CN219678005U - Electric power bridge - Google Patents

Electric power bridge Download PDF

Info

Publication number
CN219678005U
CN219678005U CN202320615380.4U CN202320615380U CN219678005U CN 219678005 U CN219678005 U CN 219678005U CN 202320615380 U CN202320615380 U CN 202320615380U CN 219678005 U CN219678005 U CN 219678005U
Authority
CN
China
Prior art keywords
fixed
top surface
plate
bottom plate
roof
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320615380.4U
Other languages
Chinese (zh)
Inventor
司剑
司马智怀
祁闻彦
虞志坚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Classic Electric Power Survey And Design Co ltd
Original Assignee
Shanxi Classic Electric Power Survey And Design Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Classic Electric Power Survey And Design Co ltd filed Critical Shanxi Classic Electric Power Survey And Design Co ltd
Priority to CN202320615380.4U priority Critical patent/CN219678005U/en
Application granted granted Critical
Publication of CN219678005U publication Critical patent/CN219678005U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Installation Of Indoor Wiring (AREA)

Abstract

The utility model belongs to the technical field of buildings, and particularly relates to an electric power bridge frame, which comprises a bottom plate, wherein the top surface of the bottom plate is fixedly provided with slots, three slots are fixedly arranged on the top surface of the bottom plate, the three slots are respectively connected with a partition plate in an inserted mode, the top surfaces of the three partition plates are respectively connected with a limiting groove in an inserted mode, and the three limiting grooves are all fixedly provided with the bottom surface of a top plate. Through setting up the diaphragm, the both ends of diaphragm are fixed respectively and are equipped with a screw hole, and the both ends of diaphragm are respectively through screw hole screw thread through connection fastening screw, and then make the diaphragm pass through the top of fastening screw threaded connection dead lever, the top surface of the bottom welded fastening board of dead lever, the top surface at the roof is installed through four fixing bolt to the dead plate, when staff's erection equipment, can pass the diaphragm with lifting rope etc. and then hang up equipment, thereby make the structure of equipment more firm, and the setting up of fastening screw has made things convenient for the staff to dismouting to equipment more, thereby the convenience of equipment and the steadiness of structure have been improved.

Description

Electric power bridge
Technical Field
The utility model belongs to the technical field of bridges, and particularly relates to an electric power bridge.
Background
The cable bridge is a tool for managing the lines and conveniently carding the lines and partial pipelines, so that a plurality of lines in a building can be orderly arranged, the cable bridge also plays a role in supporting a large number of lines, the appearance of a large number of complicated lines is more attractive, and certain defects exist in the prior cable bridge when the cable bridge is used.
At present, after general clamping, the cable bridge is locked by a plurality of screws, so that the cable bridge is not easy to detach, when a line in the cable bridge is damaged and needs to be maintained, a great deal of time is consumed for the fussy disassembly of the cable bridge, and the working efficiency is influenced.
Disclosure of Invention
Aiming at the defects of the prior art, the utility model provides a power bridge to solve the problems in the background art.
In order to achieve the above purpose, the utility model is realized by the following technical scheme: the utility model provides an electric power bridge, includes the bottom plate, the fixed slot that is equipped with in the top surface of bottom plate, the slot in the fixed three that is equipped with in top surface of bottom plate, and three the slot is pegged graft a baffle respectively, and three peg graft a spacing groove respectively in the top surface of baffle, and three the bottom surface that is equipped with the roof is all fixed to the spacing groove.
Preferably, the top surface of roof is fixed and is equipped with the fixed plate, the fixed plate in the top surface of roof is fixed and is equipped with four, and four the top surface of fixed plate is fixed respectively and is equipped with a dead lever, and four the top surface of dead lever is the bottom surface of two diaphragms of fixed connection respectively, and two the top surface of diaphragm is all fixed and is equipped with two fastening screw.
Preferably, a connecting rod is fixedly arranged on one side of the top plate, two connecting rods are fixedly arranged on the outer walls of two sides of the top plate respectively, one side of each connecting rod is fixedly provided with a fastening bolt, each connecting rod is fixedly provided with a fastening screw hole, two fastening screw holes are fixedly arranged on the outer walls of two sides of the top plate respectively, and each fastening bolt is in threaded connection with two fastening screw holes.
Preferably, the top of connecting rod is fixed and is equipped with the articulated ball, articulated ball is in four the top of connecting rod is all fixed and is equipped with one, and four the outer wall of articulated ball is one fixed connection's one end of connecting plate respectively, and four the connecting plate is fixed respectively and is equipped with a connecting screw and passes through respectively connecting screw threaded connection connecting bolt.
Preferably, a wire harness concave block is fixedly arranged on one side of the bottom plate, two wire harness concave blocks are fixedly arranged on the outer walls of two sides of the bottom plate respectively, two clamping grooves are formed in two sides of the wire harness concave blocks respectively, the clamping grooves are connected with a limiting plate in a clamping mode, two ends of the limiting plate are respectively provided with a mounting screw hole and are respectively connected with a mounting bolt through the mounting screw holes in a threaded mode, and each mounting bolt is connected with the mounting screw holes formed in one side of the bottom plate in a threaded mode.
Preferably, the top surface of bottom plate is fixed and is equipped with the bracing piece, the bracing piece in the top surface of bottom plate is fixed and is equipped with four, and four the top surface of bracing piece is all fixed connection the bottom surface of roof.
The utility model provides a power bridge, which has the following beneficial effects:
according to the utility model, the transverse plates are arranged, the threaded holes are respectively fixedly formed in the two ends of the transverse plates, the two ends of the transverse plates are respectively connected with the fastening screw rod in a threaded manner through the threaded holes, the transverse plates are further connected with the top ends of the fixing rods through the threaded manner of the fastening screw rods, the top surfaces of the fixing plates are welded at the bottom ends of the fixing rods, and the fixing plates are arranged on the top surfaces of the top plates through the four fixing bolts.
2. According to the utility model, through arranging the wire harness concave blocks, after the equipment is installed by a worker, two ends of a hanging belt or a hanging rope and the like respectively pass through the two wire harness concave blocks from the lower part of the bottom plate, then the two wire harness concave blocks are fixed, the effect of hanging the equipment is achieved, and further the weight born by the connecting plate is shared, so that the service life of the connecting plate is prolonged, when the connecting plate passes through the wire harness concave blocks, the limiting plate is clamped in the clamping groove, and then the limiting plate is installed on one side of the bottom plate through the two mounting bolts, so that the hanging belt and the like cannot deviate in position, and the safety and the practicability of the equipment are improved.
Drawings
FIG. 1 is a right-side view overall structure schematic diagram of the present utility model;
FIG. 2 is a left-hand overall schematic of the present utility model;
FIG. 3 is a schematic view of the overall structure of the baffle plate of the present utility model;
fig. 4 is a schematic diagram of the overall structure of the harness concave block according to the present utility model.
In the figure: 1. a bottom plate; 2. a support rod; 3. a slot; 4. a partition plate; 5. a top plate; 6. a connecting rod; 7. a fastening bolt; 8. a hinged ball; 9. a connecting plate; 10. a connecting bolt; 11. a fixing plate; 12. a fixed rod; 13. a cross plate; 14. fastening a screw; 15. a wire harness concave block; 16. installing a bolt; 17. a limiting plate; 18. and a limit groove.
Description of the embodiments
Embodiments of the present utility model are described in further detail below with reference to the accompanying drawings and examples. The following examples are illustrative of the utility model but are not intended to limit the scope of the utility model.
In the description of the present utility model, unless otherwise indicated, the meaning of "a plurality" is two or more; the terms "upper," "lower," "left," "right," "inner," "outer," "front," "rear," "head," "tail," and the like are used as an orientation or positional relationship based on that shown in the drawings, merely to facilitate description of the utility model and to simplify the description, and do not indicate or imply that the devices or elements referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore should not be construed as limiting the utility model. Furthermore, the terms "first," "second," "third," and the like are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present utility model, it should be noted that, unless explicitly specified and limited otherwise, the terms "connected," "connected," and "connected" are to be construed broadly, and may be either fixedly connected, detachably connected, or integrally connected, for example; can be mechanically or electrically connected; can be directly connected or indirectly connected through an intermediate medium. The specific meaning of the above terms in the present utility model will be understood in specific cases by those of ordinary skill in the art.
Referring to fig. 1 to 4, the present utility model provides a technical solution: the utility model provides an electric power bridge, includes bottom plate 1, and the fixed slot 3 that is equipped with in top surface of bottom plate 1, slot 3 are equipped with three in the fixed top surface of bottom plate 1, and three slot 3 peg graft a baffle 4 respectively, and the top surface of three baffle 4 peg graft a spacing groove 18 respectively, and the bottom surface that is equipped with roof 5 is all fixed to three spacing groove 18.
Through setting up baffle 4, when the staff installs the cable conductor, insert baffle 4 in three slot 3 respectively earlier, and then make baffle 4's top grafting spacing groove 18 and bottom grafting slot 3, then begin to install the cable conductor after baffle 4 installs, insert respectively in the empty slot that every two baffles 4 formed after good with the cable conductor distribution, and then make the cable conductor can not take place winding and be difficult to the condition such as distinguish when the installation to convenience and practicality of equipment have been improved.
The top surface of roof 5 is fixed and is equipped with fixed plate 11, and fixed plate 11 is fixed in the top surface of roof 5 and is equipped with four, and the top surface of four fixed plates 11 is fixed respectively and is equipped with a dead lever 12, and the top surface of four dead levers 12 is the bottom surface of two diaphragm 13 of fixed connection respectively, and the top surface of two diaphragm 13 is all fixed and is equipped with two fastening screw 14.
Through setting up diaphragm 13, the both ends of diaphragm 13 are fixed respectively and are equipped with a screw hole, and the both ends of diaphragm 13 pass through screw hole screw thread through connection fastening screw 14 respectively, and then make diaphragm 13 pass through the top of fastening screw 14 threaded connection dead lever 12, the top surface of the bottom welded fastening plate 11 of dead lever 12, the top surface at roof 5 is installed through four fixing bolt to the fixed plate 11, when staff's erection equipment, can pass diaphragm 13 and then lift up equipment with lifting rope etc. to make the structure of equipment more firm, and the setting up of fastening screw 14 has made things convenient for the staff to dismouting to equipment more, thereby the convenience of equipment and the steadiness of structure have been improved.
One side of the top plate 5 is fixedly provided with connecting rods 6, two connecting rods 6 are fixedly arranged on the outer walls of the two sides of the top plate 5 respectively, one faces of the four connecting rods 6 are fixedly provided with fastening bolts 7 respectively, the four connecting rods 6 are fixedly provided with fastening screw holes respectively, the outer walls of the two sides of the top plate 5 are fixedly provided with two fastening screw holes respectively, and the four fastening bolts 7 are in threaded connection with the two fastening screw holes respectively.
Through setting up connecting rod 6, connecting rod 6 passes through two fastening screw of fastening bolt 7 threaded connection and then connects one side of roof 5 to make things convenient for the staff to dismantle more, then equipment is through the angle of articulated ball 8 adjustment connecting plate 9 when the installation, and then makes equipment more conveniently install and the adaptation more condition, thereby has improved the convenience and the adaptability of equipment.
The top of connecting rod 6 is fixed and is equipped with articulated ball 8, and articulated ball 8 is all fixed in the top of four connecting rods 6 and is equipped with one, and the outer wall of four articulated balls 8 is one end of a connecting plate 9 of fixed connection respectively, and four connecting plates 9 are fixed respectively and are equipped with a connecting screw and are connected a connecting bolt 10 through connecting screw threaded connection respectively.
The wire harness concave blocks 15 are fixedly arranged on one side of the bottom plate 1, two wire harness concave blocks 15 are fixedly arranged on the outer walls of two sides of the bottom plate 1 respectively, two clamping grooves are formed in two sides of the four wire harness concave blocks 15 respectively, the clamping grooves are connected with the limiting plates 17 in a clamping mode, two mounting screw holes are formed in two ends of the limiting plates 17 respectively and are connected with the mounting bolts 16 through the mounting screw holes in a threaded mode respectively, and each mounting bolt 16 is connected with the mounting screw hole formed in one side of the bottom plate 1 in a threaded mode.
Through setting up the concave piece 15 of restraint line, the staff accomplishes the equipment installation back, pass two concave pieces 15 of restraint line with the both ends of suspender or lifting rope etc. respectively from the below of bottom plate 1, then reach the effect of lifting up equipment after fixing it, and then make the weight that connecting plate 9 bore obtain sharing, thereby make the life of connecting plate 9 improve, and when passing the concave piece 15 of restraint line, with limiting plate 17 card in the draw-in groove, then install limiting plate 17 in one side of bottom plate 1 through two mounting bolts 16, and then make the suspender etc. can not take place the condition such as position offset, thereby the security and the practicality of equipment have been improved.
The top surface of the bottom plate 1 is fixedly provided with support rods 2, the support rods 2 are fixedly provided with four on the top surface of the bottom plate 1, and the top surfaces of the four support rods 2 are fixedly connected with the bottom surface of the top plate 5.
Specific use and action of the embodiment: when a worker installs the cable, the partition boards 4 are respectively inserted into the three slots 3, the top ends of the partition boards 4 are connected with the limiting grooves 18 in an inserting mode, the bottom ends of the partition boards 4 are connected with the slots 3 in an inserting mode, then after the installation of the partition boards 4 is completed, the cable is installed, the cable is respectively inserted into empty slots formed by each two partition boards 4 after being distributed, further the cable cannot be wound and difficult to distinguish when being installed, two ends of the transverse board 13 are respectively fixedly provided with a threaded hole, two ends of the transverse board 13 are respectively connected with the fastening screw 14 in a penetrating mode through threads of the threaded holes, the transverse board 13 is further connected with the top ends of the fixing rods 12 through threads of the fastening screw 14, the bottom ends of the fixing rods 12 are welded with the top surfaces of the fixing plates 11, the fixing plates 11 are installed on the top surfaces of the top plates 5 through four fixing bolts, when the worker installs equipment, a lifting rope and the like can be penetrated through the transverse board 13 to lift the equipment, so that the structure of the equipment is more stable, the arrangement of the fastening screw 14 is more convenient for the staff to disassemble and assemble the equipment, the connecting rod 6 is connected with two fastening screw holes through the fastening screw 7 in a threaded manner so as to be connected with one side of the top plate 5, thereby being more convenient for the staff to disassemble and assemble, then the angle of the connecting plate 9 is adjusted through the hinging ball 8 when the equipment is installed, further the equipment is more convenient to install and adapt to more conditions, after the staff completes the equipment installation, two ends of a hanging belt or a lifting rope and the like respectively penetrate through the two wire harness concave blocks 15 from the lower part of the bottom plate 1, then the effect of lifting the equipment is achieved after the hanging belt or the lifting rope is fixed, further the weight born by the connecting plate 9 is shared, thereby the service life of the connecting plate 9 is prolonged, and when the wire harness concave blocks 15 are penetrated, the limiting plate 17 is clamped in a clamping groove, and then the limiting plate 17 is arranged on one side of the bottom plate 1 through the two mounting bolts 16, so that the hanging belt and the like cannot deviate in position.
The foregoing is only a preferred embodiment of the present utility model, but the scope of the present utility model is not limited thereto, and any person skilled in the art, who is within the scope of the present utility model, should make equivalent substitutions or modifications according to the technical scheme of the present utility model and the inventive concept thereof, and should be covered by the scope of the present utility model.

Claims (6)

1. An electric power bridge comprising a base plate (1), characterized in that: the top surface of bottom plate (1) is fixed be equipped with slot (3), slot (3) in the top surface of bottom plate (1) is fixed be equipped with three, and three slot (3) peg graft a baffle (4) respectively, and three the top surface of baffle (4) peg graft a spacing groove (18) respectively, and three spacing groove (18) all are fixed the bottom surface that is equipped with roof (5).
2. The power bridge of claim 1, wherein: the top surface of roof (5) is fixed be equipped with fixed plate (11), fixed plate (11) in the top surface of roof (5) is fixed be equipped with four, and four the top surface of fixed plate (11) is fixed respectively and is equipped with dead lever (12), and four the top surface of dead lever (12) is the bottom surface of two diaphragm (13) of fixed connection respectively, and two the top surface of diaphragm (13) is all fixed be equipped with two fastening screw (14).
3. The power bridge of claim 1, wherein: connecting rod (6) are fixedly arranged on one side of roof (5), connecting rod (6) in two side outer walls of roof (5) are fixedly respectively equipped with two, and four one side of connecting rod (6) is fixedly equipped with a fastening bolt (7) respectively, and four connecting rod (6) is fixedly equipped with a fastening screw respectively, just the both sides outer wall of roof (5) is fixedly equipped with two respectively fastening screw, and four fastening bolt (7) are threaded connection two respectively fastening screw.
4. A power bridge according to claim 3, characterized in that: the top of connecting rod (6) is fixed and is equipped with articulated ball (8), articulated ball (8) are in four all fixed being equipped with one in the top of connecting rod (6), and four the outer wall of articulated ball (8) is one end of a connecting plate (9) of fixed connection respectively, and four connecting plate (9) are fixed respectively and are equipped with a connecting screw and pass through respectively connecting bolt (10) of connecting screw threaded connection.
5. The power bridge of claim 1, wherein: the utility model discloses a wire harness concave block, including bottom plate (1), mounting screw hole threaded connection, mounting screw bolt (16), and every mounting screw bolt (16) equal threaded connection mounting screw hole that one side of bottom plate (1) was equipped with is equipped with respectively to one side of bottom plate (1) is fixed be equipped with wire harness concave block (15), and four the both sides of wire harness concave block (15) are equipped with a draw-in groove respectively, and draw-in groove joint limiting plate (17), the both ends of limiting plate (17) are equipped with a mounting screw hole respectively and pass through respectively mounting screw hole threaded connection mounting screw bolt (16), and every mounting screw bolt (16) equal threaded connection one side of bottom plate (1) is equipped with.
6. The power bridge of claim 1, wherein: the top surface of bottom plate (1) is fixed be equipped with bracing piece (2), bracing piece (2) in the top surface of bottom plate (1) is fixed be equipped with four, and four the top surface of bracing piece (2) is all fixed connection the bottom surface of roof (5).
CN202320615380.4U 2023-03-27 2023-03-27 Electric power bridge Active CN219678005U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320615380.4U CN219678005U (en) 2023-03-27 2023-03-27 Electric power bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320615380.4U CN219678005U (en) 2023-03-27 2023-03-27 Electric power bridge

Publications (1)

Publication Number Publication Date
CN219678005U true CN219678005U (en) 2023-09-12

Family

ID=87920833

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320615380.4U Active CN219678005U (en) 2023-03-27 2023-03-27 Electric power bridge

Country Status (1)

Country Link
CN (1) CN219678005U (en)

Similar Documents

Publication Publication Date Title
CN219678005U (en) Electric power bridge
CN216489532U (en) Cable duct three-dimensional space suspension isolation fixture
CN213275715U (en) Support for fixing electric meter box
CN219717779U (en) Cable bridge
CN209975840U (en) Indoor simple decoration suspended ceiling structure
CN210291334U (en) Block terminal erection equipment
CN113622579A (en) Fastening type light gauge steel hangs member
CN214614948U (en) Novel polyester fiber acoustic board suspended ceiling system
CN217812042U (en) False roof beam package roof beam structure
CN210291606U (en) Parlor ceiling lamp convenient to install
CN217325813U (en) Energy-saving building convenient to build dismouting temporarily
CN220267176U (en) Suspension operation platform
CN220664670U (en) Hoisting frame for wellhead equipment of ocean drilling platform
CN215563761U (en) Hospital is with assembled high steady keel frame furred ceiling
CN211126936U (en) Adjustable cable bridge fixing device
CN212377705U (en) Mounting rack for mounting LED display unit and LED display device
CN219257626U (en) Detachable railing of ship
CN217998576U (en) Indoor ceiling decoration structure
CN215452435U (en) Tubular hanger rod assembly
CN213391433U (en) Wire pole with prevent down mechanism
CN218622770U (en) Keel system of assembled wallboard
CN219980181U (en) Outdoor distribution box convenient to fix
CN211320827U (en) Cable bridge
CN220291525U (en) Electric power installation overhauls platform
CN215110938U (en) Engagement type assembled support and hanger

Legal Events