CN214784513U - Municipal administration road water supply and drainage pipeline - Google Patents

Municipal administration road water supply and drainage pipeline Download PDF

Info

Publication number
CN214784513U
CN214784513U CN202120310198.9U CN202120310198U CN214784513U CN 214784513 U CN214784513 U CN 214784513U CN 202120310198 U CN202120310198 U CN 202120310198U CN 214784513 U CN214784513 U CN 214784513U
Authority
CN
China
Prior art keywords
plate
water supply
mounting
fixed plate
drainage pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120310198.9U
Other languages
Chinese (zh)
Inventor
葛从瑞
葛志新
常强
王振海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Xunting Construction Engineering Co ltd
Original Assignee
Jiangsu Xunting Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Xunting Construction Engineering Co ltd filed Critical Jiangsu Xunting Construction Engineering Co ltd
Priority to CN202120310198.9U priority Critical patent/CN214784513U/en
Application granted granted Critical
Publication of CN214784513U publication Critical patent/CN214784513U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The utility model relates to a town road water supply and drainage pipe relates to the field of municipal drainage, and it includes the body, is used for the lower holder and the last holder of centre gripping body, the holder is including the lower plate that is located the body below, install first fixed plate and the second fixed plate at the lower plate both ends respectively down, the mounting hole that extends along vertical direction is all seted up to the up end of first fixed plate and second fixed plate, two all install the lifter in the mounting hole, the lifter is worn to establish the screw rod that just is used for supporting the body in the screw thread section of thick bamboo including rotating the screw thread section of thick bamboo, the screw thread of wearing to establish in the mounting hole, the lower terminal surface of screw rod is less than the minimum of lower plate. This application has the effect that reduces the pipe laying cost.

Description

Municipal administration road water supply and drainage pipeline
Technical Field
The application relates to the field of municipal drainage, in particular to a municipal road water supply and drainage pipeline.
Background
At present, municipal drainage pipes refer to rainwater and sewage pipelines under municipal roads, different pipelines such as electric power, communication, gas, water supply, drainage pipelines and the like are generally arranged according to the current situation of facilities under municipal roads in China, and the drainage pipelines are used for draining rainwater and are called as rainwater pipelines.
The related art can refer to Chinese patent with publication number CN210947089U, which discloses a municipal road water supply and drainage pipeline, the structure of which comprises a first pipe seat, a pressure-resistant layer, a leakage-proof layer, a drainage channel, a second pipe seat, a pipeline main body and equal-height supports, wherein the pipeline main body is provided with the second pipe seat which is hooped integrally, the second pipe seat is extended with the installation radial line of the first pipe seat, the first pipe seat is fixedly arranged on the water inlet wall surface of the pipeline main body, the inner layer of the pipeline main body structure is provided with the pressure-resistant layer, the drainage channel is formed by a pipe cavity which is communicated with the front and the back of the pipeline main body, and the equal-height supports which can contact with the ground are formed on the bottom wall of the pipeline main body.
With respect to the related art in the above, the inventors consider that: in the process of laying the pipeline, need use the bearing board to carry out the bearing to the pipeline, but because the height difference on ground, the height of bearing board is also different, and the pipeline bending amplitude of placing on the bearing board is great for the use length overlength of pipeline, thereby lead to pipeline laying's cost higher.
SUMMERY OF THE UTILITY MODEL
In order to reduce the cost of pipe laying, this application provides a town road water supply and drainage pipe.
The application provides a town road water supply and drainage pipeline adopts following technical scheme:
the utility model provides a town road water supply and drainage pipe, includes the body, is used for the lower holder and the last holder of centre gripping body, the mounting hole that extends along vertical direction is all seted up including the lower plate that is located the body below, installs first fixed plate and the second fixed plate at the lower plate both ends respectively to the holder down, first fixed plate and the up end of second fixed plate, two all install the lift piece in the mounting hole, the screw rod that just is used for supporting the body in the screw thread section of thick bamboo is worn to establish including rotating the screw thread section of thick bamboo, the screw thread of wearing to establish in the mounting hole to the lift piece, the lower terminal surface of screw rod is less than the minimum of lower plate.
By adopting the technical scheme, when the pipe body is required to be laid on different ground surfaces, the two thread cylinders are firstly rotated, the thread cylinders drive the screw rods to vertically move, then the length of the screw rods extending out of the thread cylinders is adjusted according to the heights of different terrains, and finally the pipe body is placed between the lower clamping piece and the upper clamping piece to clamp the pipe body, so that the laying of the pipe body is completed; through setting up a screw thread section of thick bamboo and screw rod, can be according to the altitude mixture control body of different relief apart from the height on ground for the pipeline can the level place when laying, has reduced the service length of pipeline, has reduced pipeline laying's cost.
Preferably, the upper clamping piece comprises an upper clamping plate positioned above the pipe body, and a first mounting plate and a second mounting plate which are respectively mounted at two ends of the upper clamping plate; first mounting panel hinged joint is at the up end of first fixed plate, install the locking piece on the second mounting panel, the second mounting panel passes through the locking piece and installs on the second fixed plate.
Through adopting above-mentioned technical scheme, when needs carry out the centre gripping to the body, at first place the body on the lower plate, then rotate the second mounting panel towards one side of second fixed plate, the second mounting panel drives first mounting panel and upper plate and rotates towards one side of second fixed plate, when the lateral wall of upper plate and the global butt of body, lock the locking piece for lock between second mounting panel and the second fixed plate, thereby the centre gripping of body has been accomplished.
Preferably, the lateral wall of lower plate, the lateral wall of upper plate all laminate with the global of body.
Through adopting above-mentioned technical scheme, when needs use lower plate and punch holder to carry out the centre gripping to the body, the area of contact increase of lower plate, punch holder and body has improved the stability that the body was placed.
Preferably, a connecting rod is arranged between the two screw rods.
Through adopting above-mentioned technical scheme, at the in-process that the screw rod was driven to screw thread section of thick bamboo vertical migration, the screw rod drives connecting rod vertical migration, has reduced the emergence that the screw rod was driven to screw thread section of thick bamboo rotation condition.
Preferably, the hole of placing that extends along vertical direction is all seted up to the up end of first mounting panel and second mounting panel, two all install in placing the hole and be used for driving screw thread section of thick bamboo pivoted driving piece, the driving piece is including rotating the branch of wearing to establish in placing the hole, the top of branch extends to the outside of first mounting panel, install joint spare on the lower terminal surface of branch, branch passes through joint spare and is connected with the screw thread section of thick bamboo.
Through adopting above-mentioned technical scheme, when still need be to the altitude mixture control of body after laying the completion at the body, only need rotate branch, branch drives a thread section of thick bamboo through joint spare and rotates, can adjust the body apart from the height on ground, and the staff of being convenient for highly adjusts the body, has improved the installation effectiveness of pipeline.
Preferably, the clamping piece comprises a square block arranged on the lower end face of the supporting rod, and a square groove for inserting the square block is formed in the upper end face of the threaded cylinder.
Through adopting above-mentioned technical scheme, at the in-process that rotates branch, branch drives square piece and rotates, and square piece drives a screw thread section of thick bamboo through the square groove with it matched with and rotates to the rotation of a screw thread section of thick bamboo has been realized.
Preferably, two the up end of a thread section of thick bamboo all is not higher than the up end of first fixed plate and second fixed plate, two the lower terminal surface of branch all is not less than the lower terminal surface of first mounting panel and second mounting panel.
Through adopting above-mentioned technical scheme, at the in-process of rotating one side with the second mounting panel towards the second fixed plate, the lower terminal surface of second mounting panel can closely laminate with the up end of second fixed plate, has reduced the emergence of the condition that the second mounting panel rocked for the second fixed plate, has further improved the stability that the body was placed.
Preferably, the locking member includes a bolt inserted into the second mounting plate, a bottom end of the bolt is inserted into the second fixing plate and extends to an outer side of the second fixing plate, and a nut located below the second fixing plate is screwed on the bolt.
Through adopting above-mentioned technical scheme, when needs lock second mounting panel and second fixed plate, at first insert the bolt in the second fixed plate, then establish the nut cover on the bolt, rotate the nut, when nut and second fixed plate butt, accomplished the locking between second mounting panel and the second fixed plate.
In summary, the present application includes at least one of the following beneficial technical effects:
according to the pipeline laying device, the threaded barrel and the screw rod are arranged, the threaded barrel can drive the screw rod to vertically move only by rotating the threaded barrel, then the length of the screw rod extending out of the threaded barrel can be adjusted according to the heights of different terrains, the height of the pipeline body from the ground can be adjusted according to the heights of different terrains, so that a pipeline can be horizontally placed when being laid, the use length of the pipeline is reduced, and the pipeline laying cost is reduced;
according to the pipe body, the side walls of the lower clamping plate and the upper clamping plate are attached to the peripheral surface of the pipe body, so that the contact areas of the lower clamping plate and the upper clamping plate with the pipe body are increased, and the stability of placing the pipe body is improved;
this application is through setting up the connecting rod, and at the in-process that the screw rod vertical removal was driven to the screw thread section of thick bamboo, the emergence of the screw rod rotation condition was driven to the screw thread section of thick bamboo has been reduced.
Drawings
FIG. 1 is a schematic view of the overall construction of a municipal water supply and drainage pipeline according to an embodiment of the application.
Fig. 2 is a schematic structural diagram of a driving member according to an embodiment of the present application.
Fig. 3 is a schematic structural diagram of a clip according to an embodiment of the present application.
Description of reference numerals: 1. a pipe body; 2. a lower clamping member; 21. a lower splint; 22. a first fixing plate; 23. a second fixing plate; 231. mounting grooves; 3. an upper clamping member; 31. an upper splint; 32. a first mounting plate; 33. a second mounting plate; 331. a placement groove; 4. a locking member; 41. a bolt; 42. a nut; 5. a lifting member; 51. a threaded barrel; 511. a first limit plate; 52. a screw; 521. a connecting rod; 522. a support; 6. a drive member; 61. a strut; 611. a second limiting plate; 62. a handle is rotated; 7. a clamping piece; 71. a square block; 711. a square groove; 8. mounting holes; 9. placing the holes.
Detailed Description
The present application is described in further detail below with reference to figures 1-3.
The embodiment of the application discloses town road water supply and drainage pipeline. Referring to fig. 1 and 2, the municipal road water supply and drainage pipeline comprises a pipe body 1, a lower clamping piece 2 is placed below the pipe body 1, an upper clamping piece 3 is placed above the pipe body 1, and the lower clamping piece 2 comprises a lower clamping plate 21, a first fixing plate 22 and a second fixing plate 23; the lower clamping plate 21 is positioned below the pipe body 1 and is attached to the circumferential surface of the pipe body 1; the first fixing plate 22 is fixedly connected to one end of the lower clamp plate 21 and is horizontally arranged; the second fixing plate 23 is fixedly connected to one end of the lower clamp plate 21 far away from the first fixing plate 22 and is horizontally arranged. The upper clamping piece 3 comprises an upper clamping plate 31, a first mounting plate 32 and a second mounting plate 33; the upper clamping plate 31 is positioned above the pipe body 1 and is attached to the circumferential surface of the pipe body 1; the first mounting plate 32 is fixedly connected to one end of the upper clamp plate 31 and is horizontally arranged, the first mounting plate 32 is hinged to one side, away from the upper clamp plate 31, of the upper end surface of the first fixing plate 22, and a hinge shaft arranged in the first mounting plate 32 is the same as the extending direction of the pipe body 1; the second mounting plate 33 is fixedly connected to one end of the upper clamping plate 31 far away from the first mounting plate 32, and the locking piece 4 is mounted on the second mounting plate 33.
The locking member 4 includes a bolt 41 and a nut 42; the bolt 41 is vertically penetrated in the second mounting plate 33, and the bottom end of the bolt 41 is inserted into the second fixing plate 23 and extends to the outer side of the second fixing plate 23; the nut 42 is screw-fitted on the bolt 41 and located below the second fixing plate 23.
When needing to carry out the centre gripping to body 1, at first place body 1 on lower plate 21, then rotate second mounting panel 33 towards one side of second fixed plate 23, second mounting panel 33 drives first mounting panel 32 and upper plate 31 and rotates towards one side of second fixed plate 23, when the lateral wall of upper plate 31 and the global butt of body 1, insert bolt 41 in second fixed plate 23, then rotate nut 42, when nut 42 and second fixed plate 23 butt, the locking between second mounting panel 33 and the second fixed plate 23 has been accomplished, thereby the centre gripping to body 1 has been accomplished.
Referring to fig. 1 and 2, the upper end surfaces of the first fixing plate 22 and the second fixing plate 23 are both provided with mounting holes 8 extending in the vertical direction, the lifting members 5 are mounted in both the mounting holes 8, and taking the lifting member 5 mounted in the second fixing plate 23 as an example, the lifting member 5 includes a threaded cylinder 51 and a threaded rod 52; the screw 52 is rotatably arranged in the mounting hole 8 in a penetrating manner, the upper end surface of the threaded cylinder 51 and the upper end surface of the second fixing plate 23 are positioned on the same horizontal plane, the lower end of the threaded cylinder 51 extends to the outer side of the second fixing plate 23, two first limiting plates 511 are fixedly sleeved on the threaded cylinder 51, the upper end surface and the lower end surface of the second fixing plate 23 are respectively provided with a mounting groove 231 for the first limiting plate 511 to insert, and the mounting grooves 231 are matched with the first limiting plates 511 in shape; the screw 52 is threaded through the threaded cylinder 51, a support 522 is fixedly connected to the lower end surface of the screw 52, the lower end surface of the support 522 is lower than the lowest point of the lower clamp plate 21, and a connecting rod 521 is fixedly connected between the two screws 52.
When the pipe body 1 needs to be laid on different ground surfaces, firstly, the two thread cylinders 51 are rotated, the thread cylinders 51 drive the screw rods 52 to vertically move, the screw rods 52 drive the connecting rods 521 to vertically move, the situation that the thread cylinders 51 drive the screw rods 52 to rotate is reduced, when the support 522 is abutted to the ground surface, the two thread cylinders 51 are stopped rotating, and the height of the pipe body 1 from the ground surface is adjusted; through setting up a screw thread section of thick bamboo 51 and screw rod 52, can be according to the height-adjusting body 1 of different relief apart from the height on ground for body 1 can the level place when laying, has reduced the service length of pipeline, has reduced pipeline laying's cost.
Referring to fig. 2 and 3, the upper end surfaces of the first mounting plate 32 and the second mounting plate 33 are both provided with placing holes 9 extending in the vertical direction, the two placing holes 9 are both located between the hinge shaft and the bolt 41 in the first mounting plate 32, driving members 6 are mounted in the two placing holes 9, taking the driving member 6 mounted in the second mounting plate 33 as an example, the driving member 6 includes a support rod 61 and a rotating handle 62; the supporting rod 61 is rotatably arranged in the placing hole 9 in a penetrating manner, the top end of the supporting rod 61 extends to the outer side of the first mounting plate 32, the lower end face of the supporting rod 61 and the lower end face of the second mounting plate 33 are located on the same horizontal plane, two second limiting plates 611 are fixedly sleeved on the supporting rod 61, placing grooves 331 for the second limiting plates 611 to be inserted into are formed in the upper end face and the lower end face of the second mounting plate 33, and the shapes of the placing grooves 331 and the second limiting plates 611 are matched; the stem 62 is fixedly sleeved on the top end of the support rod 61 and is located above the second mounting plate 33.
The lower end surfaces of the two supporting rods 61 are respectively provided with a clamping piece 7, taking the clamping piece 7 positioned on one side of the second mounting plate 33 as an example, the clamping piece 7 comprises a square block 71; the square block 71 is fixedly connected to the lower end face of the support rod 61, the upper end face of the threaded cylinder 51 is provided with a square groove 711 into which the square block 71 is inserted, and a gap is formed between the square block 71 and the square groove 711.
When the pipe body 1 is laid and still needs the height adjustment to the pipe body 1, only need to rotate the turning handle 62, the turning handle 62 drives the supporting rod 61 to rotate, the supporting rod 61 drives the square block 71 to rotate, the square block 71 drives the threaded cylinder 51 to rotate through the square groove 711 matched with the square block, the height of the pipe body 1 from the ground can be adjusted, and the height of the pipe body 1 can be adjusted by a worker conveniently.
The embodiment of the application implementation principle of town road water supply and drainage pipeline does: when the pipe body 1 needs to be laid on different ground surfaces, firstly, the pipe body 1 is placed on the lower clamping plate 21, then the second mounting plate 33 rotates towards one side of the second fixing plate 23, the second mounting plate 33 drives the first mounting plate 32 and the upper clamping plate 31 to rotate towards one side of the second fixing plate 23, when the side wall of the upper clamping plate 31 is abutted to the peripheral surface of the pipe body 1, the bolt 41 is inserted into the second fixing plate 23, then the nut 42 rotates, and when the nut 42 is abutted to the second fixing plate 23; rotate the turning handle 62, the turning handle 62 drives branch 61 and rotates, branch 61 drives square piece 71 and rotates, square piece 71 drives screw thread section of thick bamboo 51 through square groove 711 with it matched with and rotates, screw thread section of thick bamboo 51 drives screw rod 52 vertical migration, screw rod 52 drives connecting rod 521 vertical migration, the emergence that screw thread section of thick bamboo 51 drove screw rod 52 and rotates the condition has been reduced, when support 522 and ground butt, with turning handle 62 stall, the regulation of body 1 apart from ground height has been accomplished.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. The utility model provides a town road water supply and drainage pipeline, includes body (1), lower holder (2) and last holder (3) that are used for centre gripping body (1), its characterized in that: lower holder (2) are including lower plate (21) that is located body (1) below, install first fixed plate (22) and second fixed plate (23) at lower plate (21) both ends respectively, mounting hole (8) along vertical direction extension are all seted up to the up end of first fixed plate (22) and second fixed plate (23), two all install lifter (5) in mounting hole (8), lifter (5) are worn to establish screw thread section of thick bamboo (51) in mounting hole (8), screw thread and are arranged in screw thread section of thick bamboo (51) and be used for supporting screw rod (52) of body (1) including rotating, the lower terminal surface of screw rod (52) is less than the minimum of lower plate (21).
2. The municipal water supply and drainage pipeline of claim 1, wherein: the upper clamping piece (3) comprises an upper clamping plate (31) positioned above the pipe body (1), and a first mounting plate (32) and a second mounting plate (33) which are respectively mounted at two ends of the upper clamping plate (31); first mounting panel (32) hinged joint is at the up end of first fixed plate (22), install locking piece (4) on second mounting panel (33), second mounting panel (33) are installed on second fixed plate (23) through locking piece (4).
3. The municipal water supply and drainage pipeline of claim 2, wherein: the side wall of the lower clamping plate (21) and the side wall of the upper clamping plate (31) are attached to the circumferential surface of the pipe body (1).
4. The municipal water supply and drainage pipeline of claim 1, wherein: a connecting rod (521) is arranged between the two screw rods (52).
5. The municipal water supply and drainage pipeline of claim 2, wherein: first mounting panel (32) and the up end of second mounting panel (33) all set up along the vertical direction extension place hole (9), two all install in placing hole (9) and be used for driving screw thread section of thick bamboo (51) pivoted driving piece (6), driving piece (6) wear to establish branch (61) in placing hole (9) including rotating, the top of branch (61) extends to the outside of first mounting panel (32), install joint spare (7) on the lower terminal surface of branch (61), branch (61) are connected with screw thread section of thick bamboo (51) through joint spare (7).
6. A municipal water supply and drainage pipeline according to claim 5, wherein: the clamping piece (7) comprises a square block (71) arranged on the lower end face of the support rod (61), and a square groove (711) for inserting the square block (71) is formed in the upper end face of the threaded cylinder (51).
7. A municipal water supply and drainage pipeline according to claim 5, wherein: the upper end face of the threaded cylinder (51) is not higher than the upper end faces of the first fixing plate (22) and the second fixing plate (23), and the lower end face of the support rod (61) is not lower than the lower end faces of the first mounting plate (32) and the second mounting plate (33).
8. The municipal water supply and drainage pipeline of claim 2, wherein: the locking piece (4) comprises a bolt (41) arranged in the second mounting plate (33) in a penetrating mode, the bottom end of the bolt (41) is inserted into the second fixing plate (23) and extends to the outer side of the second fixing plate (23), and a nut (42) located below the second fixing plate (23) is in threaded fit with the bolt (41).
CN202120310198.9U 2021-02-03 2021-02-03 Municipal administration road water supply and drainage pipeline Active CN214784513U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120310198.9U CN214784513U (en) 2021-02-03 2021-02-03 Municipal administration road water supply and drainage pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120310198.9U CN214784513U (en) 2021-02-03 2021-02-03 Municipal administration road water supply and drainage pipeline

Publications (1)

Publication Number Publication Date
CN214784513U true CN214784513U (en) 2021-11-19

Family

ID=78752023

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120310198.9U Active CN214784513U (en) 2021-02-03 2021-02-03 Municipal administration road water supply and drainage pipeline

Country Status (1)

Country Link
CN (1) CN214784513U (en)

Similar Documents

Publication Publication Date Title
CN214784513U (en) Municipal administration road water supply and drainage pipeline
CN2835235Y (en) Adjustable mounting support for aerator
CN209874004U (en) Water pipe support of adjustable water pipe slope
CN210290988U (en) Quick installing support of gas pipeline
CN216407960U (en) Hydraulic pipeline supporting and connecting device for hydraulic engineering
CN113897974B (en) Enclosing purlin internally-hung intercepting ditch and installation method
CN216810173U (en) Municipal administration road drainage pipe angular adjustment bearing structure
CN215763642U (en) Pipeline positioning support frame with pipe hole diameter adjustable structure for drainage engineering
CN210716293U (en) Be used for irrigation pipe support frame
CN214743772U (en) A positioning support that arranges for municipal drainage engineering's pipeline
CN213685558U (en) Pipeline fixing device is used in municipal administration plumbing construction
CN218236418U (en) Stable connecting structure for water supply and drainage pipeline
CN213332759U (en) Water conservancy pipeline supports connection structure
CN214579287U (en) Building water supply and drainage pipeline lays and uses bearing structure based on BIM technique
CN217355838U (en) Pipeline supporting device
CN219753365U (en) Base support structure for secondary water supply tank
CN219530029U (en) Pipeline construction device
CN214980601U (en) Anchor rod positioning and mounting auxiliary device
CN217030224U (en) Adjustable installation component of drain pipe for building
CN220218272U (en) Auxiliary device for installing heat supply water pump
CN217925231U (en) But height-adjusting's arc glass structure
CN218378025U (en) Energy-saving limiting device for water supply and drainage pipeline
CN218294754U (en) Adjustable stable ecological flow discharge pipe support frame
CN214590501U (en) Power cable supporting seat for municipal administration
CN220268665U (en) Municipal administration water supply and drainage pipeline strutting arrangement

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant