CN219611296U - Intensive bus duct with installing support - Google Patents
Intensive bus duct with installing support Download PDFInfo
- Publication number
- CN219611296U CN219611296U CN202320641033.9U CN202320641033U CN219611296U CN 219611296 U CN219611296 U CN 219611296U CN 202320641033 U CN202320641033 U CN 202320641033U CN 219611296 U CN219611296 U CN 219611296U
- Authority
- CN
- China
- Prior art keywords
- bus duct
- frame
- plate
- duct body
- connecting rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Installation Of Bus-Bars (AREA)
Abstract
The utility model discloses a dense bus duct with a mounting bracket, which comprises a bus duct body, wherein a first frame and a second frame are respectively arranged at two outer sides of the bus duct body, one ends of the first frame and the second frame, which are close to the bus duct body, are respectively provided with a first supporting plate and a second supporting plate for bearing the bus duct body, a limiting area for fixing the bus duct is formed between the first frame and the second frame, and connecting rods for mounting the bus duct are respectively arranged on the first frame and the second frame. Make the limiting plate rotate, exposed in letting the pole setting insert the draw-in groove in the joint portion to accomplish the fixed after first backup pad and the connection of second backup pad, be connected the connecting rod with external mounting department at last, can install the bus duct body, overall structure is simple, and the bus duct body of mountable equidimension not is more convenient to install.
Description
Technical Field
The utility model belongs to the field of compact bus ducts with mounting brackets.
Background
With the rapid development of cities, high-rise buildings are more and more, the electricity load of the buildings is increased sharply, and the original electric wires and cables are gradually replaced by bus ducts with large capacity, convenient branching, convenient bundling management and the like due to small capacity, inconvenient branching, inconvenient bundling management and the like. The bus duct is widely used for heavy-point projects such as electric power transmission main lines of fire-fighting equipment and main lines of fire-fighting emergency equipment, for example, important projects such as hotels, airports, subways and the like, so that the safety and stability of the bus duct product are of great importance.
At present, in the installation process of the intensive bus duct, the position for placing the bus duct is reserved at the general installation position, but the model of each bus duct is different, and the size of each bus duct is also different, so that the bus duct cannot be installed, and a bracket is needed to be used for installing the bus duct.
Disclosure of Invention
The utility model aims to provide an intensive bus duct with a mounting bracket, so as to solve the problems in the prior art.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides an intensive bus duct with installing support, includes the bus duct body, this external both sides of bus duct are provided with first frame and second frame respectively, first frame and second frame are close to bus duct body one end and are provided with first backup pad and the second backup pad that is used for accepting the bus duct body respectively, form the spacing region that is used for fixed bus duct between first frame and the second frame, and all be provided with the connecting rod that is used for installing the bus duct on first frame and the second frame.
Preferably, the first support plate and the second support plate are respectively provided with a fixing plate, the number of the fixing plates is two, the fixing plates are respectively provided with a second chute, and the connecting rods are fixed in the second chutes through second nuts.
Preferably, a gasket for enhancing the stability of the connecting rod is arranged between the second nut and the fixing plate.
Preferably, the number of the connecting rods is two, a hanging frame is arranged between the two connecting rods, a cavity is formed in the hanging frame, and a first sliding groove for adjusting the distance between the two connecting rods is formed in the cavity.
Preferably, the connecting rod is provided with a first nut for fixing the hanging frame on the connecting rod near the upper end and the lower end of the hanging frame.
Preferably, the side, away from the bus duct body, of the first support plate and the second support plate is provided with a locking assembly for fixing the first support plate and the second support plate after being combined.
Preferably, the locking assembly comprises a rotating rod arranged on the lower surface of the first supporting plate, a buckle plate is arranged on the rotating rod, and a clamping part is arranged on one side, away from the rotating rod, of the buckle plate.
Preferably, the lower surface of the second supporting plate is provided with a vertical rod which is used for being clamped in the clamping part, one end, close to the clamping part, of the buckle plate is provided with a spring column, and the outer side of the spring column is connected with a limiting plate.
The utility model has the technical effects and advantages that: this intensive bus duct with installing support, through measuring the distance between installation department and the bus duct, rotate first nut and second nut, unscrew it, and remove the distance between the hanger bracket and the installation department, make connecting rod and hanger bracket all together with installation department installation, afterwards, according to the size of bus duct body, slide two connecting rods in first spout, drive the removal of fixed plate, thereby the size of spacing region has been changed, make spacing region's size the same with the bus duct body, place the bus duct body in spacing region afterwards, after first backup pad and second backup pad are in the same place, through the bull stick rotation, drive the rotation of buckle, make joint portion towards the pole setting removal, this moment pole setting and limiting plate looks butt, the rotation of spring post, make the limiting plate rotate, expose and let the pole setting insert in the draw-in groove in the joint portion, thereby accomplish the fixed after first backup pad and the second backup pad are connected, finally be connected the connecting rod with outside installation department, can install the bus duct body, the whole structure is simple structure, the bus duct body of different sizes can be installed, it is more convenient to install.
Drawings
FIG. 1 is a schematic overall structure of the present utility model;
FIG. 2 is a schematic structural view of a fixing plate according to the present utility model;
FIG. 3 is a schematic view of the gasket of the present utility model;
FIG. 4 is a schematic view of a first chute according to the present utility model;
fig. 5 is an enlarged schematic view of the structure of fig. 4 a according to the present utility model.
In the figure: 1. a first frame; 2. a first support plate; 3. a second support plate; 4. a second frame; 5. a cavity; 6. a connecting rod; 7. a hanging frame; 8. a first chute; 9. a second chute; 10. a first nut; 11. a second nut; 12. a gasket; 13. a buckle plate; 14. a clamping part; 15. a limiting plate; 16. a spring post; 17. a vertical rod; 18. a rotating rod; 19. a bus duct body; 20. and a fixing plate.
Detailed Description
The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model.
In order to change the size of the limit area according to the size of the bus bar body, the bus bar body is shown in reference to fig. 1, 2 and 3, and comprises a bus bar body 19, a first frame 1 and a second frame 4 are respectively arranged at two outer sides of the bus bar body 19, a first support plate 2 and a second support plate 3 for supporting the bus bar body 19 are respectively arranged at one ends of the first frame 1 and the second frame 4, which are close to the bus bar body 19, a limit area for fixing the bus bar is formed between the first frame 1 and the second frame 4, a connecting rod 6 for installing the bus bar is arranged on each of the first frame 1 and the second frame 4, the first nut 10 and the second nut 11 are rotated to unscrew the bus bar body by measuring the distance between the installation position and the bus bar, the distance between the hanging frame 7 and the installation position is moved, so that the connecting rod 6 and the hanging frame 7 are installed together with the installation position, then according to the size of bus duct body 19, slide two connecting rods 6 in first spout 8, drive the removal of fixed plate 20, thereby change spacing regional size, make spacing regional size the same with bus duct body 19, place bus duct body 19 in spacing regional afterwards, after first backup pad 2 and second backup pad 3 link together, rotate through bull stick 18, drive buckle 13's rotation, make joint portion 14 move towards pole setting 17, pole setting 17 and limiting plate 15 looks butt at this moment, the rotation of spring post 16, make limiting plate 15 rotate, the draw-in groove that lets pole setting 17 insert in joint portion 14, thereby accomplish the fixed after first backup pad 2 and second backup pad 3 are connected, finally be connected connecting rod 6 and external mounting department, can install bus duct body 19.
In order to facilitate the installation of the bus duct body 19 on the outside, referring to fig. 1, 2, 3, 4 and 5, the first support plate 2 and the second support plate 3 are provided with two fixing plates 20, the two fixing plates 20 are provided with two second sliding grooves 9, the connecting rod 6 is fixed in the second sliding grooves 9 through the second nuts 11, and the distance between the bus duct body 19 and the external installation site can be changed by changing the distance between the connecting rod 6 and the second sliding grooves 9. A gasket 12 for enhancing the stability of the connecting rod 6 is arranged between the second nut 11 and the fixing plate 20, and the stability of the first nut 10 after being installed is enhanced through the gasket 12. The number of the connecting rods 6 is two, a hanging frame 7 is arranged between the two connecting rods 6, and the whole can be installed after the connecting rods are installed at the installation position through the hanging frame 7. The cavity 5 is arranged in the suspension bracket 7, the first chute 8 for adjusting the distance between the two connecting rods 6 is arranged in the cavity 5, and the distance between the first frame 1 and the second frame 4 can be changed by changing the distance between the two connecting rods 6 in the first chute 8, so that the size of a limiting area is changed, and the bus duct body 19 is placed in the limiting area. The connecting rod 6 is close to the upper and lower end of mounted frame 7 and all is provided with the first nut 10 that is used for being fixed in mounted frame 7 on connecting rod 6, first backup pad 2 and second backup pad 3 are kept away from bus duct body 19 one side and are provided with the locking subassembly that is used for carrying out fixed with both after combining first backup pad 2 and second backup pad 3, the locking subassembly is including setting up in the bull stick 18 of first backup pad 2 lower surface, be provided with buckle 13 on the bull stick 18, buckle 13 is kept away from bull stick 18 one side and is provided with joint portion 14, second backup pad 3 lower surface is provided with the pole setting 17 that is used for the joint in joint portion 14, buckle 13 is close to joint portion 14 one end and is provided with spring post 16, the spring post 16 outside is connected with limiting plate 15, rotates through the bull stick 18, drives the rotation of buckle 13, makes joint portion 14 towards pole setting 17 and limiting plate 15 looks butt, and the rotation of spring post 16 for limiting plate 15 has been exposed and has been made in the draw-in groove that pole setting 17 inserts joint portion 14.
When the connecting rod fixing device is used, firstly, the distance between the installation position and the bus duct is measured, the first nut 10 and the second nut 11 are unscrewed, the distance between the mounting position and the mounting position of the hanging frame 7 is moved, the connecting rods 6 and the hanging frame 7 are installed together with the installation position, then, according to the size of the bus duct body 19, the two connecting rods 6 slide in the first sliding groove 8 to drive the fixing plate 20 to move, the size of a limiting area is changed, the size of the limiting area is identical with that of the bus duct body 19, then, the bus duct body 19 is placed in the limiting area, after the first supporting plate 2 and the second supporting plate 3 are connected together, the rotating rod 18 rotates to drive the buckling plate 13 to rotate, the clamping part 14 moves towards the vertical rod 17, at the moment, the vertical rod 17 is abutted against the limiting plate 15, the spring column 16 rotates, the limiting plate 15 is exposed, the vertical rod 17 is inserted into the clamping groove in the clamping part 14, the connection of the first supporting plate 2 and the second supporting plate 3 is fixed, and finally, the connecting rod 6 is connected with the external installation position.
Finally, it should be noted that: the foregoing description is only of the preferred embodiments of the utility model and is not intended to limit the utility model.
Claims (8)
1. The utility model provides an intensive bus duct with installing support, its characterized in that, includes bus duct body (19), bus duct body (19) outer both sides are provided with first frame (1) and second frame (4) respectively, first frame (1) and second frame (4) are close to bus duct body (19) one end and are provided with first backup pad (2) and second backup pad (3) that are used for accepting bus duct body (19) respectively, form spacing region that is used for fixed bus duct between first frame (1) and second frame (4), and all be provided with connecting rod (6) that are used for installing bus duct on first frame (1) and second frame (4).
2. An intensive bus duct with mounting brackets as set forth in claim 1, wherein: the novel sliding device is characterized in that fixing plates (20) are arranged on the first supporting plate (2) and the second supporting plate (3), the number of the fixing plates (20) is two, the number of the second sliding grooves (9) are formed in the two fixing plates (20), and the connecting rod (6) is fixed in the second sliding grooves (9) through second nuts (11).
3. An intensive bus duct with mounting brackets as set forth in claim 2, wherein: a gasket (12) for enhancing the stability of the connecting rod (6) is arranged between the second nut (11) and the fixing plate (20).
4. An intensive bus duct with mounting brackets as set forth in claim 1, wherein: the two connecting rods (6) are arranged, a hanging frame (7) is arranged between the two connecting rods (6), a cavity (5) is formed in the hanging frame (7), and a first sliding groove (8) for adjusting the distance between the two connecting rods (6) is formed in the cavity (5).
5. An intensive bus duct with mounting brackets as set forth in claim 4, wherein: the connecting rod (6) is close to the upper end and the lower end of the hanging frame (7) and is provided with a first nut (10) for fixing the hanging frame (7) on the connecting rod (6).
6. An intensive bus duct with mounting brackets as set forth in claim 1, wherein: the bus duct is characterized in that a locking assembly used for fixing the first support plate (2) and the second support plate (3) after being combined is arranged on one side, far away from the bus duct body (19), of the first support plate (2) and the second support plate (3).
7. The compact busway with mounting bracket of claim 6, wherein: the locking assembly comprises a rotating rod (18) arranged on the lower surface of the first supporting plate (2), a buckle plate (13) is arranged on the rotating rod (18), and a clamping part (14) is arranged on one side, away from the rotating rod (18), of the buckle plate (13).
8. The compact busway with mounting bracket of claim 7, wherein: the lower surface of the second supporting plate (3) is provided with a vertical rod (17) which is used for being clamped in the clamping part (14), one end, close to the clamping part (14), of the buckle plate (13) is provided with a spring column (16), and the outer side of the spring column (16) is connected with a limiting plate (15).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320641033.9U CN219611296U (en) | 2023-03-28 | 2023-03-28 | Intensive bus duct with installing support |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320641033.9U CN219611296U (en) | 2023-03-28 | 2023-03-28 | Intensive bus duct with installing support |
Publications (1)
Publication Number | Publication Date |
---|---|
CN219611296U true CN219611296U (en) | 2023-08-29 |
Family
ID=87744527
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202320641033.9U Active CN219611296U (en) | 2023-03-28 | 2023-03-28 | Intensive bus duct with installing support |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN219611296U (en) |
-
2023
- 2023-03-28 CN CN202320641033.9U patent/CN219611296U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN218771219U (en) | Adjustable cable tunnel self-supporting type round tunnel combined support | |
CN219611296U (en) | Intensive bus duct with installing support | |
CN210092810U (en) | Firm supporting structure for cable bus duct bridge | |
CN212412720U (en) | Power transmission and transformation wire clamp | |
CN114784735B (en) | Wire lifting device for electric wires and cables | |
CN217760345U (en) | Charged lead fixed insulation cross arm | |
CN112952708B (en) | Triangle clamping plate type spacing rod for live working | |
CN111864679B (en) | Electric power transmission overhead line cable isolating rod | |
CN210297106U (en) | Cable fixing device that electric power engineering used | |
CN211670473U (en) | Convenient electric class switch board of building that overhauls | |
CN211017750U (en) | Ammeter batch meter installation mechanism | |
CN210224922U (en) | Junction box convenient to maintain for electric power engineering | |
CN207719751U (en) | A kind of rotatable cable bearer | |
CN219287100U (en) | Fixing device for cable installation | |
CN215870371U (en) | Vertical control box for external thread detection equipment | |
CN219801822U (en) | Wire slot fixing support | |
CN215343022U (en) | Floodlighting lightning protection grounding device for building curtain wall | |
CN221408328U (en) | Photovoltaic cable pre-buried equipment | |
CN212810571U (en) | Wedge-shaped splicing fitting capable of being installed quickly | |
CN218124147U (en) | Drainage wire insulating support | |
CN221150814U (en) | Mouth-shaped cable fixing device | |
CN220139210U (en) | Cable tunnel structure for ultrahigh voltage leading | |
CN212392650U (en) | Municipal works interlude cable special stand | |
CN218783531U (en) | Fixing protection device for hanging and installing bus duct | |
CN221810718U (en) | Building platform convenient to extension |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |