CN219683409U - Rail train overhauls platform - Google Patents
Rail train overhauls platform Download PDFInfo
- Publication number
- CN219683409U CN219683409U CN202321161673.6U CN202321161673U CN219683409U CN 219683409 U CN219683409 U CN 219683409U CN 202321161673 U CN202321161673 U CN 202321161673U CN 219683409 U CN219683409 U CN 219683409U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- maintenance platform
- water
- rail train
- bottom plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 44
- 239000002351 wastewater Substances 0.000 claims abstract description 32
- 238000012423 maintenance Methods 0.000 claims abstract description 31
- 238000004140 cleaning Methods 0.000 claims description 9
- 230000006978 adaptation Effects 0.000 claims description 3
- 238000003466 welding Methods 0.000 claims description 3
- 238000005507 spraying Methods 0.000 claims 2
- 239000010865 sewage Substances 0.000 claims 1
- 239000007921 spray Substances 0.000 description 9
- 238000007689 inspection Methods 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000004804 winding Methods 0.000 description 2
- FGRBYDKOBBBPOI-UHFFFAOYSA-N 10,10-dioxo-2-[4-(N-phenylanilino)phenyl]thioxanthen-9-one Chemical compound O=C1c2ccccc2S(=O)(=O)c2ccc(cc12)-c1ccc(cc1)N(c1ccccc1)c1ccccc1 FGRBYDKOBBBPOI-UHFFFAOYSA-N 0.000 description 1
- 230000004075 alteration Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 239000003657 drainage water Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 238000005406 washing Methods 0.000 description 1
Landscapes
- Vehicle Cleaning, Maintenance, Repair, Refitting, And Outriggers (AREA)
Abstract
The utility model discloses a rail train maintenance platform, which relates to the technical field of maintenance platforms, and particularly relates to a maintenance platform, wherein a push rod is fixedly connected to the upper surface of a bottom plate, the top end of the push rod is connected with the maintenance platform, a placing cavity A is formed in the maintenance platform, a waste water collecting barrel and a water storage barrel are sequentially arranged on one side of the inside of the placing cavity A from left to right.
Description
Technical Field
The utility model relates to the technical field of maintenance platforms, in particular to a rail train maintenance platform.
Background
The parts of the railway train are damaged in the running process, and the parts are required to be repaired and maintained through corresponding maintenance platforms when the train stops at the moment, so that the train can safely travel.
Most of the existing maintenance platforms are simple in structure and lack of design of a water pump and a water storage barrel, so that inconvenience and cleaning of parts of a train are caused, and the maintenance platforms are not fixed on the ground during use, so that the maintenance platforms shake during use, and convenience is brought to use of staff.
Disclosure of Invention
(one) solving the technical problems
Aiming at the defects of the prior art, the utility model provides a rail train maintenance platform, which solves the problems that most of the existing maintenance platforms provided in the background art are simpler in structure and lack of design of a water pump and a water storage barrel, so that the maintenance platform is inconvenient to clean with parts of a train, and is not fixed on the ground during use, so that the maintenance platform shakes during use, and is inconvenient for workers to use.
(II) technical scheme
In order to achieve the above object, the present utility model is achieved by the following technical scheme; the utility model provides a rail train overhauls platform, includes bottom plate, its characterized in that: the upper surface of the bottom plate is fixedly connected with a push rod (2), the top end of the push rod is connected with an overhaul stand, a placing cavity A is arranged in the overhaul stand, one side in the placing cavity A is sequentially provided with a wastewater collecting barrel and a water storage barrel from left to right, the water pump is arranged on the other side inside the placing cavity A, the input end of the water pump is fixedly connected with the water storage barrel, and the output end of the water pump is fixedly connected with the three-way valve.
Optionally, a water filling port and a cleaning pool are sequentially formed in one side of the upper surface of the overhaul stand from top to bottom, and a wastewater outflow port is formed in one side of the inner bottom wall of the cleaning pool.
