CN219652530U - Steel construction stand hoisting device - Google Patents

Steel construction stand hoisting device Download PDF

Info

Publication number
CN219652530U
CN219652530U CN202320527787.1U CN202320527787U CN219652530U CN 219652530 U CN219652530 U CN 219652530U CN 202320527787 U CN202320527787 U CN 202320527787U CN 219652530 U CN219652530 U CN 219652530U
Authority
CN
China
Prior art keywords
lifting
mounting plate
swivel
rods
steel structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320527787.1U
Other languages
Chinese (zh)
Inventor
蒋旭
张紫阳
韩正龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Industrial and Energy Engineering Group Co Ltd
Original Assignee
China Construction Industrial and Energy Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Industrial and Energy Engineering Group Co Ltd filed Critical China Construction Industrial and Energy Engineering Group Co Ltd
Priority to CN202320527787.1U priority Critical patent/CN219652530U/en
Application granted granted Critical
Publication of CN219652530U publication Critical patent/CN219652530U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model belongs to the technical field of steel structure upright posts, in particular to a steel structure upright post lifting device which comprises a hanging beam body, wherein a mounting plate is arranged on the hanging beam body, a swivel is connected to the mounting plate through bearing seat rotation, two sides of the swivel are respectively connected with a second storage rod through bearing seat rotation, two second storage rods are respectively connected with a second connecting rope in a winding manner, a clamping assembly is arranged between movable ends of the two second connecting ropes, and a lifting assembly is arranged on the mounting plate and positioned on the inner side of the swivel.

Description

Steel construction stand hoisting device
Technical Field
The utility model relates to the technical field of steel structure upright posts, in particular to a steel structure upright post lifting device.
Background
The steel structure upright post is a structure formed by steel materials, the upright post is generally I-steel, square steel pipes, round steel pipes, channel steel and the like, is one of main building structure types, and because the upright post is heavy, lifting devices such as a crane and the like are required to be used for vertically lifting the upright post and transporting the upright post to a designated position for installation, the current crane mainly utilizes a lifting rope to lift the end part of the upright post, and can not accurately grasp the gravity center position of the upright post, so that the lifting process of the upright post can be inclined, and the upright post can shake and rotate in the air, so that the stable installation of the upright post and the stability of a fixed structure of the lifting upright post can be influenced, thereby loosening of the fixed structure can occur, and potential safety hazards exist.
Disclosure of Invention
(one) solving the technical problems
Aiming at the defects of the prior art, the utility model provides a steel structure upright post lifting device, which solves the problem of poor stability of the existing steel structure upright post lifting device.
(II) technical scheme
The utility model adopts the following technical scheme for realizing the purposes:
the utility model provides a steel construction stand hoisting device, includes the hanging beam body, be provided with the mounting panel on the hanging beam body, it is connected with the swivel to rotate through the bearing frame on the mounting panel, the both sides of swivel all are connected with the second through the bearing frame rotation and accomodate the pole, two all twine on the second accomodate the pole and be connected with the second and connect the rope, two be provided with the clamping assembly between the rope expansion end is connected to the second, just be located the swivel inboard on the mounting panel and be provided with lifting assembly.
Further, the clamping assembly comprises two clamping plates, two fixing rods and two threaded rods, wherein the two fixing rods and the two threaded rods are respectively arranged on the two clamping plates, the threaded rods are in threaded connection with thread grooves formed in the end parts of the fixing rods, and one sides of the two clamping plates are respectively fixedly connected with movable ends of two second connecting ropes.
Further, the lifting assembly comprises a first storage rod and a lifting rope, one end of the lifting rope is wound and connected onto the first storage rod, the first storage rod is rotationally connected onto the mounting plate through a bearing seat, a second connecting piece is rotationally connected onto a first connecting piece arranged at the other end of the lifting rope through the bearing seat, a first connecting rope is fixedly connected onto the second connecting piece, and a lifting hook is arranged at the end part of the first connecting rope.
Further, two first servo motors which drive the two second storage rods to rotate are arranged on the swivel respectively, second servo motors which drive the first storage rods to rotate are arranged on the mounting plate, and third servo motors which drive the swivel to rotate are arranged on the hanging beam body.
Further, a through type chute is formed in the hanging beam body, the mounting plate is slidably connected in the chute, and a driving assembly for driving the mounting plate to slide in the chute is arranged in the hanging beam body.
(III) beneficial effects
Compared with the prior art, the utility model provides a steel structure upright post lifting device, which comprises the following components
The beneficial effects are that:
according to the utility model, the two first connecting ropes capable of balancing the steel structure upright post are arranged in the crane, so that the steel structure upright post can be stably lifted, and the steel structure upright post is prevented from rotating and tilting in high altitude, so that the stability of the steel structure upright post lifting device can be effectively improved, and meanwhile, the inclination angle of the steel structure upright post can be adjusted, so that the applicability and practicability of the steel structure upright post lifting device are effectively improved.
Drawings
FIG. 1 is a perspective view of the whole of the present utility model;
FIG. 2 is a perspective view of a swivel of the present utility model;
fig. 3 is a schematic perspective view of the fitting of the swivel and mounting plate of the utility model.
In the figure: 1. a hanging beam body; 2. a mounting plate; 3. a first receiving bar; 4. a swivel; 5. a hanging rope; 6. a first connecting rope; 7. a lifting hook; 8. a fixed rod; 9. a threaded rod; 10. a second connecting rope; 11. a clamping plate; 12. and a second storage rod.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Examples
As shown in fig. 1 to 3, the steel structure upright post lifting device provided by one embodiment of the utility model comprises a hanging beam body 1, wherein a mounting plate 2 is arranged on the hanging beam body 1, a swivel 4 is rotatably connected to the mounting plate 2 through a bearing seat, two sides of the swivel 4 are rotatably connected with second storage rods 12 through bearing seats, second connecting ropes 10 are respectively wound and connected on the two second storage rods 12, a clamping assembly is arranged between movable ends of the two second connecting ropes 10, and a lifting assembly is arranged on the mounting plate 2 and positioned on the inner side of the swivel 4;
the hanging beam body 1 is arranged on a vertical supporting arm of the crane and is mutually vertical to the supporting arm, wherein the hanging beam body 1, the crane and the supporting arm are of the prior art, the concrete structure and the using mode are not described, a steel structure upright post is vertically hung by utilizing a lifting component, then the end parts of two second connecting ropes 10 are fixed on the steel structure upright post by utilizing a clamping component, the two second connecting ropes 10 and the mounting plate 2 form a triangle shape, then one second connecting rope 10 is accommodated by utilizing a second accommodating rod 12 according to the tilting direction of the steel structure upright post, and the other second accommodating rod 12 is responsible for releasing the other second connecting rope 10, so that the tilting mode of the steel structure upright post can be slightly adjusted to be aligned;
wherein, through rotating swivel 4, the installation angle of steel construction stand can be adjusted.
As shown in fig. 1, in some embodiments, the clamping assembly includes two clamping plates 11, two fixing rods 8 and two threaded rods 9 respectively arranged on the two clamping plates 11, the threaded rods 9 are in threaded connection with thread grooves formed at the ends of the fixing rods 8, and one sides of the two clamping plates 11 are respectively and fixedly connected with movable ends of two second connecting ropes 10;
the fixed rod 8 is rotationally connected in a rotating opening formed in one clamping plate 11 through a bearing seat, and one end of the threaded rod 9 is directly and fixedly connected to the other clamping plate 11;
the two clamping plates 11 are respectively abutted against the two sides of the steel structure upright post, and then the two fixing rods 8 are rotated, so that the fixing rods 8 and the threaded rods 9 are matched with each other, and the two clamping plates 11 are mutually close to or far away from each other, so that the clamping assembly can be fixed on the steel structure upright post.
As shown in fig. 1, in some embodiments, the lifting assembly includes a first storage rod 3 and a lifting rope 5, one end of the lifting rope 5 is wound and connected on the first storage rod 3, the first storage rod 3 is rotatably connected on the mounting plate 2 through a bearing seat, a first connecting piece arranged at the other end of the lifting rope 5 is rotatably connected with a second connecting piece through the bearing seat, a first connecting rope 6 is fixedly connected on the second connecting piece, and a lifting hook 7 is arranged at the end part of the first connecting rope 6;
hanging or tying the steel structure upright post on the lifting hook 7 or the lifting rope 5; the various structures in the lifting assembly are prior art and are not specifically described.
As shown in fig. 1, in some embodiments, two first servomotors driving the two second storage rods 12 to rotate are provided on the swivel 4, a second servomotor driving the first storage rod 3 to rotate is provided on the mounting plate 2, and a third servomotor driving the swivel 4 to rotate is provided on the hanging beam body 1;
the third servo motor, the second servo motor and the first servo motor are all electrically connected with a control panel in the crane, the third servo motor, the second servo motor and the first servo motor can be started and stopped or rotate positively and negatively through the control panel, the third servo motor, the second servo motor, the first servo motor and the control panel are important components in the crane and are all actually existing in the prior art, and specific description is omitted.
As shown in fig. 1, in some embodiments, a through-type chute is formed on a hanging beam body 1, a mounting plate 2 is slidably connected in the chute, and a driving assembly for driving the mounting plate 2 to slide in the chute is arranged in the hanging beam body 1;
the driving assembly can be a driving device such as a hydraulic cylinder or a motor, and is mainly used for driving the mounting plate 2 to move on the arc groove, and the structure is also in the prior art and is not specifically described.
Finally, it should be noted that: the above is only a preferred embodiment of the present utility model, and the present utility model is not limited thereto, but it is to be understood that the present utility model is described in detail with reference to the foregoing embodiments, and modifications and equivalents of some of the technical features described in the foregoing embodiments may be made by those skilled in the art. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present utility model should be included in the protection scope of the present utility model.

Claims (5)

1. The utility model provides a steel construction stand hoisting device, includes hanging beam body (1), its characterized in that: the lifting beam is characterized in that a mounting plate (2) is arranged on the lifting beam body (1), a swivel (4) is rotationally connected to the mounting plate (2) through a bearing seat, second storage rods (12) are rotationally connected to two sides of the swivel (4) through bearing seats, second connection ropes (10) are wound on the second storage rods (12), clamping assemblies are arranged between movable ends of the second connection ropes (10), and lifting assemblies are arranged on the mounting plate (2) and located on the inner sides of the swivel (4).
2. The steel structure column lifting device according to claim 1, wherein: the clamping assembly comprises two clamping plates (11), and two fixing rods (8) and two threaded rods (9) which are respectively arranged on the two clamping plates (11), wherein the threaded rods (9) are in threaded connection with threaded grooves formed in the end parts of the fixing rods (8), and one sides of the two clamping plates (11) are respectively fixedly connected with movable ends of two second connecting ropes (10).
3. The steel structure column lifting device according to claim 1, wherein: the lifting assembly comprises a first storage rod (3) and a lifting rope (5), one end of the lifting rope (5) is wound and connected onto the first storage rod (3), the first storage rod (3) is rotationally connected onto the mounting plate (2) through a bearing seat, a second connecting piece is rotationally connected onto a first connecting piece arranged at the other end of the lifting rope (5) through the bearing seat, a first connecting rope (6) is fixedly connected onto the second connecting piece, and a lifting hook (7) is arranged at the end part of the first connecting rope (6).
4. A steel structure column lifting device according to claim 3, characterized in that: two first servo motors which drive the two second storage rods (12) to rotate respectively are arranged on the swivel (4), second servo motors which drive the first storage rods (3) to rotate are arranged on the mounting plate (2), and third servo motors which drive the swivel (4) to rotate are arranged on the hanging beam body (1).
5. The steel structure column lifting device according to claim 1, wherein: the lifting beam is characterized in that a through type chute is formed in the lifting beam body (1), the mounting plate (2) is slidably connected in the chute, and a driving assembly for driving the mounting plate (2) to slide in the chute is arranged in the lifting beam body (1).
CN202320527787.1U 2023-03-17 2023-03-17 Steel construction stand hoisting device Active CN219652530U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320527787.1U CN219652530U (en) 2023-03-17 2023-03-17 Steel construction stand hoisting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320527787.1U CN219652530U (en) 2023-03-17 2023-03-17 Steel construction stand hoisting device

Publications (1)

Publication Number Publication Date
CN219652530U true CN219652530U (en) 2023-09-08

Family

ID=87854797

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320527787.1U Active CN219652530U (en) 2023-03-17 2023-03-17 Steel construction stand hoisting device

Country Status (1)

Country Link
CN (1) CN219652530U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117682421A (en) * 2024-02-04 2024-03-12 河南斯玛特起重机有限公司 Hoist tilting prevention device of crane

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117682421A (en) * 2024-02-04 2024-03-12 河南斯玛特起重机有限公司 Hoist tilting prevention device of crane
CN117682421B (en) * 2024-02-04 2024-04-30 河南斯玛特起重机有限公司 Hoist tilting prevention device of crane

Similar Documents

Publication Publication Date Title
CN219652530U (en) Steel construction stand hoisting device
CN211813021U (en) High-precision crane hoisting mechanism
CN111792519A (en) Bridge pier hoisting machine for constructing large sea-crossing bridge
CN116654795B (en) Component lifting device for steel structure factory building assembly
CN213651652U (en) Overturning and positioning device for bridge pier stud
CN209602047U (en) A kind of prefabricated component rollover stand
CN108678395B (en) Fixing device of hoisting type building supporting device
CN110359757A (en) A kind of mechanical upender of cement electric power bar
CN214890069U (en) Fixing device for traffic monitoring camera
CN113668937B (en) Waist ring device and lifting system for inner suspension holding rod hoisting tower set
CN214456153U (en) Balance beam device for hoisting iron core
CN110040618B (en) Wall-hanging equipment fixing frock
CN108678396B (en) Base structure of hoisting type building supporting device
CN206857955U (en) Brake type sling upper rack and crane
KR20120002917U (en) Turning Supporter for H-beam Provisional Welding
CN220679889U (en) Welding turnover device for lithium ion battery
CN110329897B (en) High-strength lifting buckle for airport runway
CN216549312U (en) Aerial work platform with lifting winch
CN112320619B (en) Overturning and positioning device for bridge pier
CN211338613U (en) Crane auxiliary arm mounting equipment
CN217600259U (en) Counterweight device for crane
CN217708633U (en) Mounting tool for mounting large-diameter spiral steel pipe
CN219652473U (en) Can realize stabilizing girder steel hoist device
CN216074801U (en) Continuous beam pier top temporary support dismantling device
CN217684828U (en) High-pole lamp mounting tool

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant