CN219515632U - Cost budget processing device for construction engineering cost - Google Patents

Cost budget processing device for construction engineering cost Download PDF

Info

Publication number
CN219515632U
CN219515632U CN202221598214.XU CN202221598214U CN219515632U CN 219515632 U CN219515632 U CN 219515632U CN 202221598214 U CN202221598214 U CN 202221598214U CN 219515632 U CN219515632 U CN 219515632U
Authority
CN
China
Prior art keywords
platform
workbench
box
push button
temporary
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221598214.XU
Other languages
Chinese (zh)
Inventor
李红娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202221598214.XU priority Critical patent/CN219515632U/en
Application granted granted Critical
Publication of CN219515632U publication Critical patent/CN219515632U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Tables And Desks Characterized By Structural Shape (AREA)

Abstract

The utility model discloses a construction cost budget processing device for construction engineering construction cost, and relates to the technical field of construction engineering. The drawing machine comprises a workbench, a drawing storage cabinet, a drawing platform, a storage cabinet and a temporary drawing box, wherein the drawing storage cabinet is arranged in the middle of the workbench, the storage cabinet is arranged on the lower side of the drawing storage cabinet, the drawing platform is arranged on the upper portion of the workbench, the temporary drawing box is arranged on one side of the workbench, and drawing is arranged in the temporary drawing box. According to the utility model, the temporary drawing and tool storage boxes are arranged on two sides of the platform, the sorting and arrangement space is reasonably configured, the flip cover of the drawing platform is subjected to the backward fixing treatment, the auxiliary platform and the platform storage space are provided, so that the tabletop is tidy and noninterference during drawing, the cost can be compared with the storage of the drawing which is not drawn, the drawing error caused by the stacking problem of the tools and the drawing in the existing drawing work is solved, and the problems that the drawing comparison cost is inconvenient and the integrity of the drawing which is not drawn is difficult to ensure are solved.

Description

Cost budget processing device for construction engineering cost
Technical Field
The utility model belongs to the technical field of construction engineering, and particularly relates to a construction cost budget processing device for construction engineering construction cost.
Background
The project cost budget is a project cost estimated work, most of project cost estimated modes are firstly drawn by workers on a construction drawing, then the construction cost of the construction project is estimated rapidly and conveniently according to the drawing, the prior publication, CN213524342U, is a cost budget processing device for the construction project cost, and is provided with a support side plate and a fixed sleeve plate. However, the following drawbacks still exist in practical use:
1. when working staff performs drawing work, the existing construction project cost budget treatment device often causes drawing errors due to too many drawing tools and drawings, messy stacking and mistakenly touching the tools during drawing, has low overall drawing efficiency, is troublesome to collect and sort, and is not good to sort;
2. the existing construction engineering cost budget processing device is mostly in a single drawing plane, cost price pairs cannot be made on a plurality of drawings, and large-size platforms or a plurality of platforms are used for splicing occupied space, so that the efficiency of overall cost budget processing is affected, drawing integrity of the drawing can be affected when the drawing is not drawn, and the drawing is inconvenient to continue to draw next time.
Disclosure of Invention
The utility model aims to provide a cost budget processing device for construction engineering cost, which is characterized in that temporary drawing and tool storage boxes are arranged on two sides of a platform, a sorting and arranging space is reasonably configured, a flip cover of a drawing platform is subjected to backward fixing processing, an auxiliary platform and a storage space of the platform are provided, so that the tabletop is tidy and noninterference during drawing, the cost can be compared with the storage of drawing which is not drawn, drawing errors caused by the stacking problem of tools and drawing in the existing drawing work are solved, the drawing efficiency is reduced, and the drawing comparison cost is inconvenient, and the storage of drawing which is not drawn is difficult to ensure the integrity.
In order to solve the technical problems, the utility model is realized by the following technical scheme:
the utility model relates to a construction cost budget processing device for construction engineering construction cost, which comprises a workbench, a drawing storage cabinet, a drawing platform, a storage cabinet and a temporary drawing box, wherein the drawing storage cabinet is arranged in the middle of the workbench;
the drawing platform is composed of a drawing platform, an auxiliary platform, a temporary storage space and a clamping piece, wherein the edge of the rear part of the upper side of the workbench is connected with the drawing platform, the temporary storage space is arranged in the upper part of the workbench, the auxiliary platform is arranged in the temporary storage space, and the clamping piece is fixed on one side of the upper part of the workbench.
Further, drawing storing compartment internally connected has the drawer of depositing, deposits the drawer outside and is connected with the pulling handle, deposits the inside drawing storage space that is equipped with of drawer, and locker outside edge connection has the switch door, and the outside of switch door is fixed with the switch and draws the cap, and the inside of locker is equipped with the storing space.
Further, the temporary drawing box is composed of a drawing collecting box and a box upper cover, the upper side of the drawing collecting box is connected with the box upper cover, a box connecting piece is arranged on the upper side of the drawing collecting box, a classification baffle is fixed in the box upper cover, and a clamping connection interface is arranged on one side of the box upper cover.
Further, draw the platform both sides and be fixed with spacing fastener, the bottom of spacing fastener is equipped with the connection bayonet socket, and the junction of drawing the platform is connected with rotates the connecting piece, and the middle part of rotating the connecting piece is connected with the rotation axostylus axostyle, and the outside of rotating the axostylus axostyle is connected with the axostylus axostyle connecting piece, and the outside of rotating the connecting piece is fixed with rotates the locating part, and one side of rotating the locating part is equipped with spacing protruding piece.
Further, auxiliary grasping ports are formed in two sides of the auxiliary platform, platform fixing portions are arranged in two sides of the auxiliary grasping ports, and the auxiliary grasping ports can be used for conveniently taking out the platform and the fixing platform, so that drawing work is stable.
Further, the platform fixed part comprises push button spout, push button spread groove, remove push button, fixed part export, locking push pedal, fixed locating part, elastic component and elastic connection spare jointly, push button spout inboard is equipped with the push button spread groove, be connected with the removal push button in the slide of push button spout, one side of push button spout is equipped with the fixed part export, it is connected with the locking push pedal to remove the push button inboard, the inboard of locking push pedal is equipped with fixed locating part, the internal connection of fixed locating part has the elastic component, the middle part of elastic component is connected with the elastic connection spare, one side of locking push pedal is equipped with supplementary chute.
The utility model has the following beneficial effects:
1. a cost budget processing apparatus for construction engineering cost is provided with interim drawing containing box in the platform both sides, and the case lid also can be used for accomodating drawing instrument, makes drawing during operation, and instrument and drawing put neatly, mutually noninterfere, has improved drawing efficiency, has rationally distributed each accommodation space, can sort after the work is accomplished and accomodates, and is neat and reasonable more.
2. The cost budget processing device for construction engineering cost enables the drawing platform to be fixed in a backward turning mode, the auxiliary platform can be taken out, new drawing is carried out on the drawing platform, drawn drawing paper is clamped on the turned drawing platform, a plurality of drawing papers are conveniently manufactured in a price-making mode at a certain elevation angle, and after the drawing papers are finished, the drawing papers which are not drawn can be placed in a temporary storage box along with the auxiliary platform, integrity of the drawing papers is protected, drawing is conveniently carried out continuously in the next taking out mode, drawing efficiency is greatly improved, and space is saved.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present utility model, the drawings that are needed for the description of the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present utility model, and that other drawings may be obtained according to these drawings without inventive effort for a person skilled in the art.
FIG. 1 is a schematic illustration of an overall structure;
FIG. 2 is a block diagram of the overall structure in normal use;
FIG. 3 is a block diagram of the overall structure when a comparison drawing is required;
FIG. 4 is a schematic structural view of the temporary carton;
FIG. 5 is an enlarged view of the structure at A in FIG. 1;
FIG. 6 is a side cross-sectional view of the overall device;
fig. 7 is an enlarged view of the structure at B in fig. 6;
FIG. 8 is a schematic structural view of an auxiliary platform;
fig. 9 is an enlarged view of the structure at C in fig. 8;
fig. 10 is a structural cross-sectional view of the platform fixing portion.
In the drawings, the list of components represented by the various numbers is as follows:
1. a work table; 2. drawing storage cabinets; 201. a storage drawer; 202. pulling the handle; 203. a drawing storage space; 3. a drawing platform; 301. drawing a platform; 3011. a limit clamping piece; 3012. a connection bayonet; 3013. rotating the connecting piece; 3014. rotating the shaft lever; 3015. rotating the limiting piece; 3016. a limit protrusion; 3017. a shaft lever connector; 302. an auxiliary platform; 303. a temporary storage space; 304. a platform fixing part; 3041. a push button sliding groove; 3042. a push button connecting groove; 3043. moving the push button; 3044. a fixed part outlet; 3045. locking the push plate; 3046. an auxiliary chute; 3047. fixing the limiting piece; 3048. an elastic member; 3049. an elastic connection member; 305. an auxiliary grip; 306. a clamping piece; 4. a storage cabinet; 401. opening and closing a door; 402. the switch pulls the cap; 403. a storage space; 5. a temporary drawing paper box; 501. a drawing collection box; 5011. a tank connection; 502. a box upper cover; 5021. classifying separator plates; 5022. a clamping connection interface; 6. drawing a drawing.
Detailed Description
The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model.
Referring to fig. 1, 2 and 4, the utility model relates to a cost budget processing device for construction engineering cost, which comprises a workbench 1, a drawing storage cabinet 2, a drawing platform 3, a storage cabinet 4, a temporary drawing paper box 5 and drawing paper 6, wherein the drawing storage cabinet 2 is arranged in the middle of the workbench 1, the drawing platform 3 is arranged at the upper part of the workbench 1, the temporary drawing paper box 5 is arranged at one side of the workbench 1, the drawing paper 6 is arranged in the temporary drawing paper box 5, the temporary drawing paper box 5 consists of a drawing collecting box 501 and a box upper cover 502 together, the upper side of the drawing collecting box 501 is connected with the box upper cover 502, the upper side of the drawing collecting box 501 is provided with a box connecting piece 5011, a classification baffle 5021 is fixed in the box upper cover 502, and a clamping connection interface 5022 is arranged at one side of the box upper cover 502; when normal drawing cost budget processing work is performed, a new drawing is firstly taken out from the drawing storage cabinet 2 and placed on the drawing platform 3, then each drawing tool is taken out, the upper case cover 502 of the temporary drawing paper box 5 is reversely clamped at one side of the workbench 1 through the clamping connection interface 5022, the drawing tools are placed in the upper case cover 502 in a classified manner, drawing work is started, drawing of the drawing 6 which is finished but is not needed temporarily is completed, and the drawing tools are rolled up and placed in the drawing collection box 501.
As shown in fig. 1 to 10, a drawing platform 3 is arranged at the upper part of the workbench 1, the drawing platform 3 is composed of a drawing platform 301, an auxiliary platform 302, a temporary storage space 303 and a clamping piece 306, the edge of the rear part of the upper side of the workbench 1 is connected with the drawing platform 301, the temporary storage space 303 is arranged in the upper part of the workbench 1, the auxiliary platform 302 is arranged in the temporary storage space 303, the clamping piece 306 is fixed at one side of the upper part of the workbench 1, limiting clamping pieces 3011 are fixed at two sides of the drawing platform 301, a connecting bayonet 3012 is arranged at the bottom of the limiting clamping pieces 3011, a rotating connecting piece 3013 is connected at the connecting part of the drawing platform 301, a rotating shaft rod 3014 is connected at the middle part of the rotating connecting piece 3013, a shaft rod connecting piece 3017 is connected at the outer side of the rotating connecting piece 3013, a limiting piece 3015 is arranged at one side of the rotating limiting piece 3015, the auxiliary gripping ports 305 are arranged on two sides of the auxiliary gripping ports 305, the platform fixing portions 304 are arranged on two sides of the auxiliary gripping ports 305, each platform fixing portion 304 is composed of a push button sliding groove 3041, a push button connecting groove 3042, a movable push button 3043, a fixing portion outlet 3044, a locking push plate 3045, a fixing limiting piece 3047, an elastic piece 3048 and an elastic connecting piece 3049, the push button connecting groove 3042 is arranged on the inner side of the push button sliding groove 3041, the movable push button 3043 is connected in a slideway of the push button sliding groove 3041, the fixing portion outlet 3044 is arranged on one side of the push button sliding groove 3041, the locking push plate 3045 is connected on the inner side of the movable push button 3043, the fixing limiting piece 3047 is arranged on the inner side of the locking push plate 3045, the elastic piece 3048 is connected with the elastic piece 3048, the elastic connecting piece 3049 is connected on the middle of the elastic piece 3048, and the auxiliary chute 3046 is arranged on one side of the locking push plate 3045; when the construction cost budget processing work needs to be compared with drawing paper, the drawing platform 301 rotates along the rotating shaft rod 3014 through the rotating connecting piece 3013 until the rotating limiting piece 3015 contacts the limiting protruding piece 3016, so that the drawing platform 301 is stabilized in a certain elevation state, at the moment, the auxiliary platform 302 in the temporary storage space 303 is taken out through the auxiliary gripping opening 305, the push button 3043 is moved in a sliding mode, the locking push plate 3045 is opened, the fixed limiting piece 3047 is propped out by the elastic piece 3048, the auxiliary platform 302 is clamped at the top of the workbench 1, then the drawing paper needing to be compared is clamped on the drawing platform 301, a new drawing paper is drawn on the auxiliary platform 302, and the drawing paper is compared.
As shown in fig. 1 to 2, a drawing storage cabinet 2 is arranged in the middle of the workbench 1, a storage cabinet 4 is arranged on the lower side of the drawing storage cabinet 2, a temporary drawing box 5 is arranged on one side of the workbench 1, a storage drawer 201 is connected inside the drawing storage cabinet 2, a pulling handle 202 is connected to the outer side of the storage drawer 201, a drawing storage space 203 is arranged inside the storage drawer 201, a switch door 401 is connected to the edge of the outer side of the storage cabinet 4, a switch pulling cap 402 is fixed on the outer side of the switch door 401, and a storage space 403 is arranged inside the storage cabinet 4; when the drawing is drawn and the final storage and arrangement work is carried out, the storage drawer 201 is opened by pulling the handle 202, the drawing which is not drawn is orderly placed in the drawing storage space 203, after the drawing tool is well picked up, the switch cap 402 is opened by the switch cap 401, the drawing tool is placed in the storage space 403, and the drawing 6 which is already drawn is stored in the temporary drawing carton 5.
The utility model has the specific application as follows: when normal drawing cost budget processing work is carried out, firstly, new drawings are taken out from a drawing storage cabinet 2 and placed on a drawing platform 3, then, each drawing tool is taken out, a box upper cover 502 of a temporary drawing box 5 is reversely clamped at one side of a workbench 1 through a clamping connection interface 5022, the drawing tools are classified and placed in the box upper cover 502, drawing work is started, drawing of drawings 6 which are finished but are not needed temporarily is completed, and the drawing tools are rolled up and placed in a drawing collecting box 501; when the construction cost budget processing work needs to be compared with drawing paper, the drawing platform 301 rotates along the rotating shaft rod 3014 through the rotating connecting piece 3013 until the rotating limiting piece 3015 contacts the limiting protruding piece 3016, so that the drawing platform 301 is stabilized in a certain elevation state, at the moment, the auxiliary platform 302 in the temporary storage space 303 is taken out through the auxiliary gripping port 305, the push button 3043 is moved in a sliding mode, the locking push plate 3045 is opened, the fixed limiting piece 3047 is propped out by the elastic piece 3048, the auxiliary platform 302 is clamped at the top of the workbench 1, then the drawing paper needing to be compared is clamped on the drawing platform 301, a new drawing paper is drawn on the auxiliary platform 302, and the drawing paper is compared, when the drawing paper is not drawn, the fixed limiting piece 3047 is pressed, the locking push plate 3045 is pushed, then the drawing paper is flatly placed on the auxiliary platform 302, and the drawing paper is placed in the temporary storage space 303; when the drawing is drawn and the final storage and arrangement work is carried out, the storage drawer 201 is opened by pulling the handle 202, the drawing which is not drawn is orderly placed in the drawing storage space 203, after the drawing tool is well picked up, the switch cap 402 is opened by the switch cap 401, the drawing tool is placed in the storage space 403, and the drawing 6 which is already drawn is stored in the temporary drawing carton 5.
The foregoing is only a preferred embodiment of the present utility model, and the present utility model is not limited thereto, and any modification, equivalent replacement, and improvement of some of the technical features described in the foregoing embodiments are all within the scope of the present utility model.

Claims (6)

1. The utility model provides a cost budget processing apparatus for construction engineering cost, includes workstation (1), drawing storing compartment (2), drawing platform (3), locker (4) and interim picture carton (5), its characterized in that: the automatic drawing machine is characterized in that a drawing storage cabinet (2) is arranged in the middle of the workbench (1), a storage cabinet (4) is arranged on the lower side of the drawing storage cabinet (2), a drawing platform (3) is arranged on the upper portion of the workbench (1), a temporary drawing paper box (5) is arranged on one side of the workbench (1), and drawing drawings (6) are arranged in the temporary drawing paper box (5);
the drawing platform (3) is composed of a drawing platform (301), an auxiliary platform (302), a temporary storage space (303) and a clamping piece (306), the edge of the rear part of the upper side of the workbench (1) is connected with the drawing platform (301), the temporary storage space (303) is arranged in the upper part of the workbench (1), the auxiliary platform (302) is arranged in the temporary storage space (303), and the clamping piece (306) is fixed on one side of the upper part of the workbench (1).
2. A construction cost budget treatment device for construction projects according to claim 1, wherein: drawing storing compartment (2) internally connected has deposits drawer (201), it is connected with pulling handle (202) to deposit drawer (201) outside, it is equipped with drawing storage space (203) to deposit drawer (201) inside, locker (4) outside edge connection has switch door (401), the outside of switch door (401) is fixed with switch cap (402), the inside of locker (4) is equipped with storing space (403).
3. A construction cost budget treatment device for construction projects according to claim 1, wherein: the temporary drawing paper box (5) is composed of a drawing collecting box (501) and a box upper cover (502) together, the upper side of the drawing collecting box (501) is connected with the box upper cover (502), a box connecting piece (5011) is arranged on the upper side of the drawing collecting box (501), a classification baffle plate (5021) is fixed inside the box upper cover (502), and a clamping connection interface (5022) is arranged on one side of the box upper cover (502).
4. A construction cost budget treatment device for construction projects according to claim 1, wherein: the drawing platform is characterized in that limiting clamping pieces (3011) are fixed on two sides of the drawing platform (301), connecting bayonets (3012) are arranged at the bottoms of the limiting clamping pieces (3011), rotating connecting pieces (3013) are connected at the connecting positions of the drawing platform (301), rotating shaft rods (3014) are connected at the middle parts of the rotating connecting pieces (3013), shaft rod connecting pieces (3017) are connected on the outer sides of the rotating shaft rods (3014), rotating limiting pieces (3015) are fixed on the outer sides of the rotating connecting pieces (3013), and limiting protruding pieces (3016) are arranged on one sides of the rotating limiting pieces (3015).
5. A construction cost budget treatment device for construction projects according to claim 1, wherein: auxiliary gripping openings (305) are formed in two sides of the auxiliary platform (302), and platform fixing portions (304) are arranged on two sides of the auxiliary gripping openings (305).
6. A construction cost budget treatment device for construction projects according to claim 5, wherein: the platform fixed part (304) is composed of a push button sliding groove (3041), a push button connecting groove (3042), a movable push button (3043), a fixed part outlet (3044), a locking push plate (3045), a fixed limiting piece (3047), an elastic piece (3048) and an elastic connecting piece (3049), the push button connecting groove (3042) is formed in the inner side of the push button sliding groove (3041), the movable push button (3043) is connected in a sliding way of the push button sliding groove (3041), the fixed part outlet (3044) is formed in one side of the push button sliding groove (3041), a locking push plate (3045) is connected in the inner side of the movable push button (3043), the fixed limiting piece (3047) is arranged in the inner side of the locking push plate (3045), the elastic piece (3048) is connected in the inner side of the fixed limiting piece (3047), the elastic connecting piece (3049) is connected in the middle of the elastic piece (3048), and an auxiliary chute (3045) is arranged on one side of the locking push plate (3045).
CN202221598214.XU 2022-06-23 2022-06-23 Cost budget processing device for construction engineering cost Active CN219515632U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221598214.XU CN219515632U (en) 2022-06-23 2022-06-23 Cost budget processing device for construction engineering cost

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221598214.XU CN219515632U (en) 2022-06-23 2022-06-23 Cost budget processing device for construction engineering cost

Publications (1)

Publication Number Publication Date
CN219515632U true CN219515632U (en) 2023-08-15

Family

ID=87587731

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221598214.XU Active CN219515632U (en) 2022-06-23 2022-06-23 Cost budget processing device for construction engineering cost

Country Status (1)

Country Link
CN (1) CN219515632U (en)

Similar Documents

Publication Publication Date Title
CN206230499U (en) Auto repair multifunction operation vehicle elevation
CN219515632U (en) Cost budget processing device for construction engineering cost
CN209981334U (en) Portable automobile-used group battery base
CN215976378U (en) Embroidery tool box convenient for taking tools
CN212146337U (en) Workpiece placing device
CN217806256U (en) Logistics distribution device based on cloud calculates
CN206066388U (en) A kind of machining tool access device
CN213106776U (en) Bicycle repair tools case
CN210943078U (en) Storage device for liquid detergent convenient to stack and place
CN220994439U (en) Tool storage box with classifying and storing functions
CN211795189U (en) A categorised statistics case for statistics
CN218576191U (en) Debris storage box is used in laboratory construction
CN214446255U (en) Tool box
CN216940613U (en) Novel movable tool cabinet for automobile maintenance
CN212978301U (en) Portable machine tool maintenance tool case
CN211333121U (en) Woodworking blade box
CN215153336U (en) Economic management bill containing box
CN213820351U (en) Drawing tool for mechanical design
CN214492312U (en) Multifunctional storage box for accountants
CN217408180U (en) Information-based management cabinet for electric power construction
CN203622408U (en) Hand-held tool kit
CN216300583U (en) Automatic document collection device
CN217070959U (en) Plate feeding table
CN214358175U (en) Pull formula upper cover and categorised collection bucket of rubbish thereof
CN210173483U (en) Movable multifunctional aluminum profile workbench

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant