CN208870277U - The limited wallboard assembly in operating space - Google Patents
The limited wallboard assembly in operating space Download PDFInfo
- Publication number
- CN208870277U CN208870277U CN201821113360.2U CN201821113360U CN208870277U CN 208870277 U CN208870277 U CN 208870277U CN 201821113360 U CN201821113360 U CN 201821113360U CN 208870277 U CN208870277 U CN 208870277U
- Authority
- CN
- China
- Prior art keywords
- wallboard
- steel skeleton
- operating space
- limited
- assembly
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Load-Bearing And Curtain Walls (AREA)
Abstract
The utility model discloses the wallboard assemblies that a kind of operating space is limited, its deadlight includes steel skeleton and the panel for being fixed on steel skeleton, it at least is correspondingly arranged weld part on the steel skeleton of part adjacent wall board, alternatively, correspondence is embedded with weld part on the panel of at least part adjacent wall board;When wallboard assembling, the distance between adjacent solder portion meets expected design requirement.The utility model can the construction and installation in the case where operating space is limited, while wall body structure will not be destroyed, construction efficiency is high, and safety is good.
Description
Technical field
The utility model relates to the wallboard assemblies that a kind of operating space is limited.
Background technique
With the development of urban construction, the requirement to the beauty and physical property of building is higher and higher, various curtain walls, especially
It is that the utilization rate of green curtain wall is higher and higher.The GRC curtain wall curtain wall good as a kind of mouldability of green energy conservation, increasingly
It receives an acclaim.
It finds in the construction process, under Part load, operating space is limited, and existing various panel structures can not
It realizes rapid construction, or even cannot construct completely, influence the use of product.Such as the building structure in composition tubular or class tubular
When, there is a part wallboard, such as the installation operation of last block wallboard is extremely difficult.
In order to solve this problem, there are mainly two types of schemes for the prior art:
One is the locking mechanisms of setting clamping, and wallboard is connected together.This mode is difficult to large-scale application, mainly
Disadvantage includes that structure is easy failure, and safety is poor;Man-hour requirement is applied to be pressed with special machinery, thus realize clamping,
Operation difficulty is big, and some regions do not have enough region setting construction machineries;To the dimension precision requirement of product node and
Node size status requirement at joint connection in site is very high, is difficult to realize in practice.
Second is that punching on wallboard, an operating space is provided, after being then installed, then fills up corresponding hole.It is this
Mode destroys the structure of wall, influences its physical property;Work progress is also more troublesome;In addition the beauty of wallboard is had an effect on.
Utility model content
Purpose of utility model: a kind of wallboard assembly and assemble method that operating space is limited is provided, to solve existing skill
At least one problem existing for art.
Technical solution: the limited wallboard assembly in operating space, deadlight include steel skeleton and are fixed on steel skeleton
Panel,
At least it is correspondingly arranged weld part on the steel skeleton of part adjacent wall board, alternatively, at least part adjacent wall board
Correspondence is embedded with weld part on panel;
When wallboard assembling, the distance between adjacent solder portion meets expected design requirement.
In a further embodiment, reinforcing bar is provided in the gap between adjacent solder portion.
In a further embodiment, the weld part is L-type steel, steel plate, rectangular steel tube or other fashioned iron.
In a further embodiment, the panel is GRC plate, glass or stone plate.
In a further embodiment, the wallboard assembly is in closed tubular.
In a further embodiment, one or more wallboard is welded and fixed by steel skeleton, forms a wallboard
Assembly is correspondingly arranged weld part on the steel skeleton at the wall panel assemblies body both ends;It is another to form cylinder with the wall panel assemblies body
Weld part is correspondingly arranged on the sealing wallboard of shape assembly;When wall panel assemblies body and the envelope wall board group fill, weld part it
Between gap meet needs of expected design.
In a further embodiment, the wall panel assemblies body is spirally connected and/or is weldingly fixed on building, or passes through
Connection structure is fixedly connected with building.
In a further embodiment, one end of the steel skeleton is provided with casing, and described sleeve pipe passes through bolt and reinforcing bar
Frame connects, and connecting plate is welded in described sleeve pipe, and the connecting plate is connect by bolt with building;The steel skeleton and building
Horizontal or vertical location hole is respectively arranged on object.
The assemble method for further providing for a kind of wallboard that operating space is limited, includes the following steps:
Step 1, production wallboard, including welding steel skeleton, make GRC panel, and GRC panel is fixed on steel skeleton;
Step 2, production wall panel assemblies body, if being welded together drywall panel by the steel skeleton on wallboard;It is being located at wall
A group welding portion is fixedly connected on the steel skeleton at board group zoarium edge;The sealing wallboard being adapted to the wall panel assemblies body is made, and
Weld part is set on the steel skeleton of the sealing wallboard;
Wall panel assemblies body is fixed on scheduled position by step 3;
Sealing wallboard is moved to scheduled position by step 4, so that the gap between weld part is reached scheduled requirement, so
L shape plain steel-bar is installed in this gap afterwards, welding wire or welding rod are sent by the gap between panel to welding position, welded
Connect operation.
Preferably, step 3 is further that fixed connection apparatus is arranged on building, by way of welding or being spirally connected,
Wall panel assemblies body is fixedly connected with building.
The utility model has the advantages that the structure of the utility model can the construction and installation in the case where operating space is limited, while will not
Wall body structure is destroyed, the prior art is solved and wants the technical problem overcome all the time.The method of the utility model, which is constructed, imitates
Rate is higher, and safety is good.
Detailed description of the invention
Fig. 1 is the partial structural diagram of the utility model.
Fig. 2 is the overall schematic of one embodiment of the utility model.
Fig. 3 is the partial structural diagram of another embodiment of the utility model.
Fig. 4 is the structural schematic diagram of another embodiment of the utility model.
Fig. 5 is the partial schematic diagram of the weld of the utility model another embodiment.
In each figure, appended drawing reference are as follows: panel (GRC plate) 1, steel skeleton 2, weld part 3, reinforcing bar 4, weld 5, gap 6, weldering
Stitch 7, dowel 8, building 9, the 10, first screw rod 11 of casing (square tube), connecting plate 12, the second screw rod 13, nut 14.
Specific embodiment
In conjunction with Fig. 1 to Fig. 5, the structure, principle and advantage of the utility model is described in detail.In order to solve to deposit in background technique
The problem of, applicant carried out in depth research and analysis, are combed to the advantage and disadvantage of existing patent and paper.It provides
A kind of new solution.
As depicted in figs. 1 and 2, when (cross sectional shape can be trapezoidal, rectangular, round, oval for assembling tubular or class tubular
Or analogous shape) when, when last block plate is especially installed, there is very big difficulty, the reason is that installation operating space is very small
Do not have at all in other words.In response to this, clamping is either used, first destroys and repairs afterwards, or enters internal sky from top
Between mode, it is all extremely difficult, it is therefore desirable to design new structure.At A in Fig. 2, it is with the difference in Fig. 1, welds
One, portion uses square tube, and one uses L shape steel.
It should be noted that in the embodiment shown in Figure 2, for the assembly of a certain section, by four blocks of wallboards
It is composed, wherein three pieces of wallboard pre-assemblies are integral, last block wallboard is attached thereto fixation.In other implementations, certain
The quantity of one section wallboard can be 2 pieces, 3 pieces or more.
For some assembly, it can be made of more piece.
As shown in Figure 1, wallboard primary structure includes that panel (GRC plate) 1 and steel skeleton 2, GRC plate are shown in figure by dowel 8(
2) it is fixedly connected with steel skeleton, on the steel skeleton of wallboard junction, one or more groups of weld parts 3 is set, which can be with
It welds or is spirally connected and be fixed on steel skeleton, the position of weld part is corresponding, when combined, gap (gap) 6 therebetween
Meet welding process requirement.Preferable welding slope can be formed in gap by reinforcing bar 4, such as the mode of L shape plain steel-bar
Mouth (weld) 5, increases weld strength and welding efficiency.When weld part (L shape steel) is welded on reinforcing bar by the way of welding
When on frame, the length of weld seam 7 and position should meet the requirement of technique, guarantee whole intensity.
From in the figure it is found that the gap between panel is corresponding with the gap of weld on steel skeleton, welding wire or welding rod energy
The position that weld part is enough entered by the gap between panel, to be subjected to.Enter tubular without worker or machine
Inside assembly.Therefore the construction difficult problem of sealing building assembly is solved.For the structure in opposing seal, this structure
Bigger operating space is provided, decorative structure lesser for diameter, the structure of this programme is more superior.
Fig. 3 is gone to, in girder construction or rod structure, the installation of wallboard needs to install to facilitate there are certain redundancy, be
This, is provided with one group of hole, such as slot, waist hole on steel skeleton and connecting plate or building 9, and the direction of two groups of slots is mutual
Vertically, so as to adjusting the position of wallboard in two directions.Sleeve 10 is fixed on steel skeleton by the first screw rod 11
A certain hole in, connecting plate 12 is welded on casing, connecting plate is connect with the second screw rod 13 being fixed on building, and is passed through
Nut is fixed.By the position of adjusting screw rod, two-dimensional movement may be implemented.To easier for installation.
Fig. 4 is finally described, i.e., another embodiment, in the operating condition, the thickness of assembled panel 201 is thicker, can pre- slugging
Fishplate bar 203, the other end of welded plate are provided with shearing resistance muscle 202.
Need to illustrate when, weld part can also be set on steel skeleton while pre-buried weld part on panel, for
The higher situation of intensity requirement, can be combined use.
In production and construction, mainly include the following steps:
Step 1, production wallboard, including welding steel skeleton, make GRC panel, and GRC panel is fixed on steel skeleton;
Step 2, production wall panel assemblies body, if being welded together drywall panel by the steel skeleton on wallboard;It is being located at wall
A group welding portion is fixedly connected on the steel skeleton at board group zoarium edge;The sealing wallboard being adapted to the wall panel assemblies body is made, and
Weld part is set on the steel skeleton of the sealing wallboard;
Step 2 can complete in factory, can also complete at the construction field (site);
Wall panel assemblies body is fixed on scheduled position by step 3;
Sealing wallboard is moved to scheduled position by step 4, so that the gap between weld part is reached scheduled requirement, so
L shape plain steel-bar is installed in this gap afterwards, welding wire is sent by the gap between panel to welding position, welding behaviour is carried out
Make.
As shown in figure 5, the details to junction is further described.It, can be from two by adding L shape plain steel-bar
It is welded on the direction of a Relative vertical, not only increases weld strength, and can constrained and be soldered from both direction
Device, improve whole stability.Moreover, the stress of weld is smaller, structural strength is more preferable.
As can be seen that the structure of the utility model is not necessarily to the complex operations of the prior art from work progress above, and
And process ruggedness is fully able to meet the requirements, speed of application is fast, and the safety of structure is secure, and for different shape, multiple
The wall panel assemblies body of miscellaneous moulding can be realized using which, provide a kind of new thinking, and technological effect is very good.
It should be noted that specific technical features described in the above specific embodiments, reconcilable
In the case of, it can be combined in any appropriate way.In order to avoid unnecessary repetition, the utility model to it is various can
No further explanation will be given for the combination of energy.In addition, can also be appointed between a variety of different embodiments of the utility model
Meaning combination, as long as it, without prejudice to the thought of the utility model, equally should be considered as content disclosed in the utility model.
Claims (8)
1. the limited wallboard assembly in operating space, deadlight includes steel skeleton and the panel for being fixed on steel skeleton, feature
It is,
It at least is correspondingly arranged weld part on the steel skeleton of part adjacent wall board, alternatively, the panel of at least part adjacent wall board
Upper correspondence is embedded with weld part;
When wallboard assembling, the distance between adjacent solder portion meets expected design requirement.
2. the limited wallboard assembly in operating space according to claim 1, which is characterized in that between adjacent solder portion
Reinforcing bar is provided in gap.
3. the limited wallboard assembly in operating space according to claim 1, which is characterized in that the weld part is L-type
Steel, steel plate or rectangular steel tube.
4. the limited wallboard assembly in operating space according to claim 1, which is characterized in that the panel be GRC plate,
Glass or stone plate.
5. the limited wallboard assembly in operating space according to claim 1, which is characterized in that the wallboard assembly at
Closed tubular.
6. the limited wallboard assembly in operating space according to claim 1, which is characterized in that wherein, more than two
Wallboard is welded and fixed by steel skeleton, is formed a wall panel assemblies body, is correspondingly arranged weldering on the steel skeleton at the wall panel assemblies body both ends
Socket part;Weld part is correspondingly arranged on another sealing wallboard that can form tubular assembly with the wall panel assemblies body;Work as wallboard
When assembly and the envelope wall board group fill, the gap between weld part meets needs of expected design.
7. the limited wallboard assembly in operating space according to claim 6, which is characterized in that the wall panel assemblies body spiral shell
It connects and/or is weldingly fixed on building, or be fixedly connected by connection structure with building.
8. the limited wallboard assembly in operating space according to claim 1, which is characterized in that one end of the steel skeleton
It is provided with casing, described sleeve pipe is connect by bolt with steel skeleton, connecting plate is welded in described sleeve pipe, the connecting plate passes through
Bolt is connect with building;Horizontal or vertical location hole is respectively arranged on the steel skeleton and building.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821113360.2U CN208870277U (en) | 2018-07-13 | 2018-07-13 | The limited wallboard assembly in operating space |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821113360.2U CN208870277U (en) | 2018-07-13 | 2018-07-13 | The limited wallboard assembly in operating space |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208870277U true CN208870277U (en) | 2019-05-17 |
Family
ID=66463006
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821113360.2U Active CN208870277U (en) | 2018-07-13 | 2018-07-13 | The limited wallboard assembly in operating space |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208870277U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109025055A (en) * | 2018-07-13 | 2018-12-18 | 南京奥捷墙体材料有限公司 | Operating space limited wallboard assembly and assemble method |
-
2018
- 2018-07-13 CN CN201821113360.2U patent/CN208870277U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109025055A (en) * | 2018-07-13 | 2018-12-18 | 南京奥捷墙体材料有限公司 | Operating space limited wallboard assembly and assemble method |
CN109025055B (en) * | 2018-07-13 | 2024-01-05 | 南京奥捷墙体材料有限公司 | Wallboard assembly with limited operation space and assembly method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105888080B (en) | Assembled steel tube casing reinforced concrete combined joint and installation method | |
CN201535015U (en) | Connecting node of outer sleeve-type square and rectangular steel pipe column and H-shaped steel beam | |
CN107299683B (en) | Compound concrete-filled tubular column assembled docks node and connection method | |
CN102995756B (en) | Concrete-filled rectangular steel tube column-box girder full-bolt connection node and construction method | |
CN105064503A (en) | Steel tube and core tube mixed structure | |
CN208934197U (en) | The plug-in filling wall construction system of steel frame and assembled filled-in panel | |
CN105064529A (en) | Prefabricated and assembled large-board shear wall structure with concealed bracings | |
CN108487453B (en) | Connecting structure and connecting method for steel tube concrete column and reinforced concrete beam | |
CN107023076A (en) | A kind of assembly concrete pole steel beam connecting node and preparation method thereof | |
CN107503442A (en) | A kind of assembled connecting node of steel core concrete column and girder steel | |
CN106320537A (en) | Prefabricated concrete-filled square steel tube column and steel girder connecting joint | |
CN107905385A (en) | The assembled arthitecutral structure and method of construction that steel construction is combined with concrete structure | |
CN107989228A (en) | A kind of prefabricated steel reinforced concrete shear wall structure and its preparation and installation method | |
CN112112264A (en) | Prefabricated column connecting joint for dry connection and construction method | |
CN203361354U (en) | Beam column pitch point connecting device | |
CN2496949Y (en) | Shape steel and steel reinforced concrete sheear wall integrated load-bearing shear wall structure | |
CN206157913U (en) | Assembled square steel tube concrete post and girder steel connected node | |
CN105275087A (en) | A prefabricated assembled type concrete beam-column connecting structure | |
CN208870277U (en) | The limited wallboard assembly in operating space | |
CN108086471A (en) | Detachable prefabricated assembled concrete-filled steel square tubular column and girder steel combined joint | |
CN106948549A (en) | A kind of prefabricated special-shaped side column, prefabricated assembled bean column node and its construction method | |
CN212689211U (en) | Prefabricated column connecting joint for dry-type connection | |
CN203113523U (en) | Assembled type framework beam column node using vertical connection | |
CN203514531U (en) | Square steel tube concrete column and steel beam node connecting structure with internal diaphragms | |
CN207144181U (en) | The attachment structure of assembly concrete-filled steel tube post and girder steel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |