CN219530029U - Pipeline construction device - Google Patents

Pipeline construction device Download PDF

Info

Publication number
CN219530029U
CN219530029U CN202320033458.1U CN202320033458U CN219530029U CN 219530029 U CN219530029 U CN 219530029U CN 202320033458 U CN202320033458 U CN 202320033458U CN 219530029 U CN219530029 U CN 219530029U
Authority
CN
China
Prior art keywords
seat
mounting seat
rotating
lower mounting
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320033458.1U
Other languages
Chinese (zh)
Inventor
雷勇春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinyue Construction Engineering Co ltd
Original Assignee
Jinyue Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinyue Construction Engineering Co ltd filed Critical Jinyue Construction Engineering Co ltd
Priority to CN202320033458.1U priority Critical patent/CN219530029U/en
Application granted granted Critical
Publication of CN219530029U publication Critical patent/CN219530029U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model relates to the technical field of pipeline construction, in particular to a pipeline construction device, which comprises an adjusting seat, wherein a lower mounting seat is arranged at the top of the adjusting seat, an upper mounting seat is arranged at the top of the lower mounting seat, a fastening bolt is connected with the top of the upper mounting seat in a threaded manner, a knob is rotationally connected to the front face of the adjusting seat, a bidirectional screw rod is fixedly connected to the rear end of the knob, a threaded sleeve is connected with the periphery of the bidirectional screw rod in a threaded manner, a rotating rod is rotationally connected to the top of the threaded sleeve, a first rotary connecting seat is rotationally connected to the top of the rotating rod, a limiting clamping plate is clamped on one side of the lower mounting seat, a pull rod is slidingly connected to the rear of the limiting clamping plate on the same side of the lower mounting seat, and a connecting block is clamped on the rear end of the bottom of the lower mounting seat. According to the hydraulic pipeline construction device, the height and the inclination angle of the hydraulic pipeline construction device can be adjusted by arranging the adjusting seat, so that the hydraulic pipeline construction device is convenient to adapt to different topography conditions, and the practicability of the device is improved.

Description

Pipeline construction device
Technical Field
The utility model relates to the technical field of pipeline construction, in particular to a pipeline construction device.
Background
The hydraulic engineering is a common name of engineering such as flood control, waterlogging removal, irrigation, power generation, water supply, reclamation, water and soil conservation, immigration, water resource protection and the like and matched and affiliated engineering thereof, is used for controlling and allocating surface water and underground water in the nature, achieves the purpose of removing harm and benefiting, is also called as the water engineering, water is an essential precious resource for human production and life, and only the hydraulic engineering is built to control water flow so as to meet the needs of people's life and production on water resources, and nowadays, a hydraulic pipeline construction device is generally used for connecting a plurality of pipelines so as to finish water transmission operation for long-distance transportation of water flow.
Chinese patent No. CN202111084609.8 discloses a pipe construction device, which includes a base frame and two side frames, the base frame is located between the two side frames, and the base frame is detachably connected with the side frames; a pipeline is arranged between the two side frames, a top frame is arranged at the top of the pipeline, first clamping plates are arranged at the end parts of the two ends of the top frame, and the top frame is placed at the top of the pipeline through the first clamping plate covers; and a clamping device is arranged on the outer side of the side frame. According to the utility model, the inner side surfaces of the underframe, the side frames and the top frame are completely attached to the circumferential side surfaces of the pipeline, so that the fastening effect of the pipeline is ensured, in the assembly process of the construction device, the adaptive underframe is selected according to the pipeline, then the side frames are clamped on the two sides of the underframe, the integrity of the whole construction device is ensured by the top frame, and the stability of the whole construction device in the transportation and placement processes is increased.
However, the installation mechanism is inconvenient to adjust the inclination angle of the construction device according to the terrain and is inconvenient to connect two pipelines in an inclined shape, so that the limitation of the use of the device is larger, and the practicability of the use of the device is affected.
Disclosure of Invention
In view of the above, the present utility model provides a pipe construction device, which mainly solves the technical problems: the height of the construction device cannot be adjusted according to the terrain, and the device cannot be used in uneven terrain conveniently, so that the limitation of the device in use is large, and the practicability of the device in use is affected.
In order to achieve the above purpose, the present utility model adopts the following technical scheme: the utility model provides a pipeline construction device, includes the regulating seat, the regulating seat top is provided with down the mount pad, lower mount pad top is provided with the mount pad, go up mount pad top threaded connection has fastening bolt, regulating seat openly rotates and is connected with the knob, knob rear end fixedly connected with two-way lead screw, two-way lead screw peripheral threaded connection has the thread bush, the thread bush top rotates and is connected with the bull stick, the bull stick top rotates and is connected with first rotation connecting seat, mount pad one side joint has spacing cardboard down, mount pad homonymy is located spacing cardboard rear sliding connection has the pull rod down, mount pad bottom rear end joint has the connecting block down, connecting block bottom and regulating seat top equal fixedly connected with second rotates the connecting seat, two fixedly connected with connecting rod between the second rotation connecting seat, the pulling groove has been seted up to spacing cardboard top one side, the inside storage groove that is located the pull rod periphery of lower mount pad, the fixed orifices has been seted up in the running through in the connecting block both sides, peripheral one side fixedly connected with slide, peripheral fixedly connected with fixed plate of the opposite side, fixedly connected with slide between pull rod and the fixed plate.
Through adopting above-mentioned technical scheme, make things convenient for adjusting device's height and inclination, improved the suitability of device.
As a further description of the above technical solution: the lower mounting seat is fixedly connected with the upper mounting seat through fastening bolts, and anti-slip gaskets are fixedly connected to the inner walls of the lower mounting seat and the upper mounting seat.
By adopting the technical scheme, the catheter is convenient to fix.
As a further description of the above technical solution: the first rotating connecting seat is fixedly connected with the lower mounting seat, and the limiting clamping plate is matched with the first rotating connecting seat in size.
Through adopting above-mentioned technical scheme, conveniently fix and remove fixedly first rotation connecting seat.
As a further description of the above technical solution: the bidirectional screw rod is rotationally connected with the adjusting seat, and two threaded sleeves and two rotating rods are arranged.
By adopting the technical scheme, the first rotary connecting seat is conveniently driven to work.
As a further description of the above technical solution: the pull rod is in a circular arrangement, and the diameter of the pull rod is the same as the inner diameter of the fixing hole.
Through adopting above-mentioned technical scheme, through pull rod cooperation fixed orifices, can fix the connecting block.
As a further description of the above technical solution: the sliding plate is in sliding connection with the storage groove, and the fixed plate is fixedly connected with the lower mounting seat.
Through adopting above-mentioned technical scheme, make things convenient for the pull rod to outwards stimulate, and can fix the connecting block under reset spring's effect.
By means of the technical scheme, the pipeline construction device has the following beneficial effects:
1. compared with the prior art, this pipeline construction device, when two pipelines of connection are the slope form and set up, pull open spacing cardboard through the pulling groove for spacing cardboard and first rotation connecting seat phase separation, the rotation knob drives two-way lead screw and rotates, cooperation bull stick and first rotation connecting seat, simultaneously through second rotation connecting seat and connecting rod, make down the mount pad take place to incline, wait to stop when the mount pad inclines to required angle, can carry out fixed connection to the pipeline of two slope forms at this moment, make things convenient for adjusting device's inclination, thereby the convenience is fixed the pipeline that is the slope form, the suitability of device has been improved.