Optionally, the top fixed connection rectangular plate at the access table back, the positive one side fixed connection T shape slide rail of rectangular plate, the positive sliding connection of T shape slide rail has the slider, the inside fixedly connected with of slider removes tap, it passes through slider sliding connection in the inside of T shape spout to remove tap, one side fixedly connected with water pipe of removing tap, water pipe fixed connection is in one side of three-way valve, the opposite side fixedly connected with control panel of rectangular plate.
Optionally, maintenance bench openly and one side swivelling joint have the revolving door, the positive bottom welding of waste water collecting vessel has the extension ear, the screw column is worn to be equipped with by the upper surface screw thread of extension ear, place the screw hole of intracavity diapire one side offered with screw column looks adaptation, the lower fixed surface of waste water collecting vessel is connected with universal wheel A.
Optionally, place chamber B has been seted up to one side of maintenance platform, place the inside one side of chamber B and seted up circular passageway B, place the inside winding of chamber B and have the spray pipe, spray pipe fixed connection is in the opposite side of three-way valve. .
Optionally, the front and the back of bottom plate all are equipped with flexible sucking disc, the lower surface fixedly connected with universal wheel B of bottom plate.
(III) beneficial effects
The utility model provides a rail train maintenance platform, which has the following beneficial effects:
this a maintenance platform for rail train, through the water pump, the water storage bucket, the three-way valve, wash the pond, remove tap's setting, the input fixedly connected with of water pump is in the water storage bucket during the use, the output fixedly connected with three-way valve of water pump, start through control panel, the water of water pump drainage water storage bucket is provided in the three-way valve, the three-way valve provides to tap and spray pipe in, the staff can take the part of train to wash in the pond, can open the part of wasing with removing tap, and make flexible sucking disc flexible put ground through control panel, reduce most rocking when maintenance platform during operation, the convenience is worked in the staff.
Drawings
In order to more clearly illustrate the embodiments of the present utility model or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below. It will be apparent to those skilled in the art from this disclosure that the drawings described below are merely exemplary and that other embodiments may be derived from the drawings provided without undue effort.
FIG. 1 is a schematic diagram of the structure of the present utility model;
FIG. 2 is a schematic view of the disassembly of the base plate of the inspection bench of the present utility model;
FIG. 3 is a schematic view of an inspection station assembly of the present utility model in a disassembled state;
FIG. 4 is a schematic view showing the disassembly of the internal components of the inspection bench of the present utility model.
In the figure: 1. a bottom plate; 2. a push rod; 3. an overhaul stand; 4. a water storage bucket; 5. a wastewater collection tank; 6. a water pump; 7. a three-way valve; 8. a water filling port; 9. a cleaning pool; 10. a waste water outflow port; 11. a T-shaped slide rail; 12. moving the faucet; 13. a control panel; 14. a water spray pipe; 15. and a telescopic sucker.
Detailed Description
The structures, proportions, sizes, etc. shown in the present specification are shown only for the purposes of illustration and description, and are not intended to limit the scope of the utility model, which is defined by the claims, so that any structural modifications, proportional changes, or adjustments of size, which do not affect the efficacy of the utility model or the objects achieved, should fall within the scope of the utility model.
Referring to fig. 1 to 4, the present utility model provides a technical solution: the rail train maintenance platform comprises a bottom plate 1, wherein the upper surface of the bottom plate 1 is fixedly connected with a push rod 2, the top end of the push rod 2 is connected with a maintenance platform 3, a placing cavity A is arranged in the maintenance platform 3, a wastewater collecting barrel 5 and a water storage barrel 4 are sequentially arranged on one side of the inside of the placing cavity A from left to right, a water pump 6 is arranged on the other side of the inside of the placing cavity A, the input end of the water pump 6 is fixedly connected with the water storage barrel 4, the output end of the water pump 6 is fixedly connected with a three-way valve 7,
one side of the upper surface of the overhaul stand 3 is sequentially provided with a water filling port 8 and a cleaning pool 9 from top to bottom, one side of the bottom wall in the cleaning pool 9 is provided with a waste water outflow port 10, when the overhaul stand is cleaned for a certain time, a top end cover of the waste water outflow port 10 can be opened, waste water flows into the waste water collecting barrel 5 through the waste water outflow port 10, personnel can conveniently clean the next part, and meanwhile the cleaning degree of the part is guaranteed.
The top fixed connection rectangular plate at the back of access table 3, rectangular positive one side fixed connection T shape slide rail 11 of rectangular plate, the positive sliding connection of T shape slide rail 11 has the slider, the inside fixedly connected with of slider removes tap 12, remove tap 12 through slider sliding connection in the inside of T shape spout 11, one side fixedly connected with water pipe of removing tap 12, water pipe fixed connection is in one side of three-way valve 7, the opposite side fixedly connected with control panel 13 of rectangular plate, when wasing the part in wash pond 9, accessible T shape slide rail is removed to removing tap 12, be convenient for in staff washs the part.
The front and one side swivelling joint of access table 3 have the revolving door, and the positive bottom welding of waste water collecting vessel 5 has the extension ear, and the screw post is worn to be equipped with by the upper surface screw thread of extension ear, and the screw hole with screw post looks adaptation has been seted up to one side of placing the intracavity diapire, and the lower fixed surface of waste water collecting vessel 5 is connected with universal wheel A, and personnel accessible pull rod pulling waste water collecting vessel 5 removes, and the brake block of stepping on, can make waste water collecting vessel 5 be in the restriction state, avoids taking place the displacement.
The cavity B has been seted up to one side of maintenance platform 3, and the inside winding of placing cavity B has spray pipe 14, and spray pipe 14 fixed connection is in the opposite side of three-way valve 7, when the great part of needs clearance, can take out spray pipe 14, aim at the part and wash, has made things convenient for the staff to wash great part.
The front and the back of the bottom plate 1 are both provided with the telescopic sucking disc 15, when the overhaul stand 3 works, the telescopic sucking disc 15 is telescopic to the ground through the control panel 13, most of shaking is reduced when the overhaul stand 3 works, working by workers is facilitated, and the universal wheels B are fixedly connected to the lower surface of the bottom plate 1 and can conveniently move on the overhaul stand 3.
As a preferred technical scheme of the utility model:
the electrical components are all connected with an external main controller and 220V mains supply, and the main controller can be conventional known equipment for controlling a computer and the like.
To sum up, this rail train overhauls platform, firstly place ground with the maintenance platform 3, simultaneously push down universal wheel B's inside brake block B, make it fix on ground, secondly open the revolving door, place waste water collecting vessel 5 and place the intracavity A inside, simultaneously push down universal wheel A's inside brake block A, again with the screw column through extending ear with waste water collecting vessel 5 fixed connection in place one side of chamber A diapire, insert the power, when the messenger washs the train, utilize control panel 13 to let flexible sucking disc 15 fix on ground, then adjust push rod 2 with control panel 13, until adjust to staff's comfortable position, then utilize control panel 13 to open the switch of water pump 6, for less part, the staff can place wash pond 9 with the part, for great part, the staff can open the revolving door in one side of maintenance platform 3, take out spray pipe 14, aim at great part with spray pipe 14 and wash, after a period, wash pond 9 stores a large amount of waste water, can be with washing pond 9 one side of inner bottom wall surface of 10 open the upper surface of waste water outlet 10, let waste water 5 flow into the waste water collecting vessel through the discharge opening of brake drum 10, when the waste water is opened, empty the waste water collecting vessel 5 is opened, and finally, empty the waste water collecting vessel is washed in the waste water collecting vessel 5, empty the waste water after that the water is used, empty.
Although embodiments of the present utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. Rail train overhauls platform, including bottom plate (1), its characterized in that: the utility model discloses a sewage treatment device, including bottom plate (1), catch bar (2) are fixedly connected with on the upper surface of bottom plate (1), the top of catch bar (2) is connected with overhauls platform (3), place chamber A has been seted up to the inside of overhauls platform (3), place inside one side of chamber A is equipped with waste water collecting vat (5) and water storage bucket (4) from a left side to the right side in proper order, place inside opposite side of chamber A and be equipped with water pump (6), the input fixedly connected with of water pump (6) is in water storage bucket (4), the output fixedly connected with three-way valve (7) of water pump (6).
2. A rail train service stand according to claim 1, wherein: one side of the upper surface of the overhaul stand (3) is sequentially provided with a water filling port (8) and a cleaning tank (9) from top to bottom, and one side of the inner bottom wall of the cleaning tank (9) is provided with a wastewater outflow port (10).
3. A rail train service stand according to claim 1, wherein: the intelligent maintenance platform is characterized in that the top of the back of the maintenance platform (3) is fixedly connected with a rectangular plate, one side of the front of the rectangular plate is fixedly connected with a T-shaped sliding rail (11), the front of the T-shaped sliding rail (11) is slidably connected with a sliding block, the inside of the sliding block is fixedly connected with a movable faucet (12), the movable faucet (12) is slidably connected with the inside of the T-shaped sliding rail (11) through the sliding block, one side of the movable faucet (12) is fixedly connected with a water pipe, the water pipe is fixedly connected with one side of a three-way valve (7), and the other side of the rectangular plate is fixedly connected with a control panel (13).
4. A rail train service stand according to claim 1, wherein: the maintenance platform (3) openly and one side swivelling joint have the revolving door, the positive bottom welding of waste water collecting vessel (5) has the extension ear, the screw post is worn to be equipped with by the upper surface screw thread of extension ear, the screw hole with screw post looks adaptation has been seted up to one side of placing the intracavity diapire, the lower fixed surface of waste water collecting vessel (5) is connected with universal wheel A.
5. A rail train service stand according to claim 1, wherein: the maintenance platform is characterized in that a placing cavity B is formed in one side of the maintenance platform (3), a water spraying pipe (14) is wound in the placing cavity B, and the water spraying pipe (14) is fixedly connected to the other side of the three-way valve (7).
6. A rail train service stand according to claim 1, wherein: the front and the back of the bottom plate (1) are respectively provided with a telescopic sucker (15), and the lower surface of the bottom plate (1) is fixedly connected with a universal wheel B.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202321161673.6U CN219683409U (en) | 2023-05-15 | 2023-05-15 | Rail train overhauls platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202321161673.6U CN219683409U (en) | 2023-05-15 | 2023-05-15 | Rail train overhauls platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN219683409U true CN219683409U (en) | 2023-09-15 |
Family
ID=87970165
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202321161673.6U Active CN219683409U (en) | 2023-05-15 | 2023-05-15 | Rail train overhauls platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN219683409U (en) |
-
2023
- 2023-05-15 CN CN202321161673.6U patent/CN219683409U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203200824U (en) | Automatic washing water tank | |
CN101775831B (en) | Integrated water-saving device | |
CN209809602U (en) | Purifier for sewage treatment | |
CN219683409U (en) | Rail train overhauls platform | |
CN209035026U (en) | A kind of PE can washing apparatus | |
CN211547578U (en) | Trolley for cleaning and disinfecting workshop | |
CN208435504U (en) | Sweeping robot automatically adds water drainage arrangement | |
CN213793312U (en) | Energy-saving environment-friendly cleaning and disinfecting device for secondary water supply facilities of high-rise building | |
CN211141631U (en) | Decanter pool surface spraying system | |
CN210993196U (en) | Scraped car residual oil recovery unit | |
CN209614224U (en) | A kind of water tank casting integratedization equipment | |
CN208960266U (en) | A kind of steel pipe oil-spraying device | |
CN210873350U (en) | Wound cleaning and sterilizing device for surgery | |
CN208894691U (en) | A kind of swing cleaning device of building implement | |
CN203320636U (en) | Water saving device for washing cabinet | |
CN213960884U (en) | Pruning device for forest engineering | |
CN215823856U (en) | All-round high pressure washing degassing unit of retaining container | |
CN220832708U (en) | Direct drinking water equipment with wastewater recovery device | |
CN212964145U (en) | Sampling device that municipal administration sewage treatment used | |
CN108543338A (en) | A kind of sewage treatment unit | |
CN203436922U (en) | Wastewater recovery device | |
CN203429718U (en) | Water-saving device for recycling washing water | |
CN211989953U (en) | Spray washing device for surface treatment | |
CN103290892B (en) | Water-saving device for washing cabinet | |
CN213625587U (en) | Portable water absorption device for dam construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |