CN219527629U - High-strength bolt connection point structure of precast pile and steel pile - Google Patents

High-strength bolt connection point structure of precast pile and steel pile Download PDF

Info

Publication number
CN219527629U
CN219527629U CN202320417660.4U CN202320417660U CN219527629U CN 219527629 U CN219527629 U CN 219527629U CN 202320417660 U CN202320417660 U CN 202320417660U CN 219527629 U CN219527629 U CN 219527629U
Authority
CN
China
Prior art keywords
steel pipe
pile
precast pile
strength bolt
inner sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320417660.4U
Other languages
Chinese (zh)
Inventor
魏建华
海明雷
郭星宇
王勇
马宗玉
苏瓅
李庆鸿
于凯文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Survey Design And Research Institute Group Co ltd
Original Assignee
SGIDI Engineering Consulting Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SGIDI Engineering Consulting Group Co Ltd filed Critical SGIDI Engineering Consulting Group Co Ltd
Priority to CN202320417660.4U priority Critical patent/CN219527629U/en
Application granted granted Critical
Publication of CN219527629U publication Critical patent/CN219527629U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a high-strength bolt connection point structure of a precast pile and a steel pile, which comprises the precast pile, an inner sleeve steel pipe connected with the top of the precast pile and a steel pipe arranged outside the inner sleeve steel pipe, wherein the inner sleeve steel pipe and the steel pipe are fixed through high-strength bolts, a plurality of high-strength bolts are arranged in the vertical direction, and a plurality of high-strength bolts are arranged in different directions on a horizontal plane. The utility model has the advantages that: the connection of the precast pile and the steel pile is realized, the high-strength bolt connection speed is high, the construction time is shortened, the construction cost is reduced, good social benefits are created, and good economical efficiency and practicability are realized; the high-strength bolt has good compression resistance, bending resistance and compression buckling resistance, can realize reliable force transmission and has good stability.

Description

High-strength bolt connection point structure of precast pile and steel pile
Technical Field
The utility model relates to the technical field of connection of precast piles and steel piles, in particular to a high-strength bolt connection point structure of precast piles and steel piles.
Background
Precast piles and steel piles are used as common pile types and are widely applied to industrial and civil buildings, and the welding (low construction efficiency) and mechanical connection (high construction efficiency) technologies of the precast piles or the steel piles are mature, but the precast piles and the steel piles are usually independently designed and used, so that two pile types are combined in engineering, the manufacturing cost is reduced, the precast piles and the steel piles are connected to form a combined pile type, and the problem of difficulty in pile splicing in construction exists.
Disclosure of Invention
According to the defects of the prior art, the utility model provides a high-strength bolt connection point structure of a precast pile and a steel pile, a section of round steel pipe is fixed at the end part of the precast pile in advance to serve as a precast pile joint, and the precast pile and the steel pile are connected through the high-strength bolt, so that the problem of pile splicing difficulty is solved, the construction time is shortened, and the construction cost is reduced.
The utility model is realized by the following technical scheme:
a precast pile and steel pile's high strength bolt tie point structure, its characterized in that: the high-strength steel pipe is fixed between the inner sleeve steel pipe and the steel pipe through high-strength bolts, a plurality of high-strength bolts are arranged in the vertical direction, and a plurality of high-strength bolts are arranged in different directions on a horizontal plane.
The high-strength bolt comprises a screw rod and a nut, wherein the screw rod sequentially penetrates through the through hole on one side of the steel pipe, the through hole on one side of the inner sleeve steel pipe, the through hole on the other side of the inner sleeve steel pipe and the through hole on the other side of the steel pipe and is fixed through the nut.
And the inner sleeve steel pipe is connected with a precast pile end plate at the top of the precast pile.
And welding or bonding is performed between the precast pile and the inner sleeve steel pipe.
The utility model has the advantages that: the connection of the precast pile and the steel pile is realized, the high-strength bolt connection speed is high, the construction time is shortened, the construction cost is reduced, good social benefits are created, and good economical efficiency and practicability are realized; the high-strength bolt has good compression resistance, bending resistance and compression buckling resistance, can realize reliable force transmission and has good stability.
Drawings
FIG. 1 is a schematic view of the construction of a high-strength bolt connection point between a precast pile and a steel pile according to the present utility model;
FIG. 2 is a cross-sectional view of A-A of FIG. 1;
FIG. 3 is a schematic diagram of a construction method of a high-strength bolt connection point structure of a precast pile and a steel pile according to the step 1;
FIG. 4 is a schematic diagram of a construction method step 2 of a high-strength bolt connection point structure of a precast pile and a steel pile;
FIG. 5 is a schematic diagram of a construction method of a high-strength bolt connection point structure of a precast pile and a steel pile according to the step 3 of the construction method;
fig. 6 is a schematic diagram of a construction method step 4 of a high-strength bolt connection point structure of a precast pile and a steel pile.
Detailed Description
The features of the utility model and other related features are described in further detail below by way of example in conjunction with the following figures to facilitate understanding by those skilled in the art:
as shown in figures 1-6, the marks 1-5 are respectively shown as a precast pile 1, a steel pipe 2, an inner sleeve steel pipe 3, a high-strength bolt 4 and a precast pile end plate 5.
Examples: as shown in fig. 1-2, the present embodiment relates to a high-strength bolt connection point structure of precast pile and steel pile, which mainly comprises a precast pile 1, an inner sleeve steel pipe 3 connected with the top of the precast pile 1, and a steel pipe 2 arranged outside the inner sleeve steel pipe 3, wherein the precast pile 1 and the inner sleeve steel pipe 3 are connected by welding or bonding, the inner sleeve steel pipe 3 is fixed with a precast pile end plate 5 at the top of the precast pile 1, a precast pile 1 with an inner sleeve steel pipe 3 connector is formed, and the size of the inner sleeve steel pipe 3 is determined according to the model of the precast pile 1 and the model of the steel pipe 2. The inner sleeve steel pipe 3 and the steel pipe 2 are fixed through the high-strength bolts 4, three high-strength bolts 4 are arranged in the vertical direction, the three high-strength bolts 4 are arranged in different directions on a horizontal plane, the steel pipe 2 and the inner sleeve steel pipe 3 are provided with opposite perforations (staggered arrangement), and the size of each perforation is determined according to the type of the high-strength bolt 4. In this embodiment, the high-strength bolt 4 includes a screw and a nut, and the screw sequentially passes through the through hole on one side of the steel pipe 2, the through hole on one side of the inner sleeve steel pipe 3, the through hole on the other side of the inner sleeve steel pipe 3, and the through hole on the other side of the steel pipe 2 and is fixed by the nut.
As shown in fig. 3 to 6, the present embodiment further has the following construction method:
as shown in fig. 3, first, a first precast pile 1 (with an inner sleeve steel pipe 3 at the top and an opposite perforation in the inner sleeve steel pipe 3) is pressed into a soil layer to a certain depth according to a designed angle by a pile pressing machine.
As shown in fig. 4, a steel pipe 2 (the steel pipe 2 has a pair of perforations) is added to the precast pile 1, and the centers of the pair of perforations of the steel pipe 2 and the inner sleeve steel pipe 3 are aligned.
As shown in fig. 5, the high-strength bolt 4 is perforated and the nut is screwed down to fix the connection.
As shown in fig. 6, the precast pile 1 and the steel pipe 2 are continuously pressed into the designed position at the designed angle.
The beneficial technical effects of this embodiment are: the connection of the precast pile and the steel pile is realized, the high-strength bolt connection speed is high, the construction time is shortened, the construction cost is reduced, good social benefits are created, and good economical efficiency and practicability are realized; the high-strength bolt has good compression resistance, bending resistance and compression buckling resistance, can realize reliable force transmission and has good stability.
Although the foregoing embodiments have been described in some detail with reference to the accompanying drawings, it will be appreciated by those skilled in the art that various modifications and changes may be made thereto without departing from the scope of the utility model as defined in the appended claims, and thus are not repeated herein.

Claims (4)

1. A precast pile and steel pile's high strength bolt tie point structure, its characterized in that: the high-strength steel pipe is fixed between the inner sleeve steel pipe and the steel pipe through high-strength bolts, a plurality of high-strength bolts are arranged in the vertical direction, and a plurality of high-strength bolts are arranged in different directions on a horizontal plane.
2. A high strength bolt joint structure of precast pile and steel pile as defined in claim 1, wherein: the high-strength bolt comprises a screw rod and a nut, wherein the screw rod sequentially penetrates through the through hole on one side of the steel pipe, the through hole on one side of the inner sleeve steel pipe, the through hole on the other side of the inner sleeve steel pipe and the through hole on the other side of the steel pipe and is fixed through the nut.
3. A high strength bolt joint structure of precast pile and steel pile as defined in claim 1, wherein: and the inner sleeve steel pipe is connected with a precast pile end plate at the top of the precast pile.
4. A high strength bolt joint structure of precast pile and steel pile as defined in claim 1, wherein: and welding or bonding is performed between the precast pile and the inner sleeve steel pipe.
CN202320417660.4U 2023-03-08 2023-03-08 High-strength bolt connection point structure of precast pile and steel pile Active CN219527629U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320417660.4U CN219527629U (en) 2023-03-08 2023-03-08 High-strength bolt connection point structure of precast pile and steel pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320417660.4U CN219527629U (en) 2023-03-08 2023-03-08 High-strength bolt connection point structure of precast pile and steel pile

Publications (1)

Publication Number Publication Date
CN219527629U true CN219527629U (en) 2023-08-15

Family

ID=87632510

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320417660.4U Active CN219527629U (en) 2023-03-08 2023-03-08 High-strength bolt connection point structure of precast pile and steel pile

Country Status (1)

Country Link
CN (1) CN219527629U (en)

Similar Documents

Publication Publication Date Title
CN105064503A (en) Steel tube and core tube mixed structure
CN205046677U (en) Assembled concrete frame nodal connection structure
CN219527629U (en) High-strength bolt connection point structure of precast pile and steel pile
CN113699884A (en) Rectangular concrete-filled steel tube cable tower adopting prefabricated web plates
CN217998414U (en) Connecting device for quickly assembling horizontal seams of multi-cavity steel pipes
CN219343156U (en) Flange connection point structure of precast pile and steel pile
CN217651599U (en) Connecting device for multi-corner bent steel plate
CN202359553U (en) Pure mechanical connection structure between piles
CN212271038U (en) Building reinforcing, correcting and underpinning system
CN213233427U (en) Bolt connecting piece
CN204464754U (en) Punching type lightning rod clamp
CN113293692A (en) Connecting device and manufacturing method of multi-corner bent steel plate
CN208870277U (en) The limited wallboard assembly in operating space
CN202482854U (en) Pure mechanical connection structure between piles
JP3215315U (en) Side punch chuck body for pile presser
CN220117465U (en) Assembled reinforced concrete column and girder steel connection structure of multiple roof beam height of adaptation
CN109518881A (en) A kind of assembling light gauge cold-formed steel shape triangular-section lattice column
CN215167200U (en) Section steel column
CN210530134U (en) Novel concrete cladding steel column
CN205217651U (en) Crooked correcting device of steel sheet pile
CN220365353U (en) Reinforcing structure for controlling longitudinal deformation of corrugated steel
CN214833542U (en) Steel column stopper
CN209837306U (en) Semi-rigid corrugated shear connector
CN211646757U (en) Bolt connector for connecting beam and column
CN218233437U (en) Grouting steel pipe pile

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 200093 No. 38 Shui Feng Road, Yangpu District, Shanghai.

Patentee after: Shanghai Survey, Design and Research Institute (Group) Co.,Ltd.

Address before: 200093 No. 38 Shui Feng Road, Yangpu District, Shanghai.

Patentee before: SGIDI ENGINEERING CONSULTING (Group) Co.,Ltd.