2. Compared with the prior art, this pipeline construction device, when the topography that fluctuates uses, the pulling pull rod for the pull rod breaks away from with the fixed orifices completely, and the connecting block can break away from with lower mount pad mutually this moment, rotates the knob and drives two screw rod and rotate, drives two thread bush and remove in opposite directions, and the cooperation bull stick can drive down the mount pad and upwards remove, thereby can change this pipeline construction device's height, thereby can guarantee that two pipelines are installed under the horizontality, make the suitability of device stronger.
Drawings
FIG. 1 is a front view of a pipe construction apparatus according to the present utility model;
FIG. 2 is a side cross-sectional view of a pipe construction apparatus according to the present utility model;
FIG. 3 is a schematic view of the first rotatable connection base and the limiting clamping plate in the pipe construction device according to the present utility model;
FIG. 4 is a front cross-sectional view of a pipe construction apparatus according to the present utility model;
fig. 5 is an overall schematic diagram of a connecting block and a pull rod in a pipe construction device according to the present utility model.
Legend description:
1. an adjusting seat; 2. a lower mounting seat; 3. an upper mounting seat; 4. a fastening bolt; 5. a knob; 6. a limiting clamping plate; 7. a pull rod; 8. a two-way screw rod; 9. a thread sleeve; 10. a rotating rod; 11. a first rotary connection base; 12. a connecting block; 13. the second rotary connecting seat; 14. a connecting rod; 15. pulling the groove; 16. a storage groove; 17. a fixing hole; 18. a slide plate; 19. a fixing plate; 20. and a return spring.
Detailed Description
Referring to fig. 1 to 5, the present utility model provides a pipe construction apparatus: including adjusting seat 1, adjusting seat 1 top is provided with down mount pad 2, lower mount pad 2 top is provided with mount pad 3, go up mount pad 3 top threaded connection and have fastening bolt 4, adjusting seat 1 openly rotates and is connected with knob 5, knob 5 rear end fixedly connected with two-way lead screw 8, two-way lead screw 8 peripheral threaded connection has thread bush 9, thread bush 9 top is rotated and is connected with bull stick 10, through knob 5 cooperation two-way lead screw 8 and bull stick 10, can drive first rotation connecting seat 11 work, bull stick 10 top is rotated and is connected with first rotation connecting seat 11, mount pad 2 one side joint has spacing cardboard 6 down, it is convenient to fix first rotation connecting seat 11, lower mount pad 2 homonymy is located spacing cardboard 6 rear sliding connection and has pull rod 7, lower mount pad 2 bottom rear end joint has connecting block 12, connecting block 12 bottom and adjusting seat 1 top equal fixedly connected with second rotation connecting seat 13, fixedly connected with connecting rod 14 between two second rotation connecting seat 13, pulling groove 15 has been seted up to one side of spacing cardboard 6 top, lower mount pad 2 inside is located 7 peripheral and is seted up and is accomodate groove 16, the fixed connection 20 is fixed with the connecting rod 20 through connecting block 19 with the fixed connection 20, the fixed connection 20 is fixed connection with the connecting plate 20 down to the opposite side, the fixed connection 20 is fixed connection 20 with the connecting plate is fixed connection with the connecting plate 20 down.
Wherein, through fastening bolt 4 fixed connection between lower mount pad 2 and the last mount pad 3, equal fixedly connected with anti-skidding gasket on lower mount pad 2 and the last mount pad 3 inner wall, the convenience is fixed the pipe, first rotation connecting seat 11 and lower mount pad 2 fixed connection, spacing cardboard 6 and first rotation connecting seat 11 size phase-match, the convenience is fixed and is removed fixedly first rotation connecting seat 11, two-way lead screw 8 rotates with adjusting seat 1 to be connected, thread bush 9 all is provided with two with bull stick 10, the convenience drives first rotation connecting seat 11 work.
The pull rod 7 is circular setting, and the pull rod 7 diameter is the same with fixed orifices 17 internal diameter size, and through pull rod 7 cooperation fixed orifices 17, can fix connecting block 12, slide 18 and storage tank 16 sliding connection, fixed plate 19 and lower mount pad 2 fixed connection, make things convenient for pull rod 7 outwards to stimulate, and can fix connecting block 12 under reset spring 20's effect.
Working principle: firstly, fix the regulating seat 1 to the assigned position, put two pipelines on the lower mount pad 2, make the interface department of two pipelines be located down mount pad 2, cover mount pad 3, can fix two pipelines through fastening bolt 4, in hydraulic engineering's work progress, can meet uneven topography, when being the high and low topography, pulling rod 7, make pull rod 7 break away from with fixed orifices 17 completely, connecting block 12 can break away from with lower mount pad 2 this moment, rotate knob 5 and drive two-way lead screw 8 rotation, drive two thread bush 9 and move in opposite directions, the cooperation bull stick 10, can drive down mount pad 2 and upwards move, thereby can change the height of this pipeline construction device, thereby can guarantee that two pipelines are installed under the horizontality, make the suitability of device stronger, when two pipelines of connection are the slope form setting, pull spacing cardboard 6 and first rotation connecting seat 11 phase separation through pulling groove 15, it drives two-way lead screw 8 rotation to cooperate saddle 10 and first rotation connecting seat 11, simultaneously make the slope form setting up through the second rotation connecting seat 13 and the connection seat that can be adjusted through the slope, the two pipelines that need to take place under the high demand, the slope 1, the setting up of the device is convenient for the two-way connection seat is realized, the slope condition is realized through the two-down regulating seat is simultaneously, the slope setting up of the connecting seat is convenient to the height of the pipeline.
Finally, it should be noted that: the foregoing description is only illustrative of the preferred embodiments of the present utility model, and although the present utility model has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described, or equivalents may be substituted for elements thereof, and any modifications, equivalents, improvements or changes may be made without departing from the spirit and principles of the present utility model.

Claims (6)

1. The utility model provides a pipeline construction device, includes adjustment seat (1), its characterized in that: the utility model discloses a connecting rod (16) is provided with a connecting rod (16) and is characterized in that a lower mounting seat (2) is arranged at the top of an adjusting seat (1), an upper mounting seat (3) is arranged at the top of the lower mounting seat (2), a fastening bolt (4) is connected to the top of the upper mounting seat (3) in a threaded manner, a knob (5) is connected to the front of the adjusting seat (1) in a rotating manner, a bidirectional screw rod (8) is fixedly connected to the rear end of the knob (5), a threaded sleeve (9) is connected to the periphery of the bidirectional screw rod (8) in a threaded manner, a rotating rod (10) is connected to the top of the threaded sleeve (9) in a rotating manner, a first rotating connecting seat (11) is connected to the top of the rotating rod (10) in a rotating manner, a limiting clamping plate (6) is connected to one side of the lower mounting seat (2) in a clamping manner, a connecting rod (7) is connected to the rear of the lower mounting seat (2) in a sliding manner, a connecting block (12) is connected to the rear end of the bottom of the lower mounting seat (2), a second rotating connecting seat (13) is fixedly connected to the top of the bottom of the adjusting seat (1), a connecting rod (14) is connected to the two second rotating seats (13) in a rotating manner, a connecting rod (16) is connected to the periphery of the connecting rod (16) in a fixed manner between the second rotating seat (13), a connecting rod (16) is connected to the top of the connecting rod (16) in a side, an inner accommodating groove (16), fixing holes (17) are formed in two sides of the connecting block (12) in a penetrating mode, a sliding plate (18) is fixedly connected to one side of the periphery of the pull rod (7), a fixing plate (19) is fixedly connected to the other side of the periphery of the pull rod (7), and a reset spring (20) is fixedly connected between the sliding plate (18) and the fixing plate (19).
2. A pipe construction apparatus according to claim 1, wherein: the lower mounting seat (2) is fixedly connected with the upper mounting seat (3) through a fastening bolt (4), and anti-slip gaskets are fixedly connected on the inner walls of the lower mounting seat (2) and the upper mounting seat (3).
3. A pipe construction apparatus according to claim 1, wherein: the first rotating connecting seat (11) is fixedly connected with the lower mounting seat (2), and the limiting clamping plate (6) is matched with the first rotating connecting seat (11) in size.
4. A pipe construction apparatus according to claim 1, wherein: the bidirectional screw rod (8) is rotationally connected with the adjusting seat (1), and two threaded sleeves (9) and two rotating rods (10) are respectively arranged.
5. A pipe construction apparatus according to claim 1, wherein: the pull rod (7) is circularly arranged, and the diameter of the pull rod (7) is the same as the inner diameter of the fixing hole (17).
6. A pipe construction apparatus according to claim 1, wherein: the sliding plate (18) is in sliding connection with the containing groove (16), and the fixing plate (19) is fixedly connected with the lower mounting seat (2).
CN202320033458.1U 2023-01-06 2023-01-06 Pipeline construction device Active CN219530029U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320033458.1U CN219530029U (en) 2023-01-06 2023-01-06 Pipeline construction device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320033458.1U CN219530029U (en) 2023-01-06 2023-01-06 Pipeline construction device

Publications (1)

Publication Number Publication Date
CN219530029U true CN219530029U (en) 2023-08-15

Family

ID=87587185

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320033458.1U Active CN219530029U (en) 2023-01-06 2023-01-06 Pipeline construction device

Country Status (1)

Country Link
CN (1) CN219530029U (en)

Similar Documents

Publication Publication Date Title
CN111022770A (en) Transportation pipeline supporting device for oil exploitation
CN219530029U (en) Pipeline construction device
CN212656230U (en) Film drum type vibrator for concrete curing
CN208381650U (en) A kind of navel orange plantation long-distance monitorng device
CN213712122U (en) Hydraulic pipeline for hydraulic engineering
CN211287631U (en) Anti-falling device for petroleum wellhead
CN212421053U (en) Welded tube support convenient for height adjustment for welded tube equipment
CN220953205U (en) Water retaining device for hydraulic engineering construction
CN218882504U (en) Screw pump for oil recovery based on geological detection
CN213271357U (en) Hydraulic pipeline supporting and connecting device for hydraulic engineering
CN214784513U (en) Municipal administration road water supply and drainage pipeline
CN214274700U (en) Supporting frame for pipeline arrangement
CN221322365U (en) Anti-blocking valve for petroleum exploitation
CN216715414U (en) Pipeline strutting arrangement suitable for hydraulic engineering construction usefulness
CN218952278U (en) Grouting device
CN216242671U (en) Water conservancy and hydropower engineering's drain pipe reinforcement instrument
CN214946925U (en) Fixing device for pipeline installation of chemical equipment
CN215410536U (en) A water conservancy pipeline supports connection structure for hydraulic engineering
CN214061643U (en) Pipeline supporting construction for city water supply and drainage
CN215673960U (en) Pipeline laying equipment for water conservancy construction
CN219975798U (en) Water supply and drainage anti-seismic structure
CN219753365U (en) Base support structure for secondary water supply tank
CN213712218U (en) Assembled hydraulic engineering uses multi-functional irrigation equipment
CN218348068U (en) Building water supply and drainage pipeline fixing device with adjustable
CN220080556U (en) Siphon rain bucket tail pipe fastening system with good fastening performance

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant