CN219528457U - Working space platform and construction building - Google Patents

Working space platform and construction building Download PDF

Info

Publication number
CN219528457U
CN219528457U CN202320251136.4U CN202320251136U CN219528457U CN 219528457 U CN219528457 U CN 219528457U CN 202320251136 U CN202320251136 U CN 202320251136U CN 219528457 U CN219528457 U CN 219528457U
Authority
CN
China
Prior art keywords
horizontal direction
beams
space platform
working space
holes
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320251136.4U
Other languages
Chinese (zh)
Inventor
房军轶
方振亚
朱毅
朱浩
李京龙
邵凯
戴建晔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Steel Structure Jiangsu Corp Ltd
China Construction Steel Structure Engineering Co Ltd
Original Assignee
China Construction Steel Structure Jiangsu Corp Ltd
China Construction Steel Structure Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Steel Structure Jiangsu Corp Ltd, China Construction Steel Structure Engineering Co Ltd filed Critical China Construction Steel Structure Jiangsu Corp Ltd
Priority to CN202320251136.4U priority Critical patent/CN219528457U/en
Application granted granted Critical
Publication of CN219528457U publication Critical patent/CN219528457U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/60Other road transportation technologies with climate change mitigation effect
    • Y02T10/70Energy storage systems for electromobility, e.g. batteries

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The utility model discloses an operation space platform and a construction building, and relates to the technical field of construction buildings. The working space platform comprises a mounting piece, a main beam, a secondary beam, a bearing plate and a fixing piece; the mounting parts are arranged in two and are arranged at intervals along the first horizontal direction; one end of each of the two main beams is connected with the two mounting pieces respectively; the plurality of secondary beams are arranged at intervals in sequence along the second horizontal direction, two ends of each secondary beam are respectively connected with the side ends of the two main beams which are oppositely arranged, and the secondary beams extend along the first horizontal direction; the bearing plate is arranged in an extending mode along the second horizontal direction and is movably arranged at the top end of the secondary beam; the first horizontal direction and the second horizontal direction are mutually perpendicular; the fixing piece is detachably connected with the bearing plate and the secondary beam so as to connect the bearing plate and the secondary beam. The working space platform can support mechanical equipment and provide larger space which can occupy for the mechanical equipment so as to provide conditions for working by using the mechanical equipment in the construction process.

Description

Working space platform and construction building
Technical Field
The utility model relates to the technical field of construction buildings, in particular to an operation space platform and a construction building.
Background
With the rapid development of urban construction in recent years, the fabricated building is greatly promoted, and the steel structure is favored by the building industry by virtue of the advantages of high strength, light weight, good anti-seismic performance and the like, and is widely applied in the building industry.
In the installation of steel construction, often need use mechanical equipment to cooperate constructor to install, and in actual job site, because some mechanical equipment's weight is heavier, probably appear that mechanical equipment is too big to the ground load, therefore require ground and do not allow to stop mechanical equipment, and because some mechanical equipment occupation space is great, can appear can not provide required occupation space's condition for mechanical equipment, can not use mechanical equipment to carry out the operation when leading to the construction for the construction degree of difficulty is great, and influences the efficiency of construction.
Disclosure of Invention
The present utility model aims to solve at least one of the technical problems existing in the prior art. Therefore, the utility model provides a working space platform which can support mechanical equipment and provide conditions for working by using the mechanical equipment in the construction process.
The utility model also provides a construction building with the working space platform.
According to an embodiment of the first aspect of the present utility model, a job space platform includes: the mounting parts are provided with two mounting parts and are arranged at intervals along the first horizontal direction; the two main beams are arranged, one ends of the two main beams are respectively connected with the two mounting pieces, and the two main beams are oppositely arranged and extend along the second horizontal direction; the secondary beams are arranged in a plurality and sequentially arranged at intervals along the second horizontal direction, two ends of each secondary beam are respectively connected with opposite side ends of the two main beams, and the secondary beams extend along the first horizontal direction; the bearing plate is arranged at the top end of the secondary beam and extends along the second horizontal direction; the first horizontal direction and the second horizontal direction are mutually perpendicular; and the fixing piece is detachably connected with the bearing plate and the secondary beam so as to connect the bearing plate and the secondary beam.
The working space platform provided by the utility model has at least the following beneficial effects: in the embodiment of the utility model, the mounting pieces can be welded with a building structure in a construction building, the two mounting pieces are respectively connected with the two main beams, the main beams are arranged in an extending manner along the second horizontal direction, the secondary beams are arranged between the two main beams, the bearing plates are arranged at the top ends of the secondary beams, after the bearing plates are moved to corresponding positions, the bearing plates can be fixed on the secondary beams through the fixing pieces, the mechanical equipment can walk on the bearing plates, the bearing plates can bear the mechanical equipment, the bearing plates are arranged in an extending manner along the second direction, and the main beams are arranged at intervals along the first horizontal direction so as to increase the movable positions of the mechanical equipment; by arranging the working space platform, the working space platform can be connected with a building through the mounting piece in a welded mode, and the bearing plate can bear mechanical equipment, so that the mechanical equipment is placed on the bearing plate and can move on the bearing plate, and the space for the mechanical equipment to move can be increased; the operation space platform can support mechanical equipment and provide larger space capable of occupying for the mechanical equipment so as to provide conditions for operation by using the mechanical equipment in the construction process, reduce construction difficulty and ensure construction efficiency.
According to some embodiments of the utility model, the connecting piece is arranged along the second horizontal direction in an extending mode, and the connecting piece is connected with the lower ends of the plurality of secondary beams.
According to some embodiments of the utility model, the connector is provided in plurality and spaced apart along the first horizontal direction.
According to some embodiments of the utility model, the support plate is provided in plurality and arranged in a first horizontal direction.
According to some embodiments of the utility model, the supporting plate is provided with a plurality of supporting plates, and the widths of the supporting plates are different from each other, wherein one supporting plate is arranged at the top end of the secondary beam.
According to some embodiments of the utility model, the supporting plate is provided with a plurality of supporting plates, and the lengths of the supporting plates are different from each other, wherein one supporting plate is arranged at the top end of the secondary beam.
According to some embodiments of the utility model, the main beam further comprises a plurality of first connecting bolts, the side ends of the main beam are provided with a plurality of first connecting holes arranged along the second horizontal direction, the first connecting holes penetrate through the main beam along the horizontal direction, the two end parts of the secondary beam are provided with first mounting holes, the first connecting holes are arranged opposite to the first mounting holes one by one, and the first connecting bolts penetrate through the first connecting holes and the first mounting holes to connect the main beam and the secondary beam.
According to some embodiments of the utility model, the connecting piece further comprises a plurality of second connecting bolts, the side ends of the connecting piece are provided with a plurality of second connecting holes which are arranged along a second horizontal direction, the second connecting holes penetrate through the connecting piece along a vertical direction, the bottom ends of the secondary beams are respectively provided with a second mounting hole, the second connecting holes are arranged opposite to the second mounting holes one by one, and the second connecting bolts penetrate through the second connecting holes and the second mounting holes to connect the connecting piece and the secondary beams.
According to some embodiments of the utility model, the fixing pieces are a plurality of third connecting bolts, the bearing plate is provided with a plurality of third connecting holes arranged along a second horizontal direction, the third connecting holes penetrate through the bearing plate along a vertical direction, the top ends of the secondary beams are respectively provided with a third mounting hole, the third connecting holes are arranged in one-to-one opposite to the third mounting holes, and the fixing pieces penetrate through the third connecting holes and the third mounting holes to connect the bearing plate and the secondary beams.
A construction building according to an embodiment of the second aspect of the present utility model comprises a working space platform according to the above-described embodiment of the first aspect of the present utility model.
The construction building provided by the embodiment of the utility model has at least the following beneficial effects: by adopting the working space platform, in the embodiment of the utility model, the mounting parts can be welded with a building structure in a construction building, the two mounting parts are respectively connected with two main beams, the main beams are arranged in an extending way along the second horizontal direction, the secondary beams are arranged between the two main beams, the bearing plate is arranged at the top ends of the secondary beams, after the bearing plate is moved to the corresponding position, the bearing plate can be fixed on the secondary beams through the fixing parts, the mechanical equipment can walk on the bearing plate, the bearing plate can bear the mechanical equipment, the bearing plate is arranged in an extending way along the second direction, and the main beams are arranged at intervals along the first horizontal direction so as to increase the movable position of the mechanical equipment; by arranging the working space platform, the working space platform can be connected with a building through the mounting piece in a welded mode, and the bearing plate can bear mechanical equipment, so that the mechanical equipment is placed on the bearing plate and can move on the bearing plate, and the space for the mechanical equipment to move can be increased; the operation space platform can support mechanical equipment and provide larger space capable of occupying for the mechanical equipment so as to provide conditions for operation by using the mechanical equipment in the construction process, reduce construction difficulty and ensure construction efficiency.
Additional aspects and advantages of the utility model will be set forth in part in the description which follows, and in part will be obvious from the description, or may be learned by practice of the utility model.
Drawings
The foregoing or additional aspects and advantages of the utility model will become apparent and readily appreciated from the following description of the embodiments, taken in conjunction with the accompanying drawings, in which:
FIG. 1 is a schematic view of a working space platform according to the present utility model;
fig. 2 is a schematic structural view of the working space platform of fig. 1 from another perspective.
Reference numerals:
a mounting member 100; a main beam 200; a secondary beam 300; a support plate 400; the connector 500.
Detailed Description
Embodiments of the present utility model are described in detail below, examples of which are illustrated in the accompanying drawings, wherein like or similar reference numerals refer to like or similar elements or elements having like or similar functions throughout. The embodiments described below by referring to the drawings are illustrative only and are not to be construed as limiting the utility model.
In the description of the present utility model, it should be understood that the direction or positional relationship indicated with respect to the description of the orientation, such as up, down, left, right, front, rear, etc., is based on the direction or positional relationship shown in the drawings, is merely for convenience of describing the present utility model and simplifying the description, and does not indicate or imply that the apparatus or element to be referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus should not be construed as limiting the present utility model.
In the description of the present utility model, the description of the first and second is only for the purpose of distinguishing technical features, and should not be construed as indicating or implying relative importance or implying the number of technical features indicated or the precedence of the technical features indicated.
In the description of the present utility model, unless explicitly defined otherwise, terms such as arrangement, installation, connection, etc. should be construed broadly and the specific meaning of the terms in the present utility model can be reasonably determined by a person skilled in the art in combination with the specific contents of the technical scheme.
A working space platform and a construction building according to an embodiment of the present utility model are described below with reference to fig. 1 and 2.
The working space platform according to the novel embodiment of the first aspect of the present utility model comprises a mounting piece 100, a main beam 200, a secondary beam 300, a bearing plate 400 and a fixing piece; the mounting members 100 are provided in two and spaced apart along the first horizontal direction; the two main beams 200 are arranged, one ends of the two main beams 200 are respectively connected with the two mounting pieces 100, and the two main beams 200 are oppositely arranged and extend along the second horizontal direction; the secondary beams 300 are arranged in a plurality of ways and are sequentially arranged at intervals along the second horizontal direction, two ends of each secondary beam 300 are respectively connected with the side ends of the two main beams 200 which are oppositely arranged, and the secondary beams 300 are arranged in an extending way along the first horizontal direction; the supporting plate 400 extends along the second horizontal direction, and the supporting plate 400 is movably arranged at the top end of the secondary beam 300; the first horizontal direction and the second horizontal direction are mutually perpendicular; the fixing member is detachably coupled with the bearing plate 400 and the sub-beam 300 to couple the bearing plate 400 and the sub-beam 300.
In the embodiment of the present utility model, the mounting members 100 may be welded to a building structure in a construction building, the two mounting members 100 are respectively connected to two main beams 200, the main beams 200 are extended in a second horizontal direction, a sub-beam 300 is disposed between the two main beams 200, a bearing plate 400 is disposed at the top end of the sub-beam 300, after the bearing plate 400 is moved to a corresponding position, the bearing plate 400 may be fixed to the sub-beam 300 by a fixing member, a machine may travel on the bearing plate 400, the bearing plate 400 may support the machine, and the bearing plate 400 may be extended in the second direction, and the main beams 200 may be spaced in a first horizontal direction to increase the position where the machine may travel; by providing the working space platform, the working space platform can be welded to the building through the mounting member 100, and the support plate 400 can support the mechanical equipment, so that the mechanical equipment is placed on the support plate 400 and can move on the support plate 400, so that the space in which the mechanical equipment can move can be increased; the operation space platform can support mechanical equipment and provide larger space capable of occupying for the mechanical equipment so as to provide conditions for operation by using the mechanical equipment in the construction process, reduce construction difficulty and ensure construction efficiency.
Referring to fig. 1 and 2, it can be understood that the connector 500 is further included, and the connector 500 is disposed to extend in the second horizontal direction, and the connector 500 is connected to the lower ends of the plurality of sub-beams 300.
Specifically, the connection member 500 is disposed at the lower ends of the sub-beams 300 and connected with the lower ends of the plurality of sub-beams 300, so as to be able to improve the stability of the whole of the plurality of sub-beams 300; the connection member 500 is positioned near the middle of the sub-beams 300 to reduce the degree of bending of a certain sub-beam 300 toward the middle; wherein the connector 500 can be connected with other structures in the building to improve the stability of the working space platform.
It will be appreciated that the connector 500 is provided in plurality and spaced apart along the first horizontal direction.
The stability of the whole of the plurality of sub beams 300 can be further improved by providing the plurality of connection members 500, and the stability of the working space platform can be further improved by providing the plurality of connection members 500 because the connection members 500 can be connected with other structures in the building.
Referring to fig. 1, it can be understood that the support plate 400 is provided in plurality and arranged in a first horizontal direction.
Specifically, since the areas occupied by different working apparatuses are different, the area occupied by the bearing plates 400 on the secondary beam 300 can be increased by providing a plurality of bearing plates 400, so that the working apparatuses which need to occupy a larger area can be adapted, so as to improve the adaptability of the working space platform.
It will be appreciated that the support plates 400 are provided in plurality and the widths of the support plates 400 are different from each other, wherein one support plate 400 is provided at the top of the secondary beam 300.
Specifically, because the widths of the occupied parts of different working devices are different, the supporting plates 400 with different widths are arranged, so that the supporting plates 400 which can be matched with the working devices can be selected in the use process, different working devices can be matched, the overall weight of the working space is reduced, and the suitability of the working space platform is improved.
It will be appreciated that the support plates 400 are provided in plurality and the lengths of the support plates 400 are different from each other, wherein one support plate 400 is provided at the top of the secondary beam 300.
Specifically, because the lengths of the occupied parts of different working devices are different, the supporting plates 400 with different lengths are arranged, so that the supporting plates 400 which can be matched with the working devices can be selected in the use process, different working devices can be matched, the overall weight of the working space is reduced, and the suitability of the working space platform is improved.
It is to be understood that the main beam 200 further comprises a plurality of first connecting bolts, the side ends of the main beam 200 are provided with a plurality of first connecting holes arranged along the second horizontal direction, the first connecting holes penetrate through the second horizontal direction, the two end portions of the secondary beam 300 are provided with first mounting holes, the first connecting holes are arranged in one-to-one opposite manner to the first mounting holes, and the first connecting bolts penetrate through the first connecting holes and the first mounting holes to connect the main beam 200 and the secondary beam 300.
Can fixed connection girder 200 and secondary beam 300 through first connecting bolt, of course, according to specific needs, after this operation space platform uses to accomplish, can be through dismantling first connecting bolt to dismantle girder 200 and secondary beam 300, in order to make things convenient for this operation space platform's installation, dismantlement and transfer, and this operation space platform can reuse later, reduce cost.
The number of secondary beams 300 can be selected according to the weight and size of the working platform, so as to control the weight of the working space platform and improve the load capacity of the working space platform.
It is to be understood that the side end of the connecting piece 500 is provided with a plurality of second connecting holes arranged along the second horizontal direction, the second connecting holes penetrate through the second connecting holes along the vertical direction, the bottom ends of the secondary beams 300 are respectively provided with a second mounting hole, the second connecting holes are arranged in one-to-one opposite to the second mounting holes, and the second connecting bolts penetrate through the second connecting holes and the second mounting holes to connect the connecting piece 500 and the secondary beams 300.
The connecting piece 500 and the secondary beam 300 can be fixedly connected through the second connecting bolt, and of course, after the working space platform is used according to specific requirements, the second connecting bolt can be detached to detach the connecting piece 500 and the secondary beam 300 so as to facilitate the installation, detachment and transfer of the working space platform, and the working space platform can be reused subsequently, so that the cost is reduced.
It is to be understood that the fixing members are provided in plurality, the fixing members are third connecting bolts, a plurality of third connecting holes are formed in the bearing plate 400 and arranged along the second horizontal direction, the third connecting holes penetrate through the vertical direction, third mounting holes are formed in the top ends of the secondary beams 300, the third connecting holes are arranged in one-to-one opposite to the third mounting holes, and the fixing members penetrate through the third connecting holes and the third mounting holes to connect the bearing plate 400 and the secondary beams 300.
The bearing plate 400 and the secondary beam 300 can be fixedly connected through the third connecting bolt, and of course, after the working space platform is used according to specific requirements, the third connecting bolt can be detached to detach the bearing plate 400 and the secondary beam 300 so as to facilitate the installation, detachment and transfer of the working space platform, and the working space platform can be reused subsequently, so that the cost is reduced.
Referring to fig. 1 and 2, a construction building according to a novel embodiment of a second aspect of the present utility model includes the working space platform according to the embodiment of the first aspect.
By adopting the working space platform according to the first aspect of the embodiment of the utility model, in the embodiment of the utility model, the mounting members 100 can be welded to a building structure in a construction building, the two mounting members 100 are respectively connected to the two main beams 200, the main beams 200 are arranged to extend in the second horizontal direction, the secondary beam 300 is arranged between the two main beams 200, the bearing plate 400 is arranged at the top end of the secondary beam 300, after the bearing plate 400 is moved to the corresponding position, the bearing plate 400 can be fixed on the secondary beam 300 by the fixing members, the mechanical equipment can walk on the bearing plate 400, the bearing plate 400 can bear the mechanical equipment, the bearing plate 400 is arranged to extend in the second direction, and the main beams 200 are arranged at intervals in the first horizontal direction, so that the movable position of the mechanical equipment is increased;
by providing the working space platform, the working space platform can be welded to the building through the mounting member 100, and the support plate 400 can support the mechanical equipment, so that the mechanical equipment is placed on the support plate 400 and can move on the support plate 400, so that the space in which the mechanical equipment can move can be increased; the operation space platform can support mechanical equipment and provide larger space capable of occupying for the mechanical equipment so as to provide conditions for operation by using the mechanical equipment in the construction process, reduce construction difficulty and ensure construction efficiency.
In the description of the present specification, a description of the terms "one embodiment," "some embodiments," or "some examples," etc., means that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the utility model. In this specification, schematic representations of the above terms do not necessarily refer to the same embodiments or examples. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
While embodiments of the present utility model have been shown and described, it will be understood by those of ordinary skill in the art that: many changes, modifications, substitutions and variations may be made to the embodiments without departing from the spirit and principles of the utility model, the scope of which is defined by the claims and their equivalents.

Claims (10)

1. The operation space platform, its characterized in that includes:
the mounting parts are provided with two mounting parts and are arranged at intervals along the first horizontal direction;
the two main beams are arranged, one ends of the two main beams are respectively connected with the two mounting pieces, and the two main beams are oppositely arranged and extend along the second horizontal direction;
the secondary beams are arranged in a plurality and sequentially arranged at intervals along the second horizontal direction, two ends of each secondary beam are respectively connected with opposite side ends of the two main beams, and the secondary beams extend along the first horizontal direction;
the bearing plate is arranged at the top end of the secondary beam and extends along the second horizontal direction; the first horizontal direction and the second horizontal direction are mutually perpendicular;
and the fixing piece is detachably connected with the bearing plate and the secondary beam so as to connect the bearing plate and the secondary beam.
2. The work space platform of claim 1, further comprising a connector extending in a second horizontal direction, the connector being connected to lower ends of the plurality of secondary beams.
3. The work space platform of claim 2, wherein the connectors are provided in a plurality and spaced apart along the first horizontal direction.
4. The work space platform of claim 1, wherein the support plate is provided in plurality and arranged in a first horizontal direction.
5. The working space platform according to claim 1, wherein the support plates are provided in plurality and the widths of the support plates are different from each other, wherein one of the support plates is provided at the top end of the secondary beam.
6. The working space platform according to claim 1, wherein the support plates are provided in plurality and the lengths of the support plates are different from each other, wherein one of the support plates is provided at the top end of the secondary beam.
7. The working space platform according to claim 1, further comprising a plurality of first connecting bolts, wherein a plurality of first connecting holes are formed in the side ends of the main beams and are arranged in a second horizontal direction, the first connecting holes penetrate through the main beams in the horizontal direction, first mounting holes are formed in the end portions of the two ends of the secondary beams, the first connecting holes are arranged in one-to-one opposite to the first mounting holes, and the first connecting bolts penetrate through the first connecting holes and the first mounting holes to connect the main beams and the secondary beams.
8. The working space platform according to claim 2, further comprising a plurality of second connecting bolts, wherein a plurality of second connecting holes are formed in the side ends of the connecting pieces and arranged in a second horizontal direction, the second connecting holes penetrate through the connecting pieces in a vertical direction, second mounting holes are formed in the bottom ends of the secondary beams, the second connecting holes are arranged in one-to-one opposite to the second mounting holes, and the second connecting bolts penetrate through the second connecting holes and the second mounting holes to connect the connecting pieces and the secondary beams.
9. The working space platform according to claim 1, wherein the fixing pieces are provided with a plurality of third connecting bolts, the supporting plate is provided with a plurality of third connecting holes arranged along the second horizontal direction, the third connecting holes penetrate through the supporting plate along the vertical direction, the top ends of the secondary beams are provided with third mounting holes, the third connecting holes are arranged in one-to-one opposite to the third mounting holes, and the fixing pieces penetrate through the third connecting holes and the third mounting holes to connect the supporting plate and the secondary beams.
10. Construction building, its characterized in that includes:
the workspace platform of any of claims 1 to 9.
CN202320251136.4U 2023-02-17 2023-02-17 Working space platform and construction building Active CN219528457U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320251136.4U CN219528457U (en) 2023-02-17 2023-02-17 Working space platform and construction building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320251136.4U CN219528457U (en) 2023-02-17 2023-02-17 Working space platform and construction building

Publications (1)

Publication Number Publication Date
CN219528457U true CN219528457U (en) 2023-08-15

Family

ID=87628310

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320251136.4U Active CN219528457U (en) 2023-02-17 2023-02-17 Working space platform and construction building

Country Status (1)

Country Link
CN (1) CN219528457U (en)

Similar Documents

Publication Publication Date Title
CN219528457U (en) Working space platform and construction building
CN106894625B (en) Modularized external hanging scaffold
CN112962824A (en) Short-limb steel plate shear wall with replaceable energy consumption component and construction method thereof
CN214833419U (en) Beam joint and steel structure
CN214034133U (en) Horizontal connecting device for connecting wallboard components and wallboard assembly
CN213062632U (en) Assembled steel truss structure
CN220845205U (en) Vehicle overhauling platform
CN213059958U (en) Combined supporting platform of high-rise building construction tower crane
CN116771025A (en) Assembled adjustable conversion layer system
CN220768575U (en) Beam assembly structure of adjustable conversion layer
CN216074809U (en) Bridge rail guard template installation platform truck
CN218177641U (en) Connection structure and support frame
CN219058373U (en) Wall-attached bracket support structure of distributed inner climbing tower crane
CN214574906U (en) Shear wall structure with high bearing capacity
CN219823390U (en) Steel rib beam lifting tool at cast-in-situ box beam
CN215212522U (en) Assembled combinable embedded temporary steel support
CN220209859U (en) Combined cable bridge convenient to disassemble and assemble
CN217027739U (en) High-strength C-shaped cold-bending formed steel joist matched with socket type disc buckle support for use
CN217215812U (en) Novel ladder type roller bridge
CN216444913U (en) Pass power in existing post and set up tower crane structure between floor
KR102623001B1 (en) Dual frame structure for lifting prefabricated steel structure and load dispersion type indoor lifting apparatus of prefabricated steel structure including the same
CN215760343U (en) Cross-floor supporting structure
CN219930996U (en) Assembled backing plate structure
CN219298775U (en) Multifunctional super-structure column for building construction template
KR102628253B1 (en) Stacker system and load dispersion type indoor lifting apparatus of prefabricated steel structure including the same

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant