CN219671608U - Non-blocking integrated prefabricated pump station - Google Patents

Non-blocking integrated prefabricated pump station Download PDF

Info

Publication number
CN219671608U
CN219671608U CN202320658359.2U CN202320658359U CN219671608U CN 219671608 U CN219671608 U CN 219671608U CN 202320658359 U CN202320658359 U CN 202320658359U CN 219671608 U CN219671608 U CN 219671608U
Authority
CN
China
Prior art keywords
pump station
prefabricated pump
filter screen
integrated prefabricated
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320658359.2U
Other languages
Chinese (zh)
Inventor
熊代兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Ningshui Technology Co ltd
Original Assignee
Chengdu Ningshui Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Ningshui Technology Co ltd filed Critical Chengdu Ningshui Technology Co ltd
Priority to CN202320658359.2U priority Critical patent/CN219671608U/en
Application granted granted Critical
Publication of CN219671608U publication Critical patent/CN219671608U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Filtration Of Liquid (AREA)

Abstract

The utility model discloses an unblocked integrated prefabricated pump station, which relates to the field of prefabricated pump stations and comprises an integrated prefabricated pump station, wherein a filtering and sewage disposal assembly comprises a filter screen, a flow guide baffle and a flow guide frame, the sewage disposal and blocking prevention assembly comprises a telescopic cylinder, a sewage disposal push plate, a mounting bracket, a shunt tube, a high-pressure spray head, a telescopic hose and a water inlet pipe, the high-pressure spray head is arranged at the lower end of the filter screen, a water outlet pipe is arranged on the right side surface of the integrated prefabricated pump station, and a pipeline on a submersible pump set is communicated with the water outlet pipe.

Description

Non-blocking integrated prefabricated pump station
Technical Field
The utility model relates to the field of prefabricated pump stations, in particular to an integrated prefabricated pump station without blockage.
Background
The utility model provides a prefabricated pump station of integration is the promotion equipment that promotes sewage, rainwater, drinking water and waste water, transport to the booster pump station of field installation after assembling by the unified production of mill, with the equipment that satisfies the boost drainage requirement, have flexibility, pump station construction cycle is extremely short, install extremely portably, when the prefabricated pump station of integration uses, a sewage treatment of its aim at basement drainage, subway drainage, living area, mill etc. is less than the bottom surface, when sewage treatment, can mix more pollutant, for example solid particle etc. for a long time can cause silt to pile up, thereby lead to prefabricated pump station time to use for a long time, the blowdown function is worse, if can carry out filtration treatment to water when the water gets into the pump station, the silt discharge of filtering out, then can improve the work efficiency of pump station greatly.
Therefore, the utility model provides an unblocked integrated prefabricated pump station to solve the problem that the sludge accumulation and pollution discharge functions are poorer.
Disclosure of Invention
The utility model aims to provide an unblocked integrated prefabricated pump station to solve the problems in the background art.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides a prefabricated pump station of integration that does not block up, includes prefabricated pump station of integration, the inside of prefabricated pump station of integration is provided with filters blowdown subassembly, it includes filter screen, water conservancy diversion baffle and water conservancy diversion frame to filter blowdown subassembly, the surface of filtering blowdown subassembly is provided with separates the backup pad, the surface of separating the backup pad is provided with the anti-blocking subassembly of decontaminating, the anti-blocking subassembly of decontaminating includes telescopic cylinder, decontaminating push pedal, installing support, shunt tubes, high-pressure shower nozzle, flexible hose and water inlet pipe, the upper surface at the filter screen is slided to the decontaminating push pedal, the high-pressure shower nozzle sets up the lower extreme at the filter screen.
Preferably, the lower surface mounting of the prefabricated pump station of integration is at the upper surface of pump station base, and the left surface mounting of the prefabricated pump station of integration has the inlet tube, the left surface mounting of the prefabricated pump station of integration has the blow off pipe, the blow off pipe sets up the lower extreme at the inlet tube, separate the upper surface at the pump station base is fixed to the backup pad, the last surface mounting of pump station base has the submerged pump group, the outlet pipe is installed to the right side of the prefabricated pump station of integration, pipeline on the submerged pump group is linked together with the outlet pipe.
Preferably, the filter screen is arranged obliquely downwards from left to right, and the right side surface of the filter screen is fixed at the upper end of the left side surface of the separation supporting plate.
Preferably, the upper surface mounting of water conservancy diversion baffle is in the lower surface left end portion of filter screen, and the lower surface mounting of water conservancy diversion baffle is in the upper surface right-hand member portion of water conservancy diversion frame, the drain has been seted up to the left surface of the prefabricated pump station of integration, the water conservancy diversion frame is linked together with the blow off pipe through the drain.
Preferably, the telescopic cylinder is installed on the upper end of the right side face of the separation supporting plate, the output end of the telescopic cylinder is arranged towards the left, the telescopic cylinder is parallel to the filter screen, the right side face of the trash cleaning push plate is installed on the left side face of the output end of the telescopic cylinder, and the trash cleaning push plate slides along the upper surface of the filter screen.
Preferably, the installing support is U type structure setting, the lower surface at the installing support is fixed to the shunt tubes, high pressure shower nozzle is provided with a plurality of, and a plurality of high pressure shower nozzle is linear array setting, high pressure shower nozzle's output sets up, and high pressure shower nozzle's input is connected at the delivery port surface of shunt tubes.
Preferably, the upper surface of the telescopic hose is arranged on the surface of the water inlet of the shunt pipe, the lower surface of the telescopic hose is arranged on the left side surface of the water inlet pipe, the right side surface of the separation supporting plate is fixed with a fixing plate, and the water inlet pipe is fixed on the surface of the fixing plate.
The utility model has the technical effects and advantages that:
1. through setting up filtering blowdown subassembly, domestic sewage gets into the prefabricated pump station of integration through the inlet tube, filters domestic sewage through the filter screen, and the sewage after filtering is stored in the prefabricated pump station of integration, and the mud after filtering is piled up on the surface of filter screen, stretches and adjusts flexible cylinder and opens high-pressure shower nozzle, and flexible cylinder drives the push pedal of decontaminating and slides along the filter screen surface, makes the mud on filter screen surface drop along the baffle surface of water conservancy diversion, finally discharges to the external world by the blow off pipe after water conservancy diversion frame water conservancy diversion, realizes handling of mud, avoids the jam, and blowdown function is good;
2. through setting up the anti-blocking subassembly of decontaminating, at the clearance mud in-process, go into the water pipe and draw the prefabricated pump station of integration in water and by flexible hose leading-in shunt tubes, spray to the bottom of filter screen by high pressure shower nozzle finally, upwards dash out the mud that blocks up in the filter screen, improve the water transmission rate of filter screen, improve the work efficiency of the prefabricated pump station of integration then, excellent in use effect is fit for promoting.
Drawings
FIG. 1 is a schematic view of an unblocked integrated prefabricated pump station according to the present utility model.
FIG. 2 is a schematic view of the connection structure of the filtering and draining assembly of the present utility model.
FIG. 3 is a schematic view of the filter drain assembly of the present utility model.
Fig. 4 is a schematic structural diagram of the dirt-cleaning anti-blocking assembly of the present utility model.
In the figure: 1. an integrated prefabricated pump station; 2. a pump station base; 3. a water inlet pipe; 4. a filtering and sewage discharging assembly; 401. a filter screen; 402. a flow guiding baffle; 403. a flow guiding frame; 5. a blow-down pipe; 6. a partition support plate; 7. a submersible pump unit; 8. the dirt-cleaning anti-blocking component; 801. a telescopic cylinder; 802. a cleaning push plate; 803. a mounting bracket; 804. a shunt; 805. a high pressure nozzle; 806. a flexible hose; 807. a water inlet pipe; 9. a fixing plate; 10. and a water outlet pipe.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
The utility model provides an unblocked integrated prefabricated pump station as shown in fig. 1-4, which comprises an integrated prefabricated pump station 1, wherein the lower surface of the integrated prefabricated pump station 1 is arranged on the upper surface of a pump station base 2, the left side surface of the integrated prefabricated pump station 1 is provided with a water inlet pipe 3, the inside of the integrated prefabricated pump station 1 is provided with a filtering and draining assembly 4, the filtering and draining assembly 4 comprises a filter screen 401, a flow guide baffle 402 and a flow guide frame 403, the filter screen 401 is obliquely arranged from left to right, the right side surface of the filter screen 401 is fixed at the upper end of the left side surface of a separation support plate 6, domestic sewage enters the integrated prefabricated pump station 1 through the water inlet pipe 3, the domestic sewage is filtered through the filter screen 401, the filtered sewage is stored in the integrated prefabricated pump station 1, the filtered sludge is accumulated on the surface of the filter screen 401, the left side surface of the integrated prefabricated pump station 1 is provided with a drain pipe 5, the upper surface of the flow guide baffle 402 is arranged at the left end of the lower surface of the water inlet pipe 3, the lower surface of the flow guide baffle 402 is arranged at the left end of the lower surface of the flow guide frame 403, the lower surface of the flow guide baffle 402 is arranged at the right end of the upper surface of the flow guide frame 403, the left surface of the flow guide frame 403 is quickly discharged from the left side surface of the integrated prefabricated pump station 1 to the sewage through the flow guide frame 403, and the sewage is quickly discharged to the drain through the drain pipe 5, and the drain pipe is discharged outside through the flow guide frame, which is arranged on the left surface of the flow guide frame, and the drain is quickly is arranged on the left surface of the drain surface of the filter screen is arranged on the surface of the side surface of the drain surface.
The surface of filtering blowdown subassembly 4 is provided with separates backup pad 6, separate backup pad 6 and fix the upper surface at pump station base 2, pump station base 2's upper surface mounting has submerged pump group 7, separate backup pad 6's surface and be provided with the anti-clogging subassembly 8 of decontaminating, the anti-clogging subassembly 8 of decontaminating includes flexible cylinder 801, the push pedal 802 of decontaminating, installing support 803, shunt tubes 804, high-pressure nozzle 805, flexible hose 806 and water inlet pipe 807, flexible cylinder 801 installs the right flank upper end at separate backup pad 6, and flexible cylinder 801's output sets up towards the left side, flexible cylinder 801 keeps parallelism with filter screen 401, the right flank of push pedal 802 of decontaminating is installed in flexible cylinder 801's output left surface, the push pedal 802 of decontaminating slides along filter screen 401's upper surface, during the blowdown, stretch adjusting flexible cylinder 801 and open high-pressure nozzle 805, flexible cylinder 801 drives the push pedal 802 of decontaminating and slides along filter screen 401 surface, make the mud on filter screen 401 surface drop along the baffle 402 surface, realize the clearance to mud of blocking up, the blowdown function is good.
The cleaning push plate 802 slides on the upper surface of the filter screen 401, the high-pressure spray head 805 is arranged at the lower end of the filter screen 401, the water outlet pipe 10 is arranged on the right side surface of the integrated prefabricated pump station 1, a pipeline on the submersible pump set 7 is communicated with the water outlet pipe 10, the mounting bracket 803 is in a U-shaped structure, the shunt pipes 804 are fixed on the lower surface of the mounting bracket 803, the high-pressure spray heads 805 are provided with a plurality of high-pressure spray heads 805, the high-pressure spray heads 805 are arranged in a linear array, the output ends of the high-pressure spray heads 805 face upwards, the input ends of the high-pressure spray heads 805 are connected to the water outlet surface of the shunt pipes 804, in the sludge cleaning process, the water inlet pipe 807 pumps water in the integrated prefabricated pump station 1 and is led into the shunt pipes 804 through the flexible hoses 806, finally the high-pressure spray heads 805 spray the bottom of the filter screen 401, the sludge blocked in the filter screen 401 is upwards washed out, the water transmission rate of the filter screen 401 is improved, and the working efficiency of the integrated prefabricated pump station 1 is improved.
The upper surface mounting of flexible hose 806 is at the water inlet surface of shunt tubes 804, and the lower surface mounting of flexible hose 806 is in the left surface of water inlet pipe 807, and the right side of separation backup pad 6 is fixed with fixed plate 9, and water inlet pipe 807 is fixed on the surface of fixed plate 9, and in the in-process that high pressure shower nozzle 805 removed, because of flexible hose 806 is flexible characteristic, makes the hydroenergy spout through high pressure shower nozzle 805 smoothly, realizes the washing to filter screen 401.
Working principle: when the device is used, domestic sewage enters the integrated prefabricated pump station 1 through the water inlet pipe 3, domestic sewage is filtered through the filter screen 401, filtered sewage is stored in the integrated prefabricated pump station 1, filtered sludge is accumulated on the surface of the filter screen 401, the telescopic cylinder 801 is stretched and adjusted, the high-pressure spray head 805 is opened, the telescopic cylinder 801 drives the cleaning push plate 802 to slide along the surface of the filter screen 401, the sludge on the surface of the filter screen 401 falls along the surface of the guide baffle 402, finally, the sludge is guided by the guide frame 403 and then discharged to the outside through the blow-off pipe 5, the sludge treatment is realized, the blockage is avoided, the blow-off function is good, in the sludge cleaning process, the water pipe 807 extracts water in the integrated prefabricated pump station 1 and is led into the shunt pipe 804 through the telescopic hose 806, finally, the high-pressure spray head 805 sprays the sludge blocked in the filter screen 401 upwards, the water transmission rate of the filter screen 401 is improved, the working efficiency of the integrated prefabricated pump station 1 is further improved, the use effect is good, and the device is suitable for popularization.

Claims (7)

1. The utility model provides a prefabricated pump station of integration that does not block up, includes prefabricated pump station (1) of integration, its characterized in that: the inside of prefabricated pump station (1) of integration is provided with filters blowdown subassembly (4), filter blowdown subassembly (4) including filter screen (401), guide baffle (402) and water conservancy diversion frame (403), the surface of filtering blowdown subassembly (4) is provided with separates backup pad (6), the surface of separating backup pad (6) is provided with the anti-blocking subassembly (8) of decontaminating, the anti-blocking subassembly (8) of decontaminating includes telescopic cylinder (801), decontaminating push pedal (802), installing support (803), shunt tubes (804), high-pressure shower nozzle (805), flexible hose (806) and water inlet pipe (807), the upper surface at filter screen (401) is slided in decontaminating push pedal (802), high-pressure shower nozzle (805) set up the lower extreme at filter screen (401).
2. An unblocked integrated prefabricated pump station according to claim 1, wherein: the utility model discloses a pump station, including pump station base (2), pump station base (2) and integrated prefabricated pump station, lower surface mounting of integrated prefabricated pump station (1) is at the upper surface of pump station base (2), and the left surface mounting of integrated prefabricated pump station (1) has inlet tube (3), the left surface mounting of integrated prefabricated pump station (1) has blow off pipe (5), blow off pipe (5) set up the lower extreme at inlet tube (3), separate backup pad (6) and fix the upper surface at pump station base (2), the upper surface mounting of pump station base (2) has submerged pump group (7), outlet pipe (10) are installed to the right flank of integrated prefabricated pump station (1), pipeline on submerged pump group (7) is linked together with outlet pipe (10).
3. An unblocked integrated prefabricated pump station according to claim 1, wherein: the filter screen (401) is obliquely arranged from left to right downwards, and the right side surface of the filter screen (401) is fixed at the upper end of the left side surface of the separation supporting plate (6).
4. An unblocked integrated prefabricated pump station according to claim 1, wherein: the upper surface mounting of water conservancy diversion baffle (402) is at the lower surface left end portion of filter screen (401), and the lower surface mounting of water conservancy diversion baffle (402) is at the upper surface right-hand member portion of water conservancy diversion frame (403), the drain has been seted up to the left surface of prefabricated pump station of integration (1), water conservancy diversion frame (403) are linked together with blow off pipe (5) through the drain.
5. An unblocked integrated prefabricated pump station according to claim 1, wherein: the telescopic cylinder (801) is arranged at the upper end of the right side face of the separation supporting plate (6), the output end of the telescopic cylinder (801) is arranged leftwards, the telescopic cylinder (801) is parallel to the filter screen (401), the right side face of the dirt cleaning push plate (802) is arranged at the left side face of the output end of the telescopic cylinder (801), and the dirt cleaning push plate (802) slides along the upper surface of the filter screen (401).
6. An unblocked integrated prefabricated pump station according to claim 1, wherein: the installation support (803) is U type structure setting, the lower surface at installation support (803) is fixed to shunt tubes (804), high-pressure shower nozzle (805) are provided with a plurality of, and a plurality of high-pressure shower nozzle (805) are linear array setting, the output of high-pressure shower nozzle (805) sets up, and the delivery port surface at shunt tubes (804) is connected to the input of high-pressure shower nozzle (805).
7. An unblocked integrated prefabricated pump station according to claim 1, wherein: the upper surface mounting of flexible hose (806) is at the water inlet surface of shunt tubes (804), and the lower surface mounting of flexible hose (806) is in the left surface of water inlet pipe (807), the right flank of separating backup pad (6) is fixed with fixed plate (9), the surface at fixed plate (9) is fixed to water inlet pipe (807).
CN202320658359.2U 2023-03-29 2023-03-29 Non-blocking integrated prefabricated pump station Active CN219671608U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320658359.2U CN219671608U (en) 2023-03-29 2023-03-29 Non-blocking integrated prefabricated pump station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320658359.2U CN219671608U (en) 2023-03-29 2023-03-29 Non-blocking integrated prefabricated pump station

Publications (1)

Publication Number Publication Date
CN219671608U true CN219671608U (en) 2023-09-12

Family

ID=87922407

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320658359.2U Active CN219671608U (en) 2023-03-29 2023-03-29 Non-blocking integrated prefabricated pump station

Country Status (1)

Country Link
CN (1) CN219671608U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117189693A (en) * 2023-10-10 2023-12-08 扬州工业职业技术学院 Anti-blocking device of booster pump

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117189693A (en) * 2023-10-10 2023-12-08 扬州工业职业技术学院 Anti-blocking device of booster pump
CN117189693B (en) * 2023-10-10 2024-04-16 扬州工业职业技术学院 Anti-blocking device of booster pump

Similar Documents

Publication Publication Date Title
CN219671608U (en) Non-blocking integrated prefabricated pump station
CN111001222A (en) Construction site rain and sewage recycling system and using method thereof
CN211836713U (en) Water supply and drainage device for environmental engineering
CN113387414A (en) Building site machineshop car self-cleaning spray set
CN210086349U (en) Sponge urban rainwater collection system
CN110723866A (en) Landfill leachate high efficiency anaerobic reactor device
CN112282016B (en) Municipal administration sewage drainage structures, drainage pipe network and drainage system
CN210152911U (en) Slurry pump system
CN212200706U (en) Factory rainwater recycling mechanism
CN207928818U (en) A kind of intelligentized anti-clogging device for discharging sludge
CN108178380A (en) Rush version water circulation recycling system
CN208747857U (en) A kind of construction site waste water, rainwater cyclic utilization system
CN110981019A (en) Community sewage discharge device based on sewage treatment
CN219231587U (en) Filter equipment for construction water supply and drainage engineering
CN220888912U (en) Wisdom vatch basin
CN215627435U (en) High-efficient sewage treatment device
CN110282794B (en) Rainwater collecting and treating system and rainwater treating method thereof
CN220928159U (en) Prevent accumulational prefabricated pump station of silt
CN113018968B (en) Efficient and environment-friendly sewage sedimentation tank
CN217352776U (en) Water recycling system for construction site
CN221399191U (en) Novel pressure-superposed water supply unit
CN216664401U (en) Municipal administration distribution of rain and sewage device
CN217092487U (en) Sediment gas reflux unit
CN221131224U (en) Pipeline self-cleaning filter with water filtering circulation function
CN214019653U (en) Rural distributed glass fiber reinforced plastic integrated sewage treatment system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant