formula double-deck board construction lift concrete foundation structure, includes bottom plate structure, roof structure and frame post structure, bottom plate structure be by vertically and horizontally steel reinforcement net and concrete overall casting's plate structure that forms, roof structure be by vertically and horizontally steel reinforcement net and concrete overall casting's plate structure that forms, frame post structure including vertical frame post and column top slant haunch, roof structure and bottom plate structure fix respectively at the top and the bottom of vertical frame post, column top slant haunch connect between the upper end of roof structure downside and vertical frame post.
The bottom plate structure, the frame column structure and the top plate structure are formed by casting concrete at one time.
The frame column structure is a vertical reinforced concrete column; the frame column structure and the top plate structure are fixed by adopting four column tops and inclined haunching.
The utility model has the advantages that:
according to the utility model, a part of backfill depth is replaced through the reinforced concrete independent column pier type double-layer plate structure, and the self stability of the concrete structure is utilized, so that uneven settlement caused by direct construction of a foundation on the backfill is avoided, the foundation safety is improved, and a new foundation form is provided for a construction lifter.
Drawings
FIG. 1 is a top plan view of the structure of the present utility model;
FIG. 2 is a front cross-sectional view of the structure of the present utility model;
FIG. 3 is a reinforcement view of a structural floor of the present utility model;
FIG. 4 is a top plate reinforcement view of the structure of the present utility model;
reference numerals in the drawings: the vertical frame column comprises a bottom plate structure 1, a frame column structure 2, vertical frame columns 21, a column top oblique haunching 22 and a top plate structure 3.
Detailed Description
As shown in fig. 1-4, an independent column pier type double-layer plate construction elevator concrete foundation structure comprises a bottom plate structure 1, a top plate structure 3 and a frame column structure 2, wherein the bottom plate structure 1 is a plate structure formed by integrally pouring longitudinal and transverse reinforcing steel meshes and concrete, the top plate structure 3 is a plate structure formed by integrally pouring longitudinal and transverse reinforcing steel meshes and concrete, the frame column structure 2 comprises a vertical frame column 21 and a column top oblique haunch 22, the top plate structure 3 and the bottom plate structure 1 are respectively fixed at the top end and the bottom end of the vertical frame column 21, and the column top oblique haunch 22 is connected between the lower side surface of the top plate structure 3 and the upper end of the vertical frame column 21.
The bottom plate structure 1, the frame column structure 2 and the top plate structure 3 are formed by casting concrete at one time.
The frame column structure 2 is a vertical reinforced concrete column; the frame column structure 2 and the top plate structure 3 are fixed by adopting four column top oblique haunches 22.
The base plate structure 1 is a reinforced concrete plate structure and is in a step shape. The frame column structure 2 is integrally arranged at the top surface of the bottom plate structure 1. The roof structure 3 is a reinforced concrete slab structure and is planar.
The frame column structure 2 is a vertical reinforced concrete column.
In this embodiment, after the construction of the reinforcing steel bars of the bottom plate structure 1 is completed, the reinforcing steel bars of the vertical frame columns 21 in the frame column structure 2 are anchored into the bottom plate structure 1, then the template installation and the reinforcing steel bar installation of the vertical frame columns 21 are performed, the haunched reinforcing steel bars of the vertical frame columns 21 are anchored into the top plate structure 3, and then the template installation and the reinforcing steel bar installation of the top plate structure 3 are performed.
In the top plate structure 3, a construction lifter bottom standard section bolt and a buffer base bolt are pre-buried. And then concrete pouring is carried out on the bottom plate structure 1, the frame column structure 2 and the top plate structure 3.
The construction process for constructing the elevator foundation comprises the following steps:
the construction steps are as follows:
1. fabrication of the floor structure 1
According to the design drawing, the templates around the plate-type structure are built by adopting the brick bed-jig, so that the structural size of the bottom plate structure 1 meets the design requirement of the drawing, and longitudinal and transverse reinforcing steel bars are installed according to the reinforcing steel bar distribution drawing.
2. Fabrication of frame column structure 2
According to the design drawing, the vertical frame column 21 in the frame column structure 2 is anchored into the bottom plate structure 1 by reinforcing steel bars, and after the binding is firm, the templates of the vertical frame column 2 are installed.
3. Manufacture of roof Structure 3
According to the design drawing, the templates of the roof structure 3 are installed, and the vertical frame column haunched 22 steel bars are anchored into the roof structure 3. And installing the reinforcing steel bars of the top plate structure 3, the standard section bolts at the bottom of the construction lifter and the buffer base, and adjusting the positions, the elevations and the levelness of the bolts.
4. Concrete pouring
And casting concrete of the bottom plate structure 1, the frame column structure 2 and the top plate structure 3 according to the requirements of a design drawing. The concrete is vibrated compactly, and the positions and the sizes of the bottom plate structure 1, the frame column structure 2 and the top plate structure 3 are ensured during vibration.
5. Template removal
And after the requirement of the demolding age is met, the templates of the frame column structure 2 and the top plate structure 3 are disassembled, and the brick bed-jig of the bottom plate structure 1 can be optionally disassembled.
According to the utility model, by means of the reinforced concrete independent column pier type double-layer plate structure, a part of backfill depth is replaced, and the load of the upper construction lifter is directly transferred to the bearing layer, so that the conditions of uneven settlement and insufficient bearing capacity caused by insufficient backfill construction are avoided, and the safety risk is effectively reduced.
The embodiments of the present utility model are merely described in terms of preferred embodiments of the present utility model, and are not intended to limit the spirit and scope of the present utility model, and various modifications and improvements made by those skilled in the art to the technical solutions of the present utility model should fall within the protection scope of the present utility model, and the technical content of the present utility model as claimed is fully described in the claims.

Claims (3)

1. An independent pier type double-layer plate construction elevator concrete foundation structure which is characterized in that: including bottom plate structure, roof structure and frame post structure, bottom plate structure be by vertically and horizontally steel bar mesh and concrete integral casting's plate structure, roof structure be by vertically and horizontally steel bar mesh and concrete integral casting's plate structure, frame post structure including vertical frame post and top of column slant haunch, roof structure and bottom plate structure fix respectively on the top and the bottom of vertical frame post, top of column slant haunch connect between the upper end of roof structure downside and vertical frame post.
2. An independent pier type double-deck construction elevator concrete foundation structure according to claim 1, wherein: the bottom plate structure, the frame column structure and the top plate structure are formed by casting concrete at one time.
3. An independent pier type double-deck construction elevator concrete foundation structure according to claim 1, wherein: the frame column structure is a vertical reinforced concrete column; the frame column structure and the top plate structure are fixed by adopting four column tops and inclined haunching.
CN202321376786.8U 2023-06-01 2023-06-01 Independent column pier type double-layer plate construction elevator concrete foundation structure Active CN219690578U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321376786.8U CN219690578U (en) 2023-06-01 2023-06-01 Independent column pier type double-layer plate construction elevator concrete foundation structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321376786.8U CN219690578U (en) 2023-06-01 2023-06-01 Independent column pier type double-layer plate construction elevator concrete foundation structure

Publications (1)

Publication Number Publication Date
CN219690578U true CN219690578U (en) 2023-09-15

Family

ID=87966478

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321376786.8U Active CN219690578U (en) 2023-06-01 2023-06-01 Independent column pier type double-layer plate construction elevator concrete foundation structure

Country Status (1)

Country Link
CN (1) CN219690578U (en)

Similar Documents

Publication Publication Date Title
CN102587286A (en) Simply supported-continuous construction method for bridge superstructure
CN106976157A (en) A kind of post stretching precast beam pedestal for being applicable different length and cross sectional shape
CN102900024A (en) Overturning die plate for large-scale concrete structure and using method for overturning die plate
CN103452350A (en) Fabricated electronic workshop and construction method thereof
CN109895239B (en) Fabricated concrete stair slow platform beam slab and construction method thereof
CN103276894A (en) Support system of large-cross-section girder transfer floor of hollow floor system and construction technology
CN212096869U (en) Precast beam processingequipment
CN210421568U (en) Assembled beam and plate structure
CN111186780A (en) Movable arm type tower crane underframe weight type foundation and construction method
CN210289267U (en) Assembled platform canopy
CN219690578U (en) Independent column pier type double-layer plate construction elevator concrete foundation structure
CN214883824U (en) Pre-leveling tower foundation
CN211769949U (en) Movable arm type tower crane underframe ballast type foundation
CN114277672A (en) Large-span prestressed concrete bent cap structure and construction method thereof
CN207027858U (en) A kind of post stretching precast beam pedestal for being applicable different length and cross sectional shape
CN217500805U (en) Self-supporting reinforcing steel bar split heads
CN219343534U (en) Connection structure of prefabricated assembled frame post and basic cushion cap
CN215053872U (en) Assembled frame system
CN221822948U (en) Construction structure combining retaining wall type bearing platform and steel column
CN214401799U (en) Prefabricated assembled elevator pit
CN217651842U (en) Foundation foundation structure
CN220903696U (en) But reuse steel pedestal
CN103233577A (en) Method for supporting framework of concrete beam through suspension truss
CN218562393U (en) Can have enough to meet need formula steel pipe concrete prefabricated basis
CN219175304U (en) Steel construction foundation for construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 230001 no.329 Wuhu Road, Hefei City, Anhui Province

Patentee after: Anhui Construction Engineering Third Construction Group Co.,Ltd.

Country or region after: China

Address before: 230001 no.329 Wuhu Road, Hefei City, Anhui Province

Patentee before: ANHUI SANJIAN ENGINEERING Co.,Ltd.

Country or region before: China