CN219526011U CN202320330960.9U CN202320330960U CN219526011U CN 219526011 U CN219526011 U CN 219526011U CN 202320330960 U CN202320330960 U CN 202320330960U CN 219526011 U CN219526011 U CN 219526011U
Authority
CN
China
Prior art keywords
turnover
cross beam
lifting
component body
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320330960.9U
Other languages
Chinese (zh)
Inventor
崔师生
谢佳骏
雷健
王勇
高亚民
何亮
高景垒
杨国庆
杨庭轩
马杰
王昊男
王海萍
乔新毓
许志强
张旭昌
王鸿锴
任涛
李向前
张超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinjiang Communications Construction Group Co ltd
Xinjiang Jiaojian Municipal Engineering Co ltd
Original Assignee
Xinjiang Communications Construction Group Co ltd
Xinjiang Jiaojian Municipal Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinjiang Communications Construction Group Co ltd, Xinjiang Jiaojian Municipal Engineering Co ltd filed Critical Xinjiang Communications Construction Group Co ltd
Priority to CN202320330960.9U priority Critical patent/CN219526011U/en
Application granted granted Critical
Publication of CN219526011U publication Critical patent/CN219526011U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Moulds, Cores, Or Mandrels (AREA)

Abstract

The utility model relates to the technical field of prefabrication of a central separation belt, in particular to a lifting turnover frame of a prefabricated part of the central separation belt, which comprises a cross beam, a lifting turnover rod, a fixed plate, a turnover seat, a turnover pipe and a part body; after pouring one side of the component body on the bottom die, when other operations are needed to be performed on the other side, the shaft can be used for penetrating through the lifting turnover rod, and then the component body can be lifted from the bottom die, at this time, the turnover pipe embedded on the component body can rotate on the turnover seat, so that a worker can directly rotate the turnover pipe to drive the component body to turn, further, the follow-up operation can be performed on the component body after the turning is completed, and the problem that the traditional central isolation belt concrete prefabricated member is inconvenient to manufacture is solved.

Description

Hoisting and overturning frame for prefabricated part of central separation belt
Technical Field
The utility model relates to the technical field of prefabrication of a central separation belt, in particular to a lifting roll-over stand for prefabricated components of the central separation belt.
Background
The utility model provides a highway central authorities ' median concrete combination formula guardrail is with reinforced concrete prefabrication piece (piece) setting up a guardrail form on road surface central authorities, traditional central authorities ' median concrete prefabrication piece is single prefabrication, utilize single template to prefabricate, prefabrication process is complicated, prefabrication time is long, need a large amount of manual works when being used for guaranteeing prefabrication efficiency because of adopting single prefabrication, and need a large amount of single prefabrication template, and the project organization is complicated, the operation is inconvenient, prefabrication inefficiency, pouring, health preserving field utilization ratio is low, traditional median prefabrication process is manual control, the compound die, the form removal process is because of unable unification standard, therefore prefabricated component shaping quality is good and bad, therefore, a central authorities ' median prefabrication template and the production line that forms are proposed, the prefabrication template can guarantee that the whole of median is a plurality of prefabrication, prefabrication and installation construction technology are simple, the construction progress is fast, construction cost such as labor cost, machinery cost are low.
Disclosure of Invention
The utility model aims to provide a lifting roll-over stand for a precast member of a central separation zone, and aims to solve the problem that the traditional precast member of the concrete of the central separation zone is inconvenient to manufacture.
In order to achieve the above purpose, the utility model provides a central separation belt prefabricated component lifting turnover frame, which comprises a cross beam, a lifting turnover rod, a fixed plate, a turnover seat, a turnover pipe and a component body;
the lifting turnover rod is fixedly connected with the cross beam and is positioned on one side of the cross beam, the fixing plate is fixedly connected with the cross beam and is positioned on one side of the cross beam, the turnover seat is fixedly connected with the fixing plate and is positioned on one side of the fixing plate, the turnover pipe is rotationally connected with the turnover seat and is positioned on one side of the turnover seat, and the component body is fixedly connected with the turnover pipe and is positioned on one side of the turnover pipe.
The central separation belt prefabricated part lifting roll-over stand further comprises a rib plate, and the rib plate is fixedly connected with the cross beam and the fixing plate.
The lifting turnover rod comprises a fixing seat and a protection ring, wherein the fixing seat is fixedly connected with the cross beam, and the protection ring is fixedly connected with the fixing seat.
According to the central separation belt precast element lifting turnover frame, after one surface of the element body is poured and molded on the bottom die, when other operations are needed on the other surface, the element body can be lifted from the bottom die by using the shaft to penetrate through the lifting turnover rod, and at the moment, the turnover pipe embedded on the element body can rotate on the turnover seat, so that a worker can directly rotate the turnover pipe to drive the element body to turn over, and further, the turned element body can be subjected to subsequent operations, so that the problem that a traditional central separation belt precast element is inconvenient to manufacture is solved.
Drawings
In order to more clearly illustrate the embodiments of the present utility model or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below.
Fig. 1 is an overall elevation view of the central separator belt preform lifting roll-over stand of the present utility model.
101-cross beams, 102-lifting turnover rods, 103-fixing plates, 104-turnover seats, 105-turnover pipes, 106-component bodies, 107-rib plates, 108-fixing seats and 109-protection rings.
Detailed Description
Referring to fig. 1, the lifting turnover frame for the prefabricated central separation belt component of the utility model comprises a cross beam 101, a lifting turnover rod 102, a fixing plate 103, a turnover seat 104, a turnover pipe 105, a component body 106 and a rib plate 107, wherein the lifting turnover rod 102 comprises a fixing seat 108 and a protection ring 109, and the problem of inconvenient manufacturing of the traditional prefabricated central separation belt concrete component is solved through the scheme.
For this embodiment, the lifting turnover rod 102 is fixedly connected with the cross beam 101, and is located on one side of the cross beam 101, the fixing plate 103 is fixedly connected with the cross beam 101, and is located on one side of the cross beam 101, the turnover seat 104 is fixedly connected with the fixing plate 103, and is located on one side of the fixing plate 103, the turnover pipe 105 is rotationally connected with the turnover seat 104, and is located on one side of the turnover seat 104, the component body 106 is fixedly connected with the turnover pipe 105, and is located on one side of the turnover pipe 105, after one side of the component body 106 is poured and formed on the bottom die, when other operations need to be performed on the other side, a shaft can be used to penetrate through the lifting turnover rod 102, and then the component body 106 can be lifted from the bottom die, at this time, because the turnover pipe 105 pre-buried on the component body 106 can rotate on the turnover seat 104, a worker can directly rotate the turnover pipe 105, and drive the component body 106 to turn over, and then the component body 106 can finish the subsequent operations of the prefabricated component body 106, and the traditional prefabricated component 106 can not be manufactured, and the following concrete can be conveniently.
The rib plate 107 is fixedly connected with the cross beam 101 and fixedly connected with the fixing plate 103, and strength of the cross beam 101 and the fixing plate 103 can be enhanced through the rib plate 107, so that breakage after long-time use is avoided.
Secondly, the fixing base 108 is fixedly connected with the cross beam 101, the protection ring 109 is fixedly connected with the fixing base 108, the protection ring is fixed on the cross beam 101 through the fixing base 108, and the equipment can be lifted by using a shaft to penetrate through the fixing ring and starting lifting equipment.
The central separation belt prefabricated part lifting turnover frame in this embodiment is fixed on the cross beam 101 through the fixing seat 108, passes through the fixing ring through the use shaft, and starts lifting equipment, the component body 106 on the equipment can be lifted from the bottom die, at this time, the turnover pipe 105 on the component body 106 can rotate on the turnover seat 104 because of being pre-buried, so that a worker can directly rotate the turnover pipe 105, drives the component body 106 to turn over, and then can carry out subsequent operation on the component body 106 after finishing the turning over, thereby solving the problem of inconvenient manufacturing of the traditional central separation belt concrete prefabricated part.
The foregoing disclosure is only illustrative of one or more preferred embodiments of the present utility model, and it is not intended to limit the scope of the claims hereof, as persons of ordinary skill in the art will understand that all or part of the processes for practicing the embodiments described herein may be practiced with equivalent variations in the claims, which are within the scope of the utility model.

Claims (3)

1. The central separation belt prefabricated part lifting roll-over stand is characterized in that,
comprises a cross beam, a lifting turnover rod, a fixed plate, a turnover seat, a turnover pipe and a component body;
the lifting turnover rod is fixedly connected with the cross beam and is positioned on one side of the cross beam, the fixing plate is fixedly connected with the cross beam and is positioned on one side of the cross beam, the turnover seat is fixedly connected with the fixing plate and is positioned on one side of the fixing plate, the turnover pipe is rotationally connected with the turnover seat and is positioned on one side of the turnover seat, and the component body is fixedly connected with the turnover pipe and is positioned on one side of the turnover pipe.
2. The center separator prefabricated unit lifting roll-over stand of claim 1,
the central separation belt prefabricated part lifting roll-over stand further comprises a rib plate, and the rib plate is fixedly connected with the cross beam and the fixing plate.
3. The center separator prefabricated unit lifting roll-over stand of claim 2,
the lifting turnover rod comprises a fixed seat and a protection ring, wherein the fixed seat is fixedly connected with the cross beam, and the protection ring is fixedly connected with the fixed seat.
CN202320330960.9U 2023-02-24 2023-02-24 Hoisting and overturning frame for prefabricated part of central separation belt Active CN219526011U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320330960.9U CN219526011U (en) 2023-02-24 2023-02-24 Hoisting and overturning frame for prefabricated part of central separation belt

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320330960.9U CN219526011U (en) 2023-02-24 2023-02-24 Hoisting and overturning frame for prefabricated part of central separation belt

Publications (1)

Publication Number Publication Date
CN219526011U true CN219526011U (en) 2023-08-15

Family

ID=87635082

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320330960.9U Active CN219526011U (en) 2023-02-24 2023-02-24 Hoisting and overturning frame for prefabricated part of central separation belt

Country Status (1)

Country Link
CN (1) CN219526011U (en)

Similar Documents

Publication Publication Date Title
CN101831875A (en) Precast assembly process of prestressed concrete cylindrical hollow pier
CN208716348U (en) Double-block sleeper mould automatic stacking system
CN202000251U (en) Cylindrical hollow prefabricated prestressed concrete pier structure
CN206267422U (en) A kind of assembly concrete superposed column
CN107584650A (en) Using the bridge prefabrication devices and methods therefor of self-propelled continuous productive process
CN107053440B (en) A kind of precast plate girder pedestal production method
CN101985856A (en) Removal-free prefabricated reinforced concrete template with cross holes inside and manufacturing method thereof
CN206512581U (en) Transverse prestress overall with reinforced concrete bridge deck slab plate combination beam
CN107419802A (en) A kind of Precast Concrete Frame and construction method
CN110344535A (en) A kind of prefabricated assembled combined wall board and construction method realized concealed beam and exempt from formwork
CN106113230B (en) The non-type prefabricated for bench, template system and its construction method can be had enough to meet the need
CN204097864U (en) A kind of bridge prefabrication hollow pier stud delay-pour joint structure
CN110005200B (en) Construction process for concrete pouring compaction of horizontal hidden beam
CN219526011U (en) Hoisting and overturning frame for prefabricated part of central separation belt
CN201660886U (en) Pretensioning prestressed concrete quadrangular pile
CN107268755A (en) A kind of construction method of inlet for stom water
CN202954490U (en) Rolling type cushion block for hoisting reinforcement cage
CN210289267U (en) Assembled platform canopy
CN216689076U (en) A prefabricated apron that is used for hollow mound top to pour construction
CN107042575A (en) A kind of umbrella skeleton support assembled core and prefabricated component manufacture method
CN109763658A (en) A kind of support device and its construction method for arrangement material distributing machine in elevator
CN103243691A (en) Prefabricated steel formwork for gallery top arch of dam absorption basin
CN201778774U (en) Movable base of oil pumping unit
CN105128135A (en) Pavement accropode production device and use method thereof
CN210850777U (en) Prefabricated plate slurry blocking part

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant