CN219672085U - Basket is hung in steel construction overhead operation - Google Patents

Basket is hung in steel construction overhead operation Download PDF

Info

Publication number
CN219672085U
CN219672085U CN202321069897.4U CN202321069897U CN219672085U CN 219672085 U CN219672085 U CN 219672085U CN 202321069897 U CN202321069897 U CN 202321069897U CN 219672085 U CN219672085 U CN 219672085U
Authority
CN
China
Prior art keywords
rod
subassembly
adjusting
arc
regulation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321069897.4U
Other languages
Chinese (zh)
Inventor
于振益
安帅
杨文震
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Baoye Steel Structure Co ltd
Shanghai Baoye Group Corp Ltd
Original Assignee
Zhengzhou Baoye Steel Structure Co ltd
Shanghai Baoye Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Baoye Steel Structure Co ltd, Shanghai Baoye Group Corp Ltd filed Critical Zhengzhou Baoye Steel Structure Co ltd
Priority to CN202321069897.4U priority Critical patent/CN219672085U/en
Application granted granted Critical
Publication of CN219672085U publication Critical patent/CN219672085U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The utility model discloses a steel structure overhead operation hanging basket, which comprises an operation table assembly, a stepping assembly fixedly connected with the side surface of the operation table assembly and positioned in the vertical direction, and a hook assembly connected with the top of the stepping assembly through a first hinged support, wherein the hook assembly comprises an adjusting rod connected with the first hinged support and positioned in the horizontal direction, and a fixing rod connected with the other end of the adjusting rod through a second hinged support and positioned in the vertical direction. And the frame body of the operation panel assembly is made of aluminum alloy materials, so that the stability is better, the safety management of a construction site is facilitated, the turnover is strong, the disassembly is convenient, the occupied space after folding is small, the turnover and the transportation are convenient, the economy is strong, and the cost expenditure of projects can be reduced.

Description

Basket is hung in steel construction overhead operation
Technical Field
The utility model relates to the technical field of building construction safety facilities, in particular to a steel structure overhead operation hanging basket.
Background
Stadium in each district is like the continuous increase of spring bamboo shoots after raining, and stadium structure is complicated, and partial node is because high and structural style scheduling problem, leads to ascending car and current operation platform unable operation, often adopt the overhead operation to hang the basket and operate, however, the basket structural style that now commonly used is single, most round steel welding forms, its stable form is relatively poor, be unfavorable for the safety control in the work process, perhaps hang the basket pertinence great, unadjustable, can't use to all nodes, for example grant the chinese patent of bulletin number CN 214995797U and disclose a safe basket that is used for pipe truss overhead operation, including hanging the basket body, it is the metal basket that the upper end was opened to hang the basket body, a serial communication port, it is equipped with two U-shaped clamps to hang basket body upper end, two U-shaped clamps are located the basket body left and right sides respectively and hang basket body fixedly, and the diameter of U-shaped clamp arc section corresponds with pipe truss diameter, thereby be convenient for utilize two U-shaped clamps to hang the basket body on the pipe truss, every U-shaped clamp is equipped with level, can's clamp is poor to dismantle the spacing truss in the middle part, can's the utility model is difficult to the stability to the pipe truss, can's of adjusting the structure is difficult to the type is adjusted to the type to the frame, can's level is difficult to use to the control the type is used to the frame is used to the frame.
Therefore, the steel structure overhead operation hanging basket which meets the construction operation of complex nodes is high in safety, low in manufacturing cost, safe and practical, and is a problem worthy of research.
Disclosure of Invention
The utility model aims to provide the steel structure overhead operation hanging basket which meets the construction operation of complex nodes, and is high in safety, low in manufacturing cost, safe and practical.
The purpose of the utility model is realized in the following way:
the utility model provides a basket is hung in steel construction eminence operation, includes the operation panel subassembly, still includes the subassembly of marking time with the side fixed connection of operation panel subassembly and be located vertical direction, the couple subassembly of being connected through first hinge support with the top of subassembly of marking time, the couple subassembly includes the regulation pole of being connected and being located the horizontal direction with first hinge support, passes through the dead lever that the second hinge support is connected and be located vertical direction with the other end of adjusting the pole, couple subassembly messenger operation panel subassembly and mark time subassembly and component laminating in order to ensure stability.
The adjusting rod comprises a first rod body connected with one end of a second hinged support, a second rod body connected with one end of the second hinged support, and an adjusting cylinder sleeved at the left end of the first rod body and the right end of the second rod body and connected through a fixing piece, and the distance between the left end of the first rod body and the right end of the second rod body is adjusted through the fixing piece so as to adjust the length of the adjusting rod.
The mounting is including a plurality of first regulation holes that are located on the first body of rod, a plurality of second regulation holes that are located on the second body of rod, a plurality of third regulation holes that are located on the adjustment section of thick bamboo, be used for making first regulation hole and third regulation hole fixed and make the fixed adjusting bolt subassembly of second regulation hole and third regulation hole, adjusting bolt subassembly makes the both ends of adjustment section of thick bamboo fixed with first body of rod and second body of rod respectively.
The pedal assembly comprises a vertical rod located in the vertical direction, and a plurality of pedals connected with the vertical rod through connecting pieces and arranged along the length direction of the vertical rod, and the positions of the pedals along the length direction of the vertical rod through the connecting pieces are adjustable.
The connecting piece is including the cover establish at the first arc of pole setting surface and second arc, be used for making the fixed fixing bolt subassembly of first arc and second arc, the tip of footboard is connected with first arc through fixing bolt subassembly.
The operation panel subassembly includes the support body, is located the bottom plate of support body bottom, the side of support body and the subassembly fixed connection of marking time.
Has the positive beneficial effects that: the hook component is adjustable, has wide application range and can be adjusted by users according to the construction environment conditions of the nodes. And the frame body of the operation panel assembly is made of aluminum alloy materials, so that the stability is better, the safety management of a construction site is facilitated, the turnover is strong, the disassembly is convenient, the occupied space after folding is small, the turnover and the transportation are convenient, the economy is strong, and the cost expenditure of projects can be reduced.
Drawings
FIG. 1 is a schematic diagram of the structure of the present utility model;
FIG. 2 is a left side view of FIG. 1;
FIG. 3 is a schematic view of the hook assembly of the present utility model;
FIG. 4 is an enlarged schematic view of the portion A;
the figure is: the pedal assembly comprises an operation platform assembly 1, a stepping assembly 2, a hook assembly 3, a first hinge support 4, a vertical rod 21, a connecting piece 22, a pedal 23, a first arc-shaped plate 221, a second arc-shaped plate 222, a fixing bolt assembly 223, a fixing rod 31, a second hinge support 32, an adjusting rod 33, a first rod body 331, a second rod body 332, an adjusting cylinder 333, a first adjusting hole 334, a second adjusting hole 335 and a third adjusting hole 336.
Description of the embodiments
The utility model is further described below with reference to the drawings and examples.
Examples
As shown in fig. 1 and 2, a steel construction overhead operation hanging basket, including operation panel assembly 1, still include with operation panel assembly 1 side fixed connection and be located the perpendicular orientation step subassembly 2, with step subassembly 2 the top through first hinge support 4 be connected, couple subassembly 3 includes with first hinge support 4 be connected and be located the regulation pole 33 of horizontal direction, with the other end of regulation pole 33 through second hinge support 32 be connected and be located the dead lever 31 of vertical direction, set up the bolt hole on first hinge support 4 and the second hinge support 32, connect through the round pin axle, set up limit device in first hinge support 4 and the second hinge support 32, let the round pin axle activity be fixed when 90 degrees.
The hook component 3 enables the operation desk component 1 and the stepping component 2 to be attached to the component to ensure stability, the hook component is arranged, the adjustable type pedal is adjustable, the application range is wide, and a user can adjust according to the construction environment condition of the node. And the frame body of operation panel subassembly adopts the aluminum alloy material, and stability is better, is favorable to job site's safety control, and the turnover is strong, and it is convenient to dismantle, and folding back space occupies for a short time, is convenient for turnover and transportation, and the economic nature is strong, reducible project's cost expenditure, then utilizes step subassembly 2 to remove, makes the operating personnel enter into on the operation panel subassembly 1 through step subassembly 2 from the structure top.
As shown in fig. 3, the adjusting lever 33 includes a first rod 331 connected to one end of the second hinge support 32, a second rod 332 connected to one end of the second hinge support 32, and an adjusting cylinder 333 sleeved on the left end of the first rod 331 and the right end of the second rod 332 and connected by a fixing member, and the distance between the left end of the first rod 331 and the right end of the second rod 332 is adjusted by the fixing member to adjust the length of the adjusting lever 33. One end of the second rod body 332 is fixedly connected with one end of the first hinged support 4 through a bolt assembly, the fixing piece comprises a plurality of first adjusting holes 334 positioned on the first rod body 331, a plurality of second adjusting holes 335 positioned on the second rod body 332, a plurality of third adjusting holes 336 positioned on the adjusting cylinder 333, and an adjusting bolt assembly used for fixing the first adjusting holes 334 and the third adjusting holes 336 and fixing the second adjusting holes 335 and the third adjusting holes 336, the two ends of the adjusting cylinder 333 are respectively fixed with the first rod body 331 and the second rod body 332 through the adjusting bolt assembly, so that the length of the adjusting rod 33 is determined, an operator can utilize the fixing piece to realize the function of adjusting the length of the adjusting rod 33 according to the width of a structure to be hung, the fitting of a hanging basket and the hanging structure is facilitated, after the adjusting rod 33 is tightly fitted with the structure, the fixing rod 31 is used for fitting the structure, the hanging basket is integrally fixed on the structure, the stability of the hanging basket can be effectively increased, a hinge joint is arranged between the fixing rod 31 and the adjusting rod 33 through the second hinged support 32, the fixing rod 31 and the adjusting rod 33 are connected with the second hinged support 32 through the bolt assembly, and the adjusting rod 33 can be conveniently folded and fixed.
As shown in fig. 4, the step assembly 2 includes a vertical rod 21 in a vertical direction, a plurality of pedals 23 connected with the vertical rod 21 through a connecting member 22 and disposed along a length direction of the vertical rod 21, and the positions of the plurality of pedals 23 along the length direction of the vertical rod 21 through the connecting member 22 are adjustable. The top of pole setting 21 passes through bolt assembly and the one end fixed connection of first hinge support 4, connecting piece 22 is including the cover setting up first arc 221 and second arc 222 at pole setting 21 surface, be used for making the fixed fixing bolt assembly 223 of first arc 221 and second arc 222, the tip of footboard 23 passes through fixing bolt assembly 223 and is connected with first arc 221, become flexible fixing bolt assembly 223, then can make first arc 221 and second arc 222 become flexible for pole setting 21, even first arc 221 and second arc 222 remove along the length direction of pole setting 21, first arc 221 drives footboard 23 and removes along the length direction of pole setting 21, the position of footboard 23 has been adjusted promptly, increase the stability of structure.
Examples
As shown in fig. 1 and 2, a steel construction overhead operation hanging basket, including operation panel assembly 1, still include with operation panel assembly 1 side fixed connection and be located the perpendicular orientation step subassembly 2, with step subassembly 2 the top through first hinge support 4 be connected, couple subassembly 3 includes with first hinge support 4 be connected and be located the regulation pole 33 of horizontal direction, with the other end of regulation pole 33 through second hinge support 32 be connected and be located the dead lever 31 of vertical direction, set up the bolt hole on first hinge support 4 and the second hinge support 32, connect through the round pin axle, set up limit device in first hinge support 4 and the second hinge support 32, let the round pin axle activity be fixed when 90 degrees.
The hook component 3 enables the operation desk component 1 and the stepping component 2 to be attached to the component to ensure stability, the hook component is arranged, the adjustable type pedal is adjustable, the application range is wide, and a user can adjust according to the construction environment condition of the node. And the frame body of operation panel subassembly adopts the aluminum alloy material, and stability is better, is favorable to job site's safety control, and the turnover is strong, and it is convenient to dismantle, and folding back space occupies for a short time, is convenient for turnover and transportation, and the economic nature is strong, reducible project's cost expenditure, then utilizes step subassembly 2 to remove, makes the operating personnel enter into on the operation panel subassembly 1 through step subassembly 2 from the structure top.
As shown in fig. 3, the adjusting lever 33 includes a first rod 331 connected to one end of the second hinge support 32, a second rod 332 connected to one end of the second hinge support 32, and an adjusting cylinder 333 sleeved on the left end of the first rod 331 and the right end of the second rod 332 and connected by a fixing member, and the distance between the left end of the first rod 331 and the right end of the second rod 332 is adjusted by the fixing member to adjust the length of the adjusting lever 33. One end of the second rod body 332 is fixedly connected with one end of the first hinged support 4 through a bolt assembly, the fixing piece comprises a plurality of first adjusting holes 334 positioned on the first rod body 331, a plurality of second adjusting holes 335 positioned on the second rod body 332, a plurality of third adjusting holes 336 positioned on the adjusting cylinder 333, and an adjusting bolt assembly used for fixing the first adjusting holes 334 and the third adjusting holes 336 and fixing the second adjusting holes 335 and the third adjusting holes 336, the two ends of the adjusting cylinder 333 are respectively fixed with the first rod body 331 and the second rod body 332 through the adjusting bolt assembly, so that the length of the adjusting rod 33 is determined, an operator can utilize the fixing piece to realize the function of adjusting the length of the adjusting rod 33 according to the width of a structure to be hung, the fitting of a hanging basket and the hanging structure is facilitated, after the adjusting rod 33 is tightly fitted with the structure, the fixing rod 31 is used for fitting the structure, the hanging basket is integrally fixed on the structure, the stability of the hanging basket can be effectively increased, a hinge joint is arranged between the fixing rod 31 and the adjusting rod 33 through the second hinged support 32, the fixing rod 31 and the adjusting rod 33 are connected with the second hinged support 32 through the bolt assembly, and the adjusting rod 33 can be conveniently folded and fixed.
As shown in fig. 4, the step assembly 2 includes a vertical rod 21 in a vertical direction, a plurality of pedals 23 connected with the vertical rod 21 through a connecting member 22 and disposed along a length direction of the vertical rod 21, and the positions of the plurality of pedals 23 along the length direction of the vertical rod 21 through the connecting member 22 are adjustable. The top of pole setting 21 passes through bolt assembly and the one end fixed connection of first hinge support 4, connecting piece 22 is including the cover setting up first arc 221 and second arc 222 at pole setting 21 surface, be used for making the fixed fixing bolt assembly 223 of first arc 221 and second arc 222, the tip of footboard 23 passes through fixing bolt assembly 223 and is connected with first arc 221, become flexible fixing bolt assembly 223, then can make first arc 221 and second arc 222 become flexible for pole setting 21, even first arc 221 and second arc 222 remove along the length direction of pole setting 21, first arc 221 drives footboard 23 and removes along the length direction of pole setting 21, the position of footboard 23 has been adjusted promptly, increase the stability of structure.
The operation panel assembly 1 comprises a frame body and a bottom plate positioned at the bottom of the frame body, wherein the frame body and the bottom plate are integrally and fixedly connected, the side surface of the frame body is fixedly connected with the stepping assembly 2, and the connecting position of the stepping assembly 2 and the frame body is provided with a spiral sleeve which can be detached and fixed.
The hook component is adjustable, has wide application range and can be adjusted by users according to the construction environment conditions of the nodes. And the frame body of the operation panel assembly is made of aluminum alloy materials, so that the stability is better, the safety management of a construction site is facilitated, the turnover is strong, the disassembly is convenient, the occupied space after folding is small, the turnover and the transportation are convenient, the economy is strong, and the cost expenditure of projects can be reduced.

Claims (6)

1. Basket is hung in steel construction overhead operation, including the operation panel subassembly, its characterized in that: still include with the side fixed connection of operation panel subassembly and be located the subassembly of marking time of vertical direction, with the couple subassembly that the top of subassembly of marking time is connected through first hinge support, couple subassembly includes the regulation pole that is connected and is located the horizontal direction with first hinge support, passes through the dead lever that the second hinge support is connected and is located vertical direction with the other end of regulation pole, couple subassembly makes operation panel subassembly and mark time subassembly and component laminating in order to ensure stability.
2. The steel structure overhead working hanging basket according to claim 1, wherein: the adjusting rod comprises a first rod body connected with one end of a second hinged support, a second rod body connected with one end of the second hinged support, and an adjusting cylinder sleeved at the left end of the first rod body and the right end of the second rod body and connected through a fixing piece, and the distance between the left end of the first rod body and the right end of the second rod body is adjusted through the fixing piece so as to adjust the length of the adjusting rod.
3. The steel structure overhead working hanging basket according to claim 2, wherein: the mounting is including a plurality of first regulation holes that are located on the first body of rod, a plurality of second regulation holes that are located on the second body of rod, a plurality of third regulation holes that are located on the adjustment section of thick bamboo, be used for making first regulation hole and third regulation hole fixed and make the fixed adjusting bolt subassembly of second regulation hole and third regulation hole, adjusting bolt subassembly makes the both ends of adjustment section of thick bamboo fixed with first body of rod and second body of rod respectively.
4. The steel structure overhead working hanging basket according to claim 1, wherein: the pedal assembly comprises a vertical rod located in the vertical direction, and a plurality of pedals connected with the vertical rod through connecting pieces and arranged along the length direction of the vertical rod, and the positions of the pedals along the length direction of the vertical rod through the connecting pieces are adjustable.
5. The steel structure overhead working hanging basket according to claim 4, wherein: the connecting piece is including the cover establish at the first arc of pole setting surface and second arc, be used for making the fixed fixing bolt subassembly of first arc and second arc, the tip of footboard is connected with first arc through fixing bolt subassembly.
6. The steel structure overhead working hanging basket according to claim 1, wherein: the operation panel subassembly includes the support body, is located the bottom plate of support body bottom, the side of support body and the subassembly fixed connection of marking time.
CN202321069897.4U 2023-05-06 2023-05-06 Basket is hung in steel construction overhead operation Active CN219672085U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321069897.4U CN219672085U (en) 2023-05-06 2023-05-06 Basket is hung in steel construction overhead operation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321069897.4U CN219672085U (en) 2023-05-06 2023-05-06 Basket is hung in steel construction overhead operation

Publications (1)

Publication Number Publication Date
CN219672085U true CN219672085U (en) 2023-09-12

Family

ID=87899354

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321069897.4U Active CN219672085U (en) 2023-05-06 2023-05-06 Basket is hung in steel construction overhead operation

Country Status (1)

Country Link
CN (1) CN219672085U (en)

Similar Documents

Publication Publication Date Title
CN219672085U (en) Basket is hung in steel construction overhead operation
CN204960266U (en) Can heighten handy foldable operation panel
CN207739933U (en) The Multifunctional hook ladder of construction
CN203094587U (en) Adjustable parcel packaging frame
CN216446286U (en) Assembled design structure of wood grain aluminum square tube based on multi-surface modeling
CN211396641U (en) Formwork diagonal bracing for building construction
CN211548291U (en) Stable reinforcing mechanism of energy-saving curtain wall
CN219698240U (en) Portable rack debugging platform of adjustable angle
CN208354952U (en) A kind of adjustable desk
CN211192310U (en) Square tube oblique fracture saw support
CN214034408U (en) Stirrup with adjustable building
CN204546696U (en) Multifunctional saw stool
CN201175142Y (en) Universal seat armrest
CN215190384U (en) Graphic hanger for construction engineering cost personnel
CN214834160U (en) Self-locking aluminum alloy gutter supporting section
CN213774010U (en) Aluminum alloy curtain wall board that inserted is connected
CN210227349U (en) Creative workbench for product design
CN220613725U (en) Metal door and window installs auxiliary stand
CN219081473U (en) Folding hard ladder for overhauling draft tube
CN218149196U (en) Metal suspended ceiling steel frame structure for hotel decoration
CN220442830U (en) Back pad quick assembly disassembly subassembly, back pad subassembly, wheelchair
CN212166394U (en) Wall-mounted single-double rod
CN210491571U (en) Multifunctional agricultural shovel
CN208934439U (en) A kind of ball node rack junior unit ground welding support spelling loose tool
CN212874011U (en) Lifting hook for adjusting damper felt

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant