CN218149196U - Metal suspended ceiling steel frame structure for hotel decoration - Google Patents

Metal suspended ceiling steel frame structure for hotel decoration Download PDF

Info

Publication number
CN218149196U
CN218149196U CN202221537267.0U CN202221537267U CN218149196U CN 218149196 U CN218149196 U CN 218149196U CN 202221537267 U CN202221537267 U CN 202221537267U CN 218149196 U CN218149196 U CN 218149196U
Authority
CN
China
Prior art keywords
steel frame
ceiling steel
fossil fragments
fixedly connected
subassembly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221537267.0U
Other languages
Chinese (zh)
Inventor
江伟彪
钱丽华
朱创文
朱藴桢
蔡才炎
韦旭裕
朱锦
韦旭爱
黄炜俊
王德彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou No1 Decoration Co ltd
Original Assignee
Guangzhou No1 Decoration Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou No1 Decoration Co ltd filed Critical Guangzhou No1 Decoration Co ltd
Priority to CN202221537267.0U priority Critical patent/CN218149196U/en
Application granted granted Critical
Publication of CN218149196U publication Critical patent/CN218149196U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses a metal furred ceiling steel frame construction is used to hotel fitment, this furred ceiling steel frame construction aim at solving prior art down the installation rate slow, and is insecure to furred ceiling steel frame construction connection simultaneously, changes the trouble moreover, the technical problem of inefficiency. This furred ceiling steel frame construction includes the jib, jib lower extreme fixedly connected with fossil fragments subassembly, the connecting hole that the equidistance distributes is seted up to fossil fragments subassembly front end, fossil fragments subassembly lower extreme swing joint has the installed part, circular through-hole has all been seted up at both ends around the installed part. This furred ceiling steel frame construction utilizes fossil fragments subassembly, and simple structure, the fossil fragments of being convenient for build and dismantle, and is of high quality, and sound construction after building, durable is particularly suitable for the hotel fitment and uses, and through the spring catch subassembly, the installation is very convenient with the dismantlement decoration panel, practices thrift operating time, and is efficient, and firm in connection is difficult for the displacement, has reduced the potential safety hazard.

Description

Metal suspended ceiling steel frame structure for hotel decoration
Technical Field
The utility model belongs to with metal furred ceiling steelframe field, concretely relates to metal furred ceiling steelframe structure is used to hotel fitment.
Background
Its basic definition in hotel is that the steelframe is connected for fixed knot structure for the fitment of the current hotel of the commercial establishment in space that provides safety, comfortable, make the user obtain short-term rest or sleep, and the hotel fitment is different from the home decoration, and the fitment time is short, and the installation is very firm simultaneously, and this kind of fixed knot structure installation time is long, and the later stage can lead to very inconvenient when the maintenance simultaneously.
At present, a utility model patent with a patent number of CN202022282374.0 discloses a ceiling connector for hotel fitment. The ceiling connecting piece is used to hotel fitment includes that the main joist hangs the piece, structure and limit structure are adjusted in the tensioning, the tensioning is adjusted structural connection and is hung a side in the main joist, the tensioning is adjusted the structure and is included silica gel arc and adjusting bolt, the inside side of main joist hangs a side and connects the silica gel arc, the main joist hangs the outside side threaded connection adjusting bolt who is close to the silica gel arc that hangs the piece, adjusting bolt's twist end runs through the main joist and hangs a lateral surface and rotate with the silica gel arc medial surface and be connected, the backing plate is connected to the interior arc side of silica gel arc, the backing plate is close to adjusting bolt one end side and is equipped with the round platform shape groove. What its adopted is that the furred ceiling connecting piece has and makes and main joist side emergence contact to the inside that the main joist hangs the piece is firmly fixed in to the extrusion main joist, improves the main joist and hangs the fastness, but this furred ceiling connecting piece is only one of steel frame construction's accessory, and becomes firm metal furred ceiling steelframe when being difficult to the hotel fitment.
Consequently, to above-mentioned daily furred ceiling steel frame construction after using be difficult to the problem that stabilizes the support to the furred ceiling when hotel fitment, need to solve urgently to improve furred ceiling steel frame construction's use scene.
SUMMERY OF THE UTILITY MODEL
(1) Technical problem to be solved
Not enough to prior art, the utility model aims at providing a metal furred ceiling steel frame construction is used to hotel fitment, this furred ceiling steel frame construction aim at solving prior art down the installation rate slow, and is insecure to furred ceiling steel frame construction connection simultaneously, changes the trouble moreover, the technical problem of inefficiency.
(2) Technical scheme
In order to solve the technical problem, the utility model provides a such metal furred ceiling steel frame construction is used to hotel fitment which comprises a jib, wherein, jib lower extreme fixedly connected with fossil fragments subassembly, the connecting hole that the equidistance distributes is seted up to fossil fragments subassembly front end, fossil fragments subassembly lower extreme swing joint has the installed part, circular through-hole has all been seted up at both ends around the installed part, through setting up bolt swing joint between connecting hole and the circular through-hole, installed part lower extreme fixedly connected with spring buckle subassembly, spring buckle subassembly outside swing joint has the draw-in groove, draw-in groove lower extreme fixedly connected with connecting piece, connecting piece lower extreme fixedly connected with decoration panel.
When using this technical scheme's furred ceiling steel frame construction, the hotel fitment, at first fix the jib, the welding of jib lower extreme has the fossil fragments subassembly, a plurality of connecting holes have been seted up to fossil fragments subassembly both sides, a plurality of installed parts of mountable, through setting up the bolt with the circular through-hole of installed part and the connecting hole locking of fossil fragments subassembly, then install in inserting the spring fastener subassembly the draw-in groove of decoration panel upper end connecting piece, simple to operate is swift, single decoration panel need be changed, only need drag the decoration panel down a little, can easily dismantle.
Preferably, the fossil fragments subassembly includes main joist, false keel and spread groove, the spread groove has all been seted up with the false keel lower extreme to main joist upper end, cross gomphosis is connected between spread groove and another spread groove, and the molding is simple, firm in connection, the installation and the dismantlement of the fossil fragments of being convenient for.
Preferably, the keel component is made of steel metal, so that the keel component is good in quality, firm in structure after being built, durable and suitable for hotel decoration.
Preferably, the spring catch assembly comprises a sleeve, a reinforcing spring, a telescopic rod, a supporting plate and a non-slip mat, wherein the reinforcing spring is installed at the top end of the inner side of the sleeve, the lower end of the reinforcing spring is fixedly connected with the telescopic rod, the lower end of the telescopic rod is fixedly connected with the supporting plate, the lower end of the sleeve and the upper end of the supporting plate are fixedly connected with the non-slip mat, the diameter of the telescopic rod is smaller than that of the sleeve, the installation is very convenient, the connection is firm, and the non-slip mat is not easy to displace.
Preferably, the clamping groove is a U-shaped groove, the connecting piece is of a structure shaped like a Chinese character 'ji', the decoration panel can be conveniently replaced in the later period, and the positioning performance is good.
Preferably, the connecting holes are the same as the circular through holes in diameter, and the mounting efficiency is greatly improved.
(3) Advantageous effects
Compared with the prior art, the beneficial effects of the utility model reside in that: the utility model discloses a furred ceiling steel frame construction utilizes fossil fragments subassembly, and simple structure, the fossil fragments of being convenient for build and dismantle, and is of high quality, and sound construction after building, durable is particularly suitable for the hotel fitment to use, and through the spring catch subassembly, the installation is very convenient with the dismantlement decoration panel, practices thrift operating time, and is efficient, firm in connection, difficult displacement has reduced the potential safety hazard.
Drawings
Fig. 1 is a schematic perspective view of a specific embodiment of the steel frame structure for a suspended ceiling of the present invention;
fig. 2 is an enlarged schematic structural view of a keel assembly according to a specific embodiment of the suspended ceiling steel frame structure of the present invention;
fig. 3 is an assembly schematic view of a keel assembly and mounting member according to an embodiment of the ceiling steel frame structure of the present invention;
fig. 4 is the structural schematic diagram of the spring fastener assembly in one embodiment of the steel frame structure for suspended ceiling.
The symbols in the drawings are: 1. a boom; 2. a keel assembly; 201. a main keel; 202. a false keel; 203. Connecting grooves; 3. connecting holes; 4. a mounting member; 5. a circular through hole; 6. fastening the bolt; 7. a spring catch assembly; 701. a sleeve; 702. a reinforcing spring; 703. a telescopic rod; 704. a resisting plate; 705. a non-slip mat; 8. A card slot; 9. a connecting member; 10. a decorative panel.
Detailed Description
Example 1
This embodiment is used for hotel fitment to use metal furred ceiling steel frame construction, its spatial structure sketch map is shown in fig. 1, its fossil fragments subassembly 2 enlargies the structure sketch map as shown in fig. 2, this furred ceiling steel frame construction includes jib 1, 1 lower extreme fixedly connected with fossil fragments subassembly 2 of jib, connecting hole 3 that the equidistance distributes is seted up to 2 front ends of fossil fragments subassembly, 2 lower extreme swing joint of fossil fragments subassembly has installed part 4, circular through-hole 5 has all been seted up at both ends around the installed part 4, through fastening bolt 6 swing joint between connecting hole 3 and the circular through- hole 5, 4 lower extreme fixedly connected with snak link subassembly 7 of installed part, 7 outside swing joint of snak link subassembly has draw-in groove 8, 8 lower extreme fixedly connected with connecting piece 9 of draw-in groove, 9 lower extreme fixedly connected with decoration panel 10.
Wherein, fossil fragments subassembly 2 includes main joist 201, false keel 202 and spread groove 203, and spread groove 203 has all been seted up with false keel 202 lower extreme in main joist 201 upper end, and cross gomphosis is connected between spread groove 203 and another spread groove 203, and simple structure, firm in connection, the installation and the dismantlement of the fossil fragments of being convenient for, fossil fragments subassembly 2 adopt steel metal material, and is of high quality, and the sound construction after buildding, durable is fit for the hotel fitment and uses.
In addition, the spring buckle assembly 7 comprises a sleeve 701, a reinforcing spring 702, a telescopic rod 703, a resisting plate 704 and an anti-slip pad 705, wherein the reinforcing spring 702 is installed at the top end of the inner side of the sleeve 701, the telescopic rod 703 is fixedly connected to the lower end of the reinforcing spring 702, the resisting plate 704 is fixedly connected to the lower end of the telescopic rod 703, the anti-slip pad 705 is fixedly connected to the upper ends of the lower end of the sleeve 701 and the resisting plate 704, and the diameter of the telescopic rod 703 is smaller than that of the sleeve 701.
In addition, the clamping groove 8 is a U-shaped groove, the connecting piece 9 is of a structure shaped like a Chinese character 'ji', the later-stage decoration panel 10 is convenient to replace, the positioning performance is good, the connecting hole 3 is the same as the aperture of the circular through hole 5, and the installation efficiency is greatly improved.
The assembly schematic diagram of the keel assembly 2 and the mounting member 4 of the suspended ceiling steel frame structure is shown in fig. 3, and the structural schematic diagram of the spring fastener assembly 7 is shown in fig. 4.
When using this technical scheme's furred ceiling steel frame construction, the hotel fitment, at first fix jib 1, 1 lower extreme welding of jib has fossil fragments subassembly 2, connect main joist 201 and the mutual gomphosis of spread groove 203 of false keel 202, build the completion back sound construction firm, durable, a plurality of connecting holes 3 have been seted up to fossil fragments subassembly 2 both sides, a plurality of installed parts 4 of mountable, through setting up bolt 6 with the circular through-hole 5 of installed part 4 and the connecting hole 3 locking of fossil fragments subassembly 2, then insert in the telescopic link 703 of hasp subassembly 7 to the draw-in groove 8 of decoration panel 10 upper end connecting piece 9, utilize the contractile force of reinforcing spring 702, with the tight centre gripping of draw-in groove 8 between sleeve 701 and offset plate 704, slipmat 705 and the contact of connecting piece 9 top, can strengthen the frictional force of connecting the face, prevent the displacement, simple to operate is swift, single decoration panel 10 need be changed, only need pull down decoration panel 10 a little, can easily dismantle.

Claims (6)

1. The utility model provides a metal furred ceiling steel frame construction is used to hotel fitment, this furred ceiling steel frame construction includes the jib, its characterized in that, jib lower extreme fixedly connected with fossil fragments subassembly, the connecting hole that the equidistance distributes is seted up to fossil fragments subassembly front end, fossil fragments subassembly lower extreme swing joint has the installed part, circular through-hole has all been seted up at both ends around the installed part, through setting up bolt swing joint between connecting hole and the circular through-hole, installed part lower extreme fixedly connected with spring buckle subassembly, the spring buckle subassembly outside swing joint has the draw-in groove, draw-in groove lower extreme fixedly connected with connecting piece, connecting piece lower extreme fixedly connected with decoration panel.
2. The metal ceiling steel frame structure for hotel fitment according to claim 1, wherein the keel assembly comprises a main keel, a cross keel and a connecting groove, the upper end of the main keel and the lower end of the cross keel are respectively provided with a connecting groove, and the connecting groove is connected with another connecting groove in a cross embedding manner.
3. The metal ceiling steel frame structure for hotel fitment according to claim 1, wherein the keel assembly is made of steel metal.
4. The metal ceiling steel frame structure for hotel fitment according to claim 1, wherein the spring fastener assembly comprises a sleeve, a reinforcing spring, a telescopic rod, a butt plate and a non-slip mat, the reinforcing spring is installed at the top end of the inner side of the sleeve, the telescopic rod is fixedly connected to the lower end of the reinforcing spring, the butt plate is fixedly connected to the lower end of the telescopic rod, the non-slip mat is fixedly connected to both the lower end of the sleeve and the upper end of the butt plate, and the diameter of the telescopic rod is smaller than that of the sleeve.
5. The metal ceiling steel frame structure for hotel fitment according to claim 1, wherein the clamping groove is a U-shaped groove, and the connecting piece adopts a structure shaped like a Chinese character 'ji'.
6. The metal ceiling steel frame structure for hotel fitment according to claim 1, wherein the connecting hole has the same diameter as the circular through hole.
CN202221537267.0U 2022-06-17 2022-06-17 Metal suspended ceiling steel frame structure for hotel decoration Active CN218149196U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221537267.0U CN218149196U (en) 2022-06-17 2022-06-17 Metal suspended ceiling steel frame structure for hotel decoration

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221537267.0U CN218149196U (en) 2022-06-17 2022-06-17 Metal suspended ceiling steel frame structure for hotel decoration

Publications (1)

Publication Number Publication Date
CN218149196U true CN218149196U (en) 2022-12-27

Family

ID=84577611

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221537267.0U Active CN218149196U (en) 2022-06-17 2022-06-17 Metal suspended ceiling steel frame structure for hotel decoration

Country Status (1)

Country Link
CN (1) CN218149196U (en)

Similar Documents

Publication Publication Date Title
CN218149196U (en) Metal suspended ceiling steel frame structure for hotel decoration
CN109236023B (en) Assembled large-space camping tent
CN200992755Y (en) Multi-supports curtainwall suspension system and suspension rib connecting device
CN210374024U (en) Intelligent air conditioner easy to assemble
CN214364348U (en) Integrated ceiling keel structure
CN211597682U (en) Telescopic bridge plate
CN209924222U (en) Firm in connection's building curtain connection structure
CN218268950U (en) Palace lantern
CN217296955U (en) Large-scale H shaped steel stand hoist and mount hoist that unhook fast
CN213774010U (en) Aluminum alloy curtain wall board that inserted is connected
CN201875900U (en) Reinforced bracket for electric water heater
CN217897123U (en) Aluminum veneer is decorated to outer wall with additional strengthening
CN213359708U (en) Suspension clamp type world hinge
CN213299066U (en) Anti-seismic support and hanger with stable auxiliary assembly structure
CN211455937U (en) Antenna support and wireless communication base station
CN212405666U (en) Suspended ceiling mounting structure
CN216817608U (en) A assembly devices for multimedia equipment projection curtain of teaching
CN211666449U (en) World pole pendant structure
CN210050644U (en) Light steel frame lamp decoration
CN216840514U (en) Hanging basket suspension device
CN216569207U (en) Apartment bed with wall fixing structure
CN214574984U (en) Multi-angle connecting component for building glass curtain wall
CN216766457U (en) Firm connection structure of square tube furred ceiling smallpox
CN210902529U (en) Double-support frame for curtain
CN215719979U (en) Quick-release member hangs down

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant