CN219621616U - Auxiliary device for installing bent cap hoop - Google Patents

Auxiliary device for installing bent cap hoop Download PDF

Info

Publication number
CN219621616U
CN219621616U CN202320576048.1U CN202320576048U CN219621616U CN 219621616 U CN219621616 U CN 219621616U CN 202320576048 U CN202320576048 U CN 202320576048U CN 219621616 U CN219621616 U CN 219621616U
Authority
CN
China
Prior art keywords
auxiliary device
hanging rod
bent cap
operation platform
platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320576048.1U
Other languages
Chinese (zh)
Inventor
于时振
寿永栋
毛剑
王连波
王特强
卓世杰
吴玉林
王书槐
高玮泽
孟祥博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Road & Bridge Construction Co ltd
Zhejiang Communications Construction Group Co Ltd
Original Assignee
Zhejiang Road & Bridge Construction Co ltd
Zhejiang Communications Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Road & Bridge Construction Co ltd, Zhejiang Communications Construction Group Co Ltd filed Critical Zhejiang Road & Bridge Construction Co ltd
Priority to CN202320576048.1U priority Critical patent/CN219621616U/en
Application granted granted Critical
Publication of CN219621616U publication Critical patent/CN219621616U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model relates to the field of building construction, in particular to a capping beam hoop installation operation auxiliary device. The utility model provides a capping beam hoop installation operation auxiliary device, which comprises an operation platform and a suspension component for erecting the operation platform on the top end of a pier column, wherein an operation hole capable of accommodating the pier column to pass through is formed in the operation platform; the hanging component comprises a horizontal hanging rod which is horizontally arranged and a vertical hanging rod which is arranged at two ends of the horizontal hanging rod and is vertical to the horizontal hanging rod, one end of the vertical hanging rod is connected with the horizontal hanging rod, the other end of the vertical hanging rod is connected with the outer side edge of the operation platform, and the number of the hanging component is two or more than two. The anchor ear fixing device has the advantages that a crane is not needed when the anchor ear is fixed on the pier stud, the structure is simple and stable, the operation is convenient, workers can directly and accurately determine the anchor ear position, and the anchor ear position can be determined better.

Description

Auxiliary device for installing bent cap hoop
Auxiliary device for installing bent cap hoop
Technical Field
The utility model relates to the field of building construction, in particular to a capping beam hoop installation operation auxiliary device.
Background
The bent cap is widely applied to construction of projects such as bridges, roads, rail transit and the like in China, and plays a great role in improving the environmental applicability of traffic projects. Reasonable design and correct construction of the capping beam template and the supporting system are important conditions for constructing the high-quality capping beam. In the bridge engineering construction process, the anchor ear method is adopted to carry out the construction of the bent cap, and a support is not required to be additionally arranged under the normal condition, only the anchor ear is required to be installed on the proper position of the pier stud, then the anchor ear is fully clamped by applying acting force, and after the anchor ear is clamped, larger static friction force can be generated between the anchor ear and the pier stud, so that the dead weight load effect of the bent cap and temporary facilities is overcome. The bent cap hoop method has the advantages of convenience in formwork supporting, short turnover time, strong operability, high safety, no damage to pier column structure and appearance and the like. Therefore, the hoop method is used more in the current construction process of the highway capping beam.
The traditional construction process is to fix the staple bolt about the position of installing the design through the crane cooperation manual work earlier, sets up the jack on the staple bolt and carries out the adjustment of template position, and the jack sets up the bent cap template system, lacks constructor's working space, leads to being inconvenient for installation staple bolt and adjustment staple bolt position for can only adopt the jack of installing on the staple bolt to adjust the elevation of bent cap system, and the jack unstability or inefficacy causes the template system unstability to collapse easily, exists huge security risk.
In order to overcome the defects and problems in the prior art, the utility model patent application with application publication number of CN111593666A discloses a bent cap anchor ear mounting platform and a bent cap anchor ear integral mounting process, wherein the bent cap anchor ear mounting platform comprises: the first anchor ear piece and the second anchor ear piece are used for encircling and fixing the first anchor ear piece and the second anchor ear piece on the pier stud, and are connected through bolts; the first working platform is arranged on the outer side of the first hoop sheet; the second working platform is arranged on the outer side of the second hoop sheet. The capping beam hoop mounting platform can accurately adjust the position of the capping beam hoop after being mounted, and the risk of template collapse caused by instability or failure of the jack is reduced.
However, such a bent cap staple bolt mounting platform still has its drawbacks. In such a mounting platform, the height adjustment of the anchor ear is required to be adjusted by the chain block after suspending the anchor ear body by a crane. In the whole adjustment and installation process, a crane is needed, and the operation is inconvenient. And the chain hoist is the manual adjusting device of chain formula, and both sides all have, are difficult to calibrate the height-adjusting of both sides, easily lead to staple bolt both sides highly unbalanced, and then have the installation problem.
Disclosure of Invention
The utility model aims to solve the defects in the prior art, and provides the capping beam hoop installation operation auxiliary device which does not need a crane when the hoop is fixed on the pier stud, has a simple and stable structure, is convenient to operate, can directly and accurately determine the position of the hoop by workers, and can better determine the position of the hoop.
The utility model provides an auxiliary device for installing a bent cap hoop, which adopts the following technical scheme:
the capping beam hoop installation operation auxiliary device comprises an operation platform and a suspension component for erecting the operation platform on the top end of the pier column, wherein an operation hole capable of accommodating the pier column to pass through is formed in the operation platform; the hanging component comprises a horizontal hanging rod which is horizontally arranged and a vertical hanging rod which is arranged at two ends of the horizontal hanging rod and is vertical to the horizontal hanging rod, one end of the vertical hanging rod is connected with the horizontal hanging rod, the other end of the vertical hanging rod is connected with the outer side edge of the operation platform, and the number of the hanging component is two or more than two.
Through adopting suspension element and operating hole, can make to let the pier stud pass the operating hole on the operation platform, hang it through suspension element and establish on pier stud top for can not need to use the crane in staple bolt installation. After the operation platform is hung on the top end of the pier column through the hanging component, workers operate on the operation platform to mount and fix the anchor ear, the operation effect is more visual and reliable, the height can be adjusted and controlled through the operation of the workers, and the mounting effect is good.
Preferably, the hanging parts are two groups, and the horizontal hanging rods of the two groups of hanging parts are vertically crossed.
Through setting up two sets of suspension element and making mutually perpendicular alternately between its horizontal peg, can be so that when hanging operation platform, operation platform's each side atress is even, and it is effectual to operation platform's suspension, more balanced, reduces its possibility that takes place slope or unstability in operation work progress.
Preferably, the projection of the intersection of the boom is located at the center of the operation hole.
Through the projection that makes the intersection be located the central point of operation hole, can make the device wholly be hung more stable in pier stud top, the device is more symmetrical, and the device each side weight deviation is less, increases the security in the use.
Preferably, the periphery of the outer edge of the working platform is also provided with a foot blocking plate.
Through setting up the fender sole, can increase the workman and carry out the security of installation work on operation platform to can guarantee that each installation component of placing on operation platform does not roll off from the installation platform, improve the construction safety, reduce the possibility of high altitude weighing down the thing.
Preferably, the height of the foot blocking plate is 20-30 cm.
Through setting the height of keeping off the sole to 20~30cm, can realize keeping off the sole and protect workman safety and ensure that the installation component does not roll off from mounting platform's function, and make things convenient for workman's installation operation, save material.
Preferably, guardrails are further arranged around the outer edge of the working platform.
Through setting up the guardrail, can ensure the workman's who carries out the installation operation on the operation platform safety, improve the practicality and the security of device.
Preferably, the height of the guardrail is 1.2-1.5 m.
Through setting the height of guardrail to 1.2~1.5 meters, can ensure workman's safety, save material again, be convenient for construction and workman carry out other engineering operation.
Preferably, an anti-slip steel plate is laid on the surface of the work platform.
By paving the anti-skid steel plate, the safety of workers during operation on the operation platform is further guaranteed. The possibility of slipping accidents of workers caused by accumulation of scraps on the platform or rainy days is reduced.
Preferably, a movable plate which can be opened and closed is also arranged at the inner side edge position of the working platform.
Through setting up the fly leaf that can open and shut, can supply the operator to climb out from here, transfer instrument etc. the use of this device of being convenient for improves the practicality of device. After the access is finished, the movable plate can be buckled, so that the construction operation on the operation platform is not influenced.
Preferably, the distance between the outer side edge of the movable plate and the outer side edge of the working platform is 10 cm to 15cm.
Through limiting the distance between the outer side edge of the movable plate and the outer side edge of the operation platform, the size of the movable plate can be ensured to be enough to support the delivery of the worker and the tool, and the outer side edge of the movable plate is not too close to the outer side edge of the operation platform, so that the edge strength of the operation platform is weakened. The structural strength of the operation platform is guaranteed, and the practicability of the device is improved.
By implementing the technical scheme, the utility model has the following beneficial effects: the device has the advantages of simple use facility, convenient installation, convenient setting, safe use process, flexible tool and personnel transferring during use, and capability of installing and fixing the bent cap anchor ear at an accurate position.
Drawings
In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings that are required in the embodiments or the description of the prior art will be briefly described, it being obvious that the drawings in the following description are only some embodiments of the utility model, and that other drawings may be obtained according to these drawings without inventive effort for a person skilled in the art.
FIG. 1 is a front view of a bent cap anchor ear installation work auxiliary device according to an embodiment of the present utility model;
fig. 2 is a top view of a bent cap hoop installation auxiliary device according to an embodiment of the present utility model.
Wherein: a work platform 1; a hanging member 2; an operation hole 11; a horizontal hanging rod 21; a vertical hanging bar 22; a foot blocking plate 3; a guardrail 4; a movable plate 12.
Detailed Description
The utility model is described in further detail below with reference to the drawings and to specific embodiments.
It should be noted that the following embodiments are only for illustrating the technical solution of the present utility model, and are not limiting; those of ordinary skill in the art will appreciate that: the technical scheme described in the foregoing embodiments can be modified or some technical features thereof can be replaced by equivalents; such modifications and substitutions do not depart from the spirit of the utility model.
Example 1
The embodiment provides a bent cap staple bolt installation operation auxiliary device, and specific structure is as follows:
the device comprises a suspension member 2 and a work platform 1.
The working platform 1 may be any material and shape with a certain supporting force, and in this embodiment, the working platform 1 is a square steel plate. In this embodiment, an anti-slip steel plate is laid on the upper surface of the work platform 1. The center of the working platform 1 is provided with an operation hole 11 through which the pier stud can pass, and in this embodiment, the operation hole 11 is square, so that the pier stud can pass through the operation hole 11. A movable plate 12 which can be opened and closed is arranged on the operation platform 1 along the edge of the operation hole 11, and the movable plate 12 is connected with the operation platform 1 through a rotatable hinge. In this embodiment, there are two movable plates 12, and the two movable plates 12 are symmetrically disposed along the edge of the operation hole 11. Lifting points are distributed on the outer side edge of the working platform 1. In this embodiment, the number of lifting points is four, and there is one center position of each of the four outer edges of the working platform 1.
The suspension member 2 is composed of a horizontal hanger bar 21 in a lateral direction and a vertical hanger bar 22 perpendicular to the horizontal hanger bar 21. In this embodiment, the suspension members 2 are two sets. The vertical hanging bar 22 is installed at the end of the horizontal hanging bar 21. In this embodiment, a reinforcing bracket plate is further provided between the vertical hanger bar 22 and the horizontal hanger bar 21. The other end of the vertical hanging rod 22 is connected with the working platform 1. In this embodiment, the other end of the vertical hanging rod 22 is connected to a lifting point on the outer edge of the work platform 1.
A foot blocking plate 3 is also arranged around the edge of the working platform 1. In this embodiment, the foot guard 3 is 25cm high. The guardrail 4 is also arranged above the foot guard plate 3, and in this embodiment, the height of the guardrail 4 is 1.5m. The guardrail 4 is composed of vertical supports arranged at four corners of the working platform 1 and at least one row of horizontal supports connected with the vertical supports. In this embodiment, the horizontal supports are arranged in two rows, one of which is arranged at the upper end of each vertical support and the other is arranged between the vertical support and the working platform 1.
The guard rail 4 is also provided with a door. Workers can enter and exit the operation platform by opening and closing the door.
When the device is used, the whole device is lifted and placed at the top end of the pier column. The horizontal hanging rod 21 is clamped at the top of the pier by using the reinforcing steel bars extending from the top of the pier, so as to hang the operation platform 1. And then, after the worker opens the door outside the guardrail 4 through the climbing vehicle and enters the working platform 1, the worker carries out hoop installation operation. After the installation, the crane or the climbing car is used for separating the crane or the climbing car respectively.
Example 2
The embodiment provides a bent cap staple bolt installation operation auxiliary device, and specific structure is as follows:
the device comprises a suspension member 2 and a work platform 1.
The working platform 1 may be any material and shape with a certain supporting force, and in this embodiment, the working platform 1 is a circular wood board. In this embodiment, the upper surface of the work platform 1 is provided with a cleat. The center of the working platform 1 is provided with an operation hole 11 capable of accommodating the pier stud to pass through, and in this embodiment, the operation hole 11 is circular matched with the pier stud in size. A movable plate 12 which can be opened and closed is arranged on the operation platform 1 along the edge of the operation hole 11, and the movable plate 12 is connected with the operation platform 1 through a rotatable hinge. In this embodiment, there is a common movable plate 12, and lifting points are distributed on the outer edge of the working platform 1. In this embodiment, there are six lifting points, and one is located at each end of the six bisectors of the work platform 1.
Also comprising a suspension member 2. The suspension member 2 is composed of a horizontal hanger bar 21 in a lateral direction and a vertical hanger bar 22 perpendicular to the horizontal hanger bar 21. In this embodiment, the suspension members 2 are in three groups. The vertical hanging bar 22 is installed at the end of the horizontal hanging bar 21. The other end of the vertical hanging rod 22 is connected with the working platform 1. In this embodiment, the other end of the vertical hanging rod 22 is connected to a lifting point on the outer edge of the work platform 1.
A foot blocking plate 3 is also arranged around the edge of the working platform 1. In this embodiment, the foot guard 3 is 20cm high. The guardrail 4 is also arranged above the foot guard plate 3, and in this embodiment, the height of the guardrail 4 is 1.2m. The guardrail 4 is composed of vertical supports arranged at four corners of the working platform 1 and at least one row of horizontal supports connected with the vertical supports. In this embodiment, the horizontal supports are arranged in a row and are connected to the upper ends of the vertical supports.
The guard rail 4 is also provided with a door. Workers can enter and exit the operation platform by opening and closing the door.
When the device is used, the whole device is lifted and placed at the top end of the pier column. The horizontal hanging rod 21 is clamped at the top of the pier by using the reinforcing steel bars extending from the top of the pier, so as to hang the operation platform 1. And then, after the worker opens the door outside the guardrail 4 through the climbing vehicle and enters the working platform 1, the worker carries out hoop installation operation. After the installation, the crane or the climbing car is used for separating the crane or the climbing car respectively.
The applicant declares that the above is only a specific embodiment of the present utility model, but the scope of the present utility model is not limited thereto, and it should be apparent to those skilled in the art that any changes or substitutions that are easily conceivable within the technical scope of the present utility model disclosed by the present utility model fall within the scope of the present utility model and the disclosure.

Claims (10)

1. The capping beam hoop installation operation auxiliary device is characterized by comprising an operation platform (1) and a suspension component (2) for erecting the operation platform (1) on the top end of a pier column, wherein an operation hole (11) capable of accommodating the pier column to pass through is formed in the operation platform (1); the hanging component (2) comprises a horizontal hanging rod (21) which is horizontally arranged and a vertical hanging rod (22) which is arranged at two ends of the horizontal hanging rod (21) and is vertical to the horizontal hanging rod (21), one end of the vertical hanging rod (22) is connected with the horizontal hanging rod (21), the other end of the vertical hanging rod (22) is connected with the outer side edge of the operation platform (1), and the hanging component (2) is two groups or more than two groups.
2. The bent cap hoop installation operation auxiliary device according to claim 1, wherein the two groups of hanging components (2) are vertically crossed with each other between the horizontal hanging rods (21) of the two groups of hanging components (2).
3. The bent cap hoop installation operation auxiliary device according to claim 2, wherein the projection of the crossing point of the horizontal hanging rod is located at the center of the operation hole (11).
4. The bent cap staple bolt installation operation auxiliary device according to claim 1, wherein the periphery of the outer edge of the operation platform (1) is also provided with a foot blocking plate (3).
5. The auxiliary device for installing the bent cap anchor ear according to claim 4, wherein the height of the foot blocking plate (3) is 20-30 cm.
6. The bent cap staple bolt installation operation auxiliary device according to claim 1, wherein the periphery of the outer edge of the operation platform (1) is also provided with guardrails (4).
7. The bent cap staple bolt installation operation auxiliary device according to claim 6, wherein the height of the guardrail (4) is 1.2-1.5 m.
8. The bent cap hoop installation operation auxiliary device according to claim 1, wherein an anti-skid steel plate is paved on the surface of the operation platform (1).
9. The auxiliary device for installing the bent cap hoop according to claim 1, wherein a movable plate (12) capable of being opened and closed is further arranged on the inner side edge position of the operation platform (1).
10. The bent cap hoop installation operation auxiliary device according to claim 9, wherein the distance between the outer side edge of the movable plate (12) and the outer side edge of the operation platform (1) is 10-15 cm.
CN202320576048.1U 2023-03-22 2023-03-22 Auxiliary device for installing bent cap hoop Active CN219621616U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320576048.1U CN219621616U (en) 2023-03-22 2023-03-22 Auxiliary device for installing bent cap hoop

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320576048.1U CN219621616U (en) 2023-03-22 2023-03-22 Auxiliary device for installing bent cap hoop

Publications (1)

Publication Number Publication Date
CN219621616U true CN219621616U (en) 2023-09-01

Family

ID=87775506

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320576048.1U Active CN219621616U (en) 2023-03-22 2023-03-22 Auxiliary device for installing bent cap hoop

Country Status (1)

Country Link
CN (1) CN219621616U (en)

Similar Documents

Publication Publication Date Title
CN210561849U (en) Height limiting alarm device for highway engineering
CN209942196U (en) Cantilever support system for large-volume concrete structure
CN207159827U (en) No. 1 plate installation and positioning structure in No. 0 block of Wavelike steel webplate bridge
CN219621616U (en) Auxiliary device for installing bent cap hoop
CN110005182A (en) A kind of expanded type construction of lift well operation protective platform
CN107366229A (en) Both a kind of construction method of wired transom pier bent cap
CN209194354U (en) High-altitude long-span binder base-supporting shellfish thunder support construction
CN218405066U (en) Wall-attached device and driving device for creeping formwork
CN111395183A (en) System and method for electric bridge type scaffold platform for double-column pier construction
CN110872063A (en) Self-propelled rail type crane for mounting and dismounting bridge anti-collision guardrail template and construction method
CN208563122U (en) A kind of " walking " Coping Construction job platform
CN109837838A (en) A kind of construction method of steel reinforced concrete box beam
CN216516813U (en) Wall-attached support
CN201649607U (en) Overhung-type outer wall scaffold
EP1854940A1 (en) Scaffolding
CN112726416A (en) Support structure meeting field construction security and construction method
CN111764623A (en) Lower hanging construction platform module of high-altitude large-cantilever steel roof truss and construction method
CN209428961U (en) A kind of steel box-girder installation bracket equipped with safe operation platform
CN113338537A (en) Construction method of ultrahigh large-section concrete frame column
CN206205475U (en) A kind of vertical opening protective device of shear wall structure
CN219527373U (en) Single-column pier bridge maintenance support
CN220666914U (en) Diagonal bracing type climbing formwork
CN220336431U (en) Protective platform opening and closing pavement plate for building construction
NZ336959A (en) Scaffolding
CN219157418U (en) Quick installation operation device of high pier stud reinforcing bar

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